[To download this poster, visit:
https://www.oeconsulting.com.sg/training-presentations]
The Quality Maintenance (Hinshitsu Hozen) Poster describes the systematic approach for establishing and maintaining zero-defect conditions to create 100% good products.
The poster comes in four monochrome variations. Formatted in PDF and in editable PPTX, the poster can be easily printed on an A3 or A4-sized paper from an office copier machine and displayed on employee workstations, or distributed together with your workshop handouts.
The Quality Maintenance Poster complements the 'Quality Maintenance (Hinshitsu Hozen)' training presentation materials. It serves as a takeaway and summary of your TPM and Quality Maintenance presentation.
The 8 Steps of Quality Maintenance are:
Step 1: Verify the Existing Situation
Step 2: Investigate the Processes where Defects Occur
Step 3: Identify & Analyze 4M Conditions
Step 4: Plan Action to Correct Deficiencies
Step 5: Establish Conditions that Allow Good Products to be Achieved
Step 6: Eliminate Flaws in 4M Conditions and Finalize
Step 7: Consolidate Checking Methods
Step 8: Determine Standard Values for Checks & Revise Standards
To downoad this poster, visit:
https://www.oeconsulting.com.sg/training-presentations