SlideShare a Scribd company logo
1 of 14
Time Planning for our final film
Time Planning:
Shoot day 1: December 12th Saturday 2015 13:00 – 17:00
Shoot day 2: December 15th Tuesday 2015 9:00 – 16:00
Shoot day 3: December 18th Friday 2015 13:00 – 17:00
Shoot day 4: December 22nd Tuesday 2015 9:00 – 16:00
Shoot day 5: January 2nd Saturday 2016 9:00 onwards
Shoot day 6: January 6th Tuesday 2016 9:00 onwards
Shoot day 7: January 9th Friday 2016 9:00 onwards (Additional shots needed Location shots in paticular)
Weather Shoot day 1:
H: 12° L: 8°
Cloudy
Weather Shoot day 2:
H: 9° L: 4°
Cloudy
Weather Shoot day 3:
H: 9° L: 4°
Cloudy with a chance of rain at 3 Pm
Weather Shoot day 4:
H: 13° L: 11°
Light clouds with sunny intervals
Weather Shoot day 5:
H: 13° L: 11°
Sunny with minimal clouds
Weather Shoot day 6:
H: 11° L: 9°
Cloudy
Technical Equipment Requirements
Supplier/Contact Equipment needed.
Russ Bennett/ Daisy Hopkins
Media Samuel ward
SLR Canon EOS 500 D Camera, Tripod, Crane. Track.
Hazard list
No.
1) Access / Egress
2) Heavy loads
3) First aid
4) Fire
5) Heat / cold / extreme weather
6) Water / proximity to water / tanks
Name Position Contact Information
Matthew Rose Lead Male Actor and
Editor
Mattrose98@hotmail.com
07841538498
Millie Iron Camera Woman and
Editor
Millie.iron@hotmail.co.uk
07772090285
Olivia Halpin Actress and Editor Olivia.halpin@hotmail.co.uk
07528186092
Niamh Mitchell Director and Editor Niamhysmitchell@outlook.com
07734589888
7) Camera work – technical facilities (handheld, camera cables, camera movement)
8) Food
Hazard Number &
level of risk
Mains risks Identified Controls to Minimise risk
1 low Access / Egress
The majority of filming is taking place on 15 Chivers road when we are filming here we are going
to leave any spare equipment that will not be used during shots in a separate room to minimalize
hazards and ensure that entry points are clear to walk in and out of. Also for the shots that are
outside we will make sure that we are not obstructing members of the public and leave spare
equipment and luggage to a separate team member at the side. On the shooting days we will
carry out a separate risk assessment to ensure that it is a safe location for pedestrians.
2 low Heavy / Fragile loads
To exclude the risk of damage to any of the equipment we have decided to drive to all of the
filming locations this gets rid of any risks due to carrying heavy equipment.
3 low First aid
In case of an emergency and anybody getting hurt we have a medical kit near by and all members
have been informed of the hospital and medical centres local to the locations.
4 Medium Fire safety
In case of any fires we can ensure the safety by maintaining a clear entry/ exit point to get out in
emergencies. There is a key scene we need to be aware of when we film fire, we will ensure to
maintain a safe environment for every member of the group by making sure flammable objects
are kept away from the fire.
5 low
Heat / cold / extreme
weather
When in the House location we will keep the heating on to ensure that we don’t get to hot or cold
and will be able to change it for our personal preference. For the outside location we have
planned to all wear the appropriate clothing materials suitable for the weather that day.
7 low
Technical facilities
(Handhelds / camera
cables / camera
movement etc.)
All the equipment used for the shots will be handled carefully and evenly distributed to each
team member when having to walk it to the location this will lower the risk of dropping it and
will make it more efficient.
8 low Food
Having breaks half way through filming when in the House we can be provided with the food and
also when filming outside we can go to a nearby shop and also provide our own lunch.
Transport by Car
19th November 2015 (Thursday)
Niamh Arrange Transport with Matt, Olivia and Millie to arrive at east town park by 3:00pm
Millie Wait for transport to arrive then get a lift with Niamh
Matt Wait for transport to arrive then get a lift with Niamh
Olivia Wait for transport to arrive then get a lift with Niamh
Everyone will arrive at the location together and leave around 4:30, as it will be getting dark around this time. Please see attached map
for any additional information.
Transport by Foot
24th November 2015 (Tuesday)
Niamh Leave school at 11:00am with Matt, Olivia and Millie to walk to location.
Millie Leave school with rest of the group at 11:00am.
Matt Leave school with rest of the group at 11:00am.
Olivia Leave school with rest of the group at 11:00am.
Make sure to arrive at the location at 11:00 as a group to ensure plenty of time to get all of our shots done.
Transport by Car
9th December 2015 (Tuesday)
Niamh Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm
Millie Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm
Matt Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm
Transport by Car
26th November 2015 (Thursday)
Niamh Leave from school at 9:00am to get a lift to location with group. Do a short walk along a path to get to the location.
Millie Get in the arranged lift with the rest of the group.
Matt Get in the arranged lift with the rest of the group.
Olivia Get in the arranged lift with the rest of the group.
Make sure to leave by 9:00am to ensure we can have room to do all the shots planned with leftover time to edit.
Transport by Car
1st December 2015 (Tuesday)
Niamh Arrange a lift to school alone to get needed equipment and wait for transport to Matts house.
Millie Arrange a lift to school alone to get needed equipment and wait for transport to Matts house.
Matt Stay at home and prepare the set for filming by getting props needed.
Olivia Arrange a lift to school alone to get needed equipment and wait for transport to Matts house.
Get to Matts house at 9:00am to be able to film for 2 hours and ensure that they can get back to school in time for lessons.
Transport by Car
6th December 2015 (Saturday)
Niamh Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.
Millie Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.
Matt Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.
Olivia Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.
As it will be getting dark we will walking along the main road, see added map for any additional details.
Olivia Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm
Arrive together and address the map before hand to know the directions to get to our locations.
1. Head west towards Chalkstone Way
2. Turn left onto Chalkstone Way
3. At the roundabout take the 2nd exit onto Millfields way
4. Turn left to stay on Millfields Way
5. Turn right onto Chalkstone Way
6. At the roundabout, take the 1st exit onto coupals Rd and the
destination will be on the left.
Shoot Day 1:
From: Samuel Ward Academy, Chalkstone Way,
Haverhill CB9 0LD, United Kingdom
To: East Town Park Centre, Coupals Road, Haverhill
CB9
Shoot Day 2:
From: Samuel Ward Academy, Chalkstone Way,
Haverhill CB9 0LD, United Kingdom
To: Chalkstone Way, Haverhill CB9 0AQ, UK
1. Head west towards Chalkstone Way
2. Turn left onto Chalkstone Way
Shoot Day 3:
From: Samuel Ward Academy, Chalkstone Way,
Haverhill CB9 0LD, United Kingdom
To: Chalkstone Way, Haverhill CB9 0AT, UK
1. Head west towards Chalkstone Way
2. Turn left onto Chalkstone Way
Shoot Day 4:
From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9
0LD, United Kingdom
To: 15 Chivers Rd, Haverhill CB9 9DS, UK
1. Continue to Wratting RD/A143
2. Continue on Wratting Rd/A143 to Crowland Rd
3. Turn left onto Crowland Rd
4. At the roundabout, take the 3rd exit onto Burton End
5. Turn right onto Chivers Rd
Shoot Day 5:
From: Samuel Ward Academy, Chalkstone Way,
Haverhill CB9 0LD, United Kingdom
To: 8 Chelmer Rd, Haverhill CB9 0AN, UK
1. Head west towards Chalkstone Way
2. Turn left onto Chalkstone way
3. Turn right onto Chelmer Rd
Shoot Day 6:
From: Samuel Ward Academy, Chalkstone Way, Haverhill
CB9 0LD, United Kingdom
To: 31 Wratting Rd, Haverhill CB9 0DA, UK
1. Head west towards Chalkstone Way
2. Turn right onto Chalkstone Way
3. Turn left onto Wratting Rd/A143
Date Arrive Time: Ending Time: Props & Camera
equipment:
Actors required Personnel
12/12/15
Scene 1: East
Town Park
3:00pm 4:30pm SLR Canon E0S,
Crane, Tripod.
Matt Rose Mille Iron
(Camera
Women)
Niamh Mitchell
(Director)
Olivia Halpin (Co
Director)
Matt Rose
(Actor)
15/12/15
Scene 2:
Chalkstone
Estate
11:10am 1:00pm SLR Canon E0S Matt Rose Mille Iron
(Camera
Women)
Niamh Mitchell
(Director)
Olivia Halpin (Co
Director)
Matt Rose
(Actor)
18/12/15
Scene 3: Bull
field.
9:10am 11:00am SLR Canon E0S Matt Rose Mille Iron
(Camera
Women)
Niamh Mitchell
(Director)
Olivia Halpin (Co
Director)
Matt Rose
(Actor)
22/12/15
Scene 4: Matts
house
9:00am 3:00pm Alcohol, Fake
Drugs, Tea
Towel, Car.
SLR Canon E0S.
Matt Rose, Olivia
Halpin
Mille Iron
(Camera
Women)
Niamh Mitchell
(Director)
Olivia Halpin
(Actress)
Matt Rose
(Actor)
2/1/16
Scene 5:
Niamh’s house
4:30am 6:00pm Garden Chimney
Burner, Photos of
actors.
SLR Canon E0S
Matt Rose Mille Iron
(Camera
Women)
Niamh Mitchell
(Director)
Olivia Halpin (Co
Director)
Matt Rose
(Actor)
6/1/16
Scene 6:
Wratting Road
bridge
3:00pm 4:30pm SLR Canon E0S Matt Rose Mille Iron
(Camera
Women)
Niamh Mitchell
(Director)
Olivia Halpin (Co
Director)
Matt Rose
(Actor)

More Related Content

Viewers also liked (7)

Proyecto de nivelación
Proyecto de nivelaciónProyecto de nivelación
Proyecto de nivelación
 
hatem cv
hatem cvhatem cv
hatem cv
 
Gregory Mohan defensive driving course
Gregory Mohan defensive driving courseGregory Mohan defensive driving course
Gregory Mohan defensive driving course
 
Semilla agustinuiana 6 de abril 2016
Semilla agustinuiana 6 de abril 2016Semilla agustinuiana 6 de abril 2016
Semilla agustinuiana 6 de abril 2016
 
Liga donk school
Liga donk schoolLiga donk school
Liga donk school
 
Cyst On Ovary
Cyst On OvaryCyst On Ovary
Cyst On Ovary
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENT
 

Similar to Time Planning for our final film (12)

Crew pack pdf
Crew pack pdfCrew pack pdf
Crew pack pdf
 
Precaution for earthquake
Precaution for earthquakePrecaution for earthquake
Precaution for earthquake
 
K14054 xuri-grc-brochure
K14054 xuri-grc-brochureK14054 xuri-grc-brochure
K14054 xuri-grc-brochure
 
BHGM-Area-Assisgnment-FOH
BHGM-Area-Assisgnment-FOHBHGM-Area-Assisgnment-FOH
BHGM-Area-Assisgnment-FOH
 
Job roles for my team
Job roles for my teamJob roles for my team
Job roles for my team
 
Risk
RiskRisk
Risk
 
Risk
RiskRisk
Risk
 
Risk
RiskRisk
Risk
 
Task 8 production schedule
Task 8   production scheduleTask 8   production schedule
Task 8 production schedule
 
Production schedule
Production scheduleProduction schedule
Production schedule
 
Audio Advert Production Schedule
Audio Advert Production ScheduleAudio Advert Production Schedule
Audio Advert Production Schedule
 
Butserfest 2014 Crew Pack
Butserfest 2014 Crew PackButserfest 2014 Crew Pack
Butserfest 2014 Crew Pack
 

Recently uploaded

Recently uploaded (20)

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

Time Planning for our final film

  • 1. Time Planning for our final film Time Planning: Shoot day 1: December 12th Saturday 2015 13:00 – 17:00 Shoot day 2: December 15th Tuesday 2015 9:00 – 16:00 Shoot day 3: December 18th Friday 2015 13:00 – 17:00 Shoot day 4: December 22nd Tuesday 2015 9:00 – 16:00 Shoot day 5: January 2nd Saturday 2016 9:00 onwards Shoot day 6: January 6th Tuesday 2016 9:00 onwards Shoot day 7: January 9th Friday 2016 9:00 onwards (Additional shots needed Location shots in paticular) Weather Shoot day 1: H: 12° L: 8° Cloudy Weather Shoot day 2: H: 9° L: 4° Cloudy Weather Shoot day 3: H: 9° L: 4° Cloudy with a chance of rain at 3 Pm Weather Shoot day 4: H: 13° L: 11° Light clouds with sunny intervals Weather Shoot day 5: H: 13° L: 11° Sunny with minimal clouds Weather Shoot day 6: H: 11° L: 9°
  • 2. Cloudy Technical Equipment Requirements Supplier/Contact Equipment needed. Russ Bennett/ Daisy Hopkins Media Samuel ward SLR Canon EOS 500 D Camera, Tripod, Crane. Track. Hazard list No. 1) Access / Egress 2) Heavy loads 3) First aid 4) Fire 5) Heat / cold / extreme weather 6) Water / proximity to water / tanks Name Position Contact Information Matthew Rose Lead Male Actor and Editor Mattrose98@hotmail.com 07841538498 Millie Iron Camera Woman and Editor Millie.iron@hotmail.co.uk 07772090285 Olivia Halpin Actress and Editor Olivia.halpin@hotmail.co.uk 07528186092 Niamh Mitchell Director and Editor Niamhysmitchell@outlook.com 07734589888
  • 3. 7) Camera work – technical facilities (handheld, camera cables, camera movement) 8) Food Hazard Number & level of risk Mains risks Identified Controls to Minimise risk 1 low Access / Egress The majority of filming is taking place on 15 Chivers road when we are filming here we are going to leave any spare equipment that will not be used during shots in a separate room to minimalize hazards and ensure that entry points are clear to walk in and out of. Also for the shots that are outside we will make sure that we are not obstructing members of the public and leave spare equipment and luggage to a separate team member at the side. On the shooting days we will carry out a separate risk assessment to ensure that it is a safe location for pedestrians. 2 low Heavy / Fragile loads To exclude the risk of damage to any of the equipment we have decided to drive to all of the filming locations this gets rid of any risks due to carrying heavy equipment. 3 low First aid In case of an emergency and anybody getting hurt we have a medical kit near by and all members have been informed of the hospital and medical centres local to the locations. 4 Medium Fire safety In case of any fires we can ensure the safety by maintaining a clear entry/ exit point to get out in emergencies. There is a key scene we need to be aware of when we film fire, we will ensure to maintain a safe environment for every member of the group by making sure flammable objects are kept away from the fire. 5 low Heat / cold / extreme weather When in the House location we will keep the heating on to ensure that we don’t get to hot or cold and will be able to change it for our personal preference. For the outside location we have planned to all wear the appropriate clothing materials suitable for the weather that day.
  • 4. 7 low Technical facilities (Handhelds / camera cables / camera movement etc.) All the equipment used for the shots will be handled carefully and evenly distributed to each team member when having to walk it to the location this will lower the risk of dropping it and will make it more efficient. 8 low Food Having breaks half way through filming when in the House we can be provided with the food and also when filming outside we can go to a nearby shop and also provide our own lunch. Transport by Car 19th November 2015 (Thursday) Niamh Arrange Transport with Matt, Olivia and Millie to arrive at east town park by 3:00pm Millie Wait for transport to arrive then get a lift with Niamh Matt Wait for transport to arrive then get a lift with Niamh Olivia Wait for transport to arrive then get a lift with Niamh Everyone will arrive at the location together and leave around 4:30, as it will be getting dark around this time. Please see attached map for any additional information. Transport by Foot 24th November 2015 (Tuesday) Niamh Leave school at 11:00am with Matt, Olivia and Millie to walk to location. Millie Leave school with rest of the group at 11:00am. Matt Leave school with rest of the group at 11:00am. Olivia Leave school with rest of the group at 11:00am. Make sure to arrive at the location at 11:00 as a group to ensure plenty of time to get all of our shots done.
  • 5. Transport by Car 9th December 2015 (Tuesday) Niamh Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm Millie Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm Matt Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm Transport by Car 26th November 2015 (Thursday) Niamh Leave from school at 9:00am to get a lift to location with group. Do a short walk along a path to get to the location. Millie Get in the arranged lift with the rest of the group. Matt Get in the arranged lift with the rest of the group. Olivia Get in the arranged lift with the rest of the group. Make sure to leave by 9:00am to ensure we can have room to do all the shots planned with leftover time to edit. Transport by Car 1st December 2015 (Tuesday) Niamh Arrange a lift to school alone to get needed equipment and wait for transport to Matts house. Millie Arrange a lift to school alone to get needed equipment and wait for transport to Matts house. Matt Stay at home and prepare the set for filming by getting props needed. Olivia Arrange a lift to school alone to get needed equipment and wait for transport to Matts house. Get to Matts house at 9:00am to be able to film for 2 hours and ensure that they can get back to school in time for lessons. Transport by Car 6th December 2015 (Saturday) Niamh Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. Millie Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. Matt Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. Olivia Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need. As it will be getting dark we will walking along the main road, see added map for any additional details.
  • 6. Olivia Walk to local Tesco with group to arrive at bridge next to the store at 3:00pm Arrive together and address the map before hand to know the directions to get to our locations.
  • 7. 1. Head west towards Chalkstone Way 2. Turn left onto Chalkstone Way 3. At the roundabout take the 2nd exit onto Millfields way 4. Turn left to stay on Millfields Way 5. Turn right onto Chalkstone Way 6. At the roundabout, take the 1st exit onto coupals Rd and the destination will be on the left. Shoot Day 1: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: East Town Park Centre, Coupals Road, Haverhill CB9
  • 8. Shoot Day 2: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: Chalkstone Way, Haverhill CB9 0AQ, UK 1. Head west towards Chalkstone Way 2. Turn left onto Chalkstone Way
  • 9. Shoot Day 3: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: Chalkstone Way, Haverhill CB9 0AT, UK 1. Head west towards Chalkstone Way 2. Turn left onto Chalkstone Way
  • 10. Shoot Day 4: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: 15 Chivers Rd, Haverhill CB9 9DS, UK 1. Continue to Wratting RD/A143 2. Continue on Wratting Rd/A143 to Crowland Rd 3. Turn left onto Crowland Rd 4. At the roundabout, take the 3rd exit onto Burton End 5. Turn right onto Chivers Rd
  • 11. Shoot Day 5: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: 8 Chelmer Rd, Haverhill CB9 0AN, UK 1. Head west towards Chalkstone Way 2. Turn left onto Chalkstone way 3. Turn right onto Chelmer Rd
  • 12. Shoot Day 6: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: 31 Wratting Rd, Haverhill CB9 0DA, UK 1. Head west towards Chalkstone Way 2. Turn right onto Chalkstone Way 3. Turn left onto Wratting Rd/A143
  • 13. Date Arrive Time: Ending Time: Props & Camera equipment: Actors required Personnel 12/12/15 Scene 1: East Town Park 3:00pm 4:30pm SLR Canon E0S, Crane, Tripod. Matt Rose Mille Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor) 15/12/15 Scene 2: Chalkstone Estate 11:10am 1:00pm SLR Canon E0S Matt Rose Mille Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor) 18/12/15 Scene 3: Bull field. 9:10am 11:00am SLR Canon E0S Matt Rose Mille Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor)
  • 14. 22/12/15 Scene 4: Matts house 9:00am 3:00pm Alcohol, Fake Drugs, Tea Towel, Car. SLR Canon E0S. Matt Rose, Olivia Halpin Mille Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Actress) Matt Rose (Actor) 2/1/16 Scene 5: Niamh’s house 4:30am 6:00pm Garden Chimney Burner, Photos of actors. SLR Canon E0S Matt Rose Mille Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor) 6/1/16 Scene 6: Wratting Road bridge 3:00pm 4:30pm SLR Canon E0S Matt Rose Mille Iron (Camera Women) Niamh Mitchell (Director) Olivia Halpin (Co Director) Matt Rose (Actor)