Vietnam - Power Development Master Plan 8 - what you must know:
In late March 2021, the very first draft of the Prime Minister’s Decision on the Approval of
National Power Development Planning VIII (“Draft PM Decision”) has been published
through unofficial sources (i.e. not through MOIT’s website). This means the final draft PM
Decision may be amended and updated, nevertheless this is very likely issued by a contact
of MOIT.
The Draft PM Decision states clearly that priority is given to the development of renewable
energy sources for electricity production. In particular, the Draft aims to increase the rate
of electricity produced from renewable energy sources (not including hydroelectric
sources greater than 30 MW, storage hydroelectricity) to about 32% in 2030 and 43% in
2045.
By 2030, it is estimated that the total capacity of all power plants will be about 138,000
MW, of which: large, medium and pumped hydropower accounts for 15.2%; coal thermal
power 27.1%; thermo-gas (including LNG) 19.9%; renewable energy sources (including
small hydroelectricity, wind power, solar power, biomass power, ...) accounts for 32.5%;
electricity import is about 4.1%
Electricity produced and imported to reach 551 billion kWh, of which: large, medium and
storage hydropower accounts for 13.5%; coal thermal power is about 41.15%; gas thermal
power (including LNG) 22.58%; renewable energy sources (including wind power, solar
power, biomass power ...) 18.73%; electricity import 3.83%.
While the PDP 8 is being finalized, the Draft PM instructs investors and relevant
government agencies to continue the implementation of renewable energy projects (wind
power, solar power) that were approved in the Revised Power Development Planning 7
and other specialized electricity planning.
Notable provisions of the Draft:
Investment Capital:
The total investment capital required to implement the PDP 8 from 2021-2030 is about
USD 128.3 billion, of which USD 95.4 billion to be used for power source development
while USD 32.9 billion to be invested in grid construction and management. The total
investment capital is calculated to reach USD 192.3 billion by 2045.
Wind power:
Raise the total capacity of onshore wind power projects to about 18,010 MW-23,080 MW in
2030 and about 60,610-76,680 MW by 2045.
For offshore wind power projects, the target capacity is 5000 MW or more by 2030 and
21,000-36,000 MW by 2045.
Total electricity produced from wind power projects is expected to account for 7.9% in
2025, about 8.1% in 2030 and about 19.2% in 2045.
Solar energy:
Encourage the development of solar power sources, including onshore, water surface as
well as rooftop systems.
The total power capacity to be about 17,240 MW in 2025, roughly 18,140 MW in 2030 and
40,090 MW by 2040. Electricity produced from solar power is expected to reach around
7.3%. In 2025, about 5.3% in 2030 and 8.9% in 2045.
Hydropower sources:
The total capacity of small hydropower sources is targeted to reach 4,800 MW in 2025,
about 5,000 MW in 2030 and nearly 6,000 MW in 2045.
Thermal power:
For thermal power plants using domestically exploited gas and liquefied natural gas (LNG):
By 2030, the total capacity will reach 27,000 MW, production to hit 124 billion kWh,
accounting for nearly 23% of the total electricity output.
In 2045, the total capacity to reach 51,000 MW while production achieves 253 billion kWh,
accounting for nearly 26% of the total electricity output.
The Government also promote the development of port storage systems, infrastructure for
LNG import in regions across the country to fuel power projects using LNG.
List of projects of national importance and prioritized for development under the
Draft PM Decision:
No. Project Name Capacity
(MW)
Appointed
investor
Fuel
2021-2025 period
1 Quang Ninh Combined Gas
Cycle Turbine
1500 LNG
2 Hai Phong I Combined Gas
Cycle Turbine (Phase I)
1500 LNG
3 Ca Na Combined Gas Cycle
Turbine (Phase I)
1500 LNG
4 Nhon Trach 3 & 4 Combined
Gas Cycle Turbine
1500 PVPower LNG
5 Hiep Phuoc Combined Gas
Cycle Turbine (Phase I)
1200 Hiep Phuoc
Electricity LLC
LNG
6 Long An I Combined Gas
Cycle Turbine (Phase I)
750 LNG
7 Bac Lieu Combined Gas
Cycle Turbine (Phase I)
1600 Delta Offshore
Energy Pte.
Ltd.
LNG
8 Long Son I Combined Gas
Cycle Turbine
750 LNG
9 O Mon I (transferring Lo B
gas)
660 EVN Domestically
exploited gas
10 O Mon III Combined Gas
Cycle Turbine (Lo B gas)
1050 Domestically
exploited gas
11 O Mon IV Combined Gas
Cycle Turbine (Lo B gas)
1050 EVN Domestically
exploited gas
12 O Mon II Combined Gas
Cycle Turbine (Lo B gas)
1050 Trading
Construction
Works
Organization
and Marubeni
Domestically
exploited gas
13 An Khanh – Bac Giang
Thermal Power
650 An Khanh – Bac
Giang Thermal
Power JSC
Coal
14 Na Duong II Thermal Power 110 TKV Coal
15 Thai Binh II Thermal Power 1200 PVN Coal
16 Hai Ha Thermal Power
(Phase I)
300 IPP (within
KCN)
Coal
17 Nghi Son II Thermal Power 1200 Marubeni Coal
18 Vung Ang II Thermal Power 1200 Vung Ang II
Thermal Power
LLC
Coal
19 Quang Trach I Thermal
Power
1200 EVN Coal
20 Cong Thanh Thermal Power 600 Cong Thanh
Thermal Power
JSC
Coal
21 Van Phong Thermal Power 1320 Sumitomo Coal
22 Duyen Hai II Thermal Power 1320 Janakusa SDN
BHD
Coal
23 Song Hau II Thermal Power 2120 TOYO Ink
Group
Coal
2026-2030 period
1 Quang Ninh 2 Combined Gas
Cycle Turbine
1500 LNG
2 Hai Phong II Combined Gas
Cycle Turbine
1500 LNG
3 Thai Binh Combined Gas
Cycle Turbine (Phase I)
1500 LNG
4 Nghi Son Combined Gas
Cycle Turbine (Phase I)
2400 LNG
5 Chan May Combined Gas
Cycle Turbine (Phase I)
1600 LNG
6 Ca Na Combined Gas Cycle
Turbine (Phase II)
3000 LNG
7 Khanh Hoa Combined Gas
Cycle Turbine (Phase I)
1500 LNG
8 Phu My 3.1 Combined Gas
Cycle Turbine
850 LNG
9 Son My II Combined Gas
Cycle Turbine
2250 AES Group
(USA)
LNG
10 Son My 1 Combined Gas
Cycle Turbine
2250 EDF, Kyushu,
Sojitz. Pacific
Group JSC
LNG
11 Ke Ga Combined Gas Cycle
Turbine (Phase I)
1500 LNG
12 Ca Mau Combined Gas Cycle
Turbine (Phase I)
1500 LNG
13 Long An I Combined Gas
Cycle Turbine (Phase II)
750 LNG
14 Bac Lieu Combined Gas
Cycle Turbine (Phase II)
1600 Delta Offshore
Energy Pte.
Ltd.
LNG
15 Long Son 2 Combined Gas
Cycle Turbine
750 LNG
16 Hai Ha Thermal Power
(Phase 2)
1800 IPP (within
KCN)
Coal
17 Hai Lang Combined Gas
Cycle Turbine (Phase I)
1500 Domestically
exploited gas
18 Mien Trung I Combined Gas
Cycle Turbine (CVX gas)
750 PVN LNG
19 Mien Trung II Combined Gas
Cycle Turbine (CVX gas)
750 PVN LNG
20 Dung Quat I Combined Gas
Cycle Turbine (CVX gas)
750 EVN LNG
21 Dung Quat II Combined Gas
Cycle Turbine (CVX gas)
750 Sembcorp
Utilities Pte.
Ltd.
LNG
22 Dung Quat III Combined Gas
Cycle Turbine (CVX gas)
750 EVN LNG
23 Quang Tri Combined Gas
Cycle Turbine (Bao Vang
gas)
340 Gazprom
International
LNG
24 Pha Lai 3 Thermal Power 660 Coal
25 Bao Dai Coal Thermal Power 600 Coal
26 Nam Dinh I Thermal Power 1200 Taekwang
Power
Holdings –
ACWA Power
Coal
27 Quang Trach II Thermal
Power
1200 EVN Coal
28 Quynh Lap I Thermal Power 1200 Coal
29 Quynh Lap II Thermal
Power
1200 Coal
30 Quang Tri I Thermal Power 1320 EGATi Coal
31 Vinh Tan III Thermal Power 1980 VTEC Coal
32 Long Phu II Thermal Power 1320 Coal
33 Hiep Phuoc Combined Gas
Cycle Turbine (Phase II)
1500 Hiep Phuoc
Electricity LLC
LNG
2031-2035 period
1 Ca Na Combined Gas Cycle
Turbine (Phase IIII)
1500 LNG
2 Hai Lang 1 Combined Gas
Cycle Turbine
1500 Domestically
exploited
gas/LNG
3 Long An II Combined Gas
Cycle Turbine
1500 LNG
4 Long Son 3,4 Combined Gas
Cycle Turbine
1500 LNG
5 Thai Binh Combined Gas
Cycle Turbine (Phase II)
1500 LNG
6 Hai Phong I Combined Gas
Cycle Turbine (Phase II)
1500 LNG
7 Nghi Son Combined Gas
Cycle Turbine (Phase 2)
2400 LNG
8 Chan May Combined Gas
Cycle Turbine (Phase 2)
2400 LNG
9 Khanh Hoa Combined Gas
Cycle Turbine (Phase 2)
1500 LNG
10 Ca Mau Combined Gas Cycle
Turbine (Phase 2)
1500 LNG
11 Vung Ang Combined Gas
Cycle Turbine (Phase 1)
1500 LNG
12 Formusa HT 2 Thermal
Power
650 Coal
13 Long Phu 1 Thermal Power 1200 PVN Coal
14 Hai Lang Combined Gas
Cycle Turbine (Phase 2)
1500 Domestically
exploited
gas/LNG
2036-2040 period
1 Nghi Son Combined Gas
Cycle Turbine (Phase 3)
2400 LNG
2 Khanh Hoa Combined Gas
Cycle Turbine (Phase 3)
1500 LNG
3 Ke Ga Combined Gas Cycle
Turbine (Phase 2)
1500 LNG
4 Vung Ang Combined Gas
Cycle Turbine (Phase 2)
1500 LNG
5 Long Phu III Thermal Power 1800 Coal
2041-2045 period
1 Thai Binh Combined Gas
Cycle Turbine (Phase 3)
1500 LNG
2 Nghi Son Combined Gas
Cycle Turbine (Phase 4)
2400 LNG
Vietnam - Power Development Master Plan 8 - what you must know:

More Related Content

What's hot

Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in IndiaIndian Energy Sector
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingAbhitendra Singh
 
[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energy
[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energy[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energy
[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energyantrikshaagrawal
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Steve Lojuntin
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauliDevanshu Yadav
 
SOLAR POWER IN MYANMAR 2019
SOLAR POWER IN MYANMAR 2019SOLAR POWER IN MYANMAR 2019
SOLAR POWER IN MYANMAR 2019MYO AUNG Myanmar
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plantJinendra Ninama
 
WA 0856 48 123438, Thermal oil Heater
WA 0856 48 123438, Thermal oil HeaterWA 0856 48 123438, Thermal oil Heater
WA 0856 48 123438, Thermal oil HeaterBisnis
 
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...Hari Bhusal
 
Vocational training in NTPC
Vocational training in NTPCVocational training in NTPC
Vocational training in NTPCMohindra
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cvHamad Talhaa
 
karisa steve 2016 pdf cv
karisa steve 2016 pdf  cvkarisa steve 2016 pdf  cv
karisa steve 2016 pdf cvkarisa steven
 

What's hot (20)

Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in India
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
 
[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energy
[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energy[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energy
[Antriksha-Agrawal] Summer-Internship-Report-Suzlon-Energy
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
Ajay123 ppt
Ajay123 pptAjay123 ppt
Ajay123 ppt
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Mtps project report
Mtps project reportMtps project report
Mtps project report
 
Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...
 
Cv of 2nd officer lucky
Cv of 2nd officer luckyCv of 2nd officer lucky
Cv of 2nd officer lucky
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
SOLAR POWER IN MYANMAR 2019
SOLAR POWER IN MYANMAR 2019SOLAR POWER IN MYANMAR 2019
SOLAR POWER IN MYANMAR 2019
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plant
 
WA 0856 48 123438, Thermal oil Heater
WA 0856 48 123438, Thermal oil HeaterWA 0856 48 123438, Thermal oil Heater
WA 0856 48 123438, Thermal oil Heater
 
Ongc report
Ongc reportOngc report
Ongc report
 
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
Hydropower Potential, History, Challanges, Possibilities and New Trend of Dev...
 
Vocational training in NTPC
Vocational training in NTPCVocational training in NTPC
Vocational training in NTPC
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 
Deviation settelment mechanism
Deviation settelment mechanismDeviation settelment mechanism
Deviation settelment mechanism
 
karisa steve 2016 pdf cv
karisa steve 2016 pdf  cvkarisa steve 2016 pdf  cv
karisa steve 2016 pdf cv
 

Similar to Vietnam - Power Development Master Plan 8 - what you must know:

Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...Dr. Oliver Massmann
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingPhat Nguyen
 
Vietnam – Power Development Plan 8 – Estimated Issuance Date
Vietnam – Power Development Plan 8 – Estimated Issuance DateVietnam – Power Development Plan 8 – Estimated Issuance Date
Vietnam – Power Development Plan 8 – Estimated Issuance DateDr. Oliver Massmann
 
Korea's energy policies and cooperation opportunities between Australia and K...
Korea's energy policies and cooperation opportunities between Australia and K...Korea's energy policies and cooperation opportunities between Australia and K...
Korea's energy policies and cooperation opportunities between Australia and K...Yonki Hyungkeun PARK
 
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...Dr. Oliver Massmann
 
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...Dr. Oliver Massmann
 
Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017Salman Haider
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridMykola Shlapak
 
Ministry electric power_myanmar_2_27_13
Ministry electric power_myanmar_2_27_13Ministry electric power_myanmar_2_27_13
Ministry electric power_myanmar_2_27_13Seokho Shin
 
VIETNAM - ENERGY - Power Development Master Plan 8 - Latest Update
VIETNAM - ENERGY - Power Development Master Plan 8 - Latest UpdateVIETNAM - ENERGY - Power Development Master Plan 8 - Latest Update
VIETNAM - ENERGY - Power Development Master Plan 8 - Latest UpdateDr. Oliver Massmann
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...
The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...
The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...MYO AUNG Myanmar
 
Power genaration in bangladesh
Power genaration in bangladeshPower genaration in bangladesh
Power genaration in bangladeshMd. Atiqur Rahman
 

Similar to Vietnam - Power Development Master Plan 8 - what you must know: (20)

Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investing
 
report
reportreport
report
 
Vietnam – Power Development Plan 8 – Estimated Issuance Date
Vietnam – Power Development Plan 8 – Estimated Issuance DateVietnam – Power Development Plan 8 – Estimated Issuance Date
Vietnam – Power Development Plan 8 – Estimated Issuance Date
 
Korea's energy policies and cooperation opportunities between Australia and K...
Korea's energy policies and cooperation opportunities between Australia and K...Korea's energy policies and cooperation opportunities between Australia and K...
Korea's energy policies and cooperation opportunities between Australia and K...
 
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
 
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
VIETNAM- LEGAL ALERT ON THE POWER DEVELOPMENT PLAN VIII - PDP 8 - WHAT YOU MU...
 
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Power Development Plan 8 - ...
 
Psmp 2010
Psmp 2010Psmp 2010
Psmp 2010
 
Overview on Hydroelectric Power Plants
Overview on Hydroelectric Power PlantsOverview on Hydroelectric Power Plants
Overview on Hydroelectric Power Plants
 
Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity Grid
 
9-Energy
9-Energy9-Energy
9-Energy
 
14-Energy.pdf
14-Energy.pdf14-Energy.pdf
14-Energy.pdf
 
Platform for the Transformation of the Energy Sector: by Senator the Honourab...
Platform for the Transformation of the Energy Sector: by Senator the Honourab...Platform for the Transformation of the Energy Sector: by Senator the Honourab...
Platform for the Transformation of the Energy Sector: by Senator the Honourab...
 
Ministry electric power_myanmar_2_27_13
Ministry electric power_myanmar_2_27_13Ministry electric power_myanmar_2_27_13
Ministry electric power_myanmar_2_27_13
 
VIETNAM - ENERGY - Power Development Master Plan 8 - Latest Update
VIETNAM - ENERGY - Power Development Master Plan 8 - Latest UpdateVIETNAM - ENERGY - Power Development Master Plan 8 - Latest Update
VIETNAM - ENERGY - Power Development Master Plan 8 - Latest Update
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...
The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...
The Republic of the Union of Myanmar Ministry of Electricity and Energy Hydro...
 
Power genaration in bangladesh
Power genaration in bangladeshPower genaration in bangladesh
Power genaration in bangladesh
 

More from Dr. Oliver Massmann

VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSDr. Oliver Massmann
 
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Dr. Oliver Massmann
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Dr. Oliver Massmann
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...Dr. Oliver Massmann
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsDr. Oliver Massmann
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:Dr. Oliver Massmann
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...Dr. Oliver Massmann
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...Dr. Oliver Massmann
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsDr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Dr. Oliver Massmann
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...Dr. Oliver Massmann
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Dr. Oliver Massmann
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...Dr. Oliver Massmann
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldLawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldDr. Oliver Massmann
 

More from Dr. Oliver Massmann (20)

VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
 
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
 
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key Highlights
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
 
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
 
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
 
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldLawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
 

Recently uploaded

POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxAbhishekchatterjee248859
 
Alexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogiAlexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogiBlayneRush1
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书SD DS
 
如何办理威斯康星大学密尔沃基分校毕业证学位证书
 如何办理威斯康星大学密尔沃基分校毕业证学位证书 如何办理威斯康星大学密尔沃基分校毕业证学位证书
如何办理威斯康星大学密尔沃基分校毕业证学位证书Fir sss
 
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书SD DS
 
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis LeeAlexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis LeeBlayneRush1
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A HistoryJohn Hustaix
 
What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...
What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...
What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...Milind Agarwal
 
如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书
如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书
如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书SD DS
 
SecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdfSecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdfDrNiteshSaraswat
 
如何办理佛蒙特大学毕业证学位证书
 如何办理佛蒙特大学毕业证学位证书 如何办理佛蒙特大学毕业证学位证书
如何办理佛蒙特大学毕业证学位证书Fir sss
 
Key Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesKey Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesHome Tax Saver
 
Law360 - How Duty Of Candor Figures In USPTO AI Ethics Guidance
Law360 - How Duty Of Candor Figures In USPTO AI Ethics GuidanceLaw360 - How Duty Of Candor Figures In USPTO AI Ethics Guidance
Law360 - How Duty Of Candor Figures In USPTO AI Ethics GuidanceMichael Cicero
 
Sports Writing for PISAYyyyyyyyyyyyyyy.pptx
Sports Writing for PISAYyyyyyyyyyyyyyy.pptxSports Writing for PISAYyyyyyyyyyyyyyy.pptx
Sports Writing for PISAYyyyyyyyyyyyyyy.pptxmarielouisetulaytay
 
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791BlayneRush1
 
The Prevention Of Corruption Act Presentation.pptx
The Prevention Of Corruption Act Presentation.pptxThe Prevention Of Corruption Act Presentation.pptx
The Prevention Of Corruption Act Presentation.pptxNeeteshKumar71
 
如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书SD DS
 
如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书
如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书
如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书SD DS
 
Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791BlayneRush1
 
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书SD DS
 

Recently uploaded (20)

POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptx
 
Alexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogiAlexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogi
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
 
如何办理威斯康星大学密尔沃基分校毕业证学位证书
 如何办理威斯康星大学密尔沃基分校毕业证学位证书 如何办理威斯康星大学密尔沃基分校毕业证学位证书
如何办理威斯康星大学密尔沃基分校毕业证学位证书
 
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
 
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis LeeAlexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A History
 
What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...
What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...
What Types of Social Media Frauds Are Prevalent in India? Investigator Perspe...
 
如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书
如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书
如何办理(UNK毕业证书)内布拉斯加大学卡尼尔分校毕业证学位证书
 
SecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdfSecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdf
 
如何办理佛蒙特大学毕业证学位证书
 如何办理佛蒙特大学毕业证学位证书 如何办理佛蒙特大学毕业证学位证书
如何办理佛蒙特大学毕业证学位证书
 
Key Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesKey Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax Rates
 
Law360 - How Duty Of Candor Figures In USPTO AI Ethics Guidance
Law360 - How Duty Of Candor Figures In USPTO AI Ethics GuidanceLaw360 - How Duty Of Candor Figures In USPTO AI Ethics Guidance
Law360 - How Duty Of Candor Figures In USPTO AI Ethics Guidance
 
Sports Writing for PISAYyyyyyyyyyyyyyy.pptx
Sports Writing for PISAYyyyyyyyyyyyyyy.pptxSports Writing for PISAYyyyyyyyyyyyyyy.pptx
Sports Writing for PISAYyyyyyyyyyyyyyy.pptx
 
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
 
The Prevention Of Corruption Act Presentation.pptx
The Prevention Of Corruption Act Presentation.pptxThe Prevention Of Corruption Act Presentation.pptx
The Prevention Of Corruption Act Presentation.pptx
 
如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书
 
如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书
如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书
如何办理(Curtin毕业证书)科廷科技大学毕业证学位证书
 
Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791
 
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
 

Vietnam - Power Development Master Plan 8 - what you must know:

  • 1. Vietnam - Power Development Master Plan 8 - what you must know: In late March 2021, the very first draft of the Prime Minister’s Decision on the Approval of National Power Development Planning VIII (“Draft PM Decision”) has been published through unofficial sources (i.e. not through MOIT’s website). This means the final draft PM Decision may be amended and updated, nevertheless this is very likely issued by a contact of MOIT. The Draft PM Decision states clearly that priority is given to the development of renewable energy sources for electricity production. In particular, the Draft aims to increase the rate of electricity produced from renewable energy sources (not including hydroelectric sources greater than 30 MW, storage hydroelectricity) to about 32% in 2030 and 43% in 2045. By 2030, it is estimated that the total capacity of all power plants will be about 138,000 MW, of which: large, medium and pumped hydropower accounts for 15.2%; coal thermal power 27.1%; thermo-gas (including LNG) 19.9%; renewable energy sources (including small hydroelectricity, wind power, solar power, biomass power, ...) accounts for 32.5%; electricity import is about 4.1% Electricity produced and imported to reach 551 billion kWh, of which: large, medium and storage hydropower accounts for 13.5%; coal thermal power is about 41.15%; gas thermal power (including LNG) 22.58%; renewable energy sources (including wind power, solar power, biomass power ...) 18.73%; electricity import 3.83%. While the PDP 8 is being finalized, the Draft PM instructs investors and relevant government agencies to continue the implementation of renewable energy projects (wind power, solar power) that were approved in the Revised Power Development Planning 7 and other specialized electricity planning. Notable provisions of the Draft: Investment Capital: The total investment capital required to implement the PDP 8 from 2021-2030 is about USD 128.3 billion, of which USD 95.4 billion to be used for power source development while USD 32.9 billion to be invested in grid construction and management. The total investment capital is calculated to reach USD 192.3 billion by 2045.
  • 2. Wind power: Raise the total capacity of onshore wind power projects to about 18,010 MW-23,080 MW in 2030 and about 60,610-76,680 MW by 2045. For offshore wind power projects, the target capacity is 5000 MW or more by 2030 and 21,000-36,000 MW by 2045. Total electricity produced from wind power projects is expected to account for 7.9% in 2025, about 8.1% in 2030 and about 19.2% in 2045. Solar energy: Encourage the development of solar power sources, including onshore, water surface as well as rooftop systems. The total power capacity to be about 17,240 MW in 2025, roughly 18,140 MW in 2030 and 40,090 MW by 2040. Electricity produced from solar power is expected to reach around 7.3%. In 2025, about 5.3% in 2030 and 8.9% in 2045. Hydropower sources: The total capacity of small hydropower sources is targeted to reach 4,800 MW in 2025, about 5,000 MW in 2030 and nearly 6,000 MW in 2045. Thermal power: For thermal power plants using domestically exploited gas and liquefied natural gas (LNG): By 2030, the total capacity will reach 27,000 MW, production to hit 124 billion kWh, accounting for nearly 23% of the total electricity output. In 2045, the total capacity to reach 51,000 MW while production achieves 253 billion kWh, accounting for nearly 26% of the total electricity output. The Government also promote the development of port storage systems, infrastructure for LNG import in regions across the country to fuel power projects using LNG. List of projects of national importance and prioritized for development under the Draft PM Decision:
  • 3. No. Project Name Capacity (MW) Appointed investor Fuel 2021-2025 period 1 Quang Ninh Combined Gas Cycle Turbine 1500 LNG 2 Hai Phong I Combined Gas Cycle Turbine (Phase I) 1500 LNG 3 Ca Na Combined Gas Cycle Turbine (Phase I) 1500 LNG 4 Nhon Trach 3 & 4 Combined Gas Cycle Turbine 1500 PVPower LNG 5 Hiep Phuoc Combined Gas Cycle Turbine (Phase I) 1200 Hiep Phuoc Electricity LLC LNG 6 Long An I Combined Gas Cycle Turbine (Phase I) 750 LNG 7 Bac Lieu Combined Gas Cycle Turbine (Phase I) 1600 Delta Offshore Energy Pte. Ltd. LNG 8 Long Son I Combined Gas Cycle Turbine 750 LNG 9 O Mon I (transferring Lo B gas) 660 EVN Domestically exploited gas 10 O Mon III Combined Gas Cycle Turbine (Lo B gas) 1050 Domestically exploited gas 11 O Mon IV Combined Gas Cycle Turbine (Lo B gas) 1050 EVN Domestically exploited gas 12 O Mon II Combined Gas Cycle Turbine (Lo B gas) 1050 Trading Construction Works Organization and Marubeni Domestically exploited gas 13 An Khanh – Bac Giang Thermal Power 650 An Khanh – Bac Giang Thermal Power JSC Coal 14 Na Duong II Thermal Power 110 TKV Coal 15 Thai Binh II Thermal Power 1200 PVN Coal 16 Hai Ha Thermal Power (Phase I) 300 IPP (within KCN) Coal 17 Nghi Son II Thermal Power 1200 Marubeni Coal 18 Vung Ang II Thermal Power 1200 Vung Ang II Thermal Power LLC Coal 19 Quang Trach I Thermal Power 1200 EVN Coal
  • 4. 20 Cong Thanh Thermal Power 600 Cong Thanh Thermal Power JSC Coal 21 Van Phong Thermal Power 1320 Sumitomo Coal 22 Duyen Hai II Thermal Power 1320 Janakusa SDN BHD Coal 23 Song Hau II Thermal Power 2120 TOYO Ink Group Coal 2026-2030 period 1 Quang Ninh 2 Combined Gas Cycle Turbine 1500 LNG 2 Hai Phong II Combined Gas Cycle Turbine 1500 LNG 3 Thai Binh Combined Gas Cycle Turbine (Phase I) 1500 LNG 4 Nghi Son Combined Gas Cycle Turbine (Phase I) 2400 LNG 5 Chan May Combined Gas Cycle Turbine (Phase I) 1600 LNG 6 Ca Na Combined Gas Cycle Turbine (Phase II) 3000 LNG 7 Khanh Hoa Combined Gas Cycle Turbine (Phase I) 1500 LNG 8 Phu My 3.1 Combined Gas Cycle Turbine 850 LNG 9 Son My II Combined Gas Cycle Turbine 2250 AES Group (USA) LNG 10 Son My 1 Combined Gas Cycle Turbine 2250 EDF, Kyushu, Sojitz. Pacific Group JSC LNG 11 Ke Ga Combined Gas Cycle Turbine (Phase I) 1500 LNG 12 Ca Mau Combined Gas Cycle Turbine (Phase I) 1500 LNG 13 Long An I Combined Gas Cycle Turbine (Phase II) 750 LNG 14 Bac Lieu Combined Gas Cycle Turbine (Phase II) 1600 Delta Offshore Energy Pte. Ltd. LNG 15 Long Son 2 Combined Gas Cycle Turbine 750 LNG 16 Hai Ha Thermal Power (Phase 2) 1800 IPP (within KCN) Coal
  • 5. 17 Hai Lang Combined Gas Cycle Turbine (Phase I) 1500 Domestically exploited gas 18 Mien Trung I Combined Gas Cycle Turbine (CVX gas) 750 PVN LNG 19 Mien Trung II Combined Gas Cycle Turbine (CVX gas) 750 PVN LNG 20 Dung Quat I Combined Gas Cycle Turbine (CVX gas) 750 EVN LNG 21 Dung Quat II Combined Gas Cycle Turbine (CVX gas) 750 Sembcorp Utilities Pte. Ltd. LNG 22 Dung Quat III Combined Gas Cycle Turbine (CVX gas) 750 EVN LNG 23 Quang Tri Combined Gas Cycle Turbine (Bao Vang gas) 340 Gazprom International LNG 24 Pha Lai 3 Thermal Power 660 Coal 25 Bao Dai Coal Thermal Power 600 Coal 26 Nam Dinh I Thermal Power 1200 Taekwang Power Holdings – ACWA Power Coal 27 Quang Trach II Thermal Power 1200 EVN Coal 28 Quynh Lap I Thermal Power 1200 Coal 29 Quynh Lap II Thermal Power 1200 Coal 30 Quang Tri I Thermal Power 1320 EGATi Coal 31 Vinh Tan III Thermal Power 1980 VTEC Coal 32 Long Phu II Thermal Power 1320 Coal 33 Hiep Phuoc Combined Gas Cycle Turbine (Phase II) 1500 Hiep Phuoc Electricity LLC LNG 2031-2035 period 1 Ca Na Combined Gas Cycle Turbine (Phase IIII) 1500 LNG 2 Hai Lang 1 Combined Gas Cycle Turbine 1500 Domestically exploited gas/LNG 3 Long An II Combined Gas Cycle Turbine 1500 LNG 4 Long Son 3,4 Combined Gas Cycle Turbine 1500 LNG 5 Thai Binh Combined Gas Cycle Turbine (Phase II) 1500 LNG
  • 6. 6 Hai Phong I Combined Gas Cycle Turbine (Phase II) 1500 LNG 7 Nghi Son Combined Gas Cycle Turbine (Phase 2) 2400 LNG 8 Chan May Combined Gas Cycle Turbine (Phase 2) 2400 LNG 9 Khanh Hoa Combined Gas Cycle Turbine (Phase 2) 1500 LNG 10 Ca Mau Combined Gas Cycle Turbine (Phase 2) 1500 LNG 11 Vung Ang Combined Gas Cycle Turbine (Phase 1) 1500 LNG 12 Formusa HT 2 Thermal Power 650 Coal 13 Long Phu 1 Thermal Power 1200 PVN Coal 14 Hai Lang Combined Gas Cycle Turbine (Phase 2) 1500 Domestically exploited gas/LNG 2036-2040 period 1 Nghi Son Combined Gas Cycle Turbine (Phase 3) 2400 LNG 2 Khanh Hoa Combined Gas Cycle Turbine (Phase 3) 1500 LNG 3 Ke Ga Combined Gas Cycle Turbine (Phase 2) 1500 LNG 4 Vung Ang Combined Gas Cycle Turbine (Phase 2) 1500 LNG 5 Long Phu III Thermal Power 1800 Coal 2041-2045 period 1 Thai Binh Combined Gas Cycle Turbine (Phase 3) 1500 LNG 2 Nghi Son Combined Gas Cycle Turbine (Phase 4) 2400 LNG