More Related Content Similar to Rio cojedes total mediciones (20) Rio cojedes total mediciones1. S I M B O L O G I A
DC DESPALME EN CORTE
DT DESPALME EN TERRAPLEN
C CORTE
T TERRAPLEN
0+000.000 983.450 979.830 31.93 7.48
0+020.000 983.440 979.778 65.05 17.12 1.00 10.00 969.80 969.80 245.98 245.98
0+040.000 983.360 979.726 64.61 14.63 1.00 10.00 1296.59 2266.39 317.54 563.52
0+060.000 983.270 979.674 64.28 13.90 1.00 10.00 1288.91 3555.31 285.32 848.84
0+080.000 983.240 979.622 64.61 14.54 1.00 10.00 1288.84 4844.15 284.40 1133.24
0+100.000 983.180 979.570 64.58 16.94 1.00 10.00 1291.86 6136.01 314.79 1448.03
0+120.000 983.140 979.518 64.76 16.58 1.00 10.00 1293.41 7429.42 335.18 1783.21
0+140.000 983.040 979.466 64.11 15.18 1.00 10.00 1288.74 8718.16 317.60 2100.81
0+160.000 983.020 979.414 64.34 16.83 1.00 10.00 1284.50 10002.66 320.09 2420.90
0+180.000 982.960 979.363 64.21 16.56 1.00 10.00 1285.46 11288.12 333.91 2754.81
0+200.000 982.870 979.311 63.70 14.01 1.00 10.00 1279.12 12567.25 305.70 3060.51
0+220.000 982.800 979.259 63.60 16.49 1.00 10.00 1273.06 13840.30 304.98 3365.49
0+240.000 982.780 979.207 64.16 15.64 1.00 10.00 1277.59 15117.89 321.30 3686.80
0+260.000 982.730 979.155 64.37 13.90 1.00 10.00 1285.27 16403.16 295.42 3982.22
0+280.000 982.690 979.103 64.54 14.35 1.00 10.00 1289.07 17692.23 282.46 4264.68
0+300.000 982.670 979.051 64.81 14.67 1.00 10.00 1293.43 18985.66 290.14 4554.81
0+320.000 982.620 978.999 65.00 15.38 1.00 10.00 1298.11 20283.76 300.45 4855.27
0+340.000 982.590 978.947 65.52 14.68 1.00 10.00 1305.18 21588.95 300.54 5155.81
0+360.000 982.540 978.895 65.45 14.76 1.00 10.00 1309.62 22898.57 294.34 5450.15
0+380.000 982.469 978.843 65.28 14.24 1.00 10.00 1307.29 24205.86 289.94 5740.09
0+400.000 982.380 978.791 65.10 12.96 1.00 10.00 1303.86 25509.72 271.95 6012.04
0+420.000 982.320 978.739 65.00 13.05 1.00 10.00 1301.07 26810.79 260.07 6272.10
0+440.000 982.300 978.687 65.47 12.99 1.00 10.00 1304.73 28115.52 260.44 6532.55
0+460.000 982.270 978.635 65.88 12.87 1.00 10.00 1313.49 29429.01 258.65 6791.19
0+480.000 982.210 978.583 65.87 12.79 1.00 10.00 1317.53 30746.55 256.59 7047.78
0+500.000 982.169 978.531 66.00 12.82 1.00 10.00 1318.69 32065.24 256.10 7303.88
0+520.000 982.070 978.480 65.32 12.90 1.00 10.00 1313.15 33378.39 257.20 7561.08
0+540.000 982.040 978.428 65.63 12.88 1.00 10.00 1309.49 34687.89 257.77 7818.85
0+560.000 982.010 978.376 66.05 12.74 1.00 10.00 1316.82 36004.71 256.19 8075.04
0+580.000 981.990 978.324 66.54 12.64 1.00 10.00 1325.95 37330.66 253.82 8328.86
0+600.000 981.980 978.272 66.90 12.80 1.00 10.00 1334.42 38665.08 254.38 8583.24
0+620.000 981.939 978.220 66.90 12.93 1.00 10.00 1338.04 40003.12 257.25 8840.49
0+640.000 981.839 978.168 66.08 13.13 1.00 10.00 1329.86 41332.98 260.62 9101.11
0+660.000 981.760 978.116 65.67 13.18 1.00 10.00 1317.56 42650.53 263.16 9364.27
0+680.000 981.750 978.064 66.13 13.26 1.00 10.00 1318.01 43968.54 264.39 9628.67
0+700.000 981.750 978.012 66.98 13.07 1.00 10.00 1331.13 45299.67 263.26 9891.93
0+720.000 981.709 977.960 67.28 12.95 1.00 10.00 1342.61 46642.28 260.17 10152.09
0+740.000 981.630 977.908 67.10 12.79 1.00 10.00 1343.79 47986.06 257.33 10409.42
0+760.000 981.590 977.856 67.18 12.86 1.00 10.00 1342.82 49328.88 256.49 10665.92
0+780.000 981.520 977.804 66.94 13.50 1.00 10.00 1341.16 50670.05 263.60 10929.52
0+800.000 981.480 977.752 66.91 14.89 1.00 10.00 1338.47 52008.51 283.90 11213.42
0+820.000 981.440 977.700 67.12 15.88 1.00 10.00 1340.28 53348.79 307.70 11521.12
0+840.000 981.430 977.648 67.75 14.86 1.00 10.00 1348.70 54697.49 307.43 11828.55
0+860.000 981.419 977.597 68.19 12.82 1.00 10.00 1359.45 56056.94 276.87 12105.42
V O L U M E N E S
SUM C SUM T
CUADRO RESUMEN
TN SUBRASANTE
Factor de
abundamiento
en corte
SEMI-
DISTANCIA
C T
COORDENADA INICIAL DE CURVA
MASA
C T
ELEVACIONESSECCIONES DE
TN
LEVANTADAS
EN CAMPO
2. V O L U M E N E S
SUM C SUM T
TN SUBRASANTE
Factor de
abundamiento
en corte
SEMI-
DISTANCIA
C T
COORDENADA INICIAL DE CURVA
MASA
C T
ELEVACIONESSECCIONES DE
TN
LEVANTADAS
EN CAMPO
0+880.000 981.349 977.545 67.89 13.30 1.00 10.00 1360.85 57417.79 261.24 12366.67
0+900.000 981.279 977.493 67.79 13.76 1.00 10.00 1356.81 58774.60 270.66 12637.33
0+920.000 981.219 977.441 67.67 13.14 1.00 10.00 1354.61 60129.21 269.07 12906.40
0+940.000 981.169 977.389 67.63 12.95 1.00 10.00 1353.02 61482.24 260.91 13167.31
0+960.000 981.119 977.337 67.59 15.55 1.00 10.00 1352.18 62834.42 285.00 13452.31
0+980.000 981.050 977.285 67.52 14.86 1.00 10.00 1351.05 64185.47 304.11 13756.42
1+000.000 981.039 977.233 68.12 13.15 1.00 10.00 1356.35 65541.82 280.09 14036.51
1+020.000 980.949 977.181 67.67 13.49 1.00 10.00 1357.88 66899.70 266.45 14302.96
1+040.000 980.869 977.129 67.32 13.60 1.00 10.00 1349.90 68249.60 270.95 14573.91
1+060.000 980.780 977.077 66.80 13.30 1.00 10.00 1341.22 69590.82 269.01 14842.92
1+080.000 980.769 977.025 67.57 13.40 1.00 10.00 1343.69 70934.50 267.02 15109.95
1+100.000 980.719 976.973 67.64 13.53 1.00 10.00 1352.04 72286.54 269.37 15379.31
1+120.000 980.669 976.921 67.57 13.18 1.00 10.00 1352.12 73638.66 267.13 15646.45
1+140.000 980.569 976.869 66.82 12.84 1.00 10.00 1343.99 74982.65 260.20 15906.65
1+160.000 980.499 976.817 66.74 13.84 1.00 10.00 1335.60 76318.24 266.84 16173.49
1+180.000 980.439 976.765 66.72 13.29 1.00 10.00 1334.54 77652.78 271.34 16444.82
1+200.000 980.359 976.714 66.31 13.30 1.00 10.00 1330.30 78983.08 265.94 16710.76
1+220.000 980.288 976.662 66.00 13.47 1.00 10.00 1323.11 80306.19 267.76 16978.52
1+240.000 980.189 976.610 65.47 12.80 1.00 10.00 1314.70 81620.89 262.70 17241.22
1+260.000 980.119 976.558 65.18 12.75 1.00 10.00 1306.52 82927.41 255.46 17496.68
1+280.000 980.079 976.506 65.64 15.00 1.00 10.00 1308.19 84235.60 277.53 17774.21
1+300.000 980.040 976.454 65.64 14.59 1.00 10.00 1312.74 85548.34 295.90 18070.10
1+320.000 980.030 976.402 66.49 12.77 1.00 10.00 1321.27 86869.62 273.51 18343.61
1+340.000 980.029 976.350 67.30 12.21 1.00 10.00 1337.89 88207.50 249.80 18593.41
1+360.000 979.989 976.298 67.37 12.25 1.00 10.00 1346.69 89554.19 244.68 18838.09
1+380.000 979.958 976.246 67.62 12.29 1.00 10.00 1349.88 90904.07 245.46 19083.55
1+400.000 979.888 976.194 67.35 12.32 1.00 10.00 1349.64 92253.72 246.11 19329.66
1+420.000 979.829 976.142 67.17 12.43 1.00 10.00 1345.16 93598.87 247.51 19577.17
1+440.000 979.799 976.090 67.26 12.52 1.00 10.00 1344.33 94943.20 249.58 19826.75
1+460.000 979.768 976.038 67.70 12.40 1.00 10.00 1349.66 96292.86 249.24 20076.00
1+480.000 979.678 975.986 67.22 12.39 1.00 10.00 1349.25 97642.10 247.94 20323.93
1+500.000 979.589 975.934 66.96 15.02 1.00 10.00 1341.82 98983.92 274.16 20598.09
1+520.000 979.536 975.882 67.15 15.24 1.00 10.00 1341.10 100325.02 302.65 20900.73
1+540.000 979.448 975.831 66.51 14.08 1.00 10.00 1336.58 101661.60 293.19 21193.93
1+560.000 979.398 975.779 66.82 14.66 1.00 10.00 1333.26 102994.86 287.40 21481.32
1+580.000 979.349 975.729 67.11 11.76 1.00 10.00 1339.30 104334.16 264.24 21745.56
1+600.000 979.330 975.681 67.22 13.27 1.00 10.00 1343.32 105677.49 250.33 21995.89
1+620.000 979.315 975.633 67.71 12.38 1.00 10.00 1349.29 107026.77 256.57 22252.46
1+640.000 979.226 975.585 67.08 15.65 1.00 10.00 1347.87 108374.64 280.32 22532.78
1+660.000 979.147 975.537 66.89 13.87 1.00 10.00 1339.64 109714.29 295.19 22827.97
1+680.000 979.106 975.489 66.96 13.16 1.00 10.00 1338.45 111052.74 270.27 23098.24
1+700.000 979.056 975.441 67.21 11.57 1.00 10.00 1341.68 112394.42 247.26 23345.50
1+720.000 978.993 975.393 67.03 11.57 1.00 10.00 1342.43 113736.85 231.41 23576.91
1+740.000 978.909 975.345 66.52 11.58 1.00 10.00 1335.56 115072.41 231.47 23808.38
1+760.000 978.893 975.297 67.27 11.34 1.00 10.00 1337.92 116410.32 229.14 24037.52
1+780.000 978.796 975.249 66.53 11.38 1.00 10.00 1337.98 117748.30 227.14 24264.65
1+800.000 978.749 975.201 66.29 11.55 1.00 10.00 1328.21 119076.52 229.31 24493.97
1+820.000 978.725 975.153 66.62 13.72 1.00 10.00 1329.11 120405.63 252.71 24746.68
1+840.000 978.657 975.105 66.08 12.00 1.00 10.00 1327.02 121732.65 257.18 25003.86
1+860.000 978.619 975.057 65.20 8.88 1.00 10.00 1312.85 123045.50 208.84 25212.70
1+880.000 978.559 975.009 66.09 11.84 1.00 10.00 1312.92 124358.42 207.19 25419.89
1+900.000 978.540 974.961 66.52 11.71 1.00 10.00 1326.13 125684.55 235.46 25655.36
3. V O L U M E N E S
SUM C SUM T
TN SUBRASANTE
Factor de
abundamiento
en corte
SEMI-
DISTANCIA
C T
COORDENADA INICIAL DE CURVA
MASA
C T
ELEVACIONESSECCIONES DE
TN
LEVANTADAS
EN CAMPO
1+920.000 978.526 974.913 67.16 11.59 1.00 10.00 1336.78 127021.33 232.99 25888.35
1+940.000 978.440 974.865 66.63 11.55 1.00 10.00 1337.90 128359.24 231.43 26119.78
1+960.000 978.427 974.817 67.20 11.63 1.00 10.00 1338.30 129697.53 231.79 26351.56
1+980.000 978.380 974.769 67.17 14.03 1.00 10.00 1343.69 131041.22 256.52 26608.08
2+000.000 978.379 974.721 67.70 12.43 1.00 10.00 1348.76 132389.98 264.55 26872.63
2+020.000 978.356 974.673 68.21 12.10 1.00 10.00 1359.16 133749.13 245.26 27117.89
2+040.000 978.279 974.625 67.85 11.99 1.00 10.00 1360.60 135109.74 240.86 27358.75
2+060.000 978.267 974.577 68.38 14.01 1.00 10.00 1362.24 136471.98 259.96 27618.71
2+080.000 978.219 974.529 68.36 14.11 1.00 10.00 1367.41 137839.38 281.14 27899.85
2+100.000 978.196 974.482 68.78 11.99 1.00 10.00 1371.40 139210.78 260.95 28160.80
2+120.000 978.140 974.434 68.75 12.75 1.00 10.00 1375.29 140586.07 247.42 28408.22
2+140.000 978.137 974.386 69.46 12.07 1.00 10.00 1382.10 141968.17 248.26 28656.48
2+160.000 978.085 974.338 69.37 12.56 1.00 10.00 1388.23 143356.40 246.36 28902.84
2+180.000 978.015 974.290 68.89 12.18 1.00 10.00 1382.58 144738.99 247.39 29150.23
2+200.000 977.949 974.242 68.44 13.48 1.00 10.00 1373.35 146112.34 256.52 29406.75
2+220.000 977.929 974.194 68.64 13.56 1.00 10.00 1370.87 147483.20 270.41 29677.16
2+240.000 977.917 974.146 69.22 12.83 1.00 10.00 1378.65 148861.86 263.97 29941.13
2+260.000 977.877 974.098 69.33 12.25 1.00 10.00 1385.55 150247.41 250.84 30191.97
2+280.000 977.838 974.050 69.55 11.42 1.00 10.00 1388.80 151636.21 236.75 30428.73
2+300.000 977.814 974.002 69.78 13.07 1.00 10.00 1393.30 153029.51 244.90 30673.63
2+320.000 977.742 973.954 69.35 13.34 1.00 10.00 1391.33 154420.84 264.02 30937.65
2+340.000 977.660 973.906 68.72 13.59 1.00 10.00 1380.65 155801.49 269.30 31206.95
2+360.000 977.656 973.858 69.45 13.12 1.00 10.00 1381.67 157183.17 267.11 31474.06
2+380.000 977.610 973.810 69.45 13.81 1.00 10.00 1389.01 158572.17 269.25 31743.31
2+400.000 977.605 973.762 69.85 12.90 1.00 10.00 1392.96 159965.13 267.06 32010.38
2+420.000 977.553 973.714 69.76 11.77 1.00 10.00 1396.09 161361.22 246.72 32257.10
2+440.000 977.481 973.666 69.34 11.98 1.00 10.00 1391.01 162752.22 237.55 32494.64
2+460.000 977.395 973.618 68.76 14.88 1.00 10.00 1381.00 164133.22 268.64 32763.28
2+480.000 977.347 973.570 68.74 14.37 1.00 10.00 1375.00 165508.22 292.56 33055.84
2+500.000 977.314 973.522 68.84 12.21 1.00 10.00 1375.81 166884.03 265.79 33321.63
2+520.000 977.255 973.474 68.51 12.34 1.00 10.00 1373.49 168257.52 245.45 33567.09
2+540.000 977.204 973.426 68.42 15.02 1.00 10.00 1369.25 169626.78 273.55 33840.63
2+560.000 977.149 973.378 67.90 13.92 1.00 10.00 1363.15 170989.92 289.33 34129.96
2+580.000 977.136 973.330 68.38 12.95 1.00 10.00 1362.74 172352.67 268.66 34398.62
2+600.000 977.105 973.282 68.51 15.02 1.00 10.00 1368.87 173721.54 279.65 34678.27
2+620.000 977.062 973.234 68.49 14.65 1.00 10.00 1369.97 175091.51 296.71 34974.98
2+640.000 977.009 973.186 68.52 12.85 1.00 10.00 1370.08 176461.59 275.05 35250.03
2+660.000 976.989 973.139 68.93 12.80 1.00 10.00 1374.52 177836.11 256.55 35506.58
2+680.000 976.908 973.091 68.42 12.91 1.00 10.00 1373.46 179209.58 257.16 35763.74
2+700.000 976.829 973.043 67.79 13.06 1.00 10.00 1362.08 180571.66 259.71 36023.45
2+720.000 976.817 972.995 68.42 12.94 1.00 10.00 1362.15 181933.81 259.95 36283.40
2+740.000 976.797 972.947 68.87 12.81 1.00 10.00 1372.98 183306.79 257.46 36540.86
2+760.000 976.768 972.899 69.10 12.89 1.00 10.00 1379.77 184686.55 257.01 36797.87
2+780.000 976.682 972.851 68.65 12.88 1.00 10.00 1377.56 186064.12 257.75 37055.62
2+800.000 976.629 972.803 68.44 12.94 1.00 10.00 1370.90 187435.02 258.20 37313.81
2+820.000 976.608 972.755 68.67 13.07 1.00 10.00 1371.07 188806.08 260.10 37573.91
2+840.000 976.518 972.707 68.18 13.10 1.00 10.00 1368.48 190174.56 261.77 37835.68
2+860.000 976.430 972.659 67.98 12.82 1.00 10.00 1361.60 191536.16 259.23 38094.91
2+880.000 976.359 972.611 67.83 12.66 1.00 10.00 1358.16 192894.32 254.77 38349.67
2+900.000 976.280 972.563 67.13 12.96 1.00 10.00 1349.60 194243.92 256.19 38605.86
2+920.000 976.209 972.515 66.78 12.98 1.00 10.00 1339.09 195583.01 259.39 38865.25
2+940.000 976.139 972.467 66.22 13.21 1.00 10.00 1330.00 196913.01 261.92 39127.17
4. V O L U M E N E S
SUM C SUM T
TN SUBRASANTE
Factor de
abundamiento
en corte
SEMI-
DISTANCIA
C T
COORDENADA INICIAL DE CURVA
MASA
C T
ELEVACIONESSECCIONES DE
TN
LEVANTADAS
EN CAMPO
2+960.000 976.125 972.419 66.84 13.05 1.00 10.00 1330.61 198243.63 262.60 39389.77
2+980.000 976.085 972.371 67.04 12.98 1.00 10.00 1338.81 199582.44 260.27 39650.04
3+000.000 976.043 972.323 67.37 12.77 1.00 10.00 1344.08 200926.52 257.53 39907.57
3+020.000 975.990 972.275 67.20 12.77 1.00 10.00 1345.68 202272.20 255.36 40162.93
3+040.000 975.918 972.227 67.07 12.65 1.00 10.00 1342.71 203614.91 254.18 40417.11
3+060.000 975.840 972.179 66.58 12.74 1.00 10.00 1336.54 204951.45 253.92 40671.04
3+080.000 975.832 972.131 67.18 13.60 1.00 10.00 1337.59 206289.03 263.39 40934.42
3+100.000 975.780 972.083 66.85 13.09 1.00 10.00 1340.25 207629.28 266.85 41201.27
3+120.000 975.769 972.035 67.55 15.48 1.00 10.00 1343.93 208973.21 285.63 41486.91
3+140.000 975.687 971.987 67.20 16.05 1.00 10.00 1347.52 210320.73 315.23 41802.14
3+160.000 975.607 971.939 66.56 14.28 1.00 10.00 1337.62 211658.35 303.32 42105.46
3+180.000 975.532 971.891 66.36 12.58 1.00 10.00 1329.14 212987.49 268.69 42374.15
3+200.000 975.478 971.843 66.27 12.30 1.00 10.00 1326.25 214313.74 248.85 42623.00
3+220.000 975.406 971.796 65.73 14.91 1.00 10.00 1319.99 215633.73 272.08 42895.08
3+240.000 975.337 971.748 65.51 14.09 1.00 10.00 1312.37 216946.10 289.97 43185.04
3+260.000 975.313 971.700 66.00 15.06 1.00 10.00 1315.02 218261.12 291.49 43476.54
3+280.000 975.278 971.652 66.11 14.51 1.00 10.00 1321.11 219582.23 295.67 43772.21
3+300.000 975.268 971.604 67.05 15.19 1.00 10.00 1331.61 220913.84 297.00 44069.21
3+320.000 975.247 971.556 67.28 14.89 1.00 10.00 1343.23 222257.08 300.85 44370.06
3+340.000 975.173 971.508 66.94 13.07 1.00 10.00 1342.22 223599.29 279.67 44649.73
3+360.000 975.092 971.460 66.46 12.53 1.00 10.00 1334.03 224933.32 256.01 44905.74
3+380.000 975.045 971.412 66.51 12.52 1.00 10.00 1329.65 226262.98 250.51 45156.25
3+400.000 974.976 971.364 66.33 12.42 1.00 10.00 1328.33 227591.31 249.49 45405.75
3+420.000 974.947 971.316 66.70 12.32 1.00 10.00 1330.24 228921.55 247.44 45653.19
3+440.000 974.871 971.268 66.31 12.37 1.00 10.00 1330.11 230251.65 246.92 45900.11
3+460.000 974.773 971.220 65.32 12.62 1.00 10.00 1316.35 231568.00 249.98 46150.09
3+480.000 974.683 971.172 64.62 12.81 1.00 10.00 1299.38 232867.38 254.30 46404.39
3+500.000 974.602 971.124 64.25 12.87 1.00 10.00 1288.66 234156.04 256.71 46661.10
3+520.000 974.562 971.076 64.54 13.66 1.00 10.00 1287.90 235443.93 265.31 46926.41
3+540.000 974.513 971.028 64.54 13.01 1.00 10.00 1290.76 236734.69 266.71 47193.12
3+560.000 974.426 970.980 63.80 12.68 1.00 10.00 1283.33 238018.03 256.90 47450.01
3+580.000 974.364 970.932 63.38 12.50 1.00 10.00 1271.73 239289.76 251.84 47701.85
3+600.000 974.338 970.884 63.80 12.82 1.00 10.00 1271.80 240561.56 253.17 47955.02
3+620.000 974.330 970.836 64.30 16.15 1.00 10.00 1281.01 241842.57 289.65 48244.68
3+640.000 974.312 970.788 64.93 15.63 1.00 10.00 1292.27 243134.83 317.82 48562.50
3+660.000 974.228 970.740 64.63 13.99 1.00 10.00 1295.58 244430.42 296.25 48858.74
3+680.000 974.170 970.692 64.12 13.44 1.00 10.00 1287.52 245717.94 274.29 49133.04
3+700.000 974.109 970.644 63.98 12.84 1.00 10.00 1281.07 246999.01 262.79 49395.83
3+720.000 974.013 970.596 63.03 15.04 1.00 10.00 1270.16 248269.17 278.82 49674.65
3+740.000 973.946 970.548 62.71 14.92 1.00 10.00 1257.38 249526.56 299.59 49974.24
3+760.000 973.926 970.501 62.94 12.96 1.00 10.00 1256.48 250783.04 278.82 50253.06
3+780.000 973.893 970.453 63.30 13.78 1.00 10.00 1262.45 252045.48 267.45 50520.50
3+800.000 973.830 970.405 62.93 13.34 1.00 10.00 1262.36 253307.84 271.17 50791.67
3+820.000 973.824 970.357 63.41 13.28 1.00 10.00 1263.44 254571.28 266.12 51057.79
3+840.000 973.781 970.309 63.55 13.25 1.00 10.00 1269.60 255840.87 265.30 51323.09
3+860.000 973.708 970.261 63.07 13.15 1.00 10.00 1266.24 257107.11 264.06 51587.15
3+880.000 973.692 970.213 63.67 13.17 1.00 10.00 1267.43 258374.54 263.25 51850.40
3+900.000 973.656 970.165 63.85 13.12 1.00 10.00 1275.17 259649.71 262.94 52113.34
3+920.000 973.629 970.117 64.15 15.30 1.00 10.00 1280.03 260929.74 284.22 52397.56
3+940.000 973.586 970.069 64.00 18.24 1.00 10.00 1281.56 262211.29 335.38 52732.94
3+960.000 973.556 970.021 64.43 15.89 1.00 10.00 1284.27 263495.57 341.31 53074.25
3+980.000 973.489 969.973 64.45 16.10 1.00 10.00 1288.77 264784.33 319.88 53394.13
5. V O L U M E N E S
SUM C SUM T
TN SUBRASANTE
Factor de
abundamiento
en corte
SEMI-
DISTANCIA
C T
COORDENADA INICIAL DE CURVA
MASA
C T
ELEVACIONESSECCIONES DE
TN
LEVANTADAS
EN CAMPO
4+000.000 973.415 969.925 63.64 16.62 1.00 10.00 1280.86 266065.19 327.12 53721.25
4+020.000 973.395 969.877 64.18 14.15 1.00 10.00 1278.18 267343.37 307.66 54028.91
4+040.000 973.373 969.829 64.53 14.86 1.00 10.00 1287.10 268630.47 290.07 54318.98
4+060.000 973.347 969.781 64.79 13.68 1.00 10.00 1293.15 269923.63 285.34 54604.32
4+080.000 973.322 969.733 64.96 14.82 1.00 10.00 1297.50 271221.13 285.00 54889.33
4+100.000 973.262 969.685 64.90 13.87 1.00 10.00 1298.64 272519.76 286.90 55176.22
4+120.000 973.225 969.637 65.15 13.15 1.00 10.00 1300.55 273820.31 270.12 55446.34
4+140.000 973.186 969.589 65.14 13.59 1.00 10.00 1302.93 275123.24 267.37 55713.71
4+160.000 973.178 969.541 66.09 15.42 1.00 10.00 1312.34 276435.57 290.08 56003.79
4+180.000 973.082 969.493 64.94 16.60 1.00 10.00 1310.36 277745.93 320.21 56324.01
4+200.000 973.036 969.445 65.22 14.40 1.00 10.00 1301.57 279047.50 310.06 56634.07
4+220.000 972.959 969.397 64.66 13.28 1.00 10.00 1298.78 280346.28 276.86 56910.93
4+240.000 972.904 969.349 64.33 13.60 1.00 10.00 1289.92 281636.20 268.86 57179.79
4+260.000 972.809 969.301 63.70 13.71 1.00 10.00 1280.26 282916.46 273.08 57452.86
4+280.000 972.731 969.253 63.30 13.76 1.00 10.00 1269.95 284186.41 274.62 57727.49
4+300.000 972.669 969.205 62.97 13.75 1.00 10.00 1262.69 285449.10 275.02 58002.51
4+320.000 972.616 969.158 62.94 16.71 1.00 10.00 1259.14 286708.24 304.55 58307.06
4+340.000 972.547 969.110 62.25 16.11 1.00 10.00 1251.99 287960.22 328.19 58635.25
4+360.000 972.537 969.062 62.99 14.22 1.00 10.00 1252.43 289212.66 303.32 58938.57
4+380.000 972.522 969.014 63.64 13.71 1.00 10.00 1266.27 290478.93 279.30 59217.87
4+400.000 972.481 968.966 64.16 14.76 1.00 10.00 1277.98 291756.91 284.67 59502.55
4+420.000 972.405 968.918 63.71 13.81 1.00 10.00 1278.67 293035.58 285.66 59788.20
4+440.000 972.332 968.870 62.52 20.08 1.00 10.00 1262.21 294297.79 338.86 60127.07
4+460.000 972.298 968.822 63.09 17.55 1.00 10.00 1256.07 295553.86 376.26 60503.32
4+480.000 972.264 968.774 63.25 13.92 1.00 10.00 1263.37 296817.23 314.71 60818.03
4+500.000 972.229 968.726 63.54 13.67 1.00 10.00 1267.88 298085.11 275.98 61094.02
4+520.000 972.150 968.678 63.43 13.46 1.00 10.00 1269.73 299354.84 271.38 61365.39
4+540.000 972.053 968.630 62.68 13.54 1.00 10.00 1261.09 300615.93 270.06 61635.46
4+560.000 971.981 968.582 62.10 14.43 1.00 10.00 1247.83 301863.76 279.77 61915.22
4+580.000 971.954 968.534 62.17 14.94 1.00 10.00 1242.71 303106.47 293.69 62208.91
4+600.000 971.916 968.486 62.20 14.05 1.00 10.00 1243.66 304350.13 289.86 62498.77
4+620.000 971.854 968.438 61.96 14.08 1.00 10.00 1241.57 305591.70 281.34 62780.12
4+640.000 971.834 968.390 62.23 14.15 1.00 10.00 1241.86 306833.56 282.33 63062.45
4+660.000 971.814 968.342 62.57 14.17 1.00 10.00 1247.99 308081.56 283.17 63345.62
4+680.000 971.791 968.294 62.83 14.97 1.00 10.00 1254.04 309335.60 291.36 63636.98
4+700.000 971.767 968.246 63.10 15.91 1.00 10.00 1259.37 310594.97 308.81 63945.79
4+720.000 971.751 968.198 63.69 14.78 1.00 10.00 1267.95 311862.92 306.96 64252.74
4+740.000 971.712 968.150 63.97 16.12 1.00 10.00 1276.58 313139.50 309.01 64561.75
4+760.000 971.651 968.102 63.84 17.16 1.00 10.00 1278.11 314417.61 332.80 64894.55
4+780.000 971.585 968.054 63.56 15.46 1.00 10.00 1274.00 315691.61 326.25 65220.80
4+800.000 971.527 968.006 63.33 14.57 1.00 10.00 1268.85 316960.46 300.27 65521.08
4+820.000 971.504 967.958 63.66 13.96 1.00 10.00 1269.86 318230.32 285.22 65806.30
4+840.000 971.448 967.910 63.56 17.17 1.00 10.00 1272.14 319502.47 311.28 66117.58
4+860.000 971.370 967.863 63.22 18.89 1.00 10.00 1267.74 320770.21 360.64 66478.22
4+880.000 971.279 967.815 62.28 16.26 1.00 10.00 1254.99 322025.21 351.48 66829.70
4+900.000 971.217 967.767 61.65 18.50 1.00 10.00 1239.33 323264.53 347.60 67177.30
4+920.000 971.196 967.719 62.40 15.92 1.00 10.00 1240.47 324505.01 344.20 67521.50
4+940.000 971.159 967.671 62.67 14.61 1.00 10.00 1250.66 325755.67 305.26 67826.77
4+960.000 971.136 967.623 63.09 14.20 1.00 10.00 1257.62 327013.29 288.10 68114.87
4+980.000 971.105 967.575 63.47 14.74 1.00 10.00 1265.58 328278.87 289.36 68404.23
5+000.000 971.028 967.527 63.14 16.17 1.00 10.00 1266.10 329544.97 309.03 68713.25
5+020.000 970.970 967.479 62.89 16.60 1.00 10.00 1260.32 330805.30 327.68 69040.94
6. V O L U M E N E S
SUM C SUM T
TN SUBRASANTE
Factor de
abundamiento
en corte
SEMI-
DISTANCIA
C T
COORDENADA INICIAL DE CURVA
MASA
C T
ELEVACIONESSECCIONES DE
TN
LEVANTADAS
EN CAMPO
5+040.000 970.966 967.431 63.34 17.24 1.00 10.00 1262.26 332067.56 338.46 69379.40
5+060.000 970.956 967.383 63.84 13.81 1.00 10.00 1271.79 333339.36 310.56 69689.96
5+080.000 970.924 967.335 64.09 19.00 1.00 10.00 1279.34 334618.69 328.15 70018.11
5+100.000 970.850 967.287 63.60 16.20 1.00 10.00 1276.95 335895.64 351.99 70370.10
5+120.000 970.781 967.239 63.13 16.34 1.00 10.00 1267.36 337163.00 325.33 70695.43
5+140.000 970.742 967.191 62.99 13.95 1.00 10.00 1261.27 338424.26 302.85 70998.28
5+160.000 970.707 967.143 62.90 17.21 1.00 10.00 1258.95 339683.21 311.56 71309.84
5+180.000 970.662 967.095 62.97 15.16 1.00 10.00 1258.75 340941.96 323.71 71633.55
5+200.000 970.635 967.047 63.16 15.11 1.00 10.00 1261.34 342203.30 302.72 71936.26
5+220.000 970.576 966.999 62.98 17.97 1.00 10.00 1261.46 343464.76 330.81 72267.07
5+240.000 970.501 966.951 62.73 17.45 1.00 10.00 1257.11 344721.88 354.17 72621.23
5+260.000 970.458 966.903 62.50 15.73 1.00 10.00 1252.31 345974.19 331.76 72953.00
5+280.000 970.405 966.855 62.49 15.68 1.00 10.00 1249.97 347224.16 314.08 73267.07
5+300.000 970.311 966.807 61.82 16.91 1.00 10.00 1243.16 348467.32 325.91 73592.98
5+320.000 970.223 966.759 61.33 15.47 1.00 10.00 1231.51 349698.83 323.81 73916.79
5+340.000 970.176 966.711 61.41 16.46 1.00 10.00 1227.39 350926.23 319.31 74236.10
5+360.000 970.158 966.663 61.85 16.76 1.00 10.00 1232.60 352158.83 332.27 74568.37
5+380.000 970.132 966.615 62.25 18.23 1.00 10.00 1240.97 353399.80 349.88 74918.25
5+400.000 970.116 966.567 62.63 16.03 1.00 10.00 1248.83 354648.63 342.52 75260.77
5+420.000 970.075 966.520 62.56 16.21 1.00 10.00 1251.90 355900.53 322.38 75583.15
5+440.000 969.984 966.472 62.25 19.02 1.00 10.00 1248.10 357148.64 352.32 75935.47
5+460.000 969.906 966.424 61.53 18.71 1.00 10.00 1237.82 358386.45 377.31 76312.77
5+480.000 969.850 966.376 61.64 14.22 1.00 10.00 1231.66 359618.11 329.30 76642.08
5+500.000 969.783 966.328 61.57 14.74 1.00 10.00 1232.06 360850.17 289.63 76931.70
5+520.000 969.730 966.280 61.36 15.10 1.00 10.00 1229.28 362079.45 298.42 77230.13
5+540.000 969.718 966.232 61.93 15.13 1.00 10.00 1232.88 363312.33 302.24 77532.37
5+560.000 969.680 966.184 62.06 14.90 1.00 10.00 1239.90 364552.23 300.25 77832.62
5+580.000 969.650 966.136 62.21 16.78 1.00 10.00 1242.75 365794.97 316.80 78149.42
5+600.000 969.638 966.088 62.67 15.70 1.00 10.00 1248.79 367043.76 324.77 78474.19
5+620.000 969.595 966.040 62.73 15.66 1.00 10.00 1253.94 368297.70 313.59 78787.79
5+640.000 969.548 965.992 62.67 16.86 1.00 10.00 1254.03 369551.73 325.21 79113.00
5+660.000 969.526 965.944 63.09 19.84 1.00 10.00 1257.59 370809.32 367.02 79480.02
5+680.000 969.507 965.896 63.44 16.76 1.00 10.00 1265.26 372074.58 366.07 79846.09
5+700.000 969.486 965.848 64.06 14.64 1.00 10.00 1275.02 373349.60 314.03 80160.11
5+720.000 969.465 965.800 64.44 14.57 1.00 10.00 1285.02 374634.63 292.09 80452.20
5+740.000 969.417 965.752 64.57 14.48 1.00 10.00 1290.07 375924.70 290.49 80742.69
5+760.000 969.359 965.704 64.33 14.61 1.00 10.00 1288.91 377213.61 290.85 81033.53
5+780.000 969.300 965.656 64.41 14.44 1.00 10.00 1287.33 378500.94 290.43 81323.96
5+800.000 969.222 965.608 63.91 14.55 1.00 10.00 1283.17 379784.11 289.86 81613.82
5+820.000 969.153 965.560 63.46 14.71 1.00 10.00 1273.68 381057.78 292.60 81906.42
5+840.000 969.117 965.512 63.38 14.93 1.00 10.00 1268.35 382326.13 296.38 82202.80
5+860.000 969.062 965.464 63.27 14.98 1.00 10.00 1266.41 383592.54 299.01 82501.81
5+880.000 968.980 965.416 62.85 14.99 1.00 10.00 1261.16 384853.70 299.60 82801.41
5+900.000 968.919 965.368 62.53 15.12 1.00 10.00 1253.78 386107.48 301.04 83102.45
5+920.000 968.886 965.320 62.55 15.26 1.00 10.00 1250.78 387358.26 303.80 83406.25
5+940.000 968.863 965.272 62.78 18.14 1.00 10.00 1253.32 388611.58 333.99 83740.24
5+960.000 968.815 965.225 62.87 16.76 1.00 10.00 1256.55 389868.13 348.97 84089.22
5+980.000 968.755 965.177 62.92 17.05 1.00 10.00 1257.96 391126.09 338.10 84427.32
6+000.000 968.707 965.129 62.49 19.16 1.00 10.00 1254.10 392380.19 362.11 84789.43
6+020.000 968.664 965.081 62.40 20.79 1.00 10.00 1248.91 393629.10 399.46 85188.89
6+040.000 968.617 965.033 62.51 16.14 1.00 10.00 1249.10 394878.20 369.26 85558.15
6+060.000 968.565 964.985 62.46 15.64 1.00 10.00 1249.65 396127.85 317.84 85875.99
7. V O L U M E N E S
SUM C SUM T
TN SUBRASANTE
Factor de
abundamiento
en corte
SEMI-
DISTANCIA
C T
COORDENADA INICIAL DE CURVA
MASA
C T
ELEVACIONESSECCIONES DE
TN
LEVANTADAS
EN CAMPO
6+080.000 968.516 964.937 62.37 16.77 1.00 10.00 1248.33 397376.18 324.17 86200.15
6+100.000 968.479 964.889 62.70 16.68 1.00 10.00 1250.78 398626.96 334.50 86534.65
6+120.000 968.431 964.841 62.69 16.64 1.00 10.00 1253.97 399880.93 333.19 86867.84
6+140.000 968.411 964.793 63.05 16.82 1.00 10.00 1257.43 401138.36 334.57 87202.41
6+160.000 968.369 964.745 63.33 15.22 1.00 10.00 1263.78 402402.14 320.39 87522.81
6+180.000 968.312 964.697 63.19 15.28 1.00 10.00 1265.17 403667.31 305.01 87827.82
8. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
0+000.00 0.00 983.45 10.67 983.38 -0.39 0.00 979.83 7.12 979.83 -25.77
7.12 979.83 10.12 982.83 -6.36
10.12 982.83 10.67 983.38 -0.19
-0.39 -32.32 31.93
10.67 983.38 14.95 983.35 -0.38 10.67 983.38 12.92 985.63 2.37
14.95 983.35 15.08 983.35 -0.01 12.92 985.63 15.08 985.63 4.71
-0.39 7.09 -7.48
TOTAL AREAS(M2): 31.93 -7.48
0+020.00 -15.01 983.44 -10.78 983.44 0.00 -15.01 985.58 -12.92 985.58 4.46
-12.92 985.58 -10.78 983.44 2.28
0.00 6.75 -6.75
-10.78 983.44 -0.01 983.44 0.00 -10.78 983.44 -10.12 982.78 -0.22
-0.01 983.44 0.00 983.44 0.00 -10.12 982.78 -7.12 979.78 -6.49
0.00 983.44 0.00 983.44 0.00 -7.12 979.78 0.00 979.78 -26.08
0.00 983.44 10.69 983.35 -0.51 0.00 979.78 7.12 979.78 -26.08
7.12 979.78 10.12 982.78 -6.49
10.12 982.78 10.69 983.35 -0.21
-0.52 -65.57 65.05
10.69 983.35 14.28 983.31 -0.40 10.69 983.35 12.92 985.58 2.28
14.28 983.31 15.28 983.31 -0.13 12.92 985.58 15.32 985.58 5.13
15.28 983.31 17.06 983.32 -0.23 15.32 985.58 17.06 983.84 2.21
-0.76 9.62 -10.37
TOTAL AREAS(M2): 65.05 -17.12
0+040.00 -14.89 983.34 -10.74 983.34 0.01 -14.89 985.53 -12.92 985.53 4.32
-12.92 985.53 -10.74 983.34 2.39
0.01 6.71 -6.70
-10.74 983.34 0.00 983.36 0.15 -10.74 983.34 -10.12 982.73 -0.19
0.00 983.36 0.00 983.36 0.00 -10.12 982.73 -7.12 979.73 -6.34
0.00 983.36 0.01 983.36 0.00 -7.12 979.73 0.00 979.73 -25.72
0.01 983.36 10.71 983.31 -0.03 0.00 979.73 7.12 979.73 -25.72
7.12 979.73 10.12 982.73 -6.34
10.12 982.73 10.71 983.31 -0.19
0.12 -64.50 64.61
10.71 983.31 15.14 983.29 -0.16 10.71 983.31 12.92 985.53 2.39
15.14 983.29 15.38 983.29 -0.01 12.92 985.53 15.32 985.53 5.25
15.32 985.53 15.38 985.47 0.12
-0.17 7.76 -7.93
TOTAL AREAS(M2): 64.61 -14.63
0+060.00 -14.97 983.32 -10.75 983.31 -0.03 -14.97 985.47 -12.92 985.47 4.41
-12.92 985.47 -10.75 983.31 2.32
-0.03 6.72 -6.75
-10.75 983.31 0.00 983.27 -0.36 -10.75 983.31 -10.12 982.67 -0.21
0.00 983.27 0.00 983.27 0.00 -10.12 982.67 -7.12 979.67 -6.44
0.00 983.27 0.01 983.27 0.00 -7.12 979.67 0.00 979.67 -25.97
0.01 983.27 10.71 983.26 -0.61 0.00 979.67 7.12 979.67 -25.97
7.12 979.67 10.12 982.67 -6.44
10.12 982.67 10.71 983.26 -0.21
-0.97 -65.25 64.28
10.71 983.26 15.03 983.26 -0.28 10.71 983.26 12.92 985.47 2.31
12.92 985.47 15.03 985.47 4.55
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
Página 1
9. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-0.28 6.86 -7.14
TOTAL AREAS(M2): 64.28 -13.90
0+080.00 -15.32 983.26 -15.00 983.26 0.00 -15.32 985.42 -15.32 985.42 0.00
-15.00 983.26 -10.76 983.26 -0.01 -15.32 985.42 -12.92 985.42 5.18
-12.92 985.42 -10.76 983.26 2.33
-0.01 7.51 -7.52
-10.76 983.26 0.00 983.24 -0.17 -10.76 983.26 -10.12 982.62 -0.21
0.00 983.24 0.00 983.24 0.00 -10.12 982.62 -7.12 979.62 -6.43
0.00 983.24 0.00 983.24 0.00 -7.12 979.62 0.00 979.62 -25.93
0.00 983.24 10.72 983.22 -0.36 0.00 979.62 7.12 979.62 -25.93
7.12 979.62 10.12 982.62 -6.43
10.12 982.62 10.72 983.22 -0.21
-0.53 -65.13 64.61
10.72 983.22 15.00 983.22 -0.20 10.72 983.22 12.92 985.42 2.33
12.92 985.42 15.00 985.42 4.50
-0.20 6.82 -7.02
TOTAL AREAS(M2): 64.61 -14.54
0+100.00 -17.46 983.23 -15.44 983.23 0.00 -17.46 983.23 -15.32 985.37 2.28
-15.44 983.23 -14.60 983.23 0.00 -15.32 985.37 -12.92 985.37 5.13
-14.60 983.23 -10.77 983.22 -0.03 -12.92 985.37 -10.77 983.22 2.28
-0.04 9.70 -9.73
-10.77 983.22 -0.09 983.18 -0.36 -10.77 983.22 -10.12 982.57 -0.22
-0.09 983.18 0.00 983.18 0.00 -10.12 982.57 -7.12 979.57 -6.49
0.00 983.18 0.01 983.18 0.00 -7.12 979.57 0.00 979.57 -26.08
0.01 983.18 10.72 983.17 -0.62 0.00 979.57 7.12 979.57 -26.08
7.12 979.57 10.12 982.57 -6.49
10.12 982.57 10.72 983.17 -0.22
-0.99 -65.57 64.58
10.72 983.17 15.00 983.17 -0.28 10.72 983.17 12.92 985.37 2.28
15.00 983.17 15.09 983.17 -0.01 12.92 985.37 15.09 985.37 4.64
-0.28 6.92 -7.20
TOTAL AREAS(M2): 64.58 -16.94
0+120.00 -15.04 983.19 -15.00 983.19 0.00 -15.04 985.32 -12.92 985.32 4.53
-15.00 983.19 -10.77 983.17 -0.03 -12.92 985.32 -10.77 983.17 2.27
-0.03 6.80 -6.83
-10.77 983.17 -0.01 983.14 -0.31 -10.77 983.17 -10.12 982.52 -0.22
-0.01 983.14 0.00 983.14 0.00 -10.12 982.52 -7.12 979.52 -6.50
0.00 983.14 0.12 983.14 -0.01 -7.12 979.52 0.00 979.52 -26.11
0.12 983.14 10.72 983.12 -0.59 0.00 979.52 7.12 979.52 -26.11
7.12 979.52 10.12 982.52 -6.50
10.12 982.52 10.72 983.12 -0.22
-0.91 -65.67 64.76
10.72 983.12 14.29 983.11 -0.24 10.72 983.12 12.92 985.32 2.27
14.29 983.11 15.20 983.11 -0.07 12.92 985.32 15.32 985.32 5.12
15.20 983.11 16.66 983.13 -0.09 15.32 985.32 16.66 983.98 1.96
-0.40 9.35 -9.75
TOTAL AREAS(M2): 64.76 -16.58
0+140.00 -15.68 983.12 -15.02 983.12 0.00 -15.68 984.91 -15.32 985.27 0.70
-15.02 983.12 -10.75 983.10 -0.05 -15.32 985.27 -12.92 985.27 5.15
-12.92 985.27 -10.75 983.10 2.31
Página 2
10. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-0.05 8.16 -8.21
-10.75 983.10 -0.01 983.04 -0.54 -10.75 983.10 -10.12 982.47 -0.21
-0.01 983.04 0.00 983.04 0.00 -10.12 982.47 -7.12 979.47 -6.46
0.00 983.04 0.50 983.04 -0.04 -7.12 979.47 0.00 979.47 -26.01
0.50 983.04 10.72 983.07 -0.65 0.00 979.47 7.12 979.47 -26.01
7.12 979.47 10.12 982.47 -6.46
10.12 982.47 10.72 983.07 -0.21
-1.23 -65.35 64.11
10.72 983.07 14.98 983.08 -0.19 10.72 983.07 12.92 985.27 2.30
14.98 983.08 15.01 983.08 0.00 12.92 985.27 15.01 985.27 4.48
-0.19 6.78 -6.97
TOTAL AREAS(M2): 64.11 -15.18
0+160.00 -15.04 983.05 -14.82 983.04 0.00 -15.04 985.21 -12.92 985.21 4.59
-14.82 983.04 -10.74 983.04 -0.03 -12.92 985.21 -10.74 983.04 2.35
-0.03 6.94 -6.97
-10.74 983.04 -0.02 983.02 -0.19 -10.74 983.04 -10.12 982.41 -0.20
-0.02 983.02 0.00 983.02 0.00 -10.12 982.41 -7.12 979.41 -6.40
0.00 983.02 0.10 983.02 0.00 -7.12 979.41 0.00 979.41 -25.86
0.10 983.02 10.71 983.00 -0.37 0.00 979.41 7.12 979.41 -25.86
7.12 979.41 10.12 982.41 -6.40
10.12 982.41 10.71 983.00 -0.20
-0.57 -64.91 64.34
10.71 983.00 15.47 982.99 -0.23 10.71 983.00 12.92 985.21 2.35
15.47 982.99 16.69 983.02 -0.05 12.92 985.21 15.32 985.21 5.20
15.32 985.21 16.69 983.84 2.03
-0.28 9.59 -9.86
TOTAL AREAS(M2): 64.34 -16.83
0+180.00 -16.64 983.02 -15.21 983.00 -0.02 -16.64 983.84 -15.32 985.16 1.95
-15.21 983.00 -10.75 982.99 -0.14 -15.32 985.16 -12.92 985.16 5.13
-12.92 985.16 -10.75 982.99 2.28
-0.15 9.37 -9.52
-10.75 982.99 -0.02 982.96 -0.54 -10.75 982.99 -10.12 982.36 -0.22
-0.02 982.96 0.00 982.96 0.00 -10.12 982.36 -7.12 979.36 -6.49
0.00 982.96 0.82 982.96 -0.05 -7.12 979.36 0.00 979.36 -26.07
0.82 982.96 10.70 982.94 -0.75 0.00 979.36 7.12 979.36 -26.07
7.12 979.36 10.12 982.36 -6.49
10.12 982.36 10.70 982.94 -0.22
-1.34 -65.55 64.21
10.70 982.94 14.93 982.93 -0.38 10.70 982.94 12.92 985.16 2.28
14.93 982.93 14.97 982.93 0.00 12.92 985.16 14.97 985.16 4.37
-0.38 6.66 -7.04
TOTAL AREAS(M2): 64.21 -16.56
0+200.00 -15.00 983.00 -10.77 982.96 -0.08 -15.00 985.11 -12.92 985.11 4.39
-12.92 985.11 -10.77 982.96 2.23
-0.08 6.62 -6.69
-10.77 982.96 -0.02 982.87 -0.89 -10.77 982.96 -10.12 982.31 -0.24
-0.02 982.87 0.00 982.87 0.00 -10.12 982.31 -7.12 979.31 -6.57
0.00 982.87 4.62 982.86 -0.63 -7.12 979.31 0.00 979.31 -26.27
4.62 982.86 10.65 982.84 -0.91 0.00 979.31 7.12 979.31 -26.27
7.12 979.31 10.12 982.31 -6.57
Página 3
11. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
10.12 982.31 10.65 982.84 -0.23
-2.43 -66.13 63.70
10.65 982.84 15.00 982.83 -0.71 10.65 982.84 12.92 985.11 2.21
12.92 985.11 15.00 985.11 4.39
-0.71 6.60 -7.31
TOTAL AREAS(M2): 63.70 -14.01
0+220.00 -14.65 982.98 -10.80 982.94 -0.09 -14.65 985.06 -12.92 985.06 3.58
-12.92 985.06 -10.80 982.94 2.15
-0.09 5.73 -5.83
-10.80 982.94 -0.04 982.80 -1.24 -10.80 982.94 -10.12 982.26 -0.26
-0.04 982.80 0.00 982.80 -0.01 -10.12 982.26 -7.12 979.26 -6.67
0.00 982.80 0.16 982.80 -0.03 -7.12 979.26 0.00 979.26 -26.52
0.16 982.80 10.65 982.78 -2.01 0.00 979.26 7.12 979.26 -26.52
7.12 979.26 10.12 982.26 -6.67
10.12 982.26 10.65 982.78 -0.24
-3.29 -66.90 63.60
10.65 982.78 16.09 982.78 -1.11 10.65 982.78 12.92 985.06 2.13
16.09 982.78 17.59 982.78 -0.31 12.92 985.06 15.32 985.06 4.98
15.32 985.06 17.59 982.78 2.13
-1.42 9.25 -10.66
TOTAL AREAS(M2): 63.60 -16.49
0+240.00 -14.56 982.95 -10.82 982.91 -0.08 -14.56 985.01 -12.92 985.01 3.37
-12.92 985.01 -10.82 982.91 2.11
-0.08 5.48 -5.57
-10.82 982.91 -0.06 982.78 -1.15 -10.82 982.91 -10.12 982.21 -0.28
-0.06 982.78 0.00 982.78 -0.01 -10.12 982.21 -7.12 979.21 -6.73
0.00 982.78 0.12 982.78 -0.02 -7.12 979.21 0.00 979.21 -26.65
0.12 982.78 10.66 982.75 -1.97 0.00 979.21 7.12 979.21 -26.65
7.12 979.21 10.12 982.21 -6.73
10.12 982.21 10.66 982.75 -0.26
-3.15 -67.30 64.16
10.66 982.75 15.63 982.73 -1.04 10.66 982.75 12.92 985.01 2.09
15.63 982.73 16.58 982.74 -0.20 12.92 985.01 15.32 985.01 4.94
15.32 985.01 16.58 983.74 1.80
-1.25 8.83 -10.08
TOTAL AREAS(M2): 64.16 -15.64
0+260.00 -14.55 982.93 -10.84 982.88 -0.09 -14.55 984.95 -12.92 984.95 3.30
-12.92 984.95 -10.84 982.88 2.06
-0.09 5.36 -5.45
-10.84 982.88 -0.07 982.73 -1.32 -10.84 982.88 -10.12 982.15 -0.30
-0.07 982.73 0.00 982.73 -0.01 -10.12 982.15 -7.12 979.15 -6.81
0.00 982.73 0.10 982.73 -0.02 -7.12 979.15 0.00 979.15 -26.85
0.10 982.73 10.68 982.71 -2.17 0.00 979.15 7.12 979.15 -26.85
7.12 979.15 10.12 982.15 -6.81
10.12 982.15 10.68 982.71 -0.27
-3.53 -67.90 64.37
10.68 982.71 15.57 982.70 -1.07 10.68 982.71 12.92 984.95 2.03
12.92 984.95 15.32 984.95 4.87
15.32 984.95 15.57 984.71 0.47
-1.07 7.38 -8.45
Página 4
12. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
TOTAL AREAS(M2): 64.37 -13.90
0+280.00 -15.40 982.89 -15.00 982.88 0.00 -15.40 984.83 -15.32 984.90 0.15
-15.00 982.88 -10.85 982.83 -0.14 -15.32 984.90 -12.92 984.90 4.83
-12.92 984.90 -10.85 982.83 2.02
-0.15 7.00 -7.15
-10.85 982.83 -0.07 982.69 -1.42 -10.85 982.83 -10.12 982.10 -0.31
-0.07 982.69 0.00 982.69 -0.01 -10.12 982.10 -7.12 979.10 -6.87
0.00 982.69 0.10 982.69 -0.02 -7.12 979.10 0.00 979.10 -26.98
0.10 982.69 10.68 982.66 -2.29 0.00 979.10 7.12 979.10 -26.98
7.12 979.10 10.12 982.10 -6.87
10.12 982.10 10.68 982.66 -0.28
-3.74 -68.28 64.54
10.68 982.66 15.00 982.65 -1.03 10.68 982.66 12.92 984.90 2.00
12.92 984.90 15.00 984.90 4.18
-1.03 6.17 -7.20
TOTAL AREAS(M2): 64.54 -14.35
0+300.00 -16.31 982.83 -15.63 982.81 0.00 -16.31 983.86 -15.32 984.85 1.51
-15.63 982.81 -10.84 982.77 -0.17 -15.32 984.85 -12.92 984.85 4.85
-12.92 984.85 -10.84 982.77 2.04
-0.18 8.41 -8.59
-10.84 982.77 -0.07 982.67 -1.17 -10.84 982.77 -10.12 982.05 -0.30
-0.07 982.67 0.00 982.67 -0.01 -10.12 982.05 -7.12 979.05 -6.83
0.00 982.67 0.16 982.67 -0.03 -7.12 979.05 0.00 979.05 -26.90
0.16 982.67 10.67 982.60 -2.04 0.00 979.05 7.12 979.05 -26.90
7.12 979.05 10.12 982.05 -6.83
10.12 982.05 10.67 982.60 -0.28
-3.24 -68.05 64.81
10.67 982.60 14.48 982.58 -0.91 10.67 982.60 12.92 984.85 2.02
12.92 984.85 14.48 984.85 3.15
-0.91 5.17 -6.08
TOTAL AREAS(M2): 64.81 -14.67
0+320.00 -14.79 982.77 -10.85 982.73 -0.08 -14.79 984.80 -12.92 984.80 3.78
-12.92 984.80 -10.85 982.73 2.05
-0.08 5.83 -5.91
-10.85 982.73 -0.08 982.62 -1.04 -10.85 982.73 -10.12 982.00 -0.30
-0.08 982.62 0.00 982.62 -0.01 -10.12 982.00 -7.12 979.00 -6.82
0.00 982.62 0.14 982.62 -0.02 -7.12 979.00 0.00 979.00 -26.87
0.14 982.62 10.69 982.57 -1.89 0.00 979.00 7.12 979.00 -26.87
7.12 979.00 10.12 982.00 -6.82
10.12 982.00 10.69 982.57 -0.28
-2.96 -67.96 65.00
10.69 982.57 15.26 982.55 -0.98 10.69 982.57 12.92 984.80 2.03
15.26 982.55 16.18 982.54 -0.21 12.92 984.80 15.32 984.80 4.86
15.32 984.80 16.18 983.94 1.37
-1.20 8.27 -9.46
TOTAL AREAS(M2): 65.00 -15.38
0+340.00 -14.21 982.74 -10.88 982.71 -0.06 -14.21 984.75 -12.92 984.75 2.59
-12.92 984.75 -10.88 982.71 2.00
-0.06 4.60 -4.66
-10.88 982.71 -0.13 982.59 -1.02 -10.88 982.71 -10.12 981.95 -0.32
Página 5
13. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-0.13 982.59 0.00 982.59 -0.02 -10.12 981.95 -7.12 978.95 -6.89
0.00 982.59 0.13 982.59 -0.02 -7.12 978.95 0.00 978.95 -27.04
0.13 982.59 10.71 982.54 -1.91 0.00 978.95 7.12 978.95 -27.04
7.12 978.95 10.12 981.95 -6.89
10.12 981.95 10.71 982.54 -0.30
-2.97 -68.49 65.52
10.71 982.54 16.12 982.52 -1.18 10.71 982.54 12.92 984.75 1.98
16.12 982.52 16.84 982.51 -0.17 12.92 984.75 15.32 984.75 4.80
15.32 984.75 16.84 983.22 1.89
-1.34 8.68 -10.02
TOTAL AREAS(M2): 65.52 -14.68
0+360.00 -16.29 982.72 -15.37 982.71 0.00 -16.29 983.72 -15.32 984.70 1.45
-15.37 982.71 -10.89 982.66 -0.14 -15.32 984.70 -12.92 984.70 4.74
-12.92 984.70 -10.89 982.66 1.95
-0.15 8.14 -8.29
-10.89 982.66 -0.12 982.54 -1.26 -10.89 982.66 -10.12 981.90 -0.34
-0.12 982.54 0.00 982.54 -0.02 -10.12 981.90 -7.12 978.90 -6.97
0.00 982.54 0.16 982.54 -0.03 -7.12 978.90 0.00 978.90 -27.23
0.16 982.54 10.69 982.47 -2.28 0.00 978.90 7.12 978.90 -27.23
7.12 978.90 10.12 981.90 -6.97
10.12 981.90 10.69 982.47 -0.31
-3.59 -69.04 65.45
10.69 982.47 14.68 982.44 -1.06 10.69 982.47 12.92 984.70 1.92
12.92 984.70 14.68 984.70 3.48
-1.06 5.41 -6.47
TOTAL AREAS(M2): 65.45 -14.76
0+380.00 -17.27 982.70 -16.07 982.69 -0.01 -17.27 982.70 -15.32 984.64 1.89
-16.07 982.69 -10.89 982.62 -0.24 -15.32 984.64 -12.92 984.64 4.67
-12.92 984.64 -10.89 982.62 1.89
-0.25 8.44 -8.69
-10.89 982.62 -0.13 982.47 -1.66 -10.89 982.62 -10.12 981.84 -0.36
-0.13 982.47 0.00 982.47 -0.03 -10.12 981.84 -7.12 978.84 -7.07
0.00 982.47 0.38 982.47 -0.09 -7.12 978.84 0.00 978.84 -27.45
0.38 982.47 10.69 982.41 -2.67 0.00 978.84 7.12 978.84 -27.45
7.12 978.84 10.12 981.84 -7.07
10.12 981.84 10.69 982.41 -0.33
-4.45 -69.73 65.28
10.69 982.41 14.28 982.39 -1.06 10.69 982.41 12.92 984.64 1.85
12.92 984.64 14.28 984.64 2.63
-1.06 4.48 -5.55
TOTAL AREAS(M2): 65.28 -14.24
0+400.00 -15.22 982.67 -10.92 982.59 -0.18 -15.22 984.59 -12.92 984.59 4.41
-12.92 984.59 -10.92 982.59 1.84
-0.18 6.25 -6.43
-10.92 982.59 -0.12 982.38 -2.00 -10.92 982.59 -10.12 981.79 -0.38
-0.12 982.38 0.00 982.38 -0.04 -10.12 981.79 -7.12 978.79 -7.14
0.00 982.38 0.53 982.38 -0.15 -7.12 978.79 0.00 978.79 -27.62
0.53 982.38 10.71 982.38 -2.95 0.00 978.79 7.12 978.79 -27.62
7.12 978.79 10.12 981.79 -7.14
10.12 981.79 10.71 982.38 -0.34
Página 6
14. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-5.13 -70.24 65.10
10.71 982.38 14.77 982.38 -1.17 10.71 982.38 12.92 984.59 1.80
12.92 984.59 14.77 984.59 3.55
-1.17 5.35 -6.53
TOTAL AREAS(M2): 65.10 -12.96
0+420.00 -15.00 982.62 -10.92 982.54 -0.17 -15.00 984.54 -12.92 984.54 3.98
-12.92 984.54 -10.92 982.54 1.83
-0.17 5.81 -5.98
-10.92 982.54 -0.12 982.32 -2.08 -10.92 982.54 -10.12 981.74 -0.39
-0.12 982.32 0.00 982.32 -0.04 -10.12 981.74 -7.12 978.74 -7.15
0.00 982.32 0.53 982.32 -0.16 -7.12 978.74 0.00 978.74 -27.66
0.53 982.32 10.70 982.32 -3.09 0.00 978.74 7.12 978.74 -27.66
7.12 978.74 10.12 981.74 -7.15
10.12 981.74 10.70 982.32 -0.35
-5.36 -70.36 65.00
10.70 982.32 15.00 982.32 -1.30 10.70 982.32 12.92 984.54 1.79
12.92 984.54 15.00 984.54 3.98
-1.30 5.77 -7.07
TOTAL AREAS(M2): 65.00 -13.05
0+440.00 -15.00 982.59 -10.94 982.51 -0.16 -15.00 984.49 -12.92 984.49 3.95
-12.92 984.49 -10.94 982.51 1.80
-0.16 5.75 -5.91
-10.94 982.51 -0.12 982.30 -1.97 -10.94 982.51 -10.12 981.69 -0.40
-0.12 982.30 0.00 982.30 -0.04 -10.12 981.69 -7.12 978.69 -7.20
0.00 982.30 0.53 982.30 -0.15 -7.12 978.69 0.00 978.69 -27.77
0.53 982.30 10.70 982.27 -3.08 0.00 978.69 7.12 978.69 -27.77
7.12 978.69 10.12 981.69 -7.20
10.12 981.69 10.70 982.27 -0.36
-5.24 -70.71 65.47
10.70 982.27 15.00 982.26 -1.38 10.70 982.27 12.92 984.49 1.75
12.92 984.49 15.00 984.49 3.95
-1.38 5.70 -7.09
TOTAL AREAS(M2): 65.47 -12.99
0+460.00 -15.00 982.54 -10.95 982.47 -0.15 -15.00 984.44 -12.92 984.44 3.95
-12.92 984.44 -10.95 982.47 1.80
-0.15 5.74 -5.89
-10.95 982.47 -0.12 982.27 -1.83 -10.95 982.47 -10.12 981.64 -0.40
-0.12 982.27 0.00 982.27 -0.03 -10.12 981.64 -7.12 978.64 -7.21
0.00 982.27 0.53 982.27 -0.14 -7.12 978.64 0.00 978.64 -27.79
0.53 982.27 10.73 982.24 -2.87 0.00 978.64 7.12 978.64 -27.79
7.12 978.64 10.12 981.64 -7.21
10.12 981.64 10.73 982.24 -0.36
-4.88 -70.76 65.88
10.73 982.24 15.00 982.23 -1.28 10.73 982.24 12.92 984.44 1.76
12.92 984.44 15.00 984.44 3.95
-1.28 5.70 -6.98
TOTAL AREAS(M2): 65.88 -12.87
0+480.00 -15.00 982.52 -10.97 982.44 -0.17 -15.00 984.38 -12.92 984.38 3.87
-12.92 984.38 -10.97 982.44 1.73
-0.17 5.60 -5.77
Página 7
15. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-10.97 982.44 -0.12 982.21 -2.14 -10.97 982.44 -10.12 981.58 -0.44
-0.12 982.21 0.00 982.21 -0.04 -10.12 981.58 -7.12 978.58 -7.32
0.00 982.21 0.53 982.21 -0.17 -7.12 978.58 0.00 978.58 -28.04
0.53 982.21 10.72 982.18 -3.33 0.00 978.58 7.12 978.58 -28.04
7.12 978.58 10.12 981.58 -7.32
10.12 981.58 10.72 982.18 -0.38
-5.67 -71.54 65.87
10.72 982.18 15.00 982.17 -1.47 10.72 982.18 12.92 984.38 1.67
12.92 984.38 15.00 984.38 3.87
-1.47 5.55 -7.02
TOTAL AREAS(M2): 65.87 -12.79
0+500.00 -15.00 982.48 -10.99 982.40 -0.17 -15.00 984.33 -12.92 984.33 3.84
-12.92 984.33 -10.99 982.40 1.70
-0.17 5.55 -5.71
-10.99 982.40 -0.12 982.17 -2.15 -10.99 982.40 -10.12 981.53 -0.45
-0.12 982.17 0.00 982.17 -0.04 -10.12 981.53 -7.12 978.53 -7.36
0.00 982.17 0.53 982.17 -0.17 -7.12 978.53 0.00 978.53 -28.14
0.53 982.17 10.70 982.12 -3.49 0.00 978.53 7.12 978.53 -28.14
7.12 978.53 10.12 981.53 -7.36
10.12 981.53 10.70 982.12 -0.39
-5.84 -71.84 66.00
10.70 982.12 15.00 982.09 -1.63 10.70 982.12 12.92 984.33 1.64
12.92 984.33 15.00 984.33 3.84
-1.63 5.48 -7.11
TOTAL AREAS(M2): 66.00 -12.82
0+520.00 -15.00 982.46 -10.99 982.35 -0.21 -15.00 984.28 -12.92 984.28 3.79
-12.92 984.28 -10.99 982.35 1.66
-0.21 5.45 -5.66
-10.99 982.35 -0.12 982.07 -2.64 -10.99 982.35 -10.12 981.48 -0.47
-0.12 982.07 0.00 982.07 -0.05 -10.12 981.48 -7.12 978.48 -7.43
0.00 982.07 0.53 982.07 -0.21 -7.12 978.48 0.00 978.48 -28.31
0.53 982.07 10.67 982.03 -4.13 0.00 978.48 7.12 978.48 -28.31
7.12 978.48 10.12 981.48 -7.43
10.12 981.48 10.67 982.03 -0.39
-7.02 -72.34 65.32
10.67 982.03 15.00 982.01 -1.88 10.67 982.03 12.92 984.28 1.57
12.92 984.28 15.00 984.28 3.79
-1.88 5.36 -7.24
TOTAL AREAS(M2): 65.32 -12.90
0+540.00 -15.00 982.43 -11.02 982.33 -0.21 -15.00 984.23 -12.92 984.23 3.73
-12.92 984.23 -11.02 982.33 1.61
-0.21 5.34 -5.55
-11.02 982.33 -0.12 982.04 -2.69 -11.02 982.33 -10.12 981.43 -0.50
-0.12 982.04 0.00 982.04 -0.05 -10.12 981.43 -7.12 978.43 -7.51
0.00 982.04 0.53 982.04 -0.21 -7.12 978.43 0.00 978.43 -28.51
0.53 982.04 10.66 981.97 -4.37 0.00 978.43 7.12 978.43 -28.51
7.12 978.43 10.12 981.43 -7.51
10.12 981.43 10.66 981.97 -0.40
-7.32 -72.95 65.63
10.66 981.97 15.00 981.93 -2.09 10.66 981.97 12.92 984.23 1.50
Página 8
16. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
12.92 984.23 15.00 984.23 3.74
-2.09 5.24 -7.33
TOTAL AREAS(M2): 65.63 -12.88
0+560.00 -15.00 982.38 -11.03 982.28 -0.20 -15.00 984.18 -12.92 984.18 3.73
-12.92 984.18 -11.03 982.28 1.60
-0.20 5.33 -5.53
-11.03 982.28 -0.12 982.01 -2.55 -11.03 982.28 -10.12 981.38 -0.50
-0.12 982.01 0.00 982.01 -0.05 -10.12 981.38 -7.12 978.38 -7.52
0.00 982.01 0.53 982.01 -0.20 -7.12 978.38 0.00 978.38 -28.53
0.53 982.01 10.68 981.94 -4.15 0.00 978.38 7.12 978.38 -28.53
7.12 978.38 10.12 981.38 -7.52
10.12 981.38 10.68 981.94 -0.41
-6.95 -73.01 66.05
10.68 981.94 15.00 981.91 -1.97 10.68 981.94 12.92 984.18 1.51
12.92 984.18 15.00 984.18 3.73
-1.97 5.24 -7.21
TOTAL AREAS(M2): 66.05 -12.74
0+580.00 -15.00 982.29 -11.01 982.21 -0.16 -15.00 984.12 -12.92 984.12 3.81
-12.92 984.12 -11.01 982.21 1.67
-0.16 5.48 -5.64
-11.01 982.21 -0.12 981.99 -2.09 -11.01 982.21 -10.12 981.32 -0.47
-0.12 981.99 0.00 981.99 -0.04 -10.12 981.32 -7.12 978.32 -7.41
0.00 981.99 0.53 981.99 -0.16 -7.12 978.32 0.00 978.32 -28.27
0.53 981.99 10.73 981.93 -3.41 0.00 978.32 7.12 978.32 -28.27
7.12 978.32 10.12 981.32 -7.41
10.12 981.32 10.73 981.93 -0.41
-5.70 -72.24 66.54
10.73 981.93 15.00 981.91 -1.59 10.73 981.93 12.92 984.12 1.61
12.92 984.12 15.00 984.12 3.81
-1.59 5.41 -7.01
TOTAL AREAS(M2): 66.54 -12.64
0+600.00 -15.00 982.22 -11.00 982.15 -0.13 -15.00 984.07 -12.92 984.07 3.86
-12.92 984.07 -11.00 982.15 1.72
-0.13 5.58 -5.71
-11.00 982.15 -0.12 981.98 -1.62 -11.00 982.15 -10.12 981.27 -0.44
-0.12 981.98 0.00 981.98 -0.03 -10.12 981.27 -7.12 978.27 -7.33
0.00 981.98 0.53 981.97 -0.13 -7.12 978.27 0.00 978.27 -28.08
0.53 981.97 10.72 981.87 -2.99 0.00 978.27 7.12 978.27 -28.08
7.12 978.27 10.12 981.27 -7.33
10.12 981.27 10.72 981.87 -0.39
-4.77 -71.67 66.90
10.72 981.87 15.00 981.83 -1.57 10.72 981.87 12.92 984.07 1.66
12.92 984.07 15.00 984.07 3.86
-1.57 5.52 -7.09
TOTAL AREAS(M2): 66.90 -12.80
0+620.00 -15.00 982.15 -10.99 982.09 -0.11 -15.00 984.02 -12.92 984.02 3.90
-12.92 984.02 -10.99 982.09 1.75
-0.11 5.65 -5.76
-10.99 982.09 -0.12 981.94 -1.41 -10.99 982.09 -10.12 981.22 -0.43
-0.12 981.94 0.00 981.94 -0.03 -10.12 981.22 -7.12 978.22 -7.28
Página 9
17. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
0.00 981.94 0.53 981.93 -0.11 -7.12 978.22 0.00 978.22 -27.96
0.53 981.93 10.71 981.81 -2.82 0.00 978.22 7.12 978.22 -27.96
7.12 978.22 10.12 981.22 -7.28
10.12 981.22 10.71 981.81 -0.37
-4.37 -71.27 66.90
10.71 981.81 15.00 981.75 -1.57 10.71 981.81 12.92 984.02 1.70
12.92 984.02 15.00 984.02 3.90
-1.57 5.59 -7.17
TOTAL AREAS(M2): 66.90 -12.93
0+640.00 -15.00 982.08 -10.97 982.02 -0.13 -15.00 983.97 -12.92 983.97 3.93
-12.92 983.97 -10.97 982.02 1.78
-0.13 5.71 -5.84
-10.97 982.02 -0.12 981.84 -1.64 -10.97 982.02 -10.12 981.17 -0.41
-0.12 981.84 0.00 981.84 -0.03 -10.12 981.17 -7.12 978.17 -7.24
0.00 981.84 0.53 981.83 -0.13 -7.12 978.17 0.00 978.17 -27.86
0.53 981.83 10.67 981.72 -3.07 0.00 978.17 7.12 978.17 -27.86
7.12 978.17 10.12 981.17 -7.24
10.12 981.17 10.67 981.72 -0.35
-4.87 -70.95 66.08
10.67 981.72 15.00 981.67 -1.65 10.67 981.72 12.92 983.97 1.72
12.92 983.97 15.00 983.97 3.93
-1.65 5.64 -7.30
TOTAL AREAS(M2): 66.08 -13.13
0+660.00 -15.00 982.03 -10.96 981.95 -0.15 -15.00 983.92 -12.92 983.92 3.93
-12.92 983.92 -10.96 981.95 1.78
-0.15 5.71 -5.86
-10.96 981.95 -0.12 981.76 -1.82 -10.96 981.95 -10.12 981.12 -0.41
-0.12 981.76 0.00 981.76 -0.03 -10.12 981.12 -7.12 978.12 -7.23
0.00 981.76 0.53 981.75 -0.14 -7.12 978.12 0.00 978.12 -27.84
0.53 981.75 10.66 981.66 -3.23 0.00 978.12 7.12 978.12 -27.84
7.12 978.12 10.12 981.12 -7.23
10.12 981.12 10.66 981.66 -0.35
-5.23 -70.90 65.67
10.66 981.66 15.00 981.62 -1.68 10.66 981.66 12.92 983.92 1.72
12.92 983.92 15.00 983.92 3.93
-1.68 5.65 -7.33
TOTAL AREAS(M2): 65.67 -13.18
0+680.00 -15.00 981.96 -10.96 981.91 -0.12 -15.00 983.86 -12.92 983.86 3.95
-12.92 983.86 -10.96 981.91 1.80
-0.12 5.75 -5.87
-10.96 981.91 -0.12 981.75 -1.46 -10.96 981.91 -10.12 981.06 -0.40
-0.12 981.75 0.00 981.75 -0.03 -10.12 981.06 -7.12 978.06 -7.20
0.00 981.75 0.53 981.74 -0.12 -7.12 978.06 0.00 978.06 -27.77
0.53 981.74 10.66 981.60 -2.95 0.00 978.06 7.12 978.06 -27.77
7.12 978.06 10.12 981.06 -7.20
10.12 981.06 10.66 981.60 -0.34
-4.55 -70.68 66.13
10.66 981.60 15.00 981.54 -1.69 10.66 981.60 12.92 983.86 1.74
12.92 983.86 15.00 983.86 3.95
-1.69 5.69 -7.38
Página 10
18. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
TOTAL AREAS(M2): 66.13 -13.26
0+700.00 -15.00 981.93 -10.99 981.88 -0.10 -15.00 983.81 -12.92 983.81 3.91
-12.92 983.81 -10.99 981.88 1.76
-0.10 5.67 -5.77
-10.99 981.88 -0.12 981.75 -1.26 -10.99 981.88 -10.12 981.01 -0.42
-0.12 981.75 0.00 981.75 -0.02 -10.12 981.01 -7.12 978.01 -7.27
0.00 981.75 0.53 981.74 -0.10 -7.12 978.01 0.00 978.01 -27.92
0.53 981.74 10.68 981.58 -2.80 0.00 978.01 7.12 978.01 -27.92
7.12 978.01 10.12 981.01 -7.27
10.12 981.01 10.68 981.58 -0.36
-4.18 -71.17 66.98
10.68 981.58 15.00 981.51 -1.70 10.68 981.58 12.92 983.81 1.70
12.92 983.81 15.00 983.81 3.91
-1.70 5.61 -7.30
TOTAL AREAS(M2): 66.98 -13.07
0+720.00 -15.00 981.91 -11.02 981.86 -0.10 -15.00 983.76 -12.92 983.76 3.85
-12.92 983.76 -11.02 981.86 1.71
-0.10 5.57 -5.67
-11.02 981.86 -0.12 981.71 -1.36 -11.02 981.86 -10.12 980.96 -0.45
-0.12 981.71 0.00 981.71 -0.02 -10.12 980.96 -7.12 977.96 -7.34
0.00 981.71 0.53 981.70 -0.11 -7.12 977.96 0.00 977.96 -28.11
0.53 981.70 10.69 981.53 -2.97 0.00 977.96 7.12 977.96 -28.11
7.12 977.96 10.12 980.96 -7.34
10.12 980.96 10.69 981.53 -0.38
-4.46 -71.73 67.28
10.69 981.53 15.00 981.46 -1.78 10.69 981.53 12.92 983.76 1.64
12.92 983.76 15.00 983.76 3.85
-1.78 5.50 -7.28
TOTAL AREAS(M2): 67.28 -12.95
0+740.00 -15.00 981.89 -11.03 981.82 -0.14 -15.00 983.71 -12.92 983.71 3.78
-12.92 983.71 -11.03 981.82 1.65
-0.14 5.42 -5.56
-11.03 981.82 -0.12 981.63 -1.80 -11.03 981.82 -10.12 980.91 -0.48
-0.12 981.63 0.00 981.63 -0.03 -10.12 980.91 -7.12 977.91 -7.45
0.00 981.63 0.53 981.62 -0.14 -7.12 977.91 0.00 977.91 -28.37
0.53 981.62 10.70 981.48 -3.44 0.00 977.91 7.12 977.91 -28.37
7.12 977.91 10.12 980.91 -7.45
10.12 980.91 10.70 981.48 -0.40
-5.42 -72.52 67.10
10.70 981.48 15.00 981.43 -1.88 10.70 981.48 12.92 983.71 1.57
12.92 983.71 15.00 983.71 3.78
-1.88 5.34 -7.23
TOTAL AREAS(M2): 67.10 -12.79
0+760.00 -15.00 981.85 -11.05 981.78 -0.14 -15.00 983.66 -12.92 983.66 3.75
-12.92 983.66 -11.05 981.78 1.62
-0.14 5.38 -5.51
-11.05 981.78 -0.12 981.59 -1.80 -11.05 981.78 -10.12 980.86 -0.49
-0.12 981.59 0.00 981.59 -0.03 -10.12 980.86 -7.12 977.86 -7.49
0.00 981.59 0.53 981.58 -0.14 -7.12 977.86 0.00 977.86 -28.45
0.53 981.58 10.67 981.41 -3.62 0.00 977.86 7.12 977.86 -28.45
Página 11
19. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
7.12 977.86 10.12 980.86 -7.49
10.12 980.86 10.67 981.41 -0.40
-5.59 -72.77 67.18
10.67 981.41 15.00 981.34 -2.07 10.67 981.41 12.92 983.66 1.53
12.92 983.66 15.00 983.66 3.75
-2.07 5.28 -7.35
TOTAL AREAS(M2): 67.18 -12.86
0+780.00 -15.34 981.81 -15.00 981.81 0.00 -15.34 983.59 -15.32 983.60 0.03
-15.00 981.81 -11.05 981.73 -0.14 -15.32 983.60 -12.92 983.60 4.31
-12.92 983.60 -11.05 981.73 1.61
-0.14 5.96 -6.10
-11.05 981.73 -0.12 981.52 -1.96 -11.05 981.73 -10.12 980.80 -0.50
-0.12 981.52 0.00 981.52 -0.03 -10.12 980.80 -7.12 977.80 -7.51
0.00 981.52 0.56 981.51 -0.16 -7.12 977.80 0.00 977.80 -28.50
0.56 981.51 10.66 981.35 -3.81 0.00 977.80 7.12 977.80 -28.50
7.12 977.80 10.12 980.80 -7.51
10.12 980.80 10.66 981.35 -0.40
-5.97 -72.91 66.94
10.66 981.35 15.00 981.28 -2.14 10.66 981.35 12.92 983.60 1.51
12.92 983.60 15.00 983.60 3.75
-2.14 5.26 -7.40
TOTAL AREAS(M2): 66.94 -13.50
0+800.00 -16.88 981.75 -15.16 981.76 0.01 -16.88 982.00 -15.32 983.55 1.60
-15.16 981.76 -11.05 981.68 -0.12 -15.32 983.55 -12.92 983.55 4.33
-12.92 983.55 -11.05 981.68 1.63
-0.11 7.56 -7.67
-11.05 981.68 -0.13 981.48 -1.81 -11.05 981.68 -10.12 980.75 -0.49
-0.13 981.48 0.00 981.48 -0.03 -10.12 980.75 -7.12 977.75 -7.48
0.00 981.48 2.26 981.43 -0.65 -7.12 977.75 0.00 977.75 -28.44
2.26 981.43 10.64 981.27 -3.31 0.00 977.75 7.12 977.75 -28.44
7.12 977.75 10.12 980.75 -7.48
10.12 980.75 10.64 981.27 -0.38
-5.80 -72.71 66.91
10.64 981.27 14.86 981.18 -2.20 10.64 981.27 12.92 983.55 1.52
12.92 983.55 14.86 983.55 3.50
-2.20 5.02 -7.22
TOTAL AREAS(M2): 66.91 -14.89
0+820.00 -15.00 981.67 -11.03 981.61 -0.12 -15.00 983.50 -12.92 983.50 3.80
-12.92 983.50 -11.03 981.61 1.68
-0.12 5.48 -5.60
-11.03 981.61 -0.15 981.44 -1.57 -11.03 981.61 -10.12 980.70 -0.47
-0.15 981.44 0.00 981.44 -0.03 -10.12 980.70 -7.12 977.70 -7.40
0.00 981.44 0.92 981.42 -0.22 -7.12 977.70 0.00 977.70 -28.25
0.92 981.42 10.67 981.25 -3.23 0.00 977.70 7.12 977.70 -28.25
7.12 977.70 10.12 980.70 -7.40
10.12 980.70 10.67 981.25 -0.38
-5.05 -72.16 67.12
10.67 981.25 15.20 981.17 -2.07 10.67 981.25 12.92 983.50 1.59
15.20 981.17 16.59 981.15 -0.70 12.92 983.50 15.32 983.50 4.40
15.32 983.50 16.59 982.23 1.52
Página 12
20. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-2.77 7.51 -10.28
TOTAL AREAS(M2): 67.12 -15.88
0+840.00 -14.50 981.59 -11.03 981.55 -0.07 -14.50 983.45 -12.92 983.45 2.93
-12.92 983.45 -11.03 981.55 1.72
-0.07 4.65 -4.71
-11.03 981.55 -0.23 981.43 -1.08 -11.03 981.55 -10.12 980.65 -0.45
-0.23 981.43 0.00 981.43 -0.04 -10.12 980.65 -7.12 977.65 -7.34
0.00 981.43 0.52 981.42 -0.09 -7.12 977.65 0.00 977.65 -28.09
0.52 981.42 10.71 981.23 -2.72 0.00 977.65 7.12 977.65 -28.09
7.12 977.65 10.12 980.65 -7.34
10.12 980.65 10.71 981.23 -0.38
-3.92 -71.68 67.75
10.71 981.23 16.15 981.14 -2.22 10.71 981.23 12.92 983.45 1.66
16.15 981.14 16.66 981.13 -0.23 12.92 983.45 15.32 983.45 4.45
15.32 983.45 16.66 982.11 1.59
-2.46 7.69 -10.15
TOTAL AREAS(M2): 67.75 -14.86
0+860.00 -15.30 981.56 -11.05 981.52 -0.09 -15.30 983.40 -12.92 983.40 4.36
-12.92 983.40 -11.05 981.52 1.68
-0.09 6.04 -6.13
-11.05 981.52 -0.22 981.42 -0.99 -11.05 981.52 -10.12 980.60 -0.47
-0.22 981.42 0.00 981.42 -0.03 -10.12 980.60 -7.12 977.60 -7.40
0.00 981.42 0.69 981.40 -0.11 -7.12 977.60 0.00 977.60 -28.25
0.69 981.40 10.68 981.16 -2.85 0.00 977.60 7.12 977.60 -28.25
7.12 977.60 10.12 980.60 -7.40
10.12 980.60 10.68 981.16 -0.39
-3.98 -72.17 68.19
10.68 981.16 14.70 981.06 -1.84 10.68 981.16 12.92 983.40 1.59
12.92 983.40 14.70 983.40 3.27
-1.84 4.86 -6.70
TOTAL AREAS(M2): 68.19 -12.82
0+880.00 -15.22 981.52 -15.05 981.52 0.00 -15.22 983.34 -12.92 983.34 4.21
-15.05 981.52 -11.05 981.47 -0.08 -12.92 983.34 -11.05 981.47 1.67
-0.08 5.88 -5.96
-11.05 981.47 -0.21 981.35 -1.11 -11.05 981.47 -10.12 980.54 -0.47
-0.21 981.35 0.00 981.35 -0.04 -10.12 980.54 -7.12 977.54 -7.42
0.00 981.35 0.76 981.33 -0.13 -7.12 977.54 0.00 977.54 -28.28
0.76 981.33 10.66 981.08 -3.07 0.00 977.54 7.12 977.54 -28.28
7.12 977.54 10.12 980.54 -7.42
10.12 980.54 10.66 981.08 -0.38
-4.35 -72.24 67.89
10.66 981.08 14.94 980.98 -2.08 10.66 981.08 12.92 983.34 1.58
12.92 983.34 14.94 983.34 3.69
-2.08 5.26 -7.34
TOTAL AREAS(M2): 67.89 -13.30
0+900.00 -15.75 981.50 -15.15 981.51 0.00 -15.75 982.86 -15.32 983.29 0.68
-15.15 981.51 -11.08 981.45 -0.08 -15.32 983.29 -12.92 983.29 4.30
-12.92 983.29 -11.08 981.45 1.60
-0.07 6.58 -6.66
-11.08 981.45 -0.21 981.28 -1.47 -11.08 981.45 -10.12 980.49 -0.51
Página 13
21. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-0.21 981.28 0.00 981.28 -0.05 -10.12 980.49 -7.12 977.49 -7.53
0.00 981.28 1.01 981.26 -0.24 -7.12 977.49 0.00 977.49 -28.55
1.01 981.26 10.65 981.02 -3.52 0.00 977.49 7.12 977.49 -28.55
7.12 977.49 10.12 980.49 -7.53
10.12 980.49 10.65 981.02 -0.39
-5.27 -73.06 67.79
10.65 981.02 14.82 980.92 -2.22 10.65 981.02 12.92 983.29 1.49
12.92 983.29 14.82 983.29 3.40
-2.22 4.88 -7.11
TOTAL AREAS(M2): 67.79 -13.76
0+920.00 -14.92 981.48 -11.09 981.41 -0.13 -14.92 983.24 -12.92 983.24 3.53
-12.92 983.24 -11.09 981.41 1.55
-0.13 5.08 -5.21
-11.09 981.41 -0.22 981.22 -1.76 -11.09 981.41 -10.12 980.44 -0.54
-0.22 981.22 0.00 981.22 -0.06 -10.12 980.44 -7.12 977.44 -7.62
0.00 981.22 0.86 981.20 -0.23 -7.12 977.44 0.00 977.44 -28.76
0.86 981.20 10.63 980.95 -3.96 0.00 977.44 7.12 977.44 -28.76
7.12 977.44 10.12 980.44 -7.62
10.12 980.44 10.63 980.95 -0.40
-6.01 -73.68 67.67
10.63 980.95 15.13 980.84 -2.63 10.63 980.95 12.92 983.24 1.41
12.92 983.24 15.13 983.24 3.89
-2.63 5.30 -7.94
TOTAL AREAS(M2): 67.67 -13.14
0+940.00 -15.05 981.43 -11.09 981.36 -0.14 -15.05 983.19 -12.92 983.19 3.75
-12.92 983.19 -11.09 981.36 1.54
-0.14 5.30 -5.43
-11.09 981.36 -0.22 981.17 -1.77 -11.09 981.36 -10.12 980.39 -0.54
-0.22 981.17 0.00 981.17 -0.06 -10.12 980.39 -7.12 977.39 -7.62
0.00 981.17 0.92 981.14 -0.25 -7.12 977.39 0.00 977.39 -28.77
0.92 981.14 10.62 980.89 -4.02 0.00 977.39 7.12 977.39 -28.77
7.12 977.39 10.12 980.39 -7.62
10.12 980.39 10.62 980.89 -0.39
-6.10 -73.73 67.63
10.62 980.89 14.92 980.77 -2.59 10.62 980.89 12.92 983.19 1.40
12.92 983.19 14.92 983.19 3.52
-2.59 4.92 -7.51
TOTAL AREAS(M2): 67.63 -12.95
0+960.00 -14.78 981.38 -11.09 981.31 -0.12 -14.78 983.14 -12.92 983.14 3.27
-12.92 983.14 -11.09 981.31 1.55
-0.12 4.82 -4.94
-11.09 981.31 -0.25 981.12 -1.71 -11.09 981.31 -10.12 980.34 -0.54
-0.25 981.12 0.00 981.12 -0.06 -10.12 980.34 -7.12 977.34 -7.62
0.00 981.12 0.65 981.10 -0.17 -7.12 977.34 0.00 977.34 -28.76
0.65 981.10 10.60 980.82 -4.13 0.00 977.34 7.12 977.34 -28.76
7.12 977.34 10.12 980.34 -7.62
10.12 980.34 10.60 980.82 -0.39
-6.08 -73.67 67.59
10.60 980.82 15.41 980.69 -2.99 10.60 980.82 12.92 983.14 1.40
15.41 980.69 16.41 980.72 -0.67 12.92 983.14 15.32 983.14 4.23
Página 14
22. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
15.32 983.14 16.41 982.05 1.33
-3.66 6.95 -10.61
TOTAL AREAS(M2): 67.59 -15.55
0+980.00 -14.76 981.34 -14.61 981.34 0.00 -14.76 983.08 -12.92 983.08 3.22
-14.61 981.34 -11.11 981.27 -0.12 -12.92 983.08 -11.11 981.27 1.52
-0.11 4.74 -4.86
-11.11 981.27 -0.30 981.06 -1.89 -11.11 981.27 -10.12 980.28 -0.55
-0.30 981.06 0.00 981.05 -0.09 -10.12 980.28 -7.12 977.28 -7.66
0.00 981.05 0.53 981.04 -0.16 -7.12 977.28 0.00 977.28 -28.86
0.53 981.04 10.61 980.78 -4.34 0.00 977.28 7.12 977.28 -28.86
7.12 977.28 10.12 980.28 -7.66
10.12 980.28 10.61 980.78 -0.40
-6.47 -73.99 67.52
10.61 980.78 15.58 980.65 -3.09 10.61 980.78 12.92 983.08 1.37
15.58 980.65 16.06 980.67 -0.33 12.92 983.08 15.32 983.08 4.19
15.32 983.08 16.06 982.34 1.02
-3.41 6.59 -10.00
TOTAL AREAS(M2): 67.52 -14.86
1+000.00 -15.61 981.33 -15.32 981.34 0.00 -15.61 982.74 -15.32 983.03 0.45
-15.32 981.34 -11.14 981.26 -0.15 -15.32 983.03 -12.92 983.03 4.08
-12.92 983.03 -11.14 981.26 1.44
-0.15 5.97 -6.13
-11.14 981.26 -0.28 981.05 -1.98 -11.14 981.26 -10.12 980.23 -0.60
-0.28 981.05 0.00 981.04 -0.08 -10.12 980.23 -7.12 977.23 -7.80
0.00 981.04 0.67 981.02 -0.20 -7.12 977.23 0.00 977.23 -29.20
0.67 981.02 10.60 980.72 -4.62 0.00 977.23 7.12 977.23 -29.20
7.12 977.23 10.12 980.23 -7.80
10.12 980.23 10.60 980.72 -0.42
-6.90 -75.01 68.12
10.60 980.72 14.69 980.59 -2.77 10.60 980.72 12.92 983.03 1.25
12.92 983.03 14.69 983.03 3.00
-2.77 4.26 -7.03
TOTAL AREAS(M2): 68.12 -13.15
1+020.00 -15.02 981.30 -11.15 981.21 -0.18 -15.02 982.98 -12.92 982.98 3.51
-12.92 982.98 -11.15 981.21 1.40
-0.18 4.92 -5.09
-11.15 981.21 -0.29 980.96 -2.39 -11.15 981.21 -10.12 980.18 -0.63
-0.29 980.96 0.00 980.95 -0.10 -10.12 980.18 -7.12 977.18 -7.87
0.00 980.95 0.66 980.93 -0.24 -7.12 977.18 0.00 977.18 -29.36
0.66 980.93 10.59 980.65 -5.11 0.00 977.18 7.12 977.18 -29.36
7.12 977.18 10.12 980.18 -7.87
10.12 980.18 10.59 980.65 -0.42
-7.84 -75.51 67.67
10.59 980.65 14.98 980.53 -3.14 10.59 980.65 12.92 982.98 1.19
14.98 980.53 15.23 980.53 -0.19 12.92 982.98 15.23 982.98 3.87
-3.34 5.07 -8.40
TOTAL AREAS(M2): 67.67 -13.49
1+040.00 -14.76 981.24 -11.14 981.15 -0.16 -14.76 982.93 -12.92 982.93 3.11
-12.92 982.93 -11.14 981.15 1.42
-0.16 4.53 -4.69
Página 15
23. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-11.14 981.15 -0.32 980.88 -2.45 -11.14 981.15 -10.12 980.13 -0.61
-0.32 980.88 0.00 980.87 -0.12 -10.12 980.13 -7.12 977.13 -7.83
0.00 980.87 0.58 980.85 -0.22 -7.12 977.13 0.00 977.13 -29.26
0.58 980.85 10.59 980.60 -5.11 0.00 977.13 7.12 977.13 -29.26
7.12 977.13 10.12 980.13 -7.83
10.12 980.13 10.59 980.60 -0.41
-7.89 -75.21 67.32
10.59 980.60 15.34 980.48 -3.30 10.59 980.60 12.92 982.93 1.23
15.34 980.48 15.46 980.49 -0.09 12.92 982.93 15.32 982.93 4.06
15.32 982.93 15.46 982.79 0.23
-3.39 5.51 -8.91
TOTAL AREAS(M2): 67.32 -13.60
1+060.00 -15.47 981.22 -15.16 981.21 0.00 -15.47 982.72 -15.32 982.88 0.24
-15.16 981.21 -11.14 981.10 -0.24 -15.32 982.88 -12.92 982.88 3.98
-12.92 982.88 -11.14 981.10 1.37
-0.24 5.60 -5.84
-11.14 981.10 -0.30 980.79 -2.96 -11.14 981.10 -10.12 980.08 -0.64
-0.30 980.79 0.00 980.78 -0.13 -10.12 980.08 -7.12 977.08 -7.92
0.00 980.78 0.67 980.76 -0.30 -7.12 977.08 0.00 977.08 -29.47
0.67 980.76 10.57 980.53 -5.65 0.00 977.08 7.12 977.08 -29.47
7.12 977.08 10.12 980.08 -7.92
10.12 980.08 10.57 980.53 -0.41
-9.04 -75.84 66.80
10.57 980.53 14.83 980.43 -3.14 10.57 980.53 12.92 982.88 1.14
12.92 982.88 14.83 982.88 3.17
-3.14 4.31 -7.46
TOTAL AREAS(M2): 66.80 -13.30
1+080.00 -15.95 981.21 -15.24 981.20 0.00 -15.95 982.19 -15.32 982.83 0.82
-15.24 981.20 -11.18 981.09 -0.26 -15.32 982.83 -12.92 982.83 3.88
-12.92 982.83 -11.18 981.09 1.30
-0.27 6.01 -6.27
-11.18 981.09 -0.29 980.78 -3.00 -11.18 981.09 -10.12 980.03 -0.69
-0.29 980.78 0.00 980.77 -0.12 -10.12 980.03 -7.12 977.03 -8.05
0.00 980.77 0.87 980.75 -0.39 -7.12 977.03 0.00 977.03 -29.78
0.87 980.75 10.59 980.49 -5.70 0.00 977.03 7.12 977.03 -29.78
7.12 977.03 10.12 980.03 -8.05
10.12 980.03 10.59 980.49 -0.44
-9.22 -76.78 67.57
10.59 980.49 14.72 980.39 -3.17 10.59 980.49 12.92 982.83 1.05
12.92 982.83 14.72 982.83 2.91
-3.17 3.96 -7.13
TOTAL AREAS(M2): 67.57 -13.40
1+100.00 -14.93 981.17 -11.20 981.06 -0.21 -14.93 982.77 -12.92 982.77 3.22
-12.92 982.77 -11.20 981.06 1.28
-0.21 4.50 -4.71
-11.20 981.06 -0.30 980.73 -3.03 -11.20 981.06 -10.12 979.97 -0.71
-0.30 980.73 0.00 980.72 -0.13 -10.12 979.97 -7.12 976.97 -8.09
0.00 980.72 0.79 980.70 -0.36 -7.12 976.97 0.00 976.97 -29.89
0.79 980.70 10.58 980.43 -5.95 0.00 976.97 7.12 976.97 -29.89
7.12 976.97 10.12 979.97 -8.09
Página 16
24. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
10.12 979.97 10.58 980.43 -0.44
-9.48 -77.12 67.64
10.58 980.43 15.12 980.31 -3.65 10.58 980.43 12.92 982.77 1.01
15.12 980.31 15.38 980.34 -0.23 12.92 982.77 15.32 982.77 3.84
15.32 982.77 15.38 982.71 0.10
-3.87 4.95 -8.83
TOTAL AREAS(M2): 67.64 -13.53
1+120.00 -14.92 981.08 -11.18 980.98 -0.19 -14.92 982.72 -12.92 982.72 3.28
-12.92 982.72 -11.18 980.98 1.33
-0.19 4.61 -4.81
-11.18 980.98 -0.31 980.68 -2.78 -11.18 980.98 -10.12 979.92 -0.67
-0.31 980.68 0.00 980.67 -0.13 -10.12 979.92 -7.12 976.92 -7.99
0.00 980.67 0.74 980.65 -0.31 -7.12 976.92 0.00 976.92 -29.64
0.74 980.65 10.59 980.39 -5.58 0.00 976.92 7.12 976.92 -29.64
7.12 976.92 10.12 979.92 -7.99
10.12 979.92 10.59 980.39 -0.43
-8.79 -76.37 67.57
10.59 980.39 15.11 980.27 -3.44 10.59 980.39 12.92 982.72 1.10
15.11 980.27 15.22 980.28 -0.08 12.92 982.72 15.22 982.72 3.76
-3.52 4.85 -8.37
TOTAL AREAS(M2): 67.57 -13.18
1+140.00 -15.04 981.04 -11.17 980.92 -0.23 -15.04 982.67 -12.92 982.67 3.46
-12.92 982.67 -11.17 980.92 1.32
-0.23 4.79 -5.02
-11.17 980.92 -0.31 980.58 -3.15 -11.17 980.92 -10.12 979.87 -0.68
-0.31 980.58 0.00 980.57 -0.14 -10.12 979.87 -7.12 976.87 -8.01
0.00 980.57 0.75 980.55 -0.36 -7.12 976.87 0.00 976.87 -29.68
0.75 980.55 10.56 980.30 -5.99 0.00 976.87 7.12 976.87 -29.68
7.12 976.87 10.12 979.87 -8.01
10.12 979.87 10.56 980.30 -0.41
-9.64 -76.46 66.82
10.56 980.30 14.94 980.19 -3.46 10.56 980.30 12.92 982.67 1.06
12.92 982.67 14.94 982.67 3.30
-3.46 4.36 -7.82
TOTAL AREAS(M2): 66.82 -12.84
1+160.00 -14.88 981.01 -11.18 980.88 -0.23 -14.88 982.62 -12.92 982.62 3.15
-12.92 982.62 -11.18 980.88 1.29
-0.23 4.44 -4.67
-11.18 980.88 -0.33 980.51 -3.37 -11.18 980.88 -10.12 979.82 -0.70
-0.33 980.51 0.00 980.50 -0.16 -10.12 979.82 -7.12 976.82 -8.07
0.00 980.50 0.67 980.48 -0.35 -7.12 976.82 0.00 976.82 -29.83
0.67 980.48 10.56 980.26 -6.30 0.00 976.82 7.12 976.82 -29.83
7.12 976.82 10.12 979.82 -8.07
10.12 979.82 10.56 980.26 -0.43
-10.18 -76.91 66.74
10.56 980.26 15.19 980.15 -3.72 10.56 980.26 12.92 982.62 1.02
15.19 980.15 15.51 980.14 -0.28 12.92 982.62 15.32 982.62 3.87
15.32 982.62 15.51 982.43 0.29
-4.00 5.17 -9.17
TOTAL AREAS(M2): 66.74 -13.84
Página 17
25. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
1+180.00 -14.90 980.98 -11.20 980.84 -0.25 -14.90 982.57 -12.92 982.57 3.14
-12.92 982.57 -11.20 980.84 1.25
-0.25 4.39 -4.63
-11.20 980.84 -0.34 980.45 -3.59 -11.20 980.84 -10.12 979.77 -0.73
-0.34 980.45 0.00 980.44 -0.18 -10.12 979.77 -7.12 976.77 -8.14
0.00 980.44 0.63 980.42 -0.34 -7.12 976.77 0.00 976.77 -29.99
0.63 980.42 10.56 980.20 -6.59 0.00 976.77 7.12 976.77 -29.99
7.12 976.77 10.12 979.77 -8.14
10.12 979.77 10.56 980.20 -0.43
-10.71 -77.43 66.72
10.56 980.20 15.14 980.10 -3.79 10.56 980.20 12.92 982.57 0.96
15.14 980.10 15.30 980.10 -0.14 12.92 982.57 15.30 982.57 3.77
-3.93 4.73 -8.66
TOTAL AREAS(M2): 66.72 -13.29
1+200.00 -15.42 980.93 -15.05 980.92 0.00 -15.42 982.42 -15.32 982.51 0.15
-15.05 980.92 -11.18 980.78 -0.31 -15.32 982.51 -12.92 982.51 3.81
-12.92 982.51 -11.18 980.78 1.25
-0.31 5.20 -5.51
-11.18 980.78 -0.32 980.37 -3.85 -11.18 980.78 -10.12 979.71 -0.73
-0.32 980.37 0.00 980.36 -0.18 -10.12 979.71 -7.12 976.71 -8.14
0.00 980.36 0.68 980.35 -0.39 -7.12 976.71 0.00 976.71 -30.01
0.68 980.35 10.55 980.15 -6.73 0.00 976.71 7.12 976.71 -30.01
7.12 976.71 10.12 979.71 -8.14
10.12 979.71 10.55 980.15 -0.43
-11.15 -77.46 66.31
10.55 980.15 14.95 980.06 -3.62 10.55 980.15 12.92 982.51 0.95
12.92 982.51 14.95 982.51 3.22
-3.62 4.17 -7.79
TOTAL AREAS(M2): 66.31 -13.30
1+220.00 -16.11 980.90 -15.31 980.88 -0.01 -16.11 981.67 -15.32 982.46 0.93
-15.31 980.88 -11.18 980.72 -0.40 -15.32 982.46 -12.92 982.46 3.76
-12.92 982.46 -11.18 980.72 1.21
-0.41 5.89 -6.31
-11.18 980.72 -0.31 980.30 -4.19 -11.18 980.72 -10.12 979.66 -0.75
-0.31 980.30 0.00 980.29 -0.19 -10.12 979.66 -7.12 976.66 -8.20
0.00 980.29 0.96 980.27 -0.59 -7.12 976.66 0.00 976.66 -30.15
0.96 980.27 10.54 980.08 -6.91 0.00 976.66 7.12 976.66 -30.15
7.12 976.66 10.12 979.66 -8.20
10.12 979.66 10.54 980.08 -0.43
-11.88 -77.88 66.00
10.54 980.08 14.66 980.00 -3.54 10.54 980.08 12.92 982.46 0.89
12.92 982.46 14.66 982.46 2.73
-3.54 3.62 -7.17
TOTAL AREAS(M2): 66.00 -13.47
1+240.00 -15.00 980.85 -11.19 980.68 -0.32 -15.00 982.41 -12.92 982.41 3.24
-12.92 982.41 -11.19 980.68 1.20
-0.32 4.44 -4.76
-11.19 980.68 -0.31 980.20 -4.45 -11.19 980.68 -10.12 979.61 -0.76
-0.31 980.20 0.00 980.19 -0.20 -10.12 979.61 -7.12 976.61 -8.23
0.00 980.19 0.97 980.17 -0.65 -7.12 976.61 0.00 976.61 -30.21
Página 18
26. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
0.97 980.17 10.52 980.01 -7.27 0.00 976.61 7.12 976.61 -30.21
7.12 976.61 10.12 979.61 -8.23
10.12 979.61 10.52 980.01 -0.42
-12.57 -78.04 65.47
10.52 980.01 15.00 979.93 -3.94 10.52 980.01 12.92 982.41 0.86
12.92 982.41 15.00 982.41 3.24
-3.94 4.09 -8.04
TOTAL AREAS(M2): 65.47 -12.80
1+260.00 -15.09 980.79 -11.18 980.62 -0.34 -15.09 982.36 -12.92 982.36 3.41
-12.92 982.36 -11.18 980.62 1.22
-0.34 4.62 -4.96
-11.18 980.62 -0.33 980.13 -4.50 -11.18 980.62 -10.12 979.56 -0.74
-0.33 980.13 0.00 980.12 -0.22 -10.12 979.56 -7.12 976.56 -8.19
0.00 980.12 0.88 980.11 -0.60 -7.12 976.56 0.00 976.56 -30.13
0.88 980.11 10.52 979.96 -7.30 0.00 976.56 7.12 976.56 -30.13
7.12 976.56 10.12 979.56 -8.19
10.12 979.56 10.52 979.96 -0.41
-12.62 -77.80 65.18
10.52 979.96 14.90 979.89 -3.79 10.52 979.96 12.92 982.36 0.88
12.92 982.36 14.90 982.36 3.11
-3.79 3.99 -7.78
TOTAL AREAS(M2): 65.18 -12.75
1+280.00 -14.21 980.72 -11.20 980.58 -0.20 -14.21 982.31 -12.92 982.31 2.05
-12.92 982.31 -11.20 980.58 1.25
-0.20 3.30 -3.50
-11.20 980.58 -0.77 980.11 -3.87 -11.20 980.58 -10.12 979.51 -0.73
-0.77 980.11 0.00 980.08 -0.48 -10.12 979.51 -7.12 976.51 -8.14
0.00 980.08 0.73 980.07 -0.47 -7.12 976.51 0.00 976.51 -29.99
0.73 980.07 10.57 979.95 -6.95 0.00 976.51 7.12 976.51 -29.99
7.12 976.51 10.12 979.51 -8.14
10.12 979.51 10.57 979.95 -0.44
-11.78 -77.41 65.64
10.57 979.95 16.88 979.88 -5.08 10.57 979.95 12.92 982.31 0.97
16.88 979.88 17.75 979.87 -0.74 12.92 982.31 15.32 982.31 3.81
15.32 982.31 17.75 979.87 0.90
-5.82 5.68 -11.50
TOTAL AREAS(M2): 65.64 -15.00
1+300.00 -15.07 980.65 -11.16 980.49 -0.31 -15.07 982.25 -12.92 982.25 3.46
-12.92 982.25 -11.16 980.49 1.28
-0.31 4.73 -5.04
-11.16 980.49 -0.79 980.07 -3.81 -11.16 980.49 -10.12 979.45 -0.70
-0.79 980.07 0.00 980.04 -0.47 -10.12 979.45 -7.12 976.45 -8.08
0.00 980.04 0.72 980.03 -0.44 -7.12 976.45 0.00 976.45 -29.86
0.72 980.03 10.58 979.91 -6.67 0.00 976.45 7.12 976.45 -29.86
7.12 976.45 10.12 979.45 -8.08
10.12 979.45 10.58 979.91 -0.44
-11.39 -77.02 65.64
10.58 979.91 14.93 979.86 -3.32 10.58 979.91 12.92 982.25 1.02
14.93 979.86 15.81 979.86 -0.69 12.92 982.25 15.32 982.25 3.86
15.32 982.25 15.81 981.77 0.66
Página 19
27. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-4.00 5.54 -9.54
TOTAL AREAS(M2): 65.64 -14.59
1+320.00 -14.62 980.61 -11.19 980.47 -0.23 -14.62 982.20 -12.92 982.20 2.72
-12.92 982.20 -11.19 980.47 1.26
-0.23 3.98 -4.21
-11.19 980.47 -0.97 980.07 -3.46 -11.19 980.47 -10.12 979.40 -0.72
-0.97 980.07 0.00 980.03 -0.54 -10.12 979.40 -7.12 976.40 -8.12
0.00 980.03 0.65 980.02 -0.38 -7.12 976.40 0.00 976.40 -29.94
0.65 980.02 10.62 979.90 -6.45 0.00 976.40 7.12 976.40 -29.94
7.12 976.40 10.12 979.40 -8.12
10.12 979.40 10.62 979.90 -0.48
-10.83 -77.32 66.49
10.62 979.90 15.43 979.84 -3.54 10.62 979.90 12.92 982.20 1.02
12.92 982.20 15.32 982.20 3.83
15.32 982.20 15.43 982.09 0.16
-3.54 5.01 -8.55
TOTAL AREAS(M2): 66.49 -12.77
1+340.00 -15.00 980.56 -11.20 980.43 -0.26 -15.00 982.15 -12.92 982.15 3.30
-12.92 982.15 -11.20 980.43 1.25
-0.26 4.55 -4.81
-11.20 980.43 -0.97 980.06 -3.25 -11.20 980.43 -10.12 979.35 -0.73
-0.97 980.06 0.00 980.03 -0.50 -10.12 979.35 -7.12 976.35 -8.14
0.00 980.03 0.65 980.02 -0.35 -7.12 976.35 0.00 976.35 -29.99
0.65 980.02 10.65 979.88 -6.10 0.00 976.35 7.12 976.35 -29.99
7.12 976.35 10.12 979.35 -8.14
10.12 979.35 10.65 979.88 -0.51
-10.20 -77.50 67.30
10.65 979.88 15.00 979.83 -3.07 10.65 979.88 12.92 982.15 1.03
12.92 982.15 15.00 982.15 3.30
-3.07 4.33 -7.41
TOTAL AREAS(M2): 67.30 -12.21
1+360.00 -15.00 980.48 -11.17 980.35 -0.24 -15.00 982.10 -12.92 982.10 3.37
-12.92 982.10 -11.17 980.35 1.30
-0.24 4.68 -4.91
-11.17 980.35 -0.97 980.02 -2.98 -11.17 980.35 -10.12 979.30 -0.69
-0.97 980.02 0.00 979.99 -0.46 -10.12 979.30 -7.12 976.30 -8.04
0.00 979.99 0.65 979.98 -0.32 -7.12 976.30 0.00 976.30 -29.76
0.65 979.98 10.67 979.85 -5.65 0.00 976.30 7.12 976.30 -29.76
7.12 976.30 10.12 979.30 -8.04
10.12 979.30 10.67 979.85 -0.50
-9.41 -76.78 67.37
10.67 979.85 15.00 979.79 -2.85 10.67 979.85 12.92 982.10 1.11
12.92 982.10 15.00 982.10 3.37
-2.85 4.48 -7.34
TOTAL AREAS(M2): 67.37 -12.25
1+380.00 -15.00 980.42 -11.18 980.30 -0.23 -15.00 982.05 -12.92 982.05 3.38
-12.92 982.05 -11.18 980.30 1.31
-0.23 4.69 -4.92
-11.18 980.30 -0.97 979.99 -2.81 -11.18 980.30 -10.12 979.25 -0.68
-0.97 979.99 0.00 979.96 -0.44 -10.12 979.25 -7.12 976.25 -8.03
Página 20
28. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
0.00 979.96 0.66 979.95 -0.31 -7.12 976.25 0.00 976.25 -29.73
0.66 979.95 10.67 979.79 -5.52 0.00 976.25 7.12 976.25 -29.73
7.12 976.25 10.12 979.25 -8.03
10.12 979.25 10.67 979.79 -0.49
-9.07 -76.68 67.62
10.67 979.79 15.00 979.72 -2.87 10.67 979.79 12.92 982.05 1.12
12.92 982.05 15.00 982.05 3.38
-2.87 4.50 -7.38
TOTAL AREAS(M2): 67.62 -12.29
1+400.00 -15.01 980.35 -11.16 980.23 -0.23 -15.01 981.99 -12.92 981.99 3.42
-12.92 981.99 -11.16 980.23 1.34
-0.23 4.76 -4.99
-11.16 980.23 -1.00 979.92 -2.82 -11.16 980.23 -10.12 979.19 -0.66
-1.00 979.92 0.00 979.89 -0.45 -10.12 979.19 -7.12 976.19 -7.98
0.00 979.89 0.64 979.88 -0.30 -7.12 976.19 0.00 976.19 -29.61
0.64 979.88 10.67 979.74 -5.42 0.00 976.19 7.12 976.19 -29.61
7.12 976.19 10.12 979.19 -7.98
10.12 979.19 10.67 979.74 -0.49
-8.98 -76.33 67.35
10.67 979.74 15.00 979.69 -2.76 10.67 979.74 12.92 981.99 1.16
12.92 981.99 15.00 981.99 3.41
-2.76 4.57 -7.33
TOTAL AREAS(M2): 67.35 -12.32
1+420.00 -14.81 980.27 -11.14 980.16 -0.20 -14.81 981.94 -12.92 981.94 3.17
-12.92 981.94 -11.14 980.16 1.40
-0.20 4.57 -4.77
-11.14 980.16 -1.12 979.86 -2.58 -11.14 980.16 -10.12 979.14 -0.63
-1.12 979.86 0.00 979.83 -0.47 -10.12 979.14 -7.12 976.14 -7.87
0.00 979.83 0.61 979.82 -0.27 -7.12 976.14 0.00 976.14 -29.36
0.61 979.82 10.68 979.70 -5.08 0.00 976.14 7.12 976.14 -29.36
7.12 976.14 10.12 979.14 -7.87
10.12 979.14 10.68 979.70 -0.47
-8.40 -75.57 67.17
10.68 979.70 15.17 979.65 -2.65 10.68 979.70 12.92 981.94 1.25
12.92 981.94 15.17 981.94 3.77
-2.65 5.02 -7.67
TOTAL AREAS(M2): 67.17 -12.43
1+440.00 -14.96 980.18 -11.11 980.08 -0.19 -14.96 981.89 -12.92 981.89 3.49
-12.92 981.89 -11.11 980.08 1.46
-0.19 4.95 -5.13
-11.11 980.08 -1.15 979.83 -2.24 -11.11 980.08 -10.12 979.09 -0.59
-1.15 979.83 0.00 979.80 -0.42 -10.12 979.09 -7.12 976.09 -7.77
0.00 979.80 0.60 979.79 -0.23 -7.12 976.09 0.00 976.09 -29.11
0.60 979.79 10.68 979.65 -4.63 0.00 976.09 7.12 976.09 -29.11
7.12 976.09 10.12 979.09 -7.77
10.12 979.09 10.68 979.65 -0.45
-7.52 -74.79 67.26
10.68 979.65 15.03 979.59 -2.45 10.68 979.65 12.92 981.89 1.32
12.92 981.89 15.03 981.89 3.62
-2.45 4.94 -7.39
Página 21
29. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
TOTAL AREAS(M2): 67.26 -12.52
1+460.00 -15.00 980.15 -11.13 980.05 -0.19 -15.00 981.84 -12.92 981.84 3.50
-12.92 981.84 -11.13 980.05 1.42
-0.19 4.92 -5.11
-11.13 980.05 -1.12 979.80 -2.25 -11.13 980.05 -10.12 979.04 -0.61
-1.12 979.80 0.00 979.77 -0.41 -10.12 979.04 -7.12 976.04 -7.84
0.00 979.77 0.61 979.76 -0.24 -7.12 976.04 0.00 976.04 -29.28
0.61 979.76 10.69 979.61 -4.70 0.00 976.04 7.12 976.04 -29.28
7.12 976.04 10.12 979.04 -7.84
10.12 979.04 10.69 979.61 -0.47
-7.60 -75.30 67.70
10.69 979.61 15.01 979.54 -2.49 10.69 979.61 12.92 981.84 1.28
12.92 981.84 15.01 981.84 3.52
-2.49 4.80 -7.29
TOTAL AREAS(M2): 67.70 -12.40
1+480.00 -15.20 980.10 -11.12 979.99 -0.23 -15.20 981.79 -12.92 981.79 3.84
-12.92 981.79 -11.12 979.99 1.42
-0.23 5.26 -5.49
-11.12 979.99 -1.04 979.71 -2.54 -11.12 979.99 -10.12 978.99 -0.61
-1.04 979.71 0.00 979.68 -0.42 -10.12 978.99 -7.12 975.99 -7.84
0.00 979.68 0.64 979.67 -0.27 -7.12 975.99 0.00 975.99 -29.28
0.64 979.67 10.69 979.56 -4.86 0.00 975.99 7.12 975.99 -29.28
7.12 975.99 10.12 978.99 -7.84
10.12 978.99 10.69 979.56 -0.47
-8.09 -75.32 67.22
10.69 979.56 14.86 979.51 -2.35 10.69 979.56 12.92 981.79 1.28
12.92 981.79 14.86 981.79 3.27
-2.35 4.55 -6.90
TOTAL AREAS(M2): 67.22 -12.39
1+500.00 -15.02 980.07 -11.13 979.95 -0.24 -15.02 981.73 -12.92 981.73 3.49
-12.92 981.73 -11.13 979.95 1.38
-0.24 4.87 -5.11
-11.13 979.95 -1.39 979.63 -2.74 -11.13 979.95 -10.12 978.93 -0.64
-1.39 979.63 0.00 979.59 -0.64 -10.12 978.93 -7.12 975.93 -7.91
0.00 979.59 0.53 979.59 -0.26 -7.12 975.93 0.00 975.93 -29.45
0.53 979.59 10.71 979.52 -5.25 0.00 975.93 7.12 975.93 -29.45
7.12 975.93 10.12 978.93 -7.91
10.12 978.93 10.71 979.52 -0.50
-8.88 -75.84 66.96
10.71 979.52 15.10 979.50 -2.46 10.71 979.52 12.92 981.73 1.24
15.10 979.50 16.65 979.49 -0.90 12.92 981.73 15.32 981.73 3.99
15.32 981.73 16.65 980.40 1.33
-3.35 6.56 -9.91
TOTAL AREAS(M2): 66.96 -15.02
1+520.00 -15.03 980.05 -15.01 980.05 0.00 -15.03 981.68 -12.92 981.68 3.45
-15.01 980.05 -14.49 980.03 0.00 -12.92 981.68 -11.15 979.92 1.33
-14.49 980.03 -11.15 979.92 -0.25
-0.26 4.78 -5.03
-11.15 979.92 0.00 979.54 -3.60 -11.15 979.92 -10.12 978.88 -0.67
0.00 979.54 0.67 979.53 -0.35 -10.12 978.88 -7.12 975.88 -8.00
Página 22
30. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
0.67 979.53 10.72 979.49 -5.42 -7.12 975.88 0.00 975.88 -29.66
0.00 975.88 7.12 975.88 -29.66
7.12 975.88 10.12 978.88 -8.00
10.12 978.88 10.72 979.49 -0.52
-9.36 -76.51 67.15
10.72 979.49 15.01 979.47 -2.46 10.72 979.49 12.92 981.68 1.18
15.01 979.47 17.55 979.45 -1.50 12.92 981.68 15.32 981.68 3.92
15.32 981.68 17.55 979.45 1.16
-3.95 6.26 -10.21
TOTAL AREAS(M2): 67.15 -15.24
1+540.00 -15.90 980.01 -15.13 979.99 -0.01 -15.90 981.05 -15.32 981.63 0.77
-15.13 979.99 -11.14 979.85 -0.34 -15.32 981.63 -12.92 981.63 3.90
-12.92 981.63 -11.14 979.85 1.31
-0.35 5.97 -6.32
-11.14 979.85 -8.52 979.76 -0.54 -11.14 979.85 -10.12 978.83 -0.68
-8.52 979.76 0.00 979.45 -3.45 -10.12 978.83 -7.12 975.83 -8.03
0.00 979.45 0.74 979.45 -0.42 -7.12 975.83 0.00 975.83 -29.73
0.74 979.45 10.69 979.40 -5.80 0.00 975.83 7.12 975.83 -29.73
7.12 975.83 10.12 978.83 -8.03
10.12 978.83 10.69 979.40 -0.51
-10.20 -76.71 66.51
10.69 979.40 15.05 979.38 -2.69 10.69 979.40 12.92 981.63 1.13
15.05 979.38 15.26 979.38 -0.13 12.92 981.63 15.26 981.63 3.80
-2.82 4.93 -7.75
TOTAL AREAS(M2): 66.51 -14.08
1+560.00 -15.00 979.96 -11.16 979.82 -0.28 -15.00 981.58 -12.92 981.58 3.37
-12.92 981.58 -11.16 979.82 1.30
-0.28 4.68 -4.95
-11.16 979.82 -0.76 979.43 -3.51 -11.16 979.82 -10.12 978.78 -0.69
-0.76 979.43 0.00 979.40 -0.41 -10.12 978.78 -7.12 975.78 -8.04
0.00 979.40 10.73 979.38 -6.09 -7.12 975.78 0.00 975.78 -29.77
0.00 975.78 7.12 975.78 -29.77
7.12 975.78 10.12 978.78 -8.04
10.12 978.78 10.73 979.38 -0.53
-10.02 -76.83 66.82
10.73 979.38 14.85 979.38 -2.38 10.73 979.38 12.92 981.58 1.15
14.85 979.38 15.01 979.38 -0.09 12.92 981.58 15.32 981.58 3.89
15.01 979.38 16.63 979.37 -0.95 15.32 981.58 16.63 980.27 1.26
-3.42 6.30 -9.71
TOTAL AREAS(M2): 66.82 -14.66
1+580.00 -15.05 979.95 -15.01 979.95 0.00 -15.05 981.53 -12.92 981.53 3.37
-15.01 979.95 -14.30 979.92 -0.01 -12.92 981.53 -11.19 979.80 1.24
-14.30 979.92 -11.19 979.80 -0.27
-0.28 4.61 -4.90
-11.19 979.80 0.00 979.35 -4.18 -11.19 979.80 -10.12 978.73 -0.73
0.00 979.35 0.74 979.35 -0.44 -10.12 978.73 -7.12 975.73 -8.15
0.74 979.35 10.75 979.36 -5.94 -7.12 975.73 0.00 975.73 -30.03
0.00 975.73 7.12 975.73 -30.03
7.12 975.73 10.12 978.73 -8.15
10.12 978.73 10.75 979.36 -0.57
Página 23
31. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-10.56 -77.68 67.11
10.75 979.36 15.01 979.37 -2.48 10.75 979.36 12.92 981.53 1.08
12.92 981.53 15.01 981.53 3.30
-2.48 4.38 -6.86
TOTAL AREAS(M2): 67.11 -11.76
1+600.00 -16.01 979.88 -15.06 979.86 -0.01 -16.01 980.79 -15.32 981.48 0.87
-15.06 979.86 -11.16 979.72 -0.35 -15.32 981.48 -12.92 981.48 3.84
-12.92 981.48 -11.16 979.72 1.26
-0.35 5.97 -6.32
-11.16 979.72 -9.46 979.66 -0.32 -11.16 979.72 -10.12 978.68 -0.71
-9.46 979.66 0.00 979.33 -3.65 -10.12 978.68 -7.12 975.68 -8.11
0.00 979.33 0.81 979.33 -0.45 -7.12 975.68 0.00 975.68 -29.92
0.81 979.33 10.74 979.30 -5.67 0.00 975.68 7.12 975.68 -29.92
7.12 975.68 10.12 978.68 -8.11
10.12 978.68 10.74 979.30 -0.55
-10.08 -77.30 67.22
10.74 979.30 15.00 979.28 -2.52 10.74 979.30 12.92 981.48 1.11
12.92 981.48 15.00 981.48 3.32
-2.52 4.43 -6.95
TOTAL AREAS(M2): 67.22 -13.27
1+620.00 -15.06 979.81 -14.96 979.81 0.00 -15.06 981.43 -12.92 981.43 3.47
-14.96 979.81 -11.17 979.68 -0.25 -12.92 981.43 -11.17 979.68 1.31
-0.25 4.78 -5.03
-11.17 979.68 0.00 979.32 -3.47 -11.17 979.68 -10.12 978.63 -0.68
0.00 979.32 0.80 979.31 -0.39 -10.12 978.63 -7.12 975.63 -8.03
0.80 979.31 10.75 979.26 -5.20 -7.12 975.63 0.00 975.63 -29.74
0.00 975.63 7.12 975.63 -29.74
7.12 975.63 10.12 978.63 -8.03
10.12 978.63 10.75 979.26 -0.54
-9.06 -76.77 67.71
10.75 979.26 15.07 979.24 -2.40 10.75 979.26 12.92 981.43 1.17
15.07 979.24 15.20 979.25 -0.08 12.92 981.43 15.20 981.43 3.71
-2.48 4.87 -7.35
TOTAL AREAS(M2): 67.71 -12.38
1+640.00 -15.66 979.77 -15.12 979.77 0.00 -15.66 981.05 -15.32 981.38 0.49
-15.12 979.77 -11.16 979.63 -0.28 -15.32 981.38 -12.92 981.38 3.88
-12.92 981.38 -11.16 979.63 1.29
-0.28 5.66 -5.94
-11.16 979.63 -0.90 979.26 -3.33 -11.16 979.63 -10.12 978.58 -0.69
-0.90 979.26 0.00 979.23 -0.47 -10.12 978.58 -7.12 975.58 -8.05
0.00 979.23 10.72 979.19 -6.04 -7.12 975.58 0.00 975.58 -29.79
0.00 975.58 7.12 975.58 -29.79
7.12 975.58 10.12 978.58 -8.05
10.12 978.58 10.72 979.19 -0.53
-9.84 -76.92 67.08
10.72 979.19 11.88 979.18 -0.68 10.72 979.19 12.92 981.38 1.14
11.88 979.18 14.94 979.17 -1.81 12.92 981.38 15.32 981.38 3.88
14.94 979.17 15.16 979.17 -0.13 15.32 981.38 16.59 980.11 1.25
15.16 979.17 16.59 979.21 -0.83
-3.45 6.26 -9.71
Página 24
32. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
TOTAL AREAS(M2): 67.08 -15.65
1+660.00 -16.89 979.76 -15.57 979.76 0.00 -16.89 979.76 -15.32 981.34 1.23
-15.57 979.76 -13.89 979.70 -0.06 -15.32 981.34 -12.92 981.34 3.77
-13.89 979.70 -11.18 979.60 -0.31 -12.92 981.34 -11.18 979.60 1.22
-0.37 6.22 -6.59
-11.18 979.60 -5.12 979.36 -1.73 -11.18 979.60 -10.12 978.54 -0.74
-5.12 979.36 0.00 979.15 -2.62 -10.12 978.54 -7.12 975.54 -8.19
0.00 979.15 1.25 979.14 -0.78 -7.12 975.54 0.00 975.54 -30.11
1.25 979.14 10.73 979.15 -5.89 0.00 975.54 7.12 975.54 -30.11
7.12 975.54 10.12 978.54 -8.19
10.12 978.54 10.73 979.15 -0.56
-11.01 -77.90 66.89
10.73 979.15 15.14 979.15 -2.74 10.73 979.15 12.92 981.34 1.04
12.92 981.34 15.14 981.34 3.49
-2.74 4.54 -7.28
TOTAL AREAS(M2): 66.89 -13.87
1+680.00 -16.85 979.76 -16.29 979.76 0.00 -16.85 979.76 -15.32 981.29 1.17
-16.29 979.76 -11.19 979.56 -0.52 -15.32 981.29 -12.92 981.29 3.66
-12.92 981.29 -11.19 979.56 1.15
-0.52 5.98 -6.50
-11.19 979.56 -2.76 979.23 -3.10 -11.19 979.56 -10.12 978.49 -0.79
-2.76 979.23 0.00 979.11 -1.64 -10.12 978.49 -7.12 975.49 -8.32
0.00 979.11 1.86 979.10 -1.22 -7.12 975.49 0.00 975.49 -30.42
1.86 979.10 10.71 979.08 -5.94 0.00 975.49 7.12 975.49 -30.42
7.12 975.49 10.12 978.49 -8.32
10.12 978.49 10.71 979.08 -0.58
-11.89 -78.85 66.96
10.71 979.08 14.82 979.07 -2.84 10.71 979.08 12.92 981.29 0.93
12.92 981.29 14.82 981.29 2.89
-2.84 3.82 -6.66
TOTAL AREAS(M2): 66.96 -13.16
1+700.00 -15.00 979.72 -11.23 979.55 -0.31 -15.00 981.24 -12.92 981.24 3.16
-12.92 981.24 -11.23 979.55 1.14
-0.31 4.31 -4.62
-11.23 979.55 -2.76 979.18 -3.00 -11.23 979.55 -10.12 978.44 -0.80
-2.76 979.18 0.00 979.06 -1.66 -10.12 978.44 -7.12 975.44 -8.34
0.00 979.06 1.86 979.06 -1.24 -7.12 975.44 0.00 975.44 -30.47
1.86 979.06 10.73 979.05 -5.89 0.00 975.44 7.12 975.44 -30.47
7.12 975.44 10.12 978.44 -8.34
10.12 978.44 10.73 979.05 -0.60
-11.80 -79.01 67.21
10.73 979.05 15.00 979.05 -2.85 10.73 979.05 12.92 981.24 0.93
12.92 981.24 15.00 981.24 3.16
-2.85 4.10 -6.95
TOTAL AREAS(M2): 67.21 -11.57
1+720.00 -15.00 979.67 -11.22 979.50 -0.32 -15.00 981.19 -12.92 981.19 3.17
-12.92 981.19 -11.22 979.50 1.15
-0.32 4.33 -4.64
-11.22 979.50 -2.76 979.12 -3.03 -11.22 979.50 -10.12 978.39 -0.80
-2.76 979.12 0.00 978.99 -1.68 -10.12 978.39 -7.12 975.39 -8.32
Página 25
33. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
0.00 978.99 1.86 979.00 -1.25 -7.12 975.39 0.00 975.39 -30.43
1.86 979.00 10.73 979.01 -5.89 0.00 975.39 7.12 975.39 -30.43
7.12 975.39 10.12 978.39 -8.32
10.12 978.39 10.73 979.01 -0.59
-11.85 -78.89 67.03
10.73 979.01 15.00 979.01 -2.80 10.73 979.01 12.92 981.19 0.95
12.92 981.19 15.00 981.19 3.17
-2.80 4.12 -6.93
TOTAL AREAS(M2): 67.03 -11.57
1+740.00 -15.00 979.62 -11.21 979.44 -0.34 -15.00 981.14 -12.92 981.14 3.18
-12.92 981.14 -11.21 979.44 1.15
-0.34 4.33 -4.67
-11.21 979.44 -2.76 979.04 -3.21 -11.21 979.44 -10.12 978.34 -0.79
-2.76 979.04 0.00 978.91 -1.78 -10.12 978.34 -7.12 975.34 -8.31
0.00 978.91 1.86 978.92 -1.31 -7.12 975.34 0.00 975.34 -30.41
1.86 978.92 10.73 978.96 -6.03 0.00 975.34 7.12 975.34 -30.41
7.12 975.34 10.12 978.34 -8.31
10.12 978.34 10.73 978.96 -0.59
-12.32 -78.84 66.52
10.73 978.96 15.00 978.98 -2.78 10.73 978.96 12.92 981.14 0.95
12.92 981.14 15.00 981.14 3.18
-2.78 4.13 -6.91
TOTAL AREAS(M2): 66.52 -11.58
1+760.00 -15.00 979.59 -11.24 979.41 -0.32 -15.00 981.10 -12.92 981.10 3.14
-12.92 981.10 -11.24 979.41 1.13
-0.32 4.27 -4.59
-11.24 979.41 -2.76 979.03 -3.11 -11.24 979.41 -10.12 978.30 -0.82
-2.76 979.03 0.00 978.89 -1.73 -10.12 978.30 -7.12 975.30 -8.37
0.00 978.89 1.86 978.91 -1.28 -7.12 975.30 0.00 975.30 -30.54
1.86 978.91 10.77 978.95 -5.87 0.00 975.30 7.12 975.30 -30.54
7.12 975.30 10.12 978.30 -8.37
10.12 978.30 10.77 978.95 -0.63
-12.00 -79.27 67.27
10.77 978.95 15.00 978.97 -2.67 10.77 978.95 12.92 981.10 0.94
12.92 981.10 15.00 981.10 3.14
-2.67 4.08 -6.74
TOTAL AREAS(M2): 67.27 -11.34
1+780.00 -15.00 979.54 -11.22 979.35 -0.35 -15.00 981.05 -12.92 981.05 3.14
-12.92 981.05 -11.22 979.35 1.12
-0.35 4.26 -4.61
-11.22 979.35 -2.76 978.93 -3.36 -11.22 979.35 -10.12 978.25 -0.82
-2.76 978.93 0.00 978.80 -1.86 -10.12 978.25 -7.12 975.25 -8.37
0.00 978.80 1.86 978.81 -1.37 -7.12 975.25 0.00 975.25 -30.55
1.86 978.81 10.76 978.89 -6.15 0.00 975.25 7.12 975.25 -30.55
7.12 975.25 10.12 978.25 -8.37
10.12 978.25 10.76 978.89 -0.62
-12.75 -79.28 66.53
10.76 978.89 15.00 978.92 -2.70 10.76 978.89 12.92 981.05 0.92
12.92 981.05 15.00 981.05 3.14
-2.70 4.06 -6.76
Página 26
34. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
TOTAL AREAS(M2): 66.53 -11.38
1+800.00 -15.00 979.45 -11.19 979.27 -0.34 -15.00 981.00 -12.92 981.00 3.22
-12.92 981.00 -11.19 979.27 1.18
-0.34 4.40 -4.75
-11.19 979.27 -2.76 978.87 -3.20 -11.19 979.27 -10.12 978.20 -0.77
-2.76 978.87 0.00 978.75 -1.77 -10.12 978.20 -7.12 975.20 -8.26
0.00 978.75 1.86 978.76 -1.30 -7.12 975.20 0.00 975.20 -30.27
1.86 978.76 10.75 978.83 -5.85 0.00 975.20 7.12 975.20 -30.27
7.12 975.20 10.12 978.20 -8.26
10.12 978.20 10.75 978.83 -0.59
-12.12 -78.42 66.29
10.75 978.83 15.00 978.86 -2.59 10.75 978.83 12.92 981.00 1.00
12.92 981.00 15.00 981.00 3.22
-2.59 4.22 -6.81
TOTAL AREAS(M2): 66.29 -11.55
1+820.00 -16.80 979.38 -14.93 979.37 -0.02 -16.80 979.47 -15.32 980.95 1.23
-14.93 979.37 -11.17 979.21 -0.37 -15.32 980.95 -12.92 980.95 3.77
-12.92 980.95 -11.17 979.21 1.22
-0.38 6.21 -6.60
-11.17 979.21 -2.27 978.83 -3.27 -11.17 979.21 -10.12 978.15 -0.74
-2.27 978.83 0.00 978.72 -1.38 -10.12 978.15 -7.12 975.15 -8.19
0.00 978.72 2.23 978.74 -1.45 -7.12 975.15 0.00 975.15 -30.12
2.23 978.74 10.77 978.80 -5.22 0.00 975.15 7.12 975.15 -30.12
7.12 975.15 10.12 978.15 -8.19
10.12 978.15 10.77 978.80 -0.59
-11.32 -77.94 66.62
10.77 978.80 15.18 978.83 -2.51 10.77 978.80 12.92 980.95 1.06
12.92 980.95 15.18 980.95 3.55
-2.51 4.61 -7.12
TOTAL AREAS(M2): 66.62 -13.72
1+840.00 -16.90 979.32 -16.20 979.32 -0.01 -16.90 979.32 -15.32 980.91 1.23
-16.20 979.32 -11.13 979.11 -0.62 -15.32 980.91 -12.92 980.91 3.77
-12.92 980.91 -11.13 979.11 1.21
-0.63 6.20 -6.83
-11.13 979.11 -2.08 978.74 -3.69 -11.13 979.11 -10.12 978.11 -0.73
-2.08 978.74 -0.17 978.66 -1.21 -10.12 978.11 -7.12 975.11 -8.19
-0.17 978.66 3.85 978.69 -2.68 -7.12 975.11 0.00 975.11 -30.12
3.85 978.69 10.76 978.75 -4.28 0.00 975.11 7.12 975.11 -30.12
7.12 975.11 10.12 978.11 -8.19
10.12 978.11 10.76 978.75 -0.58
-11.87 -77.95 66.08
10.76 978.75 14.26 978.78 -2.02 10.76 978.75 12.92 980.91 1.06
12.92 980.91 14.26 980.91 2.10
-2.02 3.16 -5.17
TOTAL AREAS(M2): 66.08 -12.00
1+860.00 -16.94 979.24 -11.05 978.98 -1.00 -16.94 979.24 -15.32 980.86 1.24
-15.32 980.86 -12.92 980.86 3.78
-12.92 980.86 -11.05 978.98 1.20
-1.00 6.21 -7.21
-11.05 978.98 -4.68 978.71 -2.79 -11.05 978.98 -10.12 978.06 -0.71
Página 27
35. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
-4.68 978.71 -2.41 978.61 -1.42 -10.12 978.06 -7.12 975.06 -8.18
-2.41 978.61 2.10 978.63 -3.00 -7.12 975.06 0.00 975.06 -30.09
2.10 978.63 10.75 978.69 -5.40 0.00 975.06 7.12 975.06 -30.09
7.12 975.06 10.12 978.06 -8.18
10.12 978.06 10.75 978.69 -0.57
-12.60 -77.80 65.20
10.75 978.69 12.58 978.70 -1.08 10.75 978.69 12.58 980.52 0.59
-1.08 0.59 -1.67
TOTAL AREAS(M2): 65.20 -8.88
1+880.00 -15.03 979.25 -11.19 979.07 -0.34 -15.03 980.81 -12.92 980.81 3.28
-12.92 980.81 -11.19 979.07 1.20
-0.34 4.48 -4.82
-11.19 979.07 -0.78 978.59 -4.35 -11.19 979.07 -10.12 978.01 -0.76
-0.78 978.59 0.00 978.56 -0.53 -10.12 978.01 -7.12 975.01 -8.23
0.00 978.56 9.41 978.59 -6.37 -7.12 975.01 0.00 975.01 -30.21
9.41 978.59 10.71 978.60 -0.85 0.00 975.01 7.12 975.01 -30.21
7.12 975.01 10.12 978.01 -8.23
10.12 978.01 10.71 978.60 -0.56
-12.11 -78.20 66.09
10.71 978.60 15.00 978.61 -2.78 10.71 978.60 12.92 980.81 1.00
12.92 980.81 15.00 980.81 3.24
-2.78 4.23 -7.02
TOTAL AREAS(M2): 66.09 -11.84
1+900.00 -15.00 979.20 -11.19 979.03 -0.32 -15.00 980.76 -12.92 980.76 3.25
-12.92 980.76 -11.19 979.03 1.21
-0.32 4.46 -4.78
-11.19 979.03 -0.76 978.57 -4.13 -11.19 979.03 -10.12 977.96 -0.75
-0.76 978.57 0.00 978.54 -0.49 -10.12 977.96 -7.12 974.96 -8.21
0.00 978.54 10.73 978.57 -6.89 -7.12 974.96 0.00 974.96 -30.15
0.00 974.96 7.12 974.96 -30.15
7.12 974.96 10.12 977.96 -8.21
10.12 977.96 10.73 978.57 -0.57
-11.51 -78.03 66.52
10.73 978.57 14.66 978.58 -2.45 10.73 978.57 12.92 980.76 1.03
14.66 978.58 15.00 978.58 -0.21 12.92 980.76 15.00 980.76 3.25
-2.66 4.27 -6.93
TOTAL AREAS(M2): 66.52 -11.71
1+920.00 -15.00 979.15 -11.20 978.99 -0.30 -15.00 980.71 -12.92 980.71 3.25
-12.92 980.71 -11.20 978.99 1.21
-0.30 4.46 -4.76
-11.20 978.99 -0.79 978.56 -3.87 -11.20 978.99 -10.12 977.91 -0.75
-0.79 978.56 0.00 978.53 -0.48 -10.12 977.91 -7.12 974.91 -8.21
0.00 978.53 10.76 978.55 -6.58 -7.12 974.91 0.00 974.91 -30.17
0.00 974.91 7.12 974.91 -30.17
7.12 974.91 10.12 977.91 -8.21
10.12 977.91 10.76 978.55 -0.59
-10.94 -78.09 67.16
10.76 978.55 12.68 978.56 -1.15 10.76 978.55 12.92 980.71 1.04
12.68 978.56 15.01 978.56 -1.38 12.92 980.71 15.01 980.71 3.26
-2.53 4.30 -6.83
Página 28
36. Areas 12/12/2015 17:15
MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN
Obra: RIO SAN CARLOS
Autor: ORLANDO LEON
AREA(M2)
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN
SEGMENTOS RASANTE
INICIAL FINAL
A2(M2) AREA
BAJO
SEGMENTO
ESTACION
SEGMENTOS TERRENO
INICIAL FINAL
A1(M2) AREA
BAJO
SEGMENTO
TOTAL AREAS(M2): 67.16 -11.59
1+940.00 -14.99 979.14 -11.22 978.97 -0.34 -14.99 980.67 -12.92 980.67 3.15
-12.92 980.67 -11.22 978.97 1.14
-0.34 4.29 -4.63
-11.22 978.97 -0.81 978.48 -4.41 -11.22 978.97 -10.12 977.87 -0.80
-0.81 978.48 0.00 978.44 -0.55 -10.12 977.87 -7.12 974.87 -8.34
0.00 978.44 10.56 978.47 -7.28 -7.12 974.87 0.00 974.87 -30.46
10.56 978.47 10.72 978.47 -0.11 0.00 974.87 7.12 974.87 -30.46
7.12 974.87 10.12 977.87 -8.34
10.12 977.87 10.72 978.47 -0.59
-12.36 -78.99 66.63
10.72 978.47 14.99 978.48 -2.85 10.72 978.47 12.92 980.67 0.93
12.92 980.67 14.99 980.67 3.14
-2.85 4.07 -6.92
TOTAL AREAS(M2): 66.63 -11.55
1+960.00 -15.01 979.09 -11.23 978.92 -0.32 -15.01 980.62 -12.92 980.62 3.19
-12.92 980.62 -11.23 978.92 1.15
-0.32 4.34 -4.66
-11.23 978.92 -0.91 978.47 -4.08 -11.23 978.92 -10.12 977.82 -0.80
-0.91 978.47 0.00 978.43 -0.59 -10.12 977.82 -7.12 974.82 -8.32
0.00 978.43 5.20 978.44 -3.42 -7.12 974.82 0.00 974.82 -30.42
5.20 978.44 10.75 978.45 -3.60 0.00 974.82 7.12 974.82 -30.42
7.12 974.82 10.12 977.82 -8.32
10.12 977.82 10.75 978.45 -0.60
-11.69 -78.89 67.20
10.75 978.45 15.05 978.45 -2.76 10.75 978.45 12.92 980.62 0.96
12.92 980.62 15.05 980.62 3.25
-2.76 4.21 -6.97
TOTAL AREAS(M2): 67.20 -11.63
1+980.00 -15.01 979.02 -11.21 978.86 -0.31 -15.01 980.57 -12.92 980.57 3.23
-12.92 980.57 -11.21 978.86 1.18
-0.31 4.41 -4.72
-11.21 978.86 -1.10 978.42 -3.88 -11.21 978.86 -10.12 977.77 -0.77
-1.10 978.42 0.00 978.38 -0.68 -10.12 977.77 -7.12 974.77 -8.27
0.00 978.38 3.08 978.39 -1.97 -7.12 974.77 0.00 974.77 -30.30
3.08 978.39 10.76 978.41 -4.80 0.00 974.77 7.12 974.77 -30.30
7.12 974.77 10.12 977.77 -8.27
10.12 977.77 10.76 978.41 -0.60
-11.34 -78.51 67.17
10.76 978.41 15.44 978.43 -2.83 10.76 978.41 12.92 980.57 1.00
15.44 978.43 16.49 978.41 -0.64 12.92 980.57 15.32 980.57 3.71
15.32 980.57 16.49 979.40 1.12
-3.47 5.83 -9.30
TOTAL AREAS(M2): 67.17 -14.03
2+000.00 -15.00 978.96 -11.21 978.81 -0.28 -15.00 980.52 -12.92 980.52 3.24
-12.92 980.52 -11.21 978.81 1.21
-0.28 4.45 -4.73
-11.21 978.81 -1.13 978.42 -3.45 -11.21 978.81 -10.12 977.72 -0.76
-1.13 978.42 0.00 978.38 -0.63 -10.12 977.72 -7.12 974.72 -8.22
0.00 978.38 2.80 978.37 -1.63 -7.12 974.72 0.00 974.72 -30.18
Página 29