Mongolia’s expected power requirements until 2015

                 New Approach




                                  Oxford Business Group THE INSIDE EDGE
Paulius Kuncinas



Regional Editor, Asia
Oxford Business Group




                        Oxford Business Group THE INSIDE EDGE
Key Themes:

 •Opportunities for upgrading Mongolia’s existing power plants

 •Plans for introducing new power plants within the near future

 •Introducing new technologies to Mongolian power plants

 •Air cooled power plants




                                                 Oxford Business Group THE INSIDE EDGE
   Main Sources of Demand:

   Rapid Urbanization - Ulaanbaatar

   Mining Sector – Oyu Tolgoy

   New Industries




                                       Oxford Business Group THE INSIDE EDGE
   80% TPPs, 12% imports, 2.5%
    hydro

   Soviet Design

   State Dominated

   CES 95% of the 814-MW

   Last Greenfield in 1991




                                  Oxford Business Group THE INSIDE EDGE
               Available Capacity (MW)

                                  TPP2                      17.6
   814MW vs 614.3 available
                                  TPP3                      105.1

                                  TPP4                       432
   Unerpowered & Underinvested
                                  Darkhan                   38.6

   Last Investment in 1991       Erdenet                     21

                                                                

                                  Total                     614.3




                                            Oxford Business Group THE INSIDE EDGE
   CES - 95% of 814-MW

   CES - 220KV line to Russia

   100% Coal-fired




                                 Oxford Business Group THE INSIDE EDGE
   TPPs account for 85% of domestic consumption of coal

   Tariffs set below market price

   Tariff for sale to the TPPs is $14.04 vs $ 17 production cost




                                                     Oxford Business Group THE INSIDE EDGE
   Upgrading Existing TPPs

   New TPPs

   Renewables

   Nuclear

   Energy Efficiency




                              Oxford Business Group THE INSIDE EDGE
   Open Minded Policy Makers

   Focus on Clean Coal

   Air Cooling & Water Management

   Energy Efficiency




                                     Oxford Business Group THE INSIDE EDGE
   Establish supply to every settlement

   220MW Hydro on the Egiin River

   TPP 5, w 450-MW electricity and
    587-MW thermal capacity

   Nuclear remains an option




                                           Oxford Business Group THE INSIDE EDGE
   Technological Leapfrog

   Engage Policy Makers

   Superior Investment Opportunity




                                      Oxford Business Group THE INSIDE EDGE
THANK YOU!




             Oxford Business Group THE INSIDE EDGE

More Related Content

Similar to Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

Geoff Hunton Presentation to nesrb
Geoff Hunton   Presentation to nesrbGeoff Hunton   Presentation to nesrb
Geoff Hunton Presentation to nesrb
NESRB
 
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
Leonardo ENERGY
 
Power Generation In Pakistan
Power Generation In PakistanPower Generation In Pakistan
Power Generation In Pakistan
Imad Baig
 
VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships
Vacon Plc
 
View from other industry: resource management, Toini Løvseth, Finnord, Norway
View from other industry: resource management, Toini Løvseth, Finnord, NorwayView from other industry: resource management, Toini Løvseth, Finnord, Norway
View from other industry: resource management, Toini Løvseth, Finnord, Norway
EuropeanPaper
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
guest8c8206
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01  Anne  Hojer  Simonsen  Agencia  Danesa De La  Energia01  Anne  Hojer  Simonsen  Agencia  Danesa De La  Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
guest8c8206
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
guest8c8206
 

Similar to Mongolia's Expected Power Requirements until 2015 - Oxford Business Group (20)

Cal Marine Ltd. scam - executive summary ?- april 2008
Cal Marine Ltd.   scam - executive summary ?- april 2008Cal Marine Ltd.   scam - executive summary ?- april 2008
Cal Marine Ltd. scam - executive summary ?- april 2008
 
Geoff Hunton Presentation to nesrb
Geoff Hunton   Presentation to nesrbGeoff Hunton   Presentation to nesrb
Geoff Hunton Presentation to nesrb
 
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
 
Energy
EnergyEnergy
Energy
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
District cooling - sustainable energy to rely on
District cooling - sustainable energy to rely onDistrict cooling - sustainable energy to rely on
District cooling - sustainable energy to rely on
 
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
 
Power Generation In Pakistan
Power Generation In PakistanPower Generation In Pakistan
Power Generation In Pakistan
 
AEA Solar PV market update at Ecobuild 2012
AEA Solar PV market update at Ecobuild 2012AEA Solar PV market update at Ecobuild 2012
AEA Solar PV market update at Ecobuild 2012
 
VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships
 
AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycle
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO Applications
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
View from other industry: resource management, Toini Løvseth, Finnord, Norway
View from other industry: resource management, Toini Løvseth, Finnord, NorwayView from other industry: resource management, Toini Løvseth, Finnord, Norway
View from other industry: resource management, Toini Løvseth, Finnord, Norway
 
Black & Veatch Power Generation
Black & Veatch Power GenerationBlack & Veatch Power Generation
Black & Veatch Power Generation
 
Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...
Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...
Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01  Anne  Hojer  Simonsen  Agencia  Danesa De La  Energia01  Anne  Hojer  Simonsen  Agencia  Danesa De La  Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
 
Ntpc power plant
Ntpc power plantNtpc power plant
Ntpc power plant
 

More from Oxford Business Group

Asean economic and market demand overview
Asean economic and market demand overviewAsean economic and market demand overview
Asean economic and market demand overview
Oxford Business Group
 
Oxford Business Group - Thailand 2012
Oxford Business Group - Thailand 2012Oxford Business Group - Thailand 2012
Oxford Business Group - Thailand 2012
Oxford Business Group
 
Oxford Business Group - Ras Al Khaimah 2012
Oxford Business Group - Ras Al Khaimah 2012Oxford Business Group - Ras Al Khaimah 2012
Oxford Business Group - Ras Al Khaimah 2012
Oxford Business Group
 
Oxford Business Group - Paupa New Guinea 2012
Oxford Business Group - Paupa New Guinea 2012Oxford Business Group - Paupa New Guinea 2012
Oxford Business Group - Paupa New Guinea 2012
Oxford Business Group
 
Oxford Business Group - South Africa 2012 Report
Oxford Business Group - South Africa 2012 ReportOxford Business Group - South Africa 2012 Report
Oxford Business Group - South Africa 2012 Report
Oxford Business Group
 
Oxford Business Group - Turkey 2012 Report
Oxford Business Group - Turkey 2012 ReportOxford Business Group - Turkey 2012 Report
Oxford Business Group - Turkey 2012 Report
Oxford Business Group
 
Oxford Business Group - South Africa 2012 Report Part 2
Oxford Business Group - South Africa 2012 Report Part 2Oxford Business Group - South Africa 2012 Report Part 2
Oxford Business Group - South Africa 2012 Report Part 2
Oxford Business Group
 
Oxford Business Group - Peru 2012 Report
Oxford Business Group - Peru 2012 ReportOxford Business Group - Peru 2012 Report
Oxford Business Group - Peru 2012 Report
Oxford Business Group
 
Oxford Business Group - Oman 2012 Report
Oxford Business Group - Oman 2012 ReportOxford Business Group - Oman 2012 Report
Oxford Business Group - Oman 2012 Report
Oxford Business Group
 
Oxford Business Group - Mongolia 2012 Report
Oxford Business Group - Mongolia 2012 ReportOxford Business Group - Mongolia 2012 Report
Oxford Business Group - Mongolia 2012 Report
Oxford Business Group
 
Oxford Business Group - Morocco 2012 Report
Oxford Business Group - Morocco 2012 ReportOxford Business Group - Morocco 2012 Report
Oxford Business Group - Morocco 2012 Report
Oxford Business Group
 
Oxford Business Group - Kuwait 2012 Report
Oxford Business Group - Kuwait 2012 ReportOxford Business Group - Kuwait 2012 Report
Oxford Business Group - Kuwait 2012 Report
Oxford Business Group
 
Oxford Business Group - Jordan 2012 Report
Oxford Business Group - Jordan 2012 ReportOxford Business Group - Jordan 2012 Report
Oxford Business Group - Jordan 2012 Report
Oxford Business Group
 
Oxford Business Group - Indonesia 2012 Report
Oxford Business Group - Indonesia 2012 ReportOxford Business Group - Indonesia 2012 Report
Oxford Business Group - Indonesia 2012 Report
Oxford Business Group
 
Oxford Business Group - Bahrain 2012 Report
Oxford Business Group - Bahrain 2012 ReportOxford Business Group - Bahrain 2012 Report
Oxford Business Group - Bahrain 2012 Report
Oxford Business Group
 
Oxford Business Group - Philippines 2012 Report
Oxford Business Group - Philippines 2012 ReportOxford Business Group - Philippines 2012 Report
Oxford Business Group - Philippines 2012 Report
Oxford Business Group
 

More from Oxford Business Group (20)

The Report Ghana 2011
The Report Ghana 2011The Report Ghana 2011
The Report Ghana 2011
 
Agriculture In Nigeria
Agriculture In NigeriaAgriculture In Nigeria
Agriculture In Nigeria
 
Asean economic and market demand overview
Asean economic and market demand overviewAsean economic and market demand overview
Asean economic and market demand overview
 
Oxford Business Group - Thailand 2012
Oxford Business Group - Thailand 2012Oxford Business Group - Thailand 2012
Oxford Business Group - Thailand 2012
 
Oxford Business Group - Ras Al Khaimah 2012
Oxford Business Group - Ras Al Khaimah 2012Oxford Business Group - Ras Al Khaimah 2012
Oxford Business Group - Ras Al Khaimah 2012
 
Oxford Business Group - Paupa New Guinea 2012
Oxford Business Group - Paupa New Guinea 2012Oxford Business Group - Paupa New Guinea 2012
Oxford Business Group - Paupa New Guinea 2012
 
Oxford Business Group - South Africa 2012 Report
Oxford Business Group - South Africa 2012 ReportOxford Business Group - South Africa 2012 Report
Oxford Business Group - South Africa 2012 Report
 
Oxford Business Group - Turkey 2012 Report
Oxford Business Group - Turkey 2012 ReportOxford Business Group - Turkey 2012 Report
Oxford Business Group - Turkey 2012 Report
 
Oxford Business Group - South Africa 2012 Report Part 2
Oxford Business Group - South Africa 2012 Report Part 2Oxford Business Group - South Africa 2012 Report Part 2
Oxford Business Group - South Africa 2012 Report Part 2
 
Oxford Business Group - Peru 2012 Report
Oxford Business Group - Peru 2012 ReportOxford Business Group - Peru 2012 Report
Oxford Business Group - Peru 2012 Report
 
Oxford Business Group - Oman 2012 Report
Oxford Business Group - Oman 2012 ReportOxford Business Group - Oman 2012 Report
Oxford Business Group - Oman 2012 Report
 
Oxford Business Group - Mongolia 2012 Report
Oxford Business Group - Mongolia 2012 ReportOxford Business Group - Mongolia 2012 Report
Oxford Business Group - Mongolia 2012 Report
 
Oxford Business Group - Morocco 2012 Report
Oxford Business Group - Morocco 2012 ReportOxford Business Group - Morocco 2012 Report
Oxford Business Group - Morocco 2012 Report
 
Oxford Business Group - Kuwait 2012 Report
Oxford Business Group - Kuwait 2012 ReportOxford Business Group - Kuwait 2012 Report
Oxford Business Group - Kuwait 2012 Report
 
Oxford Business Group - Jordan 2012 Report
Oxford Business Group - Jordan 2012 ReportOxford Business Group - Jordan 2012 Report
Oxford Business Group - Jordan 2012 Report
 
Oxford Business Group - Indonesia 2012 Report
Oxford Business Group - Indonesia 2012 ReportOxford Business Group - Indonesia 2012 Report
Oxford Business Group - Indonesia 2012 Report
 
Oxford Business Group - Bahrain 2012 Report
Oxford Business Group - Bahrain 2012 ReportOxford Business Group - Bahrain 2012 Report
Oxford Business Group - Bahrain 2012 Report
 
Oxford Business Group - Philippines 2012 Report
Oxford Business Group - Philippines 2012 ReportOxford Business Group - Philippines 2012 Report
Oxford Business Group - Philippines 2012 Report
 
Oxford Business Group Brunei
Oxford Business Group BruneiOxford Business Group Brunei
Oxford Business Group Brunei
 
Oxford Business Group Philippines
Oxford Business Group PhilippinesOxford Business Group Philippines
Oxford Business Group Philippines
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Recently uploaded (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 

Mongolia's Expected Power Requirements until 2015 - Oxford Business Group

  • 1. Mongolia’s expected power requirements until 2015 New Approach Oxford Business Group THE INSIDE EDGE
  • 2. Paulius Kuncinas Regional Editor, Asia Oxford Business Group Oxford Business Group THE INSIDE EDGE
  • 3. Key Themes: •Opportunities for upgrading Mongolia’s existing power plants •Plans for introducing new power plants within the near future •Introducing new technologies to Mongolian power plants •Air cooled power plants Oxford Business Group THE INSIDE EDGE
  • 4. Main Sources of Demand:  Rapid Urbanization - Ulaanbaatar  Mining Sector – Oyu Tolgoy  New Industries Oxford Business Group THE INSIDE EDGE
  • 5. 80% TPPs, 12% imports, 2.5% hydro  Soviet Design  State Dominated  CES 95% of the 814-MW  Last Greenfield in 1991 Oxford Business Group THE INSIDE EDGE
  • 6.   Available Capacity (MW) TPP2 17.6  814MW vs 614.3 available TPP3 105.1 TPP4 432  Unerpowered & Underinvested Darkhan 38.6  Last Investment in 1991 Erdenet 21     Total 614.3 Oxford Business Group THE INSIDE EDGE
  • 7. CES - 95% of 814-MW  CES - 220KV line to Russia  100% Coal-fired Oxford Business Group THE INSIDE EDGE
  • 8. TPPs account for 85% of domestic consumption of coal  Tariffs set below market price  Tariff for sale to the TPPs is $14.04 vs $ 17 production cost Oxford Business Group THE INSIDE EDGE
  • 9. Upgrading Existing TPPs  New TPPs  Renewables  Nuclear  Energy Efficiency Oxford Business Group THE INSIDE EDGE
  • 10. Open Minded Policy Makers  Focus on Clean Coal  Air Cooling & Water Management  Energy Efficiency Oxford Business Group THE INSIDE EDGE
  • 11. Establish supply to every settlement  220MW Hydro on the Egiin River  TPP 5, w 450-MW electricity and 587-MW thermal capacity  Nuclear remains an option Oxford Business Group THE INSIDE EDGE
  • 12. Technological Leapfrog  Engage Policy Makers  Superior Investment Opportunity Oxford Business Group THE INSIDE EDGE
  • 13. THANK YOU! Oxford Business Group THE INSIDE EDGE