4. This model was not the first model to discuss iterative development, but it was the first model to explain why the iteration matters.Software Engineering-I
14. Four Fold Procedure Evaluating the first prototype in terms of its strengths, weaknesses, and risks. Defining the requirements of the second prototype Planning and designing the second prototype Constructing and testing the second prototype Software Engineering-I
15. Phase in spiral model There are four phases in the “SPIRAL MODEL” which are: Plan Risk analysis Engineering Customer evaluation Software Engineering-I
16.
17.
18. This phase identify and resolve all the possible risks in the project developmentSoftware Engineering-I
19.
20. The output of this phase is passed through all the phases iteratively in order to obtain improvements in the same. Software Engineering-I
21.
22.
23.
24. For smaller projects, the concept of agile software development is becoming a viable alternativeSoftware Engineering-I