CONTENTS 
• Introduction 
• Definition Of sub-Station 
• Component Of sub-station 
• Single Line Diagram Of Sub-station 
• Lightning Arrestor 
• Capacitor voltage Transformer 
• PLCC 
• Isolater 
• Current Transformer 
• Circuit Breaker 
• Bus Bar 
• Transformer 
• Protective relay 
• Control room 
• Conclusion
INTRODUCTION 
 RVPNL is a company of Rajasthan State Electricity 
Board(RSEB) established by government of Rajasthan. Aim of 
RVPNL is to provide reliable transmission service to 
customers. 220 KV G.S.S., Pindwara is a part of RVPNL. 
 It is established on 19 July 2000 by Govt. Of Rajasthan under 
the Provision of Rajasthan Power Sector Reforms Act 1999 as 
the successor company of RSEB. 
 Earlier this sub-station Pindwara was 132kv GSS Then in 
2008 it become 220kv GSS with total capacity of 125MVA.
DEFINITION OF SUBSTATION 
Sub-station is a subsidiary station of an electric generation 
,transmission and distribution system where voltage is 
transformed from high to low or low to high voltage using 
transformers. Electric Power may flow through several sub-station 
between generated plant and consumer and may be 
changed in voltage in several steps.
COMPONENT OF SUBSTATION 
1. Primary power lines 
2. Ground wire 
3. Overhead lines 
4. Transformer for measurement of electric voltage 
5. Disconnect switch 
6. Circuit breaker 
7. Current Transformer 
8. Lightning arrester 
9. Main Transformer 
10. Control building 
11. Security fence 
12. Secondary power lines
SINGLE LINE DIAGRAM
LIGHTENING ARRESTOR 
• Lightning arrester is a protective 
device which provides protection 
against high voltage surges. A 
lightning arrester has two terminals 
viz a high voltage terminal and 
a ground terminal.
CAPACITIVE VOLTAGE TRANSFORMER 
• Capacitive voltage 
transformers are special 
kind of power 
transformers using 
capacitors to step down 
the voltage. 
capacitive 
voltage 
transformer
WAVE TRAP(LINE TRAP) 
Wave trap 
• A Line trap (high-frequency 
stopper) is a maintenance-free 
inductor, mounted inline on 
high 
voltage AC transmission pow 
er lines to prevent the 
transmission of high 
frequency (40 kHz to 
1000 kHz) carrier signals 
of line communication to 
unwanted destinations.
POWER LINE CARRIER COMMUNICATION 
• PLCC for exchange of data and transfer of messages between 
substations, voice communication is necessary. For this 
purpose high frequency carrier current is transmitted over 
same transmission line on which power is transmitted. Hence 
this communication is called as power line carrier 
communication.
ISOLATOR 
• It isolates the devices 
from live line when there 
is a maintenance. It 
operates when there is no 
load. It is also used to 
change bus bar line from 
main to reserve or vise 
versa. 
220 KV ISOLATOR
CURRENT TRANSFORMER 
• C.T. is used to measure high 
value of current. C.T.`s 
secondary is connected to 
relay to protect the system 
against Overcurrent. 
Current 
Transformer
CIRCUIT BREAKER 
• Circuit breaker Today, two 
most popular Circuit breakers 
are used in substation which 
are: Vacuum Circuit breaker 
& SF6 Circuit breaker. Oil 
and Air blast Circuit breaker 
was used in earlier decades.
BUS BAR 
• Bus Bars are common 
electrical component through 
which a large no. of feeders 
operating at same voltage 
have to be connected.
BUS COUPLER 
• It is nothing but arrangement of joining of two buses. 
• It is use for load sharing purposes.
TRANSFORMER 
• The transformer is a static apparatus, which receives 
power/energy at it, one circuit and transmits it to other circuit 
without changing the frequency.
MAIN PART OF TRANSFORMER 
• 1. Primary and secondary coils (circuit) or windings. 
• 2. Core 
• 3. Main Tank 
• 4. Conservator 
• 5. Breather 
• 6. Radiator 
• 7. Buchholz relay 
• 8. Bushings (HT & LT) (Primary or secondary) 
• 9. Cooling fans 
• 10. Tap changer (on load and off load) 
• 11. NGR (Neutral Grounding Resistance) to minimize the 
earth fault current
POWER TRANSFORMER 
To step-up or step-down the voltage and transfer power from one 
a.c. voltage to another a.c. voltage at the same frequency.
CAPACITOR BANK 
• The capacitor bank provides reactive power at grid sub-station. 
the voltage problem frequently reduce so of circulation 
of reactive power.
PROTECTIVE RELAY 
• A protective relay is a device 
that detects the fault and 
initiates the operation of the 
circuit breaker to isolator the 
defective element from the 
rest of the system.
CONTROL ROOM
CONCLUSION 
• I studied lot of knowledge. In G.S.S. lot of instrumentation and 
protection required. So I gain lot of knowledge. 
• Training at 220kv GSS pindwara gives the insight of the real 
instrument used.There are many instruments like Transformer, 
C.T.,P.T.,L.A.,relay,busbar,capacitorbank,insulators,isolators,c 
ontrol room,etc. 
• To get insight of the sub station ,how things operate,how 
things manage all is learned there.
REFERENCES 
 www.rvpnl.com 
 www.wikipedia.org 
 www.electricalhub.com 
 www.techforu.com
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)

More Related Content

What's hot

132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
monga786
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
Mohit Awasthi
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
ASHOK KHOJA
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
Biswajit Pratihari
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
Ishank Ranjan
 

What's hot (20)

Power System Control And Line Compensation
Power System Control And Line CompensationPower System Control And Line Compensation
Power System Control And Line Compensation
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
Power Line Carrier Communication PLCC
Power Line Carrier Communication PLCCPower Line Carrier Communication PLCC
Power Line Carrier Communication PLCC
 
Plcc
PlccPlcc
Plcc
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
My training
My trainingMy training
My training
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Cspdcl microsoft power point presentation
Cspdcl microsoft power point presentationCspdcl microsoft power point presentation
Cspdcl microsoft power point presentation
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch center
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
Summer internship at pgcil
Summer internship at pgcilSummer internship at pgcil
Summer internship at pgcil
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 

Viewers also liked

חבר מביא חבר - לעובדי גב מערכות
חבר מביא חבר - לעובדי גב מערכותחבר מביא חבר - לעובדי גב מערכות
חבר מביא חבר - לעובדי גב מערכות
editaharonovich
 
Guerilla marketing
Guerilla marketingGuerilla marketing
Guerilla marketing
jayaram v
 
Evaluation Question 1 - How did you use, develop or challenge codes and conve...
Evaluation Question 1 - How did you use, develop or challenge codes and conve...Evaluation Question 1 - How did you use, develop or challenge codes and conve...
Evaluation Question 1 - How did you use, develop or challenge codes and conve...
RobertWragg
 
¡¡¡¡NIVELACION!!!
¡¡¡¡NIVELACION!!!¡¡¡¡NIVELACION!!!
¡¡¡¡NIVELACION!!!
locosporsaber
 

Viewers also liked (20)

132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) ppt
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension members
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression members
 
Sexto grado Productivo
Sexto grado ProductivoSexto grado Productivo
Sexto grado Productivo
 
חבר מביא חבר - לעובדי גב מערכות
חבר מביא חבר - לעובדי גב מערכותחבר מביא חבר - לעובדי גב מערכות
חבר מביא חבר - לעובדי גב מערכות
 
Apple Presentaion
Apple Presentaion Apple Presentaion
Apple Presentaion
 
Guerilla marketing
Guerilla marketingGuerilla marketing
Guerilla marketing
 
Understanding the basics of web design
Understanding the basics of web designUnderstanding the basics of web design
Understanding the basics of web design
 
A call for unity 2. english
A call for unity 2. englishA call for unity 2. english
A call for unity 2. english
 
Siła prototypu w projektowaniu UX - zrozumienie potrzeb użytkowników
Siła prototypu w projektowaniu UX - zrozumienie potrzeb użytkowników Siła prototypu w projektowaniu UX - zrozumienie potrzeb użytkowników
Siła prototypu w projektowaniu UX - zrozumienie potrzeb użytkowników
 
BIG DATA MANAGEMENT - forget the hype, let's talk about the facts!
BIG DATA MANAGEMENT - forget the hype, let's talk about the facts! BIG DATA MANAGEMENT - forget the hype, let's talk about the facts!
BIG DATA MANAGEMENT - forget the hype, let's talk about the facts!
 
Paris NoSQL User Group - In Memory Data Grids in Action (without transactions...
Paris NoSQL User Group - In Memory Data Grids in Action (without transactions...Paris NoSQL User Group - In Memory Data Grids in Action (without transactions...
Paris NoSQL User Group - In Memory Data Grids in Action (without transactions...
 
pb
pbpb
pb
 
URL Hacking 101: An Easy Way to Streamline Processes in Salesforce
URL Hacking 101: An Easy Way to Streamline Processes in Salesforce URL Hacking 101: An Easy Way to Streamline Processes in Salesforce
URL Hacking 101: An Easy Way to Streamline Processes in Salesforce
 
Evaluation Question 1 - How did you use, develop or challenge codes and conve...
Evaluation Question 1 - How did you use, develop or challenge codes and conve...Evaluation Question 1 - How did you use, develop or challenge codes and conve...
Evaluation Question 1 - How did you use, develop or challenge codes and conve...
 
¡¡¡¡NIVELACION!!!
¡¡¡¡NIVELACION!!!¡¡¡¡NIVELACION!!!
¡¡¡¡NIVELACION!!!
 
St Martin's Campus, Brighton
St Martin's Campus, BrightonSt Martin's Campus, Brighton
St Martin's Campus, Brighton
 
Oral Health Care for All Ages
Oral Health Care for All AgesOral Health Care for All Ages
Oral Health Care for All Ages
 
Presentación_1
Presentación_1Presentación_1
Presentación_1
 

Similar to 220kv gss pindwara(sirohi)

Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Gangwal
 
220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf
SinghJi18
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
VSRAGHU
 

Similar to 220kv gss pindwara(sirohi) (20)

finalseminar.docx
finalseminar.docxfinalseminar.docx
finalseminar.docx
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
DPL Transmission And Distribution
DPL Transmission And DistributionDPL Transmission And Distribution
DPL Transmission And Distribution
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Presentation on 132 kv gss
Presentation on 132 kv gssPresentation on 132 kv gss
Presentation on 132 kv gss
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
33kv substation
33kv substation33kv substation
33kv substation
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
Design of substation
Design of substationDesign of substation
Design of substation
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Recently uploaded (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

220kv gss pindwara(sirohi)

  • 1. A seminar on Practical Training taken at 220KV GSS PINDWARA PRESENTED BY: Pankaj Rawal 4th year, EE EE/11/093 DEPARTMENT OF ELECTRICAL ENGINEERING POORNIMA COLLEGE OF ENGINEERING ISI-6 RIICO INSTITUTIONAL AREA, JAIPUR -302022 GIUDED BY: Mr. Vikash kr. Saini Dept. Of Electrical Engg. 2014-15
  • 2. CONTENTS • Introduction • Definition Of sub-Station • Component Of sub-station • Single Line Diagram Of Sub-station • Lightning Arrestor • Capacitor voltage Transformer • PLCC • Isolater • Current Transformer • Circuit Breaker • Bus Bar • Transformer • Protective relay • Control room • Conclusion
  • 3. INTRODUCTION  RVPNL is a company of Rajasthan State Electricity Board(RSEB) established by government of Rajasthan. Aim of RVPNL is to provide reliable transmission service to customers. 220 KV G.S.S., Pindwara is a part of RVPNL.  It is established on 19 July 2000 by Govt. Of Rajasthan under the Provision of Rajasthan Power Sector Reforms Act 1999 as the successor company of RSEB.  Earlier this sub-station Pindwara was 132kv GSS Then in 2008 it become 220kv GSS with total capacity of 125MVA.
  • 4. DEFINITION OF SUBSTATION Sub-station is a subsidiary station of an electric generation ,transmission and distribution system where voltage is transformed from high to low or low to high voltage using transformers. Electric Power may flow through several sub-station between generated plant and consumer and may be changed in voltage in several steps.
  • 5. COMPONENT OF SUBSTATION 1. Primary power lines 2. Ground wire 3. Overhead lines 4. Transformer for measurement of electric voltage 5. Disconnect switch 6. Circuit breaker 7. Current Transformer 8. Lightning arrester 9. Main Transformer 10. Control building 11. Security fence 12. Secondary power lines
  • 7. LIGHTENING ARRESTOR • Lightning arrester is a protective device which provides protection against high voltage surges. A lightning arrester has two terminals viz a high voltage terminal and a ground terminal.
  • 8. CAPACITIVE VOLTAGE TRANSFORMER • Capacitive voltage transformers are special kind of power transformers using capacitors to step down the voltage. capacitive voltage transformer
  • 9. WAVE TRAP(LINE TRAP) Wave trap • A Line trap (high-frequency stopper) is a maintenance-free inductor, mounted inline on high voltage AC transmission pow er lines to prevent the transmission of high frequency (40 kHz to 1000 kHz) carrier signals of line communication to unwanted destinations.
  • 10. POWER LINE CARRIER COMMUNICATION • PLCC for exchange of data and transfer of messages between substations, voice communication is necessary. For this purpose high frequency carrier current is transmitted over same transmission line on which power is transmitted. Hence this communication is called as power line carrier communication.
  • 11. ISOLATOR • It isolates the devices from live line when there is a maintenance. It operates when there is no load. It is also used to change bus bar line from main to reserve or vise versa. 220 KV ISOLATOR
  • 12. CURRENT TRANSFORMER • C.T. is used to measure high value of current. C.T.`s secondary is connected to relay to protect the system against Overcurrent. Current Transformer
  • 13. CIRCUIT BREAKER • Circuit breaker Today, two most popular Circuit breakers are used in substation which are: Vacuum Circuit breaker & SF6 Circuit breaker. Oil and Air blast Circuit breaker was used in earlier decades.
  • 14. BUS BAR • Bus Bars are common electrical component through which a large no. of feeders operating at same voltage have to be connected.
  • 15. BUS COUPLER • It is nothing but arrangement of joining of two buses. • It is use for load sharing purposes.
  • 16. TRANSFORMER • The transformer is a static apparatus, which receives power/energy at it, one circuit and transmits it to other circuit without changing the frequency.
  • 17. MAIN PART OF TRANSFORMER • 1. Primary and secondary coils (circuit) or windings. • 2. Core • 3. Main Tank • 4. Conservator • 5. Breather • 6. Radiator • 7. Buchholz relay • 8. Bushings (HT & LT) (Primary or secondary) • 9. Cooling fans • 10. Tap changer (on load and off load) • 11. NGR (Neutral Grounding Resistance) to minimize the earth fault current
  • 18. POWER TRANSFORMER To step-up or step-down the voltage and transfer power from one a.c. voltage to another a.c. voltage at the same frequency.
  • 19. CAPACITOR BANK • The capacitor bank provides reactive power at grid sub-station. the voltage problem frequently reduce so of circulation of reactive power.
  • 20. PROTECTIVE RELAY • A protective relay is a device that detects the fault and initiates the operation of the circuit breaker to isolator the defective element from the rest of the system.
  • 22. CONCLUSION • I studied lot of knowledge. In G.S.S. lot of instrumentation and protection required. So I gain lot of knowledge. • Training at 220kv GSS pindwara gives the insight of the real instrument used.There are many instruments like Transformer, C.T.,P.T.,L.A.,relay,busbar,capacitorbank,insulators,isolators,c ontrol room,etc. • To get insight of the sub station ,how things operate,how things manage all is learned there.
  • 23. REFERENCES  www.rvpnl.com  www.wikipedia.org  www.electricalhub.com  www.techforu.com