SlideShare une entreprise Scribd logo
1  sur  5
Télécharger pour lire hors ligne
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 29
Paper Publications
PROBLEMS FACED IN AUTOMATION
1
Surajkumar V Gujar, 2
Prof. M R Nagare
1, 2
Veermata Jijabai Technological Institute, Mumbai
Abstract: In current scenario the automation plays important role in any type of industries for the purpose of quick
production. For changing over form manual mode to auto mode there are many problems which affect the project
of automation. There are two types of problems one is from technical side i.e. testing of software and another is
from management side i.e. managing the manpower, material management, communication management within
the organization and out of the organization which affects the progress of the project. To the authors knowledge
this is the first time to observe the factors which are affecting the progress of the project and to perform the study
on them. Result of this study support that which are the factors that affect the progress of the project and how to
tackle them in a better way so that they will not affect the project.
Keywords: Problems faced in automation, material management, miscommunication, sequence of activities,
Quantitative data analyzed during automation of lube plant, results found.
1. INTRODUCTION
Generally life cycle of any project depends upon various factors internally and externally. At the starting of project it is
affected by external factors and while progressing the project is affected by many internal factors.The external factors are
common in nature while internal factors are differ from industry to industry depending upon the culture, environment and
type of company.
These internal factors are classified into two categories-
a) Problems faced in testing of system
b) Problems faced during changing from manual to automation mode.
In the progress of any project problems may arise at any stage so finding problems which affects the project is very
important and solving them in a way so that there will not be any effect on project is equally important.
Any project has three phases which are starting phase, middle phase and end phase. At the starting of the project there are
large numbers of problems through which project has to pass and at the middle level the problems becomes moderate and
at the end the frequency of problems is very low. The intensity of problems faced in different levels is different depending
upon the type of project for ex.-In a construction project the main problem is manpower, environment but in projects
related to software these problems are not there.
2. PROBLEMS FACED IN AUTOMATION
The focus is on the problems faced during the progress of the project but here is the some common problems faced while
testing the system. These problems can be eliminated by the side of vendor and these problems is not affecting the project
to greater extent. The problems that affect the project to greater extent are internal problems within the organization
between different levels that are working on project. These problems can lead the project towards failure so to identify
and tackle these problems are very important.
a) Problems at the time of testing
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 30
Paper Publications
These are the problems at the time of testing
b) Problems faced during the progress of project are
These are the problems faced during automation
Miscommunication:
Miscommunication between different parties working on project for ex- In automation project there was various parties
working which are contractors for fabrication, instrumentation, electric connection and officers of company under whom
project is being executed and vendors who is providing the system of automation and consultant.
automation project
Misunderstanding
of company
processes
Regression testing
One test team
under multiple
projects
Understanding the
requirements
Which tests to
execute first
Relationship with
developers
problems
faced during
progress of
project
Miscommunication
priority of
activities
Improper
material
management
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 31
Paper Publications
There may be problems in these different levels which are working on project that results in communication gap between
different levels affecting the progress of the project. In automation project the vendor who is going to provide the system
should be fully aware about the processes of the company, product of the company and the requirement of company from
them and to give this information to the vendor is the duty of the concern officer if this is not done properly then
definitely the system will not meet the requirements of the company though it is free from all the faults from vendor side
and to make this happen, the main communication medium between officers and vendors is the consultant of the company
who is looking after these activities of the project.
Consultant knows all the requirements of the company, what company wants, what are the prerequisite to get the required
system which results in the completion of needs of company and it is consultants responsibility to aware the vendor about
requirement of company. For this the consultant and company officers have to arrange the timely meetings with the
vendor and contractors working on project so that everyone knows the status of the project, has to take the follow up
actions. Record of meetings held should be kept with the officer under which the project is being executed so that he
would come to know the exact status of the activities of the project.
There should be record of the contractors of completion of work for example the activities should recorded in Microsoft
project here is the Gantt chart of the activities of the contractor working on project.
Gantt chart of contractors work
With the help of this we would come to know the progress of the project and we can plan for the rest of the project.
Improper material management:
The fundamental objectives of the Materials Management function, often called the famous 5 Rs of Materials
Management, are acquisition of materials and services:
 of the right quality
 in the right quantity
 at the right time
 from the right source
 at the right price
Material management is nothing but the Effective management & supervision It depends on managerial functions of
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 32
Paper Publications
• Planning
• Organizing
• Staffing
• Directing
• Controlling
• Reporting
• Budgeting
Material management plays important role in any project. The right quantity of material should be available at right time
and at right place. In many project there is no material management due to this contractors unable to find the material
availability and officers unable to find the amount of material consumed. If there is unavailability of material required
contractor has to report to the concern officer and after his request the officer has to place the order for the material
required considering the rules and regulations of company. This process takes at least four days to complete and till the
availability of material contractor has to stop the work and is waiting for the availability of the material. Due to this the
time required to complete the specific task is more than the time required for regular operation. If we forecast the
requirement of material and managing it properly we can make material available at the time of requirement reducing the
time required.
Here is the example of record of material managed.
Table of record of material management
Priority of activities:
It is very important to decide the priority of activities to start with so that there will not be any effect on project. In any
project there are many activities for ex – In automation project there were following activities
a) Fabrication of pipe rack.
b) Dismantling of existed pipeline.
c) Instrumentation activities
d) Electric activities
e) PLC installation
f) System testing
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 33
Paper Publications
In this automation project the officer has to decide the activities in such a manner so that there will not be effect on the
continuous operations of plant. for starting of this project firstly fabrication work should complete and then taking all the
newly fabricated pipelines in operation after that without affecting the continuous operation of plant completing the rest of
activities like dismantling, instrumentation, electric activities etc.
3. CONCLUSION
from this research we can conclude that the problems apart from the software side may affect the project significantly and
by tackling them in a better way we can boost the project.
REFERENCES
[1] © 2014 IJIRT | Volume 1 Issue 6 | ISSN: 2349-6002
[2] Google Scholar
[3] Wikipedia

Contenu connexe

En vedette

Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...
Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...
Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...paperpublications3
 
Rainfall Trend Analysis of Hassan District in Karnataka
Rainfall Trend Analysis of Hassan District in KarnatakaRainfall Trend Analysis of Hassan District in Karnataka
Rainfall Trend Analysis of Hassan District in Karnatakapaperpublications3
 
Barriers to Development and Progress of Entreprenurs: Case of Lesotho
Barriers to Development and Progress of Entreprenurs: Case of LesothoBarriers to Development and Progress of Entreprenurs: Case of Lesotho
Barriers to Development and Progress of Entreprenurs: Case of Lesothopaperpublications3
 
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...paperpublications3
 
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...paperpublications3
 
Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...
Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...
Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...paperpublications3
 
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...paperpublications3
 
Microalgae as Potential Feedstock for Biodiesel Production-A Review
Microalgae as Potential Feedstock for Biodiesel Production-A ReviewMicroalgae as Potential Feedstock for Biodiesel Production-A Review
Microalgae as Potential Feedstock for Biodiesel Production-A Reviewpaperpublications3
 
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...paperpublications3
 
Internal Audit Independence and Share Performance of Firms Listed In the Nair...
Internal Audit Independence and Share Performance of Firms Listed In the Nair...Internal Audit Independence and Share Performance of Firms Listed In the Nair...
Internal Audit Independence and Share Performance of Firms Listed In the Nair...paperpublications3
 
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...paperpublications3
 
Rainfall Trend Analysis of Mysore District in Karnataka
Rainfall Trend Analysis of Mysore District in KarnatakaRainfall Trend Analysis of Mysore District in Karnataka
Rainfall Trend Analysis of Mysore District in Karnatakapaperpublications3
 
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...paperpublications3
 
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...paperpublications3
 
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...paperpublications3
 
Application of Weighted Least Squares Regression in Forecasting
Application of Weighted Least Squares Regression in ForecastingApplication of Weighted Least Squares Regression in Forecasting
Application of Weighted Least Squares Regression in Forecastingpaperpublications3
 
Discouraged Youth in Mauritius
Discouraged Youth in MauritiusDiscouraged Youth in Mauritius
Discouraged Youth in Mauritiuspaperpublications3
 
Problems and Prospects of SMES Loan Management: Case of Lesotho
Problems and Prospects of SMES Loan Management: Case of LesothoProblems and Prospects of SMES Loan Management: Case of Lesotho
Problems and Prospects of SMES Loan Management: Case of Lesothopaperpublications3
 
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...paperpublications3
 
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Review
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A ReviewStudy of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Review
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Reviewpaperpublications3
 

En vedette (20)

Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...
Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...
Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...
 
Rainfall Trend Analysis of Hassan District in Karnataka
Rainfall Trend Analysis of Hassan District in KarnatakaRainfall Trend Analysis of Hassan District in Karnataka
Rainfall Trend Analysis of Hassan District in Karnataka
 
Barriers to Development and Progress of Entreprenurs: Case of Lesotho
Barriers to Development and Progress of Entreprenurs: Case of LesothoBarriers to Development and Progress of Entreprenurs: Case of Lesotho
Barriers to Development and Progress of Entreprenurs: Case of Lesotho
 
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...
 
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...
 
Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...
Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...
Design and Implementation of an Intelligent System to Prevent Grain Loss Due ...
 
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...
 
Microalgae as Potential Feedstock for Biodiesel Production-A Review
Microalgae as Potential Feedstock for Biodiesel Production-A ReviewMicroalgae as Potential Feedstock for Biodiesel Production-A Review
Microalgae as Potential Feedstock for Biodiesel Production-A Review
 
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...
 
Internal Audit Independence and Share Performance of Firms Listed In the Nair...
Internal Audit Independence and Share Performance of Firms Listed In the Nair...Internal Audit Independence and Share Performance of Firms Listed In the Nair...
Internal Audit Independence and Share Performance of Firms Listed In the Nair...
 
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...
 
Rainfall Trend Analysis of Mysore District in Karnataka
Rainfall Trend Analysis of Mysore District in KarnatakaRainfall Trend Analysis of Mysore District in Karnataka
Rainfall Trend Analysis of Mysore District in Karnataka
 
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...
 
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
 
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...
 
Application of Weighted Least Squares Regression in Forecasting
Application of Weighted Least Squares Regression in ForecastingApplication of Weighted Least Squares Regression in Forecasting
Application of Weighted Least Squares Regression in Forecasting
 
Discouraged Youth in Mauritius
Discouraged Youth in MauritiusDiscouraged Youth in Mauritius
Discouraged Youth in Mauritius
 
Problems and Prospects of SMES Loan Management: Case of Lesotho
Problems and Prospects of SMES Loan Management: Case of LesothoProblems and Prospects of SMES Loan Management: Case of Lesotho
Problems and Prospects of SMES Loan Management: Case of Lesotho
 
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...
 
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Review
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A ReviewStudy of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Review
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Review
 

Similaire à PROBLEMS FACED IN AUTOMATION

Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxbraycarissa250
 
IRJET- Factors in Selection of Construction Project Management Software i...
IRJET-  	  Factors in Selection of Construction Project Management Software i...IRJET-  	  Factors in Selection of Construction Project Management Software i...
IRJET- Factors in Selection of Construction Project Management Software i...IRJET Journal
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...IRJET Journal
 
IRJET- Speech and Hearing
IRJET- Speech and HearingIRJET- Speech and Hearing
IRJET- Speech and HearingIRJET Journal
 
Operation Research.pptx
Operation Research.pptxOperation Research.pptx
Operation Research.pptxUwuHii
 
Project Information System
Project Information SystemProject Information System
Project Information SystemSaurabhAdhau1
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Projectijtsrd
 
G0363052058
G0363052058G0363052058
G0363052058theijes
 
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...
IRJET- Influence of Stakeholder Management on the Success Construction Pr...IRJET Journal
 
Global Freelancer- Course Work
Global Freelancer- Course WorkGlobal Freelancer- Course Work
Global Freelancer- Course WorkMubarak Jalal
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...IRJET Journal
 
Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...Joanna Paulsen
 
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...
2nd Generation Construction procurement Reform  -Published at IPPC 2012 at Se...2nd Generation Construction procurement Reform  -Published at IPPC 2012 at Se...
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...Veluppillai Mohan
 
Survey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation ProblemsSurvey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation ProblemsIJERA Editor
 

Similaire à PROBLEMS FACED IN AUTOMATION (20)

Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
 
IRJET- Factors in Selection of Construction Project Management Software i...
IRJET-  	  Factors in Selection of Construction Project Management Software i...IRJET-  	  Factors in Selection of Construction Project Management Software i...
IRJET- Factors in Selection of Construction Project Management Software i...
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
 
150
150150
150
 
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTIONUSE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
 
IRJET- Speech and Hearing
IRJET- Speech and HearingIRJET- Speech and Hearing
IRJET- Speech and Hearing
 
Operation Research.pptx
Operation Research.pptxOperation Research.pptx
Operation Research.pptx
 
Project Information System
Project Information SystemProject Information System
Project Information System
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
 
G0363052058
G0363052058G0363052058
G0363052058
 
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
 
Global Freelancer- Course Work
Global Freelancer- Course WorkGlobal Freelancer- Course Work
Global Freelancer- Course Work
 
Dsdm
DsdmDsdm
Dsdm
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
 
Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...
2nd Generation Construction procurement Reform  -Published at IPPC 2012 at Se...2nd Generation Construction procurement Reform  -Published at IPPC 2012 at Se...
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...
 
Total Quality Management TQM
Total Quality Management TQMTotal Quality Management TQM
Total Quality Management TQM
 
Survey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation ProblemsSurvey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation Problems
 
An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)
 

Dernier

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsRommel Regala
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxruthvilladarez
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 

Dernier (20)

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World Politics
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 

PROBLEMS FACED IN AUTOMATION

  • 1. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 29 Paper Publications PROBLEMS FACED IN AUTOMATION 1 Surajkumar V Gujar, 2 Prof. M R Nagare 1, 2 Veermata Jijabai Technological Institute, Mumbai Abstract: In current scenario the automation plays important role in any type of industries for the purpose of quick production. For changing over form manual mode to auto mode there are many problems which affect the project of automation. There are two types of problems one is from technical side i.e. testing of software and another is from management side i.e. managing the manpower, material management, communication management within the organization and out of the organization which affects the progress of the project. To the authors knowledge this is the first time to observe the factors which are affecting the progress of the project and to perform the study on them. Result of this study support that which are the factors that affect the progress of the project and how to tackle them in a better way so that they will not affect the project. Keywords: Problems faced in automation, material management, miscommunication, sequence of activities, Quantitative data analyzed during automation of lube plant, results found. 1. INTRODUCTION Generally life cycle of any project depends upon various factors internally and externally. At the starting of project it is affected by external factors and while progressing the project is affected by many internal factors.The external factors are common in nature while internal factors are differ from industry to industry depending upon the culture, environment and type of company. These internal factors are classified into two categories- a) Problems faced in testing of system b) Problems faced during changing from manual to automation mode. In the progress of any project problems may arise at any stage so finding problems which affects the project is very important and solving them in a way so that there will not be any effect on project is equally important. Any project has three phases which are starting phase, middle phase and end phase. At the starting of the project there are large numbers of problems through which project has to pass and at the middle level the problems becomes moderate and at the end the frequency of problems is very low. The intensity of problems faced in different levels is different depending upon the type of project for ex.-In a construction project the main problem is manpower, environment but in projects related to software these problems are not there. 2. PROBLEMS FACED IN AUTOMATION The focus is on the problems faced during the progress of the project but here is the some common problems faced while testing the system. These problems can be eliminated by the side of vendor and these problems is not affecting the project to greater extent. The problems that affect the project to greater extent are internal problems within the organization between different levels that are working on project. These problems can lead the project towards failure so to identify and tackle these problems are very important. a) Problems at the time of testing
  • 2. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 30 Paper Publications These are the problems at the time of testing b) Problems faced during the progress of project are These are the problems faced during automation Miscommunication: Miscommunication between different parties working on project for ex- In automation project there was various parties working which are contractors for fabrication, instrumentation, electric connection and officers of company under whom project is being executed and vendors who is providing the system of automation and consultant. automation project Misunderstanding of company processes Regression testing One test team under multiple projects Understanding the requirements Which tests to execute first Relationship with developers problems faced during progress of project Miscommunication priority of activities Improper material management
  • 3. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 31 Paper Publications There may be problems in these different levels which are working on project that results in communication gap between different levels affecting the progress of the project. In automation project the vendor who is going to provide the system should be fully aware about the processes of the company, product of the company and the requirement of company from them and to give this information to the vendor is the duty of the concern officer if this is not done properly then definitely the system will not meet the requirements of the company though it is free from all the faults from vendor side and to make this happen, the main communication medium between officers and vendors is the consultant of the company who is looking after these activities of the project. Consultant knows all the requirements of the company, what company wants, what are the prerequisite to get the required system which results in the completion of needs of company and it is consultants responsibility to aware the vendor about requirement of company. For this the consultant and company officers have to arrange the timely meetings with the vendor and contractors working on project so that everyone knows the status of the project, has to take the follow up actions. Record of meetings held should be kept with the officer under which the project is being executed so that he would come to know the exact status of the activities of the project. There should be record of the contractors of completion of work for example the activities should recorded in Microsoft project here is the Gantt chart of the activities of the contractor working on project. Gantt chart of contractors work With the help of this we would come to know the progress of the project and we can plan for the rest of the project. Improper material management: The fundamental objectives of the Materials Management function, often called the famous 5 Rs of Materials Management, are acquisition of materials and services:  of the right quality  in the right quantity  at the right time  from the right source  at the right price Material management is nothing but the Effective management & supervision It depends on managerial functions of
  • 4. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 32 Paper Publications • Planning • Organizing • Staffing • Directing • Controlling • Reporting • Budgeting Material management plays important role in any project. The right quantity of material should be available at right time and at right place. In many project there is no material management due to this contractors unable to find the material availability and officers unable to find the amount of material consumed. If there is unavailability of material required contractor has to report to the concern officer and after his request the officer has to place the order for the material required considering the rules and regulations of company. This process takes at least four days to complete and till the availability of material contractor has to stop the work and is waiting for the availability of the material. Due to this the time required to complete the specific task is more than the time required for regular operation. If we forecast the requirement of material and managing it properly we can make material available at the time of requirement reducing the time required. Here is the example of record of material managed. Table of record of material management Priority of activities: It is very important to decide the priority of activities to start with so that there will not be any effect on project. In any project there are many activities for ex – In automation project there were following activities a) Fabrication of pipe rack. b) Dismantling of existed pipeline. c) Instrumentation activities d) Electric activities e) PLC installation f) System testing
  • 5. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (29-33), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 33 Paper Publications In this automation project the officer has to decide the activities in such a manner so that there will not be effect on the continuous operations of plant. for starting of this project firstly fabrication work should complete and then taking all the newly fabricated pipelines in operation after that without affecting the continuous operation of plant completing the rest of activities like dismantling, instrumentation, electric activities etc. 3. CONCLUSION from this research we can conclude that the problems apart from the software side may affect the project significantly and by tackling them in a better way we can boost the project. REFERENCES [1] © 2014 IJIRT | Volume 1 Issue 6 | ISSN: 2349-6002 [2] Google Scholar [3] Wikipedia