Radiant floor heating system with usage outdoor wood boiler


For clarity, we take the pot of a certain brand-Vitolig 150 (Viessmann) - this is the most modern version
of the solid-gas generator boiler. Its feature is the combustion process, which gives up to 90%
efficiency. However, our advice will suit those who settled on a simple model of wood fired boilers, but
wants to get a cost-effective, fully automated Hydronic floor heating system. In other words, our main
task, even with wood boilers be able to regulate the flow of heat in different parts of the house, keep it
raised, comfortable temperature for us. At the same time no one wants to constantly be on duty in the
boiler room, then pouring the fire when the house is heated to the desired degree, then igniting it again
with decreasing temperature. And then, not all the rooms (and even floors) are used constantly owners,
why spend precious energy on them?

Enough to keep these areas a small temperature. In the presence of a gas boiler, these issues are more or
less just - Automatic boiler is set for a specific mode of operation and the fire in the burner it fades, it
flares up, keeping the Hydronic floor heating system at a certain temperature. In the case of wood
boiler can not be like this: the wood can not go out immediately, or as instantly ignite.

What to do?

The main feature of an automated heating boiler with wood is necessary to have in it the buffer
capacity of the hydraulic piping and wood boiler heat exchangers.

Buffer capacity and the system LADDOMAT 21.

The first appointment of the buffer capacity - store heat, save it and spend the dosage for heating. This
is due to the ability to save the buffer capacity of heat and can automate the entire Hydronic floor
heating system. Why is the system Laddomat 21? The process of gasification of woods - wood, occurs
at a certain temperature. Laddomat 21 maintains the desired temperature in the boiler and heat the
doses buffer capacity, without prejudice to the boiler.

How does it work?

After firing the boiler and boiler water temperatures reach 65 ° C, the controller turns the circulating
pump thermostat in Laddomat 21. There is a small circulation circuit, which ensures a stable
temperature necessary for the proper functioning of the boiler. If the temperature in the circuit exceeds
60 ° C, the mixer in Laddomat 21 opens and dispenses cold water from the reverse heating circuit in
the circuit of the boiler so that the temperature did not exceed 60 ° C. If, due to lack of fuel or for any
other reason the boiler temperature drops below 60 ° C, pump thermostat in Laddomat 21
vyklyuchaetsya.K time of completion of the boiler heating buffer tank has time to stock up on plenty of
heat and is ready at any moment to assume the function of heating the whole house.

You do not need all the warm water from the buffer tank (which is often more than a ton of hot water)
to drive the system in one hour. The heat will be consumed slowly, in doses, thanks to the three-way
valves on radiators. They are like a meticulous pharmacists, will be mixed into the overly hot water
supply has had time to cool a little return flow, bringing the system to the desired temperature. And
when you consider that for the underfloor heating loop temperature often exceeds supply +40 ° C
(depending on the design of floor heating), tank line at 3-5 degrees colder, and the output from the
buffer tank, we usually have a +80 ° C, the lion's share of the system would be the coolant return line
from the Hydronic floor heating system.

Thus, only can keep a comfortable temperature in the room for several hours. Buffer capacity can
sometimes serve as a boiler, especially if its volume is 1,000 or more liters of buffer capacity. The
corresponding temperature of the hot water system provides a thermostatic mixing valve.

Two boilers in the system.

Another design option for the design of the Hydronic floor heating system is the installation of two
boilers - solid and gas - either simultaneously with the accumulation of money, first install a boiler, and
after a while - the second one. In this case, the gas boiler is used in the off-season, when the
consumption of expensive fuel is better to minimize the coal and firewood to the passing attack of frost.

There is a real possibility to use simultaneously the two boilers. Automatic tracking flow of heat from
the boiler and wood to help him in case of severe frost turns the gas. As we have said, two of these
boilers can be installed either simultaneously or gradually, but in all the project documentation should
be taken into account in advance, and primarily due to the fact that each requires its own chimney pot,
which is easier to plan at the design stage at home.

However, in life everything happens according to plan, and clever ideas usually come not when they
have an urgent need. If your house is anything that was not planned in advance, but there is a desire to
put two of the boiler, you can choose from two options for installation of the flue channel. Or build an
attached chimney, or opt for a gas boiler with sealed combustion chamber - in this case does not need
flue, it is enough to drill a hole in the wall and put a PEX pipe on the facade.

Http://www.pexuniverse.com/

More Related Content

What's hot

To Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power PlantTo Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power Plant
IJMER
 
Thermal power plants presentation (bathinda)
Thermal power plants presentation (bathinda)Thermal power plants presentation (bathinda)
Thermal power plants presentation (bathinda)
Lovesh Singla
 

What's hot (20)

Lab Scale Muffle Furnace
Lab Scale Muffle FurnaceLab Scale Muffle Furnace
Lab Scale Muffle Furnace
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Residential house energy class a+
Residential house energy class a+Residential house energy class a+
Residential house energy class a+
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
Underfloor heating
Underfloor heatingUnderfloor heating
Underfloor heating
 
Steam Power Plants
Steam Power PlantsSteam Power Plants
Steam Power Plants
 
Overview of ktps v station (2×250 mw)
Overview of ktps v station (2×250 mw)Overview of ktps v station (2×250 mw)
Overview of ktps v station (2×250 mw)
 
Ktps presentation
Ktps presentationKtps presentation
Ktps presentation
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
To Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power PlantTo Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power Plant
 
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater control
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 
Furnace peterborough
Furnace peterboroughFurnace peterborough
Furnace peterborough
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 
Thermal power plants presentation (bathinda)
Thermal power plants presentation (bathinda)Thermal power plants presentation (bathinda)
Thermal power plants presentation (bathinda)
 
Steam Power Plant
Steam Power PlantSteam Power Plant
Steam Power Plant
 
Energy audit of Condenser and CW System
Energy audit of Condenser and CW SystemEnergy audit of Condenser and CW System
Energy audit of Condenser and CW System
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 

Viewers also liked

Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...
Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...
Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...
Paris Region Lab
 
Geothermal Heat for Radiant Floors
Geothermal Heat for Radiant FloorsGeothermal Heat for Radiant Floors
Geothermal Heat for Radiant Floors
Apple Built Homes
 
Renewable Energy Power Point
Renewable Energy Power PointRenewable Energy Power Point
Renewable Energy Power Point
wallbren
 

Viewers also liked (17)

How to Install a Radiant Floor Heating System
How to Install a Radiant Floor Heating SystemHow to Install a Radiant Floor Heating System
How to Install a Radiant Floor Heating System
 
Heat Exchanger
 Heat Exchanger  Heat Exchanger
Heat Exchanger
 
Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...
Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...
Efficacité Energétique 2e édition - Chauffage, réseau de chaleur et rafraichi...
 
Geothermal Heat for Radiant Floors
Geothermal Heat for Radiant FloorsGeothermal Heat for Radiant Floors
Geothermal Heat for Radiant Floors
 
Radiant Heating by ENERJOY
Radiant Heating by ENERJOYRadiant Heating by ENERJOY
Radiant Heating by ENERJOY
 
Space heating
Space heatingSpace heating
Space heating
 
Study on Alternative Energy Resources
Study on Alternative Energy ResourcesStudy on Alternative Energy Resources
Study on Alternative Energy Resources
 
Heating Ventilation & Air Conditioning (HVAC)
Heating Ventilation & Air Conditioning (HVAC)Heating Ventilation & Air Conditioning (HVAC)
Heating Ventilation & Air Conditioning (HVAC)
 
Finnish Waste-to-Energy and Bioenergy offering
Finnish Waste-to-Energy and Bioenergy  offeringFinnish Waste-to-Energy and Bioenergy  offering
Finnish Waste-to-Energy and Bioenergy offering
 
Heat pumps
Heat pumpsHeat pumps
Heat pumps
 
Solar Water Heating System
Solar Water Heating SystemSolar Water Heating System
Solar Water Heating System
 
Passive Heating
Passive HeatingPassive Heating
Passive Heating
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systems
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning System
 
Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Renewable Energy Power Point
Renewable Energy Power PointRenewable Energy Power Point
Renewable Energy Power Point
 

Similar to Radiant floor heat system

KPW - LargeRadiantSystems
KPW - LargeRadiantSystemsKPW - LargeRadiantSystems
KPW - LargeRadiantSystems
Keith Whitworth
 
MET 401 Chapter 4 boilers_and_steam_generators
MET 401 Chapter 4 boilers_and_steam_generatorsMET 401 Chapter 4 boilers_and_steam_generators
MET 401 Chapter 4 boilers_and_steam_generators
Ibrahim AboKhalil
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
SHIVAJI CHOUDHURY
 
Central steam heating system
Central steam heating systemCentral steam heating system
Central steam heating system
Zavain Rehman
 

Similar to Radiant floor heat system (20)

Gas Boilers
Gas BoilersGas Boilers
Gas Boilers
 
KPW - LargeRadiantSystems
KPW - LargeRadiantSystemsKPW - LargeRadiantSystems
KPW - LargeRadiantSystems
 
HEATING AND VENTILATION
HEATING AND VENTILATIONHEATING AND VENTILATION
HEATING AND VENTILATION
 
All about boilers: Complete Basics, Classification of boilers,types
All about boilers: Complete Basics, Classification of boilers,typesAll about boilers: Complete Basics, Classification of boilers,types
All about boilers: Complete Basics, Classification of boilers,types
 
Excess air
Excess airExcess air
Excess air
 
Heat emitters
Heat emittersHeat emitters
Heat emitters
 
Assignment- report
Assignment- reportAssignment- report
Assignment- report
 
MET 401 Chapter 4 boilers_and_steam_generators
MET 401 Chapter 4 boilers_and_steam_generatorsMET 401 Chapter 4 boilers_and_steam_generators
MET 401 Chapter 4 boilers_and_steam_generators
 
Furnaces
FurnacesFurnaces
Furnaces
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Thermo Tech Engineering (Tte)
Thermo Tech Engineering (Tte)Thermo Tech Engineering (Tte)
Thermo Tech Engineering (Tte)
 
Solar hot water
Solar hot waterSolar hot water
Solar hot water
 
mech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfmech 2nd yr lab report.pdf
mech 2nd yr lab report.pdf
 
lec 6 Steam genr ME430 fall 22.pptx
lec 6 Steam genr ME430 fall 22.pptxlec 6 Steam genr ME430 fall 22.pptx
lec 6 Steam genr ME430 fall 22.pptx
 
fully pumped systems
 fully pumped systems fully pumped systems
fully pumped systems
 
Gas Boiler
Gas BoilerGas Boiler
Gas Boiler
 
Air to Water Low Temperature Heat Pump
Air to Water Low Temperature Heat PumpAir to Water Low Temperature Heat Pump
Air to Water Low Temperature Heat Pump
 
Central steam heating system
Central steam heating systemCentral steam heating system
Central steam heating system
 
Swh 0209
Swh 0209Swh 0209
Swh 0209
 
Low cost active heat storage
Low cost active heat storageLow cost active heat storage
Low cost active heat storage
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Recently uploaded (20)

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Radiant floor heat system

  • 1. Radiant floor heating system with usage outdoor wood boiler For clarity, we take the pot of a certain brand-Vitolig 150 (Viessmann) - this is the most modern version of the solid-gas generator boiler. Its feature is the combustion process, which gives up to 90% efficiency. However, our advice will suit those who settled on a simple model of wood fired boilers, but wants to get a cost-effective, fully automated Hydronic floor heating system. In other words, our main task, even with wood boilers be able to regulate the flow of heat in different parts of the house, keep it raised, comfortable temperature for us. At the same time no one wants to constantly be on duty in the boiler room, then pouring the fire when the house is heated to the desired degree, then igniting it again with decreasing temperature. And then, not all the rooms (and even floors) are used constantly owners, why spend precious energy on them? Enough to keep these areas a small temperature. In the presence of a gas boiler, these issues are more or less just - Automatic boiler is set for a specific mode of operation and the fire in the burner it fades, it flares up, keeping the Hydronic floor heating system at a certain temperature. In the case of wood boiler can not be like this: the wood can not go out immediately, or as instantly ignite. What to do? The main feature of an automated heating boiler with wood is necessary to have in it the buffer capacity of the hydraulic piping and wood boiler heat exchangers. Buffer capacity and the system LADDOMAT 21. The first appointment of the buffer capacity - store heat, save it and spend the dosage for heating. This is due to the ability to save the buffer capacity of heat and can automate the entire Hydronic floor heating system. Why is the system Laddomat 21? The process of gasification of woods - wood, occurs at a certain temperature. Laddomat 21 maintains the desired temperature in the boiler and heat the doses buffer capacity, without prejudice to the boiler. How does it work? After firing the boiler and boiler water temperatures reach 65 ° C, the controller turns the circulating pump thermostat in Laddomat 21. There is a small circulation circuit, which ensures a stable temperature necessary for the proper functioning of the boiler. If the temperature in the circuit exceeds 60 ° C, the mixer in Laddomat 21 opens and dispenses cold water from the reverse heating circuit in the circuit of the boiler so that the temperature did not exceed 60 ° C. If, due to lack of fuel or for any other reason the boiler temperature drops below 60 ° C, pump thermostat in Laddomat 21 vyklyuchaetsya.K time of completion of the boiler heating buffer tank has time to stock up on plenty of heat and is ready at any moment to assume the function of heating the whole house. You do not need all the warm water from the buffer tank (which is often more than a ton of hot water) to drive the system in one hour. The heat will be consumed slowly, in doses, thanks to the three-way valves on radiators. They are like a meticulous pharmacists, will be mixed into the overly hot water supply has had time to cool a little return flow, bringing the system to the desired temperature. And when you consider that for the underfloor heating loop temperature often exceeds supply +40 ° C
  • 2. (depending on the design of floor heating), tank line at 3-5 degrees colder, and the output from the buffer tank, we usually have a +80 ° C, the lion's share of the system would be the coolant return line from the Hydronic floor heating system. Thus, only can keep a comfortable temperature in the room for several hours. Buffer capacity can sometimes serve as a boiler, especially if its volume is 1,000 or more liters of buffer capacity. The corresponding temperature of the hot water system provides a thermostatic mixing valve. Two boilers in the system. Another design option for the design of the Hydronic floor heating system is the installation of two boilers - solid and gas - either simultaneously with the accumulation of money, first install a boiler, and after a while - the second one. In this case, the gas boiler is used in the off-season, when the consumption of expensive fuel is better to minimize the coal and firewood to the passing attack of frost. There is a real possibility to use simultaneously the two boilers. Automatic tracking flow of heat from the boiler and wood to help him in case of severe frost turns the gas. As we have said, two of these boilers can be installed either simultaneously or gradually, but in all the project documentation should be taken into account in advance, and primarily due to the fact that each requires its own chimney pot, which is easier to plan at the design stage at home. However, in life everything happens according to plan, and clever ideas usually come not when they have an urgent need. If your house is anything that was not planned in advance, but there is a desire to put two of the boiler, you can choose from two options for installation of the flue channel. Or build an attached chimney, or opt for a gas boiler with sealed combustion chamber - in this case does not need flue, it is enough to drill a hole in the wall and put a PEX pipe on the facade. Http://www.pexuniverse.com/