Environmental Impact Assessment

Prithvi Ghag
Prithvi GhagTrainee Analyst à Reserve Bank of India
EnvironmentalEnvironmental
Impact AssessmentImpact Assessment
Prof. Sandeep HegdeProf. Sandeep Hegde
Environmental Impact AssessmentEnvironmental Impact Assessment
• Environment Impact Assessment or EIA
can be defined as the study to predict
the effect of a proposed activity/project
on the environment.
• A decision making tool, EIA compares
various alternatives for a project and
seeks to identify the one which
represents the best combination of
economic and environmental costs and
benefits.
Environmental Impact AssessmentEnvironmental Impact Assessment
is intended as an instrument ofis intended as an instrument of
preventivepreventive environmentalenvironmental
management. It provides amanagement. It provides a
framework and an informationframework and an information
basis forbasis for decision makingdecision making onon
activities affecting theactivities affecting the
environment.environment.
EIA – Three core values
1. Integrity: The EIA process should be
fair, objective, unbiased and balanced
2. Utility: The EIA process should
provide balanced, credible information
for decision making
3. Sustainability: The EIA process
should result in environmental
safeguards
““To say that infrastructure development hasTo say that infrastructure development has
impact is to state the obvious. No industrialimpact is to state the obvious. No industrial
country has advanced to such status withoutcountry has advanced to such status without
developing solid infrastructure facilities. Anddeveloping solid infrastructure facilities. And
no low-income country has managed tono low-income country has managed to
escape poverty in the absence ofescape poverty in the absence of
infrastructure.infrastructure.
In addition to economic growth,In addition to economic growth,
infrastructure development has a veryinfrastructure development has a very
tangible impact on people's daily lives, andtangible impact on people's daily lives, and
especially on the lives of poor peopleespecially on the lives of poor people ””
-- Liqun JinLiqun Jin
Vice President, ADBVice President, ADB
EIAEIA
applies to the assessment of theapplies to the assessment of the
environmental effects of those publicenvironmental effects of those public
and privateand private projectsprojects which are likely towhich are likely to
have significant effects on thehave significant effects on the
environment.environment.
EIAEIA
ProjectProject means:means:
• the execution of construction works orthe execution of construction works or
of other installations or schemesof other installations or schemes
• other interventions in the naturalother interventions in the natural
surroundings and landscape includingsurroundings and landscape including
those involving the extraction ofthose involving the extraction of
minerals.minerals.
EIAEIA
Development consentDevelopment consent means:means:
• thethe decisiondecision of the competentof the competent
authorities which entitles the developerauthorities which entitles the developer
to proceed with the project.to proceed with the project.
EIAEIA
…….. have significant effects on the.. have significant effects on the
environment by virtueenvironment by virtue inter alia,inter alia,
of their:of their:
nature, size,nature, size, locationlocation..
EIAEIA
…… direct and indirect effects of a projectdirect and indirect effects of a project
on the following factors:on the following factors:
• human beings, fauna and florahuman beings, fauna and flora
• soil, water, air, climate and the landscapesoil, water, air, climate and the landscape
• the inter-action between the factorsthe inter-action between the factors
mentioned in the first and second indentsmentioned in the first and second indents
• material assets and the culturalmaterial assets and the cultural heritage.heritage.
Environmental ImpactEnvironmental Impact
Assessment (EIA)Assessment (EIA)
There are two types of EIA models- the statutory
model which makes the assessment of impact
compulsory under an enacted law, or a delegated
legislation, and the administrative model under
which an administration exercises its discretion to
find out whether an impact study is necessary. Till
1992, India was following the administrative model
of EIA.
• On 27th
January, 1994 a notification was issued
dealing with mandatory EIA. The notification
requires project proponent to submit an EIA
report, and environment management plan, details
of the public hearing and a project report to the
impact assessment agency for clearance, further
review by a committee of experts in certain cases.
• By the amendment in the year 1997, public hearing
was made compulsory before impact assessment
was finalized.
EIA – Statutory ModelEIA – Statutory Model
Environmental
Clearance
Process
Information requirementsInformation requirements
Description of the project:Description of the project:
• physical characteristics, land-usephysical characteristics, land-use
requirements during construction andrequirements during construction and
operationoperation
• production processes, materials usedproduction processes, materials used
• estimate of expected residues andestimate of expected residues and
emissions (emissions (water, air, soil pollution, noise,water, air, soil pollution, noise,
vibrations, light, heat, radiation, etc.)vibrations, light, heat, radiation, etc.)
Information requirementsInformation requirements
Alternatives:Alternatives:
• outline of the main alternativesoutline of the main alternatives
• main reasons formain reasons for choicechoice, including, including
environmental effectsenvironmental effects
Information requirementsInformation requirements
Impacts on:Impacts on:
• population, fauna, flora, soils, water, air,population, fauna, flora, soils, water, air,
climatic factors, material assets incl.climatic factors, material assets incl.
architectural and archeological heritage,architectural and archeological heritage,
landscapelandscape
• interrelationship between these factorsinterrelationship between these factors
Information requirementsInformation requirements
Likely significant effects from:Likely significant effects from:
• existence of the projectexistence of the project
• use of natural resourcesuse of natural resources
• emission of pollutants, creation ofemission of pollutants, creation of
nuisances, elimination of wastenuisances, elimination of waste
and the description of the methodsand the description of the methods
used to assess the effects.used to assess the effects.
Information requirementsInformation requirements
Description of measures:Description of measures:
• to prevent, reduce, and whereto prevent, reduce, and where
possible to offset any significantpossible to offset any significant
adverse effects on theadverse effects on the
environment.environment.
Environmental Impact AssessmentEnvironmental Impact Assessment
procedural steps:procedural steps:
• description of the projectdescription of the project
• description of the environmentdescription of the environment
• identification of environmental impactsidentification of environmental impacts
• evaluation of environmental impactsevaluation of environmental impacts
• management and control of impactsmanagement and control of impacts
• presentation of the studypresentation of the study
• public participationpublic participation
• judgment by authoritiesjudgment by authorities
EIA Process
Environmental Impact AssessmentEnvironmental Impact Assessment
procedure:procedure:
• deciding whether an EIA is required (Screening)deciding whether an EIA is required (Screening)
• determining the scope of EIA (Scoping)determining the scope of EIA (Scoping)
• preparing of the impact statement (EIS)preparing of the impact statement (EIS)
• consultations, public participationconsultations, public participation
• evaluating EIA results and consultationsevaluating EIA results and consultations
• reaching a decisionreaching a decision
• monitoring impacts after project implementationmonitoring impacts after project implementation
Project
Life
Cycle
Phase A
Phase B
Phase C
Phase D
Phase E
A. ProjectA. Project
Concept/IdentificationConcept/Identification
• Initial stage of the project planningInitial stage of the project planning
– Basic nature of the project is knownBasic nature of the project is known
including the site(s) where the projectincluding the site(s) where the project
is being proposed to be implementedis being proposed to be implemented
– ““Screen” project to determine ifScreen” project to determine if
project requires a full EIAproject requires a full EIA
ScreeningScreening
ProjectProject
EnvironmentalEnvironmental
impactimpact
EconomicEconomic
impactimpact
SocialSocial
impactimpact
Screening
• Identify environmental issues of concern
• Determine whether EIA is needed
• Establish need for project
Not require
EIA
Require
EIA
Impacts
unclear
Threshold criteria Impact criteria
• Size
• Location
• Output
• Cost/Finances
• Environmental
effects
• etc.
• Significant but
easily identifiable
impacts
• Significant impacts
• Sensitive area
Methods for Scoping
B. Pre-feasibility StageB. Pre-feasibility Stage
Making a plan for
public involvement
Identifying major issues
of public concern
Establishing priorities for
environmental assessment
Developing a strategy for
addressing priorities
Evaluating the
significance of issues
Distribution of information
to interested parties
““Scope” the project to identify issues/impacts for investigationScope” the project to identify issues/impacts for investigation
Initial Assessment ofInitial Assessment of
ImpactsImpacts
Existing or baseline data:Existing or baseline data:
• provide a description of the status andprovide a description of the status and
trends of environmental factors (e.g., airtrends of environmental factors (e.g., air
pollutant concentrations) against whichpollutant concentrations) against which
predicted changes can be compared andpredicted changes can be compared and
evaluated in terms of importanceevaluated in terms of importance
• provide a means of detecting actual changeprovide a means of detecting actual change
by monitoring once a project has beenby monitoring once a project has been
initiatedinitiated
C. Feasibility StageC. Feasibility Stage
Conduct the EIA and determine if theConduct the EIA and determine if the
project is viableproject is viable
• Magnitude of impactMagnitude of impact -- indicate whether the impactindicate whether the impact
is irreversible or, reversible and estimated potentialis irreversible or, reversible and estimated potential
rate of recoveryrate of recovery
• Extent of impactExtent of impact -- spatial extent of impacts shouldspatial extent of impacts should
be determinedbe determined
• Duration of ImpactDuration of Impact -- arising at different phases ofarising at different phases of
the project cycle and the length of the impact [e.g.the project cycle and the length of the impact [e.g.
short term (during construction-9 yrs), medium termshort term (during construction-9 yrs), medium term
(10-20 yrs), long term (20+ yrs)](10-20 yrs), long term (20+ yrs)]
D. Implement & Audit theD. Implement & Audit the
ProjectProject
The EIA is a "reference" guide during
implementation
• Outlines mitigation strategies and monitoring
schemes
Preventative measures - reduce potential adverse impacts before
occurrence
Compensatory measures - compensate for unavoidable adverse
impacts
Corrective measures - reduces the adverse impact to an acceptable
level
• Audit project after completion to identify
lessons learned
E. Environmental MonitoringE. Environmental Monitoring
• Environmental monitoring provides feedback
about the actual environmental impacts of a
project
• Helps judge the success of mitigation
measures in protecting the environment
• Ensure compliance with environmental
standards
• Facilitate any needed project design or
operational changes
Strategic environment assessment
• Strategic environment assessment (SEA) refers to
systematic analysis of the environmental effects of
development policies, plans, programmes and other
proposed strategic actions. This process extends the
aims and principles of EIA upstream in the decision-
making process, beyond the project level and when
major alternatives are still open. SEA represents a
proactive approach to integrating environmental
considerations into the higher levels of decision-
making.
• Despite its wide use and acceptance, EIA has certain
shortcomings as a tool for minimizing environmental
effects of development proposals. It takes place
relatively late at the downstream end of the decision
making process, after major alternatives and
directions have been chosen
Environmental Impact Assessment
Environmental Impact Assessment
Environmental Impact Assessment
Environmental Impact Assessment
Activists are calling the project illegal. “The land of adivasis
here is ceiling land. During the land reforms movement,
excess land that was acquired by the government was
given to adivasis for tilling in 1972. Land deed, locally called
7/12, was also issued in their names. Such ceiling land can
neither be transferred nor sold. But the Maharashtra
government has issued special resolutions to ensure that
the ceiling land can be acquired for developing Lavasa,”
says Rifat Mumtaz of Pune-based ngo National Centre for
Advocacy Studies (ncas). Mumtaz adds that Lavasa has
flouted rules because the project has not taken any
environmental impact assessment (eia) clearance from the
Union Ministry of Environment and Forests.
Environmental Impact Assessment
Environmental Impact Assessment
“The corporation has already constructed one private dam and there is
no water downstream of this dam. Farmers have neither drinking water
nor water for irrigation. The farmers downsteam recently attacked
mkvdc and it was forced to release water. Imagine what will happen
after all the four dams are constructed,” says Shedge of Mugaon
village. A petition in the Bombay High Court challenged allocation of
mkvdc’s land in 2006. The petition also said that mkvdc was not meant
for commercial use and Lavasa was a purely commercial venture. The
case is pending.
The company says it is building 12 mini dams in the area that will “add
to the current capacity of the Warasgaon lake”. “These dams will be
built at higher levels increasing the existing catchment capacity. We will
create an additional water catchment of 0.9 thousand million cubic
metres (tmc) of which 0.4 tmc will be used by Lavasa and 0.5 tmc will
be released into the lake,” the spokesperson said.
Environmental Impact Assessment
Environmental Impact Assessment
But experts warn that water scarcity will not remain
limited to downstream villages; it will also hit Pune
city, as its water supply goes from this valley, called
the Mose valley. “On the one hand, the government is
destroying the present water source for Pune and on
the other, it is seeking funds from the Centre for
additional water supply,” says Pune corporator
Bhapkar. Meanwhile, protests against the project have
gathered steam. Villagers are demanding a Central
Bureau of Investigation enquiry.
EIA’s therefore cannot….EIA’s therefore cannot….
• Decide which alternative to choseDecide which alternative to chose
• Prevent environmental impacts fromPrevent environmental impacts from
happeninghappening
• Guarantee decisions you likeGuarantee decisions you like
• Prohibit any actionsProhibit any actions
• Cumulative effects of multiple projectsCumulative effects of multiple projects
1 sur 42

Contenu connexe

Tendances(20)

Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
Kumar 19.3K vues
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
Chandrakant Singh784 vues
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.ppt
Apoorva Mathur8.6K vues
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Samanth kumar7.3K vues
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
Deepika Verma21.9K vues
EIA MethodsEIA Methods
EIA Methods
SOUBAM INDRAKUMAR SINGH138.7K vues
 EIA-process EIA-process
EIA-process
Oshal Khan903 vues
environmental impact assessment environmental impact assessment
environmental impact assessment
Pramoda Raj69.9K vues
EIAEIA
EIA
Bimal Antony9K vues
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
goswamikusum2K vues
Socio economic study in eiaSocio economic study in eia
Socio economic study in eia
Arif Shaikh9.4K vues
Public participation in eiaPublic participation in eia
Public participation in eia
Joseph Asem34.4K vues
Environmental AuditEnvironmental Audit
Environmental Audit
k. j. somaiya college of arts & commerce52.7K vues

Similaire à Environmental Impact Assessment

Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
39 vues34 diapositives
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
9 vues34 diapositives
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13Adilah Anuar
231 vues53 diapositives

Similaire à Environmental Impact Assessment(20)

Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga239 vues
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga29 vues
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
Adilah Anuar231 vues
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Ilakiya Tamil79 vues
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
ChandanLawrence5 vues
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Hara Bhara Pakistan4.8K vues
Coastal Road ProjectCoastal Road Project
Coastal Road Project
Ekonnect Knowledge Foundation2.5K vues
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Bahadur Prasad15K vues
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Nanyang Technological University, Singapore7.5K vues
eia.ppteia.ppt
eia.ppt
MataFurniturea153 vues
eia.ppteia.ppt
eia.ppt
ssuser90355014 vues
Eia screeningEia screening
Eia screening
Iqbál Ãzàm1.4K vues
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptx
MonirulIslamEstiak20 vues
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
Angom Baleshwor518 vues
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIA
bishal sapkota2.7K vues
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
SANDEEP PATRE2.3K vues

Plus de Prithvi Ghag

sorrysorry
sorryPrithvi Ghag
1.2K vues1 diapositive
sorrysorry
sorryPrithvi Ghag
1.6K vues1 diapositive
Brand endorsementsBrand endorsements
Brand endorsementsPrithvi Ghag
4.4K vues77 diapositives
Environment ManagementEnvironment Management
Environment ManagementPrithvi Ghag
884 vues46 diapositives
Jet aiwyasJet aiwyas
Jet aiwyasPrithvi Ghag
2.8K vues12 diapositives
Inter corporate depositsInter corporate deposits
Inter corporate depositsPrithvi Ghag
15.6K vues28 diapositives

Plus de Prithvi Ghag(20)

sorrysorry
sorry
Prithvi Ghag1.2K vues
sorrysorry
sorry
Prithvi Ghag1.6K vues
Brand endorsementsBrand endorsements
Brand endorsements
Prithvi Ghag4.4K vues
Environment ManagementEnvironment Management
Environment Management
Prithvi Ghag884 vues
Jet aiwyasJet aiwyas
Jet aiwyas
Prithvi Ghag2.8K vues
Inter corporate depositsInter corporate deposits
Inter corporate deposits
Prithvi Ghag15.6K vues
Indian partnership act 1932Indian partnership act 1932
Indian partnership act 1932
Prithvi Ghag11K vues
 somalia somalia
somalia
Prithvi Ghag3.7K vues
Euro norms & carbon trading Euro norms & carbon trading
Euro norms & carbon trading
Prithvi Ghag5.7K vues
  solid waste management-40slides  solid waste management-40slides
solid waste management-40slides
Prithvi Ghag12.4K vues
ISO 140001ISO 140001
ISO 140001
Prithvi Ghag11.5K vues
Philip's CurvePhilip's Curve
Philip's Curve
Prithvi Ghag24.6K vues
Tempelate for new business modelTempelate for new business model
Tempelate for new business model
Prithvi Ghag447 vues
Ishikawa's Fish BoneIshikawa's Fish Bone
Ishikawa's Fish Bone
Prithvi Ghag17.9K vues
FIIs in IndiaFIIs in India
FIIs in India
Prithvi Ghag1.4K vues
Vita - new productVita - new product
Vita - new product
Prithvi Ghag578 vues
CRMCRM
CRM
Prithvi Ghag450 vues

Dernier(20)

[2023] Putting the R! in R&D.pdf[2023] Putting the R! in R&D.pdf
[2023] Putting the R! in R&D.pdf
Eleanor McHugh34 vues
ThroughputThroughput
Throughput
Moisés Armani Ramírez28 vues
METHOD AND SYSTEM FOR PREDICTING OPTIMAL LOAD FOR WHICH THE YIELD IS MAXIMUM ...METHOD AND SYSTEM FOR PREDICTING OPTIMAL LOAD FOR WHICH THE YIELD IS MAXIMUM ...
METHOD AND SYSTEM FOR PREDICTING OPTIMAL LOAD FOR WHICH THE YIELD IS MAXIMUM ...
Prity Khastgir IPR Strategic India Patent Attorney Amplify Innovation23 vues

Environmental Impact Assessment

  • 2. Environmental Impact AssessmentEnvironmental Impact Assessment • Environment Impact Assessment or EIA can be defined as the study to predict the effect of a proposed activity/project on the environment. • A decision making tool, EIA compares various alternatives for a project and seeks to identify the one which represents the best combination of economic and environmental costs and benefits.
  • 3. Environmental Impact AssessmentEnvironmental Impact Assessment is intended as an instrument ofis intended as an instrument of preventivepreventive environmentalenvironmental management. It provides amanagement. It provides a framework and an informationframework and an information basis forbasis for decision makingdecision making onon activities affecting theactivities affecting the environment.environment.
  • 4. EIA – Three core values 1. Integrity: The EIA process should be fair, objective, unbiased and balanced 2. Utility: The EIA process should provide balanced, credible information for decision making 3. Sustainability: The EIA process should result in environmental safeguards
  • 5. ““To say that infrastructure development hasTo say that infrastructure development has impact is to state the obvious. No industrialimpact is to state the obvious. No industrial country has advanced to such status withoutcountry has advanced to such status without developing solid infrastructure facilities. Anddeveloping solid infrastructure facilities. And no low-income country has managed tono low-income country has managed to escape poverty in the absence ofescape poverty in the absence of infrastructure.infrastructure. In addition to economic growth,In addition to economic growth, infrastructure development has a veryinfrastructure development has a very tangible impact on people's daily lives, andtangible impact on people's daily lives, and especially on the lives of poor peopleespecially on the lives of poor people ”” -- Liqun JinLiqun Jin Vice President, ADBVice President, ADB
  • 6. EIAEIA applies to the assessment of theapplies to the assessment of the environmental effects of those publicenvironmental effects of those public and privateand private projectsprojects which are likely towhich are likely to have significant effects on thehave significant effects on the environment.environment.
  • 7. EIAEIA ProjectProject means:means: • the execution of construction works orthe execution of construction works or of other installations or schemesof other installations or schemes • other interventions in the naturalother interventions in the natural surroundings and landscape includingsurroundings and landscape including those involving the extraction ofthose involving the extraction of minerals.minerals.
  • 8. EIAEIA Development consentDevelopment consent means:means: • thethe decisiondecision of the competentof the competent authorities which entitles the developerauthorities which entitles the developer to proceed with the project.to proceed with the project.
  • 9. EIAEIA …….. have significant effects on the.. have significant effects on the environment by virtueenvironment by virtue inter alia,inter alia, of their:of their: nature, size,nature, size, locationlocation..
  • 10. EIAEIA …… direct and indirect effects of a projectdirect and indirect effects of a project on the following factors:on the following factors: • human beings, fauna and florahuman beings, fauna and flora • soil, water, air, climate and the landscapesoil, water, air, climate and the landscape • the inter-action between the factorsthe inter-action between the factors mentioned in the first and second indentsmentioned in the first and second indents • material assets and the culturalmaterial assets and the cultural heritage.heritage.
  • 11. Environmental ImpactEnvironmental Impact Assessment (EIA)Assessment (EIA) There are two types of EIA models- the statutory model which makes the assessment of impact compulsory under an enacted law, or a delegated legislation, and the administrative model under which an administration exercises its discretion to find out whether an impact study is necessary. Till 1992, India was following the administrative model of EIA.
  • 12. • On 27th January, 1994 a notification was issued dealing with mandatory EIA. The notification requires project proponent to submit an EIA report, and environment management plan, details of the public hearing and a project report to the impact assessment agency for clearance, further review by a committee of experts in certain cases. • By the amendment in the year 1997, public hearing was made compulsory before impact assessment was finalized. EIA – Statutory ModelEIA – Statutory Model
  • 14. Information requirementsInformation requirements Description of the project:Description of the project: • physical characteristics, land-usephysical characteristics, land-use requirements during construction andrequirements during construction and operationoperation • production processes, materials usedproduction processes, materials used • estimate of expected residues andestimate of expected residues and emissions (emissions (water, air, soil pollution, noise,water, air, soil pollution, noise, vibrations, light, heat, radiation, etc.)vibrations, light, heat, radiation, etc.)
  • 15. Information requirementsInformation requirements Alternatives:Alternatives: • outline of the main alternativesoutline of the main alternatives • main reasons formain reasons for choicechoice, including, including environmental effectsenvironmental effects
  • 16. Information requirementsInformation requirements Impacts on:Impacts on: • population, fauna, flora, soils, water, air,population, fauna, flora, soils, water, air, climatic factors, material assets incl.climatic factors, material assets incl. architectural and archeological heritage,architectural and archeological heritage, landscapelandscape • interrelationship between these factorsinterrelationship between these factors
  • 17. Information requirementsInformation requirements Likely significant effects from:Likely significant effects from: • existence of the projectexistence of the project • use of natural resourcesuse of natural resources • emission of pollutants, creation ofemission of pollutants, creation of nuisances, elimination of wastenuisances, elimination of waste and the description of the methodsand the description of the methods used to assess the effects.used to assess the effects.
  • 18. Information requirementsInformation requirements Description of measures:Description of measures: • to prevent, reduce, and whereto prevent, reduce, and where possible to offset any significantpossible to offset any significant adverse effects on theadverse effects on the environment.environment.
  • 19. Environmental Impact AssessmentEnvironmental Impact Assessment procedural steps:procedural steps: • description of the projectdescription of the project • description of the environmentdescription of the environment • identification of environmental impactsidentification of environmental impacts • evaluation of environmental impactsevaluation of environmental impacts • management and control of impactsmanagement and control of impacts • presentation of the studypresentation of the study • public participationpublic participation • judgment by authoritiesjudgment by authorities
  • 21. Environmental Impact AssessmentEnvironmental Impact Assessment procedure:procedure: • deciding whether an EIA is required (Screening)deciding whether an EIA is required (Screening) • determining the scope of EIA (Scoping)determining the scope of EIA (Scoping) • preparing of the impact statement (EIS)preparing of the impact statement (EIS) • consultations, public participationconsultations, public participation • evaluating EIA results and consultationsevaluating EIA results and consultations • reaching a decisionreaching a decision • monitoring impacts after project implementationmonitoring impacts after project implementation
  • 23. A. ProjectA. Project Concept/IdentificationConcept/Identification • Initial stage of the project planningInitial stage of the project planning – Basic nature of the project is knownBasic nature of the project is known including the site(s) where the projectincluding the site(s) where the project is being proposed to be implementedis being proposed to be implemented – ““Screen” project to determine ifScreen” project to determine if project requires a full EIAproject requires a full EIA
  • 24. ScreeningScreening ProjectProject EnvironmentalEnvironmental impactimpact EconomicEconomic impactimpact SocialSocial impactimpact Screening • Identify environmental issues of concern • Determine whether EIA is needed • Establish need for project Not require EIA Require EIA Impacts unclear Threshold criteria Impact criteria • Size • Location • Output • Cost/Finances • Environmental effects • etc. • Significant but easily identifiable impacts • Significant impacts • Sensitive area
  • 25. Methods for Scoping B. Pre-feasibility StageB. Pre-feasibility Stage Making a plan for public involvement Identifying major issues of public concern Establishing priorities for environmental assessment Developing a strategy for addressing priorities Evaluating the significance of issues Distribution of information to interested parties ““Scope” the project to identify issues/impacts for investigationScope” the project to identify issues/impacts for investigation
  • 26. Initial Assessment ofInitial Assessment of ImpactsImpacts Existing or baseline data:Existing or baseline data: • provide a description of the status andprovide a description of the status and trends of environmental factors (e.g., airtrends of environmental factors (e.g., air pollutant concentrations) against whichpollutant concentrations) against which predicted changes can be compared andpredicted changes can be compared and evaluated in terms of importanceevaluated in terms of importance • provide a means of detecting actual changeprovide a means of detecting actual change by monitoring once a project has beenby monitoring once a project has been initiatedinitiated
  • 27. C. Feasibility StageC. Feasibility Stage Conduct the EIA and determine if theConduct the EIA and determine if the project is viableproject is viable • Magnitude of impactMagnitude of impact -- indicate whether the impactindicate whether the impact is irreversible or, reversible and estimated potentialis irreversible or, reversible and estimated potential rate of recoveryrate of recovery • Extent of impactExtent of impact -- spatial extent of impacts shouldspatial extent of impacts should be determinedbe determined • Duration of ImpactDuration of Impact -- arising at different phases ofarising at different phases of the project cycle and the length of the impact [e.g.the project cycle and the length of the impact [e.g. short term (during construction-9 yrs), medium termshort term (during construction-9 yrs), medium term (10-20 yrs), long term (20+ yrs)](10-20 yrs), long term (20+ yrs)]
  • 28. D. Implement & Audit theD. Implement & Audit the ProjectProject The EIA is a "reference" guide during implementation • Outlines mitigation strategies and monitoring schemes Preventative measures - reduce potential adverse impacts before occurrence Compensatory measures - compensate for unavoidable adverse impacts Corrective measures - reduces the adverse impact to an acceptable level • Audit project after completion to identify lessons learned
  • 29. E. Environmental MonitoringE. Environmental Monitoring • Environmental monitoring provides feedback about the actual environmental impacts of a project • Helps judge the success of mitigation measures in protecting the environment • Ensure compliance with environmental standards • Facilitate any needed project design or operational changes
  • 30. Strategic environment assessment • Strategic environment assessment (SEA) refers to systematic analysis of the environmental effects of development policies, plans, programmes and other proposed strategic actions. This process extends the aims and principles of EIA upstream in the decision- making process, beyond the project level and when major alternatives are still open. SEA represents a proactive approach to integrating environmental considerations into the higher levels of decision- making. • Despite its wide use and acceptance, EIA has certain shortcomings as a tool for minimizing environmental effects of development proposals. It takes place relatively late at the downstream end of the decision making process, after major alternatives and directions have been chosen
  • 35. Activists are calling the project illegal. “The land of adivasis here is ceiling land. During the land reforms movement, excess land that was acquired by the government was given to adivasis for tilling in 1972. Land deed, locally called 7/12, was also issued in their names. Such ceiling land can neither be transferred nor sold. But the Maharashtra government has issued special resolutions to ensure that the ceiling land can be acquired for developing Lavasa,” says Rifat Mumtaz of Pune-based ngo National Centre for Advocacy Studies (ncas). Mumtaz adds that Lavasa has flouted rules because the project has not taken any environmental impact assessment (eia) clearance from the Union Ministry of Environment and Forests.
  • 38. “The corporation has already constructed one private dam and there is no water downstream of this dam. Farmers have neither drinking water nor water for irrigation. The farmers downsteam recently attacked mkvdc and it was forced to release water. Imagine what will happen after all the four dams are constructed,” says Shedge of Mugaon village. A petition in the Bombay High Court challenged allocation of mkvdc’s land in 2006. The petition also said that mkvdc was not meant for commercial use and Lavasa was a purely commercial venture. The case is pending. The company says it is building 12 mini dams in the area that will “add to the current capacity of the Warasgaon lake”. “These dams will be built at higher levels increasing the existing catchment capacity. We will create an additional water catchment of 0.9 thousand million cubic metres (tmc) of which 0.4 tmc will be used by Lavasa and 0.5 tmc will be released into the lake,” the spokesperson said.
  • 41. But experts warn that water scarcity will not remain limited to downstream villages; it will also hit Pune city, as its water supply goes from this valley, called the Mose valley. “On the one hand, the government is destroying the present water source for Pune and on the other, it is seeking funds from the Centre for additional water supply,” says Pune corporator Bhapkar. Meanwhile, protests against the project have gathered steam. Villagers are demanding a Central Bureau of Investigation enquiry.
  • 42. EIA’s therefore cannot….EIA’s therefore cannot…. • Decide which alternative to choseDecide which alternative to chose • Prevent environmental impacts fromPrevent environmental impacts from happeninghappening • Guarantee decisions you likeGuarantee decisions you like • Prohibit any actionsProhibit any actions • Cumulative effects of multiple projectsCumulative effects of multiple projects