Part Design – Modeling and Building
1. Camera/Light Bracket and supports
Installed at our customer’s site is a Cognex camera and light on our custom stand. The panel is
mounted lower on the other side. This had to fit over the end of the conveyor for the camera to
see the ink printed on the end of the carton after a 90 degree transfer.
We designed the brackets to hold either the camera or the light, and an air hose with nozzle for
cleaning dust from the lens and light. We also designed the vertical and horizontal supports for
the camera and light brackets to have full adjustability.
This is for for a client that needed to inspect cartons at a maximum of 250 per minute. We built
two of them as there were two similar lines. We were also responsible for the reject of the
cartons which was slightly down stream.
1
2
Part Design – Modeling and Building
2. Concentric Sealing Ring
Built for our customer to help contain condensation. It was a very hazardous environment and it
had to be made of special materials.
It had to be made in 3 parts to fit around the object with tightening capabilities.
Watch the video of the animated action of the sealing ring:
(Link)
This was not what they ended up using as they had us create another design which you will see
next.
3
Part Design – Modeling and Building
3. Sealing Ring
Shown above is the installed Sealing Ring model with the new design. The actual picture cannot
be shown for privacy reasons.
4
Part Design – Modeling and Building
4. E-Stop Brackets
We make our own brackets for E-Stops, light curtains and push button stations. Show is our
E-Stop over AS-I Bracket. A normal E-Stop can also be mounted on this bracket. We use AS-I
to reduce the amount of wiring, potential wiring errors and fast start-up & commissioning.
5
Part Design – Modeling and Building
5. Light Curtain Brackets with an E-Stop/PB Station
6
Part Design – Modeling and Building
6. Case Pushers
We design and make our own case pushers. The solid brackets hold an off-the-shelf cylinder
from one of our partners. The guide or contact point is also designed, modeled and built.
7
Part Design – Modeling and Building
7. Robot Through Support Bracket
We designed a through support bracket which supports a vacuum hose and cabling. It was a
very complicated part to build. We did not accept the part from the fabrication shop, as the
anodizing process had a gap and it missed the tapped hole.
part from the fabrication shop
8
Part Design – Modeling and Building
8. Complete Cell Modeling
We design and model our cells before any procurement or construction so our clients can get a
real feel for the layout of the cell and the space around it. We take into account all of the items
inside of the cell, but also all of the logistics outside of the cell. Operation of the system with
operator stations, push button stations, guard doors are all important factors with cell design.
Material delivery and removal are also very important so the cell can operate as efficiently as
possible.

More Related Content

Viewers also liked (11)

De que forma Ahorrar Cada Dia Con Los Electrodomesticos
De que forma Ahorrar Cada Dia Con Los Electrodomesticos
De que forma Ahorrar Cada Dia Con Los Electrodomesticos
De que forma Ahorrar Cada Dia Con Los Electrodomesticos
 
Theoretical Earthquake Could Impact Coast of California
Theoretical Earthquake Could Impact Coast of CaliforniaTheoretical Earthquake Could Impact Coast of California
Theoretical Earthquake Could Impact Coast of California
 
Cuidar
CuidarCuidar
Cuidar
 
Vitaminele 121024100218-phpapp01
Vitaminele 121024100218-phpapp01Vitaminele 121024100218-phpapp01
Vitaminele 121024100218-phpapp01
 
Web 2,0
Web 2,0Web 2,0
Web 2,0
 
8. cyberbullyng
8. cyberbullyng8. cyberbullyng
8. cyberbullyng
 
Wael CV 2015 updated
Wael CV 2015 updatedWael CV 2015 updated
Wael CV 2015 updated
 
Mediaclic abbonamenti 2014 Concessionarie
Mediaclic abbonamenti 2014  ConcessionarieMediaclic abbonamenti 2014  Concessionarie
Mediaclic abbonamenti 2014 Concessionarie
 
Black History Timeline at Brown University - 12 23-13 submision
Black History Timeline at Brown University - 12 23-13  submisionBlack History Timeline at Brown University - 12 23-13  submision
Black History Timeline at Brown University - 12 23-13 submision
 
Mediaclic Abbonamenti 2014
Mediaclic Abbonamenti 2014Mediaclic Abbonamenti 2014
Mediaclic Abbonamenti 2014
 
Evaluation Q4
Evaluation Q4Evaluation Q4
Evaluation Q4
 

Similar to Jae automation part design modeling and building (id 5307)r

vending machine
vending machinevending machine
vending machine
soham pal
 
Sarah-Rose Lancaster Mech Eng Portfolio
Sarah-Rose Lancaster Mech Eng PortfolioSarah-Rose Lancaster Mech Eng Portfolio
Sarah-Rose Lancaster Mech Eng Portfolio
Sarah-Rose Lancaster
 
Phil_Sutton-Portfolio
Phil_Sutton-PortfolioPhil_Sutton-Portfolio
Phil_Sutton-Portfolio
Phil Sutton
 
ScottMelanson_Digital_2016
ScottMelanson_Digital_2016ScottMelanson_Digital_2016
ScottMelanson_Digital_2016
Scott Melanson
 
OEM FinalPresentation 2015
OEM FinalPresentation 2015OEM FinalPresentation 2015
OEM FinalPresentation 2015
Nathan Eastburn
 

Similar to Jae automation part design modeling and building (id 5307)r (20)

Vip lounge
Vip loungeVip lounge
Vip lounge
 
Case Studies Ii
Case Studies IiCase Studies Ii
Case Studies Ii
 
vending machine
vending machinevending machine
vending machine
 
Housing_Report
Housing_ReportHousing_Report
Housing_Report
 
Aec_Facade_Presentation
Aec_Facade_PresentationAec_Facade_Presentation
Aec_Facade_Presentation
 
Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009
 
Rapid tooling job 1
Rapid tooling job 1Rapid tooling job 1
Rapid tooling job 1
 
LUUV makes stabilizing camera mount using EOS 3D Printing / Additive Manufact...
LUUV makes stabilizing camera mount using EOS 3D Printing / Additive Manufact...LUUV makes stabilizing camera mount using EOS 3D Printing / Additive Manufact...
LUUV makes stabilizing camera mount using EOS 3D Printing / Additive Manufact...
 
LUUV - No More Jittery Images – Innovative Camera Mount
LUUV - No More Jittery Images – Innovative Camera MountLUUV - No More Jittery Images – Innovative Camera Mount
LUUV - No More Jittery Images – Innovative Camera Mount
 
Plant Design IDI
Plant Design IDIPlant Design IDI
Plant Design IDI
 
110426 yep pro brochure englisch
110426 yep pro brochure englisch110426 yep pro brochure englisch
110426 yep pro brochure englisch
 
Sarah-Rose Lancaster Mech Eng Portfolio
Sarah-Rose Lancaster Mech Eng PortfolioSarah-Rose Lancaster Mech Eng Portfolio
Sarah-Rose Lancaster Mech Eng Portfolio
 
Phil_Sutton-Portfolio
Phil_Sutton-PortfolioPhil_Sutton-Portfolio
Phil_Sutton-Portfolio
 
ScottMelanson_Digital_2016
ScottMelanson_Digital_2016ScottMelanson_Digital_2016
ScottMelanson_Digital_2016
 
Catalogue moulds for precast concrete Moldtech
Catalogue moulds for precast concrete MoldtechCatalogue moulds for precast concrete Moldtech
Catalogue moulds for precast concrete Moldtech
 
OEM FinalPresentation 2015
OEM FinalPresentation 2015OEM FinalPresentation 2015
OEM FinalPresentation 2015
 
Engineering portfolio
Engineering portfolioEngineering portfolio
Engineering portfolio
 
Export mold updates
Export mold  updatesExport mold  updates
Export mold updates
 
Part 4 Mods - Tower and Foundation Modifications on vertical structures
Part 4 Mods  - Tower and Foundation Modifications on vertical structures Part 4 Mods  - Tower and Foundation Modifications on vertical structures
Part 4 Mods - Tower and Foundation Modifications on vertical structures
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Recently uploaded (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Jae automation part design modeling and building (id 5307)r

  • 1. Part Design – Modeling and Building 1. Camera/Light Bracket and supports Installed at our customer’s site is a Cognex camera and light on our custom stand. The panel is mounted lower on the other side. This had to fit over the end of the conveyor for the camera to see the ink printed on the end of the carton after a 90 degree transfer. We designed the brackets to hold either the camera or the light, and an air hose with nozzle for cleaning dust from the lens and light. We also designed the vertical and horizontal supports for the camera and light brackets to have full adjustability. This is for for a client that needed to inspect cartons at a maximum of 250 per minute. We built two of them as there were two similar lines. We were also responsible for the reject of the cartons which was slightly down stream. 1
  • 2. 2 Part Design – Modeling and Building 2. Concentric Sealing Ring Built for our customer to help contain condensation. It was a very hazardous environment and it had to be made of special materials. It had to be made in 3 parts to fit around the object with tightening capabilities. Watch the video of the animated action of the sealing ring: (Link) This was not what they ended up using as they had us create another design which you will see next.
  • 3. 3 Part Design – Modeling and Building 3. Sealing Ring Shown above is the installed Sealing Ring model with the new design. The actual picture cannot be shown for privacy reasons.
  • 4. 4 Part Design – Modeling and Building 4. E-Stop Brackets We make our own brackets for E-Stops, light curtains and push button stations. Show is our E-Stop over AS-I Bracket. A normal E-Stop can also be mounted on this bracket. We use AS-I to reduce the amount of wiring, potential wiring errors and fast start-up & commissioning.
  • 5. 5 Part Design – Modeling and Building 5. Light Curtain Brackets with an E-Stop/PB Station
  • 6. 6 Part Design – Modeling and Building 6. Case Pushers We design and make our own case pushers. The solid brackets hold an off-the-shelf cylinder from one of our partners. The guide or contact point is also designed, modeled and built.
  • 7. 7 Part Design – Modeling and Building 7. Robot Through Support Bracket We designed a through support bracket which supports a vacuum hose and cabling. It was a very complicated part to build. We did not accept the part from the fabrication shop, as the anodizing process had a gap and it missed the tapped hole. part from the fabrication shop
  • 8. 8 Part Design – Modeling and Building 8. Complete Cell Modeling We design and model our cells before any procurement or construction so our clients can get a real feel for the layout of the cell and the space around it. We take into account all of the items inside of the cell, but also all of the logistics outside of the cell. Operation of the system with operator stations, push button stations, guard doors are all important factors with cell design. Material delivery and removal are also very important so the cell can operate as efficiently as possible.