Intelligent Project Acceleration:                  goal-based acceleration     Dr. Dan Patterson | CEO & Founder Acumen
2Agenda�    Introductions�    Schedule acceleration�    Case Study using Fuse 360�    Q&A    November 17, 2011
Acumen: Proven Project Analytics�      Project Management Software Company�      Improving CPM scheduling & analysis�     ...
4Fuse 360 Goal-Based Acceleration�     Module for Fuse platform�     Automated:       �    Scenario generation    Logic   ...
Goal-Based Acceleration    Accelerate schedule…      by applying criteria  …to achieve a given goal
6Acceleration�     Planning: Schedule alignment�     Execution: Delay recovery�     Goal:       �    Target date       �  ...
Criteria Sets�   Drive acceleration                                     Criteria Set    �   Reduce duration               ...
8How Does it Work?�     CPM simulation�     Critical path focus�     Incremental push�     Prioritize       �    Earliest/...
Accept or Reject Scenario�   Number of days accelerated?�   Goal achieved?
10Decision Support�     Scenario Insight:       �    Fuse forensics: what changed?       �    Fuse analysis: which option?...
11Baseline Compliance™�     Traditional measures include:       �    Earned value       �    % complete       �    Ahead/b...
Compliance Scenarios
Case Study  Baseline Compliance™ Analysis100% 80% 60% 40%  20%   0%
14 Demo Based on case study            Project slipped by 6 months            Acceleration used to recover delay          ...
Example 1                                       Example 2�   2 day project acceleration                  �   2 day project...
Fuse 360 SummaryGoal-based Schedule AccelerationBased on true CPM analysisUses yourGenerate alternate scenariosPublish to ...
More information:White papers: www.projectacumen.comSoftware Trial: www.projectacumen.com/trialTwitter: @projectacumenEmai...
Prochain SlideShare
Chargement dans…5
×

Intelligent Project Acceleration: An Introduction to Acumen 360

582 vues

Publié le

A one-hour webinar introducing Acumen 360. Acumen 360 gives you the ability to accelerate time frames effortlessly in seconds. It provides pinpointed focus, intelligent optimization and selects the most efficient means of achieving your schedule goals.

Publié dans : Business, Technologie
  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

Intelligent Project Acceleration: An Introduction to Acumen 360

  1. 1. Intelligent Project Acceleration: goal-based acceleration Dr. Dan Patterson | CEO & Founder Acumen
  2. 2. 2Agenda� Introductions� Schedule acceleration� Case Study using Fuse 360� Q&A November 17, 2011
  3. 3. Acumen: Proven Project Analytics� Project Management Software Company� Improving CPM scheduling & analysis� Thought leader in Analytics� Schedule maturity framework S1 > S5™ Framework Acumen Core Offerings S5: Acumen Fuse® Validate S4: Optimize S3: Risk- S2: Adjust Risk Assessment Workshops Critique S1: Build Software Training
  4. 4. 4Fuse 360 Goal-Based Acceleration� Module for Fuse platform� Automated: � Scenario generation Logic Analysis � Acceleration � Decision support Forensic Metric Analysis Analysis November 17, 2011
  5. 5. Goal-Based Acceleration Accelerate schedule… by applying criteria …to achieve a given goal
  6. 6. 6Acceleration� Planning: Schedule alignment� Execution: Delay recovery� Goal: � Target date � % of remaining duration � Best date possible � Project or activity November 17, 2011
  7. 7. Criteria Sets� Drive acceleration Criteria Set � Reduce duration Script � Change calendars “Cleanse & accelerate construction” � Reduce logic lags Step 1 Step 2 Step 3 Remove all Filter for Reduce � Remove constraints constraints Construction activities remaining duration by 20%
  8. 8. 8How Does it Work?� CPM simulation� Critical path focus� Incremental push� Prioritize � Earliest/latest � Longest durations � Least resistance November 17, 2011
  9. 9. Accept or Reject Scenario� Number of days accelerated?� Goal achieved?
  10. 10. 10Decision Support� Scenario Insight: � Fuse forensics: what changed? � Fuse analysis: which option?� New plan: � Publish back to Primavera or MS Project November 17, 2011
  11. 11. 11Baseline Compliance™� Traditional measures include: � Earned value � % complete � Ahead/behind baseline� Baseline Compliance™ � True measure of how plan is being executed � More than just date comparison November 17, 2011
  12. 12. Compliance Scenarios
  13. 13. Case Study Baseline Compliance™ Analysis100% 80% 60% 40% 20% 0%
  14. 14. 14 Demo Based on case study   Project slipped by 6 months   Acceleration used to recover delay   Result was faster, more achievable planNovember 17, 2011
  15. 15. Example 1 Example 2� 2 day project acceleration � 2 day project acceleration� Requires 2 days of reduction � Requires 2 days of reduction� 100% � 67% 2 day activity reduction 2 day activity reduction 1 day activity 3 reduction 2 day project 2 day project acceleration acceleration
  16. 16. Fuse 360 SummaryGoal-based Schedule AccelerationBased on true CPM analysisUses yourGenerate alternate scenariosPublish to native scheduling tool Faster schedules through intelligent acceleration Decision support through advanced analytics
  17. 17. More information:White papers: www.projectacumen.comSoftware Trial: www.projectacumen.com/trialTwitter: @projectacumenEmail: info@projectacumen.com

×