PTC = Jobs

                      John Cohen
Vice President, Government Affairs
                     April 20, 2011
Alstom: Three Areas of Innovation

                                  Leading global provider of equipment & services for…
                   Power Generation                                                                                                                                                     Rail Transportation




                                                                                                      Power Transmission




Alstom in the U.S. - P 2 | © Alstom 2011
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Strong & Sustained Sales, Worldwide


                                                                                                                                                                                                Key Facts & Figures:
                       Thermal Power                                                                                                                                   Grid
                                                                                                                                                                                             92,700 employees in 100
                                  $12.9 bn                                                                                                                         $4.8 bn                                 countries

                                                                                                                                                                                            6% increase in sales from
                                                                                                                                                                                                  2009/10 to 2010/11

                                                                                                                                                                                               Steady increase in R&D
                                                                                                                                                                                        investment to more than $1 bn
                                                                                                                                                                                                      USD in 2010//11

                                                                                                                                                       Transport                                Leading provider of
                                                                                                                                                                                        innovative clean technology
                                                                                                                                                          7.5 €bn                                          solutions
                              Renewable Power

                                             $2.6 bn                                                        Total sales 2010/11:
                                                                                                                $27.8 billion

Alstom in the U.S. - P 3 | © Alstom 2011
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Innovation, Coast-to-Coast

                                                                                                             6,000+ permanent employees in 45 states and the District of Columbia
                                                                                                                                     10,000+ employees including contract workers




                                                                                                                                                                                         100+ years of U.S.
                                                                                                                                                                                        market expertise in:
                                                                                                                                                                                           Power Generation
                                                                                                                                                                                          Rail Transportation
                                                                                                                                                                                        Energy Transmission




  •        Multimillion dollar investments in Chattanooga, Tennessee and Amarillo, Texas
                          will create up to 600 green jobs for U.S. workers.

Alstom in the U.S. - P 4 | © Alstom 2011
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - North America
      Amarillo Nacelle Assembly Facility




                                                                          O p e r a t i o n a l Q 1 2 0 12
                                                                    C o m m o n G lo b a l P r o c e s s
r illo , T X - c e n t r a lly lo c a t e d - r a il a n d t r u c k s h ip p in g
                                                                                                                       115 , 0 0 0 f t 2 o n 2 0 a c r e s
                                                                                                                2 7 0 U n it s ( 3 M W ) a n n u a lly
                                                                         2 0 0 F u ll-t im e jo b s a t f u ll c a p a c it y
                                                                                   L E E D C e r t if ie d S u s t a in a b le S it e

                     Focused Facility for ECO 100 Platform to support US, Canada and Mexico
    © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
    or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
    notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom’s Wind business
 References in US - NAM
                                                                                                                                          Adams & Danielson wind farms
                       Minnesota
            Adams & Danielson                                                                                                       • 44 MW - 24 x ECO 86
                   wind farms

        NREL                                                                                                                        • Operational since March 2011
     ECO 100

                                                      NIRE                                                                          • Exceeding annual production estimates
                                                      ECO 86
                                                                                                                                      by 10%
                                                                                                                                    • Customer:




       Alstom’s first US wind farms in commercial operation are exceeding production estimates
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
#1 Message


             Policy Certainty                                                                                                                                                           Investment




                                                                                                                                            =

Presentation title - 01/01/2007 - P 7
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
PTC: Boom and Bust




© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Value of Policy Certainty – By the numbers

       • F OUR Y E A R S of consistent wind tax policy delivered:

                     − 3 5 % annual growth

                     − 4 0 0 manufacturing facilities in 4 3 states

                     − 6 0 % of wind turbine’s value produced in U.S. (up 3 5 % since 2005)

                     − $ 6 0 b il l io n of investment since 2005.

                     − 6 ,8 1 6 megawatts (MW) installed in 2011
                         • Up 3 1 % since 2010,
                         • 4 6 ,9 1 6 MW installed in the U.S. to date.

                     − 8 ,3 0 0 MW under construction in 2012


© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
PTC Expiration: Consequences


        • If PTC expires in 2013:

                      − A n n u a l I n s t a l l a t i o n s : Drop to 2 GW in 2013, from >8
                        GW in 2012

                      − T o t a l j o b s : Drop almost 5 0 %
                                    • 7 8 ,0 0 0 in 2012
                                    • 4 1 ,0 0 0 in 2013

                      − T o t a l I n v e s t m e n t : Drop by nearly t wo t h ir d s
                                    • $ 1 5 .6 b il l io n in 2012
                                    • $ 5 .5 b il l io n in 2013



© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
PTC Extension: Benefits



       • If PTC extended for 4-years:

                     − A n n u a l I n s t a l l a t i o n s : 8 - 1 0 GW through 2016

                     − T o t a l j o b s : Grow to nearly 1 0 0 ,0 0 0 by 2016

                     − T o t a l w i n d i n v e s t m e n t : Grow to $ 1 6 .3 b il l o n in
                       2016




© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
PTC Extension: Jobs




© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
PTC: Taxpayer ROI

        • Four year PTC extension: 8 7 % r e t u r n o n
          in v e s t me n t for U.S. taxpayers

                      − T a x p a y e r I n v e s t m e n t : ~$ 1 3 .6 b il l io n
                      − T a x p a y e r B e n e f i t : ~$ 2 5 .6 b il l io n
                      − Navigant inputs:
                         • Investment
                                                  − tax credits for wind plants installed from 2013 to 2016
                                    • Returns:
                                                  −      manufacturing investment
                                                  −      expenditures during construction
                                                  −      land lease payments over the life of the plants out to 2021
                                                  −      operating expenditures and federal
                                                  −      state taxes on income from power sales

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
The Challenge



       • Congress needs to A C T t h is y e a r


                     − H.R. 3307, American Renewable Energy Production Tax Credit
                       Extension Act of 2011,
                                   • 91 co-sponsors

                     − S. 2201, American Energy and Job Promotion Act,
                                   • 7 co-sponsors




© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Conclusion


                                                PTC


                                                                                                                                                 =


© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete
or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without
notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Thank You

www.alstom.com/us

     [Speaker Name & Title]
           [Speaker Phone]
            [Speaker Email]

More Related Content

What's hot

Instant - Global Serviced Office Review
Instant - Global Serviced Office ReviewInstant - Global Serviced Office Review
Instant - Global Serviced Office ReviewInstant
 
Finning ny & boston presentation sep 5 & 6, 2012_website v2
Finning ny & boston presentation sep 5 & 6, 2012_website v2Finning ny & boston presentation sep 5 & 6, 2012_website v2
Finning ny & boston presentation sep 5 & 6, 2012_website v2FinningInternational
 
energy future holindings _share_0703
energy future holindings  _share_0703energy future holindings  _share_0703
energy future holindings _share_0703finance29
 
Tele2 at Kinnevik CMD 20110223
Tele2 at Kinnevik CMD 20110223Tele2 at Kinnevik CMD 20110223
Tele2 at Kinnevik CMD 20110223Tele2
 
Kony Mobility for Health Plans
Kony Mobility for Health PlansKony Mobility for Health Plans
Kony Mobility for Health PlansKony, Inc.
 
Presentation - MPX and E.ON to form Joint Venture
Presentation - MPX and E.ON to form Joint Venture Presentation - MPX and E.ON to form Joint Venture
Presentation - MPX and E.ON to form Joint Venture MPX_RI
 
Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...
Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...
Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...Ruta N Medellín
 
12.4.29 stow sentry akron canton lte launch
12.4.29 stow sentry   akron canton lte launch12.4.29 stow sentry   akron canton lte launch
12.4.29 stow sentry akron canton lte launchhmhollingsworth
 
Monthly update february 2013
Monthly update   february 2013Monthly update   february 2013
Monthly update february 2013KimGibson
 
IGI Listed on Commercial Integrator as a
IGI Listed on Commercial Integrator as a IGI Listed on Commercial Integrator as a
IGI Listed on Commercial Integrator as a Aaron Vlk
 

What's hot (11)

Instant - Global Serviced Office Review
Instant - Global Serviced Office ReviewInstant - Global Serviced Office Review
Instant - Global Serviced Office Review
 
Finning ny & boston presentation sep 5 & 6, 2012_website v2
Finning ny & boston presentation sep 5 & 6, 2012_website v2Finning ny & boston presentation sep 5 & 6, 2012_website v2
Finning ny & boston presentation sep 5 & 6, 2012_website v2
 
energy future holindings _share_0703
energy future holindings  _share_0703energy future holindings  _share_0703
energy future holindings _share_0703
 
Tele2 at Kinnevik CMD 20110223
Tele2 at Kinnevik CMD 20110223Tele2 at Kinnevik CMD 20110223
Tele2 at Kinnevik CMD 20110223
 
Kony Mobility for Health Plans
Kony Mobility for Health PlansKony Mobility for Health Plans
Kony Mobility for Health Plans
 
Presentation - MPX and E.ON to form Joint Venture
Presentation - MPX and E.ON to form Joint Venture Presentation - MPX and E.ON to form Joint Venture
Presentation - MPX and E.ON to form Joint Venture
 
Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...
Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...
Charlas N: Experiencias de ciudades en transformación - HP in Colombia - Bria...
 
12.4.29 stow sentry akron canton lte launch
12.4.29 stow sentry   akron canton lte launch12.4.29 stow sentry   akron canton lte launch
12.4.29 stow sentry akron canton lte launch
 
Monthly update february 2013
Monthly update   february 2013Monthly update   february 2013
Monthly update february 2013
 
IGI Listed on Commercial Integrator as a
IGI Listed on Commercial Integrator as a IGI Listed on Commercial Integrator as a
IGI Listed on Commercial Integrator as a
 
10 year drip in energy
10 year drip in energy10 year drip in energy
10 year drip in energy
 

Viewers also liked

Viewers also liked (7)

Public speaking.1
Public speaking.1Public speaking.1
Public speaking.1
 
Solar Overview 101408
Solar Overview 101408Solar Overview 101408
Solar Overview 101408
 
Forum Journal (Spring 2013): NTCIC Projects Harness the Power of the Federal ...
Forum Journal (Spring 2013): NTCIC Projects Harness the Power of the Federal ...Forum Journal (Spring 2013): NTCIC Projects Harness the Power of the Federal ...
Forum Journal (Spring 2013): NTCIC Projects Harness the Power of the Federal ...
 
Renewable Energy Presentation
Renewable Energy PresentationRenewable Energy Presentation
Renewable Energy Presentation
 
Forum Journal (Winter 2014): States with Tax Credits
Forum Journal (Winter 2014): States with Tax CreditsForum Journal (Winter 2014): States with Tax Credits
Forum Journal (Winter 2014): States with Tax Credits
 
Renewable Energy Presentation
Renewable Energy PresentationRenewable Energy Presentation
Renewable Energy Presentation
 
Presentation on dross treatment
Presentation on dross treatmentPresentation on dross treatment
Presentation on dross treatment
 

Similar to Renewable Energy Production Tax Credits and Rural Communities

Telcom Industry Review and Future of Telcom Providers - Telco 2015
Telcom Industry Review and Future of Telcom Providers - Telco 2015Telcom Industry Review and Future of Telcom Providers - Telco 2015
Telcom Industry Review and Future of Telcom Providers - Telco 2015IBMTelecom
 
Company Analysis - PTCL
Company Analysis - PTCLCompany Analysis - PTCL
Company Analysis - PTCLHira M
 
Qualcomm - Seminário Tablets & Smartphones 2011
Qualcomm - Seminário Tablets & Smartphones 2011Qualcomm - Seminário Tablets & Smartphones 2011
Qualcomm - Seminário Tablets & Smartphones 2011Teque Eventos
 
StifelNicolaus Growth Conference Feb2012
StifelNicolaus Growth Conference Feb2012StifelNicolaus Growth Conference Feb2012
StifelNicolaus Growth Conference Feb2012EXFO Inc.
 
(3/4) Australia - Comparison between two MNOs
(3/4) Australia - Comparison between two MNOs(3/4) Australia - Comparison between two MNOs
(3/4) Australia - Comparison between two MNOsAhmad Bazzari
 
Global Services Conference 2012
Global Services Conference 2012Global Services Conference 2012
Global Services Conference 2012Niketa Chauhan
 
The Power of 2; AT&T for Nortel Customers
The Power of 2; AT&T for Nortel CustomersThe Power of 2; AT&T for Nortel Customers
The Power of 2; AT&T for Nortel CustomersPeter Keiley
 
Eurostaff Wind Salary Survey
Eurostaff Wind Salary SurveyEurostaff Wind Salary Survey
Eurostaff Wind Salary SurveyPaul Flynn
 
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)finance49
 
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)finance49
 
Insights: Ericsson Region Latin America and Caribbean
Insights: Ericsson Region Latin America and CaribbeanInsights: Ericsson Region Latin America and Caribbean
Insights: Ericsson Region Latin America and CaribbeanEricsson Latin America
 
Corporate Reporting Analysis: Cable & Wireless / UK Fixed line
Corporate Reporting Analysis: Cable & Wireless / UK Fixed lineCorporate Reporting Analysis: Cable & Wireless / UK Fixed line
Corporate Reporting Analysis: Cable & Wireless / UK Fixed lineChris Corbishley
 
Small Cell Deployments: Poised for Rapid Growth
Small Cell Deployments: Poised for Rapid GrowthSmall Cell Deployments: Poised for Rapid Growth
Small Cell Deployments: Poised for Rapid GrowthMindspeed Technologies
 
KoeElecTeaser-2p-EN-USD-Jun-2016
KoeElecTeaser-2p-EN-USD-Jun-2016KoeElecTeaser-2p-EN-USD-Jun-2016
KoeElecTeaser-2p-EN-USD-Jun-2016Bruno Koegler
 
Trc investor presentation 05 13 final
Trc investor presentation 05 13 finalTrc investor presentation 05 13 final
Trc investor presentation 05 13 finaltrcsolutions
 
Fcc Resultados 2009 I
Fcc Resultados 2009 IFcc Resultados 2009 I
Fcc Resultados 2009 INaoll MARY
 

Similar to Renewable Energy Production Tax Credits and Rural Communities (20)

Telcom Industry Review and Future of Telcom Providers - Telco 2015
Telcom Industry Review and Future of Telcom Providers - Telco 2015Telcom Industry Review and Future of Telcom Providers - Telco 2015
Telcom Industry Review and Future of Telcom Providers - Telco 2015
 
Technology Cost Optimization Strategies
Technology Cost Optimization StrategiesTechnology Cost Optimization Strategies
Technology Cost Optimization Strategies
 
Company Analysis - PTCL
Company Analysis - PTCLCompany Analysis - PTCL
Company Analysis - PTCL
 
Qualcomm - Seminário Tablets & Smartphones 2011
Qualcomm - Seminário Tablets & Smartphones 2011Qualcomm - Seminário Tablets & Smartphones 2011
Qualcomm - Seminário Tablets & Smartphones 2011
 
StifelNicolaus Growth Conference Feb2012
StifelNicolaus Growth Conference Feb2012StifelNicolaus Growth Conference Feb2012
StifelNicolaus Growth Conference Feb2012
 
(3/4) Australia - Comparison between two MNOs
(3/4) Australia - Comparison between two MNOs(3/4) Australia - Comparison between two MNOs
(3/4) Australia - Comparison between two MNOs
 
Global Services Conference 2012
Global Services Conference 2012Global Services Conference 2012
Global Services Conference 2012
 
The Power of 2; AT&T for Nortel Customers
The Power of 2; AT&T for Nortel CustomersThe Power of 2; AT&T for Nortel Customers
The Power of 2; AT&T for Nortel Customers
 
Eurostaff Wind Salary Survey
Eurostaff Wind Salary SurveyEurostaff Wind Salary Survey
Eurostaff Wind Salary Survey
 
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
 
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
 
Insights: Ericsson Region Latin America and Caribbean
Insights: Ericsson Region Latin America and CaribbeanInsights: Ericsson Region Latin America and Caribbean
Insights: Ericsson Region Latin America and Caribbean
 
Maximizing Data Profitability
Maximizing Data ProfitabilityMaximizing Data Profitability
Maximizing Data Profitability
 
Corporate Reporting Analysis: Cable & Wireless / UK Fixed line
Corporate Reporting Analysis: Cable & Wireless / UK Fixed lineCorporate Reporting Analysis: Cable & Wireless / UK Fixed line
Corporate Reporting Analysis: Cable & Wireless / UK Fixed line
 
ROTH Fall Conference
ROTH Fall ConferenceROTH Fall Conference
ROTH Fall Conference
 
Small Cell Deployments: Poised for Rapid Growth
Small Cell Deployments: Poised for Rapid GrowthSmall Cell Deployments: Poised for Rapid Growth
Small Cell Deployments: Poised for Rapid Growth
 
Power strategies
Power strategiesPower strategies
Power strategies
 
KoeElecTeaser-2p-EN-USD-Jun-2016
KoeElecTeaser-2p-EN-USD-Jun-2016KoeElecTeaser-2p-EN-USD-Jun-2016
KoeElecTeaser-2p-EN-USD-Jun-2016
 
Trc investor presentation 05 13 final
Trc investor presentation 05 13 finalTrc investor presentation 05 13 final
Trc investor presentation 05 13 final
 
Fcc Resultados 2009 I
Fcc Resultados 2009 IFcc Resultados 2009 I
Fcc Resultados 2009 I
 

More from Ports-To-Plains Blog

2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference Handouts2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference HandoutsPorts-To-Plains Blog
 
Energy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation InfrastructureEnergy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation InfrastructurePorts-To-Plains Blog
 
Wind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. ManufacturingWind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. ManufacturingPorts-To-Plains Blog
 
Compressed Air Wind Energy Storage
Compressed Air Wind Energy StorageCompressed Air Wind Energy Storage
Compressed Air Wind Energy StoragePorts-To-Plains Blog
 
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...Ports-To-Plains Blog
 
Ports-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of StatePorts-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of StatePorts-To-Plains Blog
 
News Release Keystone XL Supporting SEIS Finding 041813
News Release Keystone XL Supporting SEIS Finding 041813News Release Keystone XL Supporting SEIS Finding 041813
News Release Keystone XL Supporting SEIS Finding 041813Ports-To-Plains Blog
 
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...Ports-To-Plains Blog
 
2013 Energy Conference Save the Date
2013 Energy Conference Save the Date2013 Energy Conference Save the Date
2013 Energy Conference Save the DatePorts-To-Plains Blog
 
February 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains AllianceFebruary 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains AlliancePorts-To-Plains Blog
 
Draft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL ProjectDraft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL ProjectPorts-To-Plains Blog
 
PTP supports Heineman Keystone XL Pipeline Decision
PTP supports Heineman Keystone XL Pipeline DecisionPTP supports Heineman Keystone XL Pipeline Decision
PTP supports Heineman Keystone XL Pipeline DecisionPorts-To-Plains Blog
 
News Release PTP Keystone XL Nebraska
News Release PTP Keystone XL NebraskaNews Release PTP Keystone XL Nebraska
News Release PTP Keystone XL NebraskaPorts-To-Plains Blog
 
Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012Ports-To-Plains Blog
 
Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011Ports-To-Plains Blog
 
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...Ports-To-Plains Blog
 
Interim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory CommitteesInterim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory CommitteesPorts-To-Plains Blog
 
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012Ports-To-Plains Blog
 

More from Ports-To-Plains Blog (20)

Canada and U.S. Trade Overview
Canada and U.S. Trade Overview Canada and U.S. Trade Overview
Canada and U.S. Trade Overview
 
2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference Handouts2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference Handouts
 
Energy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation InfrastructureEnergy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation Infrastructure
 
Wind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. ManufacturingWind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. Manufacturing
 
Compressed Air Wind Energy Storage
Compressed Air Wind Energy StorageCompressed Air Wind Energy Storage
Compressed Air Wind Energy Storage
 
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
 
Ports-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of StatePorts-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of State
 
News Release Keystone XL Supporting SEIS Finding 041813
News Release Keystone XL Supporting SEIS Finding 041813News Release Keystone XL Supporting SEIS Finding 041813
News Release Keystone XL Supporting SEIS Finding 041813
 
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
 
2013 Energy Conference Save the Date
2013 Energy Conference Save the Date2013 Energy Conference Save the Date
2013 Energy Conference Save the Date
 
February 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains AllianceFebruary 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains Alliance
 
Draft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL ProjectDraft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL Project
 
PTP supports Heineman Keystone XL Pipeline Decision
PTP supports Heineman Keystone XL Pipeline DecisionPTP supports Heineman Keystone XL Pipeline Decision
PTP supports Heineman Keystone XL Pipeline Decision
 
Keystone XL Letter Dec 2012 NEDEQ
Keystone XL Letter Dec 2012 NEDEQKeystone XL Letter Dec 2012 NEDEQ
Keystone XL Letter Dec 2012 NEDEQ
 
News Release PTP Keystone XL Nebraska
News Release PTP Keystone XL NebraskaNews Release PTP Keystone XL Nebraska
News Release PTP Keystone XL Nebraska
 
Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012
 
Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011
 
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
 
Interim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory CommitteesInterim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory Committees
 
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
 

Recently uploaded

Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024Stephanie Beckett
 
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfThe Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfFIDO Alliance
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...FIDO Alliance
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...CzechDreamin
 
Introduction to Open Source RAG and RAG Evaluation
Introduction to Open Source RAG and RAG EvaluationIntroduction to Open Source RAG and RAG Evaluation
Introduction to Open Source RAG and RAG EvaluationZilliz
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...FIDO Alliance
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfFIDO Alliance
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101vincent683379
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastUXDXConf
 
Buy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptxBuy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptxEasyPrinterHelp
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIES VE
 
Agentic RAG What it is its types applications and implementation.pdf
Agentic RAG What it is its types applications and implementation.pdfAgentic RAG What it is its types applications and implementation.pdf
Agentic RAG What it is its types applications and implementation.pdfChristopherTHyatt
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...CzechDreamin
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessUXDXConf
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutesconfluent
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfFIDO Alliance
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfFIDO Alliance
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
Top 10 Symfony Development Companies 2024
Top 10 Symfony Development Companies 2024Top 10 Symfony Development Companies 2024
Top 10 Symfony Development Companies 2024TopCSSGallery
 

Recently uploaded (20)

Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024
 
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfThe Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
Introduction to Open Source RAG and RAG Evaluation
Introduction to Open Source RAG and RAG EvaluationIntroduction to Open Source RAG and RAG Evaluation
Introduction to Open Source RAG and RAG Evaluation
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at Comcast
 
Buy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptxBuy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptx
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
Agentic RAG What it is its types applications and implementation.pdf
Agentic RAG What it is its types applications and implementation.pdfAgentic RAG What it is its types applications and implementation.pdf
Agentic RAG What it is its types applications and implementation.pdf
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
Top 10 Symfony Development Companies 2024
Top 10 Symfony Development Companies 2024Top 10 Symfony Development Companies 2024
Top 10 Symfony Development Companies 2024
 

Renewable Energy Production Tax Credits and Rural Communities

  • 1. PTC = Jobs John Cohen Vice President, Government Affairs April 20, 2011
  • 2. Alstom: Three Areas of Innovation Leading global provider of equipment & services for… Power Generation Rail Transportation Power Transmission Alstom in the U.S. - P 2 | © Alstom 2011 © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 3. Strong & Sustained Sales, Worldwide Key Facts & Figures: Thermal Power Grid 92,700 employees in 100 $12.9 bn $4.8 bn countries 6% increase in sales from 2009/10 to 2010/11 Steady increase in R&D investment to more than $1 bn USD in 2010//11 Transport Leading provider of innovative clean technology 7.5 €bn solutions Renewable Power $2.6 bn Total sales 2010/11: $27.8 billion Alstom in the U.S. - P 3 | © Alstom 2011 © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 4. Alstom Innovation, Coast-to-Coast 6,000+ permanent employees in 45 states and the District of Columbia 10,000+ employees including contract workers 100+ years of U.S. market expertise in: Power Generation Rail Transportation Energy Transmission • Multimillion dollar investments in Chattanooga, Tennessee and Amarillo, Texas will create up to 600 green jobs for U.S. workers. Alstom in the U.S. - P 4 | © Alstom 2011 © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 5. Alstom Wind - North America Amarillo Nacelle Assembly Facility O p e r a t i o n a l Q 1 2 0 12 C o m m o n G lo b a l P r o c e s s r illo , T X - c e n t r a lly lo c a t e d - r a il a n d t r u c k s h ip p in g 115 , 0 0 0 f t 2 o n 2 0 a c r e s 2 7 0 U n it s ( 3 M W ) a n n u a lly 2 0 0 F u ll-t im e jo b s a t f u ll c a p a c it y L E E D C e r t if ie d S u s t a in a b le S it e Focused Facility for ECO 100 Platform to support US, Canada and Mexico © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 6. Alstom’s Wind business References in US - NAM Adams & Danielson wind farms Minnesota Adams & Danielson • 44 MW - 24 x ECO 86 wind farms NREL • Operational since March 2011 ECO 100 NIRE • Exceeding annual production estimates ECO 86 by 10% • Customer: Alstom’s first US wind farms in commercial operation are exceeding production estimates © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 7. #1 Message Policy Certainty Investment = Presentation title - 01/01/2007 - P 7 © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 8. PTC: Boom and Bust © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 9. Value of Policy Certainty – By the numbers • F OUR Y E A R S of consistent wind tax policy delivered: − 3 5 % annual growth − 4 0 0 manufacturing facilities in 4 3 states − 6 0 % of wind turbine’s value produced in U.S. (up 3 5 % since 2005) − $ 6 0 b il l io n of investment since 2005. − 6 ,8 1 6 megawatts (MW) installed in 2011 • Up 3 1 % since 2010, • 4 6 ,9 1 6 MW installed in the U.S. to date. − 8 ,3 0 0 MW under construction in 2012 © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 10. PTC Expiration: Consequences • If PTC expires in 2013: − A n n u a l I n s t a l l a t i o n s : Drop to 2 GW in 2013, from >8 GW in 2012 − T o t a l j o b s : Drop almost 5 0 % • 7 8 ,0 0 0 in 2012 • 4 1 ,0 0 0 in 2013 − T o t a l I n v e s t m e n t : Drop by nearly t wo t h ir d s • $ 1 5 .6 b il l io n in 2012 • $ 5 .5 b il l io n in 2013 © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 11. PTC Extension: Benefits • If PTC extended for 4-years: − A n n u a l I n s t a l l a t i o n s : 8 - 1 0 GW through 2016 − T o t a l j o b s : Grow to nearly 1 0 0 ,0 0 0 by 2016 − T o t a l w i n d i n v e s t m e n t : Grow to $ 1 6 .3 b il l o n in 2016 © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 12. PTC Extension: Jobs © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 13. PTC: Taxpayer ROI • Four year PTC extension: 8 7 % r e t u r n o n in v e s t me n t for U.S. taxpayers − T a x p a y e r I n v e s t m e n t : ~$ 1 3 .6 b il l io n − T a x p a y e r B e n e f i t : ~$ 2 5 .6 b il l io n − Navigant inputs: • Investment − tax credits for wind plants installed from 2013 to 2016 • Returns: − manufacturing investment − expenditures during construction − land lease payments over the life of the plants out to 2021 − operating expenditures and federal − state taxes on income from power sales © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 14. The Challenge • Congress needs to A C T t h is y e a r − H.R. 3307, American Renewable Energy Production Tax Credit Extension Act of 2011, • 91 co-sponsors − S. 2201, American Energy and Job Promotion Act, • 7 co-sponsors © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 15. Conclusion PTC = © ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 16. Thank You www.alstom.com/us [Speaker Name & Title] [Speaker Phone] [Speaker Email]

Editor's Notes

  1. Last edit: 00/00/2009 The key point about this slide are:
  2. The past four years of consistent tax policy demonstrate the economic security and energy diversity benefits that the wind industry can continue to provide in a stable policy environment. The wind industry has experienced an average annual growth rate of 35% over the past four years. Over 400 facilities across 43 states manufacture for the wind energy industry today. Sixty percent of a wind turbine’s value is now produced here in America, compared to 25% prior to 2005. More than $60 billion of investment has been made since 2005. The U.S. wind industry installed 6,816 megawatts (MW) in 2011, 31 percent higher than 2010, for a total of 46,916 MW installed in the U.S. to date. There are more than 8,300 MW under construction, setting the stage for a strong 2012.
  3. Wind PTC = credit for 2.1 cents per kilowatt hour of production. The program has been around since 1994, but has been cyclical rather than a sustained effort The wind industry’s boom-and-bust cycle is evidence that the PTC affects project development. When the PTC has been allowed to expire in the past (1999, 2001, & 2003), installations have dropped between 73% and 93%, with corresponding job losses.
  4. Estimated revenue affects of the revenue provisions contained in S.1220, ‘The Fulfilling U.S. Energy Leadership (Fuel) Act of 2011’, fiscal years 2012-2021, as scored by the Joint Committee on Taxation. The Act includes a 4-year extension of the PTC for wind, hydro, biomass, and geothermal, so $13.6 billion slightly overstates the cost of an extension for wind only. According to a 2011 Navigant study commissioned by AWEA, a four year PTC extension could result in a 87% return on investment for U.S. taxpayers. Extending the PTC 4 years should be viewed as an investment by U.S. taxpayers. The investment is the tax credits The returns are both in the form of taxes on revenues generated by, and the investment spurred by manufacturing, construction and operation of, the plants. Navigant calculated return of investment of a 4 year extension using the following inputs: Investment: tax credits for wind plants installed from 2013 to 2016. Returns: manufacturing investment, expenditures during construction, land lease payments over the life of the plants out to 2021, operating expenditures and federal and state taxes on income from power sales. The PTC extension would cost ~$13.6B*, but result in ~$25.6B in investment and tax revenue. Return on investment = (sum of benefits)/(sum of costs)-1=$25.6B/$13.6B-1=87% This calculation excludes indirect and induced investment. Last edit: