SlideShare a Scribd company logo
1 of 1
Download to read offline
New Role in Piping areas
Position: Lead Piping Planning Engineer
Department: Planning
Location: Mangalore, Karnataka (transferable to any other location)
Experience: 8 - 13 Years
Qualifications: The incumbent should be a BE Mechanical with experience of 8 - 13
years. He should be conversant with Primavera - P6 and MS Project which would be an
added advantage. He should be a team leader and able to interface between the client
and the company.
Brief Job Profile:
Lead Piping Planning engineer should have experience in
• Drawing updation & document control.
• Material allocation w.r.t. to available piping drawings, establishing front availability
& material availability to the client as well as internally and spool management.
• Supervising weld joint mapping.
• Co-ordinating with QA / QC personnel and check the progress.
• Progress monitoring and progress control.
• Lead a team of 4 - 5 Planning engineers.

More Related Content

What's hot (20)

PUNITH (1) 2
PUNITH (1) 2PUNITH (1) 2
PUNITH (1) 2
 
Site-Manager & Site-Engineer (Civil Engineer)
Site-Manager & Site-Engineer (Civil Engineer)Site-Manager & Site-Engineer (Civil Engineer)
Site-Manager & Site-Engineer (Civil Engineer)
 
MUHAMMED MUSA CIVIL ENGG PP
MUHAMMED MUSA CIVIL ENGG PPMUHAMMED MUSA CIVIL ENGG PP
MUHAMMED MUSA CIVIL ENGG PP
 
Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)
 
Kunal Sengupta_CV
Kunal Sengupta_CVKunal Sengupta_CV
Kunal Sengupta_CV
 
Prashant_Kharche new
Prashant_Kharche new Prashant_Kharche new
Prashant_Kharche new
 
Resume-Estimation
Resume-EstimationResume-Estimation
Resume-Estimation
 
Resume - Adam Johnson
Resume - Adam JohnsonResume - Adam Johnson
Resume - Adam Johnson
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
Varun Vyas - CV
Varun Vyas - CVVarun Vyas - CV
Varun Vyas - CV
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 
Dinesh_Resume
Dinesh_ResumeDinesh_Resume
Dinesh_Resume
 
CV
CVCV
CV
 
Senior site engineer (civil engineer)
Senior site engineer (civil engineer)Senior site engineer (civil engineer)
Senior site engineer (civil engineer)
 
nilesh moon resume
nilesh moon resumenilesh moon resume
nilesh moon resume
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
Estimator Bid Packages
Estimator Bid PackagesEstimator Bid Packages
Estimator Bid Packages
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 

Viewers also liked (7)

Besomi m
Besomi mBesomi m
Besomi m
 
TRABAJOS verticales
TRABAJOS verticalesTRABAJOS verticales
TRABAJOS verticales
 
LIDERAZGO EN SEGURIDAD 2
LIDERAZGO EN SEGURIDAD 2LIDERAZGO EN SEGURIDAD 2
LIDERAZGO EN SEGURIDAD 2
 
obras temporales
obras temporalesobras temporales
obras temporales
 
LIDERAZGO EN SEGURIDAD 1
LIDERAZGO EN SEGURIDAD 1LIDERAZGO EN SEGURIDAD 1
LIDERAZGO EN SEGURIDAD 1
 
Manual moldajes
Manual moldajesManual moldajes
Manual moldajes
 
andamios
andamiosandamios
andamios
 

Similar to Lead Piping Planning Engineer Mangalore 8-13 Years BE Mechanical

Similar to Lead Piping Planning Engineer Mangalore 8-13 Years BE Mechanical (20)

Engr. Raja Mehran Resume
Engr. Raja Mehran ResumeEngr. Raja Mehran Resume
Engr. Raja Mehran Resume
 
Ashwin_Planning Engineer-new
Ashwin_Planning Engineer-newAshwin_Planning Engineer-new
Ashwin_Planning Engineer-new
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
CV Swapnil S
CV Swapnil SCV Swapnil S
CV Swapnil S
 
ALI IBAD(CV)
ALI IBAD(CV)ALI IBAD(CV)
ALI IBAD(CV)
 
Santosh -Resume 2016
Santosh -Resume 2016Santosh -Resume 2016
Santosh -Resume 2016
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6
 
mallesha cv
mallesha cvmallesha cv
mallesha cv
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
sourabh_resume_2016
sourabh_resume_2016sourabh_resume_2016
sourabh_resume_2016
 
CV Abbass QS
CV Abbass QSCV Abbass QS
CV Abbass QS
 
Naveen-Planning Engineer
Naveen-Planning EngineerNaveen-Planning Engineer
Naveen-Planning Engineer
 
ADARSH kUMAR
ADARSH kUMARADARSH kUMAR
ADARSH kUMAR
 
2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV
 
Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).
 
Planning Engr Samar Abbas
Planning Engr Samar AbbasPlanning Engr Samar Abbas
Planning Engr Samar Abbas
 
Job opening sr planning engineer-qatar
Job opening sr planning engineer-qatarJob opening sr planning engineer-qatar
Job opening sr planning engineer-qatar
 
Muhammad Hasan CV / Resume
Muhammad Hasan CV / ResumeMuhammad Hasan CV / Resume
Muhammad Hasan CV / Resume
 
Waqar Azeem -QS
Waqar Azeem -QSWaqar Azeem -QS
Waqar Azeem -QS
 

More from raghunathan janarthanan

More from raghunathan janarthanan (20)

Epc areas of activity
Epc areas of activityEpc areas of activity
Epc areas of activity
 
Smart communities
Smart communitiesSmart communities
Smart communities
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
3rd generation modularization by flour
3rd generation modularization   by flour3rd generation modularization   by flour
3rd generation modularization by flour
 
global recruitment services (GPS) A division of saipem
global recruitment services (GPS) A division of saipemglobal recruitment services (GPS) A division of saipem
global recruitment services (GPS) A division of saipem
 
Aveva pdms (1)
Aveva pdms (1)Aveva pdms (1)
Aveva pdms (1)
 
Pdms overview
Pdms overviewPdms overview
Pdms overview
 
Nick amott
Nick amottNick amott
Nick amott
 
Global support position in oil & gas
Global support position in oil & gasGlobal support position in oil & gas
Global support position in oil & gas
 
Innovative system implementation
Innovative system implementation Innovative system implementation
Innovative system implementation
 
Piping design engineering module
Piping design engineering modulePiping design engineering module
Piping design engineering module
 
Jr consulting services
Jr consulting services Jr consulting services
Jr consulting services
 
India development projects
India   development projectsIndia   development projects
India development projects
 
Country development projects
Country development projectsCountry development projects
Country development projects
 
Natural food corner
Natural food cornerNatural food corner
Natural food corner
 
New ventures
New venturesNew ventures
New ventures
 
Saving money
Saving moneySaving money
Saving money
 
Scheduling or routing technology
Scheduling or routing technologyScheduling or routing technology
Scheduling or routing technology
 
Finland successful school reform
Finland successful school reformFinland successful school reform
Finland successful school reform
 
Stem careers
Stem careersStem careers
Stem careers
 

Recently uploaded

Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 

Recently uploaded (20)

Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 

Lead Piping Planning Engineer Mangalore 8-13 Years BE Mechanical

  • 1. New Role in Piping areas Position: Lead Piping Planning Engineer Department: Planning Location: Mangalore, Karnataka (transferable to any other location) Experience: 8 - 13 Years Qualifications: The incumbent should be a BE Mechanical with experience of 8 - 13 years. He should be conversant with Primavera - P6 and MS Project which would be an added advantage. He should be a team leader and able to interface between the client and the company. Brief Job Profile: Lead Piping Planning engineer should have experience in • Drawing updation & document control. • Material allocation w.r.t. to available piping drawings, establishing front availability & material availability to the client as well as internally and spool management. • Supervising weld joint mapping. • Co-ordinating with QA / QC personnel and check the progress. • Progress monitoring and progress control. • Lead a team of 4 - 5 Planning engineers.