Quality/Welding inspection during Offshore
Pipeline and Platform Installation
By Rahman Suwandhi
Personal Data
Name: Rahman Suwandhi
Graduated: Technical of Metallurgy 1997
Residence: Batam
Office: EMAS AMC Pte Ltd – Singapore
Position: Quality/Welding Engineer
Main Business: offshore EPCI oil & gas
company
Contact No: +62 8127041931/+65 94524360
Email: r.suwandhi@emas.com or
suwandhi.rahman@gmail.com
Basic Requirements
Qualification and
certification required to
support on the job scope
of work are:
• Welding i.e. CSWIP 3.1,
CWI-AWS
• NDT Level II i.e. ASNT,
PCN
• Painting/Coating i.e.
BGAS, NACE
Production flow chart
Material Receiving
Cutting & Fit up
weld Joint
Welding process
Visual & NDT
inspection
Painting/Coating
Inspection
Welding inspector role:
To ensure quality of material and
welding meet to the requirement
NDT inspector:
To check weld joint using different
methods i.e. RT, UT, MT/PT complied
to the acceptance criteria
Painting/Coating Inspector:
To control & monitor of quality coating
meet to the requirement
Quality Documents:
- ITP (Inspection Testing Plan)
- PQP (Project Quality Plan)
- TQ (Technical Query)
- NCR (Non Conformance Record)
- Procedures: Welding, NDT, Painting, PWHT,
Hydrotest
- Qualified personnel: QC Inspector, Welder, NDT,
Painting Inspector
- Certificates & Reports: material cert, equipments
& tools cert, material & welding traceability record,
NDT report, painting report, PWHT & Hydrotest
report
- MDR (Manufacturing Data Record)
Code/Standard/Specification
Must understand on the following:
• Variety of code i.e. material, general
requirements, testing procedure
• Product application: structure, pressure vessel,
pipeline, piping process, storage tank etc.
• International published i.e. AS, ASTM, API, AWS,
ASME, BS, DIN, EN, EEMUA, ISO, JIS, KS, SNI
• Client’s Specification: Total, Shell, Chevron, Exxon,
ENI
• Third party/class requirements i.e. ABS, LR, GL,
BV, BKI, DNV
Material Inspection
To check the following:
• Surface condition check i.e. mill scale, material
damage, rusty, coating protection
• Dimension check i.e. length, width, thickness,
diameter
• Purchase/Delivery Order, hard stamp
• Material certificates check
Mill Certificates
Welding Procedure & welder qualification test
PWPS
Prepare test coupon &
Record parameters
NDT
DT
WPS
Result
Acc
Reject
PQR
Propose Welder
Prepare test coupon
NDT
DT
Result
Welder Certificate
Acc
Reject
Welding Inspection
To check the following:
• Before welding: approved
procedures in place,
material, consumables &
equipments/tools certificate
available, joint prep &
preheat within tolerance
• During welding: control
parameters i.e. HI, interpass
temp, PWHT
• After welding: visual check
Welding Inspection
Variables to be control & monitor during
production weld:
• Material group i.e. specification, thickness,
diameter
• Joint design, edge preparation
• Welding position & progression
• Welding parameters: voltage, current, travel
speed, Heat Input
• Preheat & interpass temperature
• Post weld heat treatment
WPS (Welding Procedure Specification)
Visual Inspection
To check the following:
• Weld bead, toe blend,
weld consistency, arc
strike, spatter, grinding
mark, mechanical
damage, surface colour,
misalignment, angular
distortion, longitudinal
distortion
• Refer to the acceptance
criteria as per
code/standard i.e. AWS
D1.1, API 1104, ASME IX,
DNV OS F101 etc.
NDT Inspection
• NDT methods: RT, UT,
MT/PT
• Basic testing
• Procedure
Qualification Test
• Approval NDT
procedure
• Acceptance criteria
Painting/Coating Inspection
• Type: Paints, HSS,
3LPP, Concrete
• Procedure
qualification test
• Painting inspection
i.e. DFT, pull test,
salt test
• Acceptance criteria
Qaulity/Welding Inspection during offshore
pipeline & platform installation
Any question?

More Related Content

What's hot (20)

Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Welder qualification
Welder qualificationWelder qualification
Welder qualification
 
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXA QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
 
ASME Codes.pdf
ASME Codes.pdfASME Codes.pdf
ASME Codes.pdf
 
cswip-3-1-new-book
 cswip-3-1-new-book cswip-3-1-new-book
cswip-3-1-new-book
 
QC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdfQC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdf
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
 
Shell rolling procedure
Shell rolling procedureShell rolling procedure
Shell rolling procedure
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Welding Inspection Cswip
Welding Inspection CswipWelding Inspection Cswip
Welding Inspection Cswip
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdf
 
Asme sec ix
Asme sec ixAsme sec ix
Asme sec ix
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 

Viewers also liked

WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)Abrianto Akuan
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsTonni Bruce
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualificationvaasuBandaru
 
Welders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_webWelders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_webmiguelbravo
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXAntonius Pompi Bramono
 
Interview questions and answers for welding inspector
Interview questions and answers for welding inspectorInterview questions and answers for welding inspector
Interview questions and answers for welding inspectortonyron13
 
Duplex welding guidelines
Duplex welding guidelinesDuplex welding guidelines
Duplex welding guidelinesLalu Rajendran
 
Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Dinh Truong Van
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c newJithu John
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineIEI GSC
 

Viewers also liked (18)

WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wps
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
 
Welding book
Welding bookWelding book
Welding book
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 
Asme wps-demo
Asme wps-demoAsme wps-demo
Asme wps-demo
 
Welders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_webWelders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_web
 
Welding Defects
Welding DefectsWelding Defects
Welding Defects
 
Question bank
Question bankQuestion bank
Question bank
 
Welder training
Welder trainingWelder training
Welder training
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
 
Interview questions and answers for welding inspector
Interview questions and answers for welding inspectorInterview questions and answers for welding inspector
Interview questions and answers for welding inspector
 
Welding defects
Welding defectsWelding defects
Welding defects
 
Duplex welding guidelines
Duplex welding guidelinesDuplex welding guidelines
Duplex welding guidelines
 
Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c new
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 

Similar to Offshore qc welding inspection versi 1

Similar to Offshore qc welding inspection versi 1 (20)

Ananda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVAnanda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCV
 
Nivin Joseph- resume
Nivin Joseph- resumeNivin Joseph- resume
Nivin Joseph- resume
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
 
ANANDHARAJAN CV
ANANDHARAJAN CVANANDHARAJAN CV
ANANDHARAJAN CV
 
Nookaraju - CV
Nookaraju - CVNookaraju - CV
Nookaraju - CV
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATED
 
VENKAT
VENKATVENKAT
VENKAT
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
Rajeshwaran - Resume
Rajeshwaran - ResumeRajeshwaran - Resume
Rajeshwaran - Resume
 
RESUME__ASATH_MATHANI_-1-2 (1)
RESUME__ASATH_MATHANI_-1-2 (1)RESUME__ASATH_MATHANI_-1-2 (1)
RESUME__ASATH_MATHANI_-1-2 (1)
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
Vijay konathala Resume
Vijay konathala ResumeVijay konathala Resume
Vijay konathala Resume
 
ars resume
ars resumears resume
ars resume
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 

Recently uploaded

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 

Recently uploaded (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

Offshore qc welding inspection versi 1

  • 1. Quality/Welding inspection during Offshore Pipeline and Platform Installation By Rahman Suwandhi
  • 2. Personal Data Name: Rahman Suwandhi Graduated: Technical of Metallurgy 1997 Residence: Batam Office: EMAS AMC Pte Ltd – Singapore Position: Quality/Welding Engineer Main Business: offshore EPCI oil & gas company Contact No: +62 8127041931/+65 94524360 Email: r.suwandhi@emas.com or suwandhi.rahman@gmail.com
  • 3. Basic Requirements Qualification and certification required to support on the job scope of work are: • Welding i.e. CSWIP 3.1, CWI-AWS • NDT Level II i.e. ASNT, PCN • Painting/Coating i.e. BGAS, NACE
  • 4. Production flow chart Material Receiving Cutting & Fit up weld Joint Welding process Visual & NDT inspection Painting/Coating Inspection
  • 5. Welding inspector role: To ensure quality of material and welding meet to the requirement NDT inspector: To check weld joint using different methods i.e. RT, UT, MT/PT complied to the acceptance criteria Painting/Coating Inspector: To control & monitor of quality coating meet to the requirement
  • 6. Quality Documents: - ITP (Inspection Testing Plan) - PQP (Project Quality Plan) - TQ (Technical Query) - NCR (Non Conformance Record) - Procedures: Welding, NDT, Painting, PWHT, Hydrotest - Qualified personnel: QC Inspector, Welder, NDT, Painting Inspector - Certificates & Reports: material cert, equipments & tools cert, material & welding traceability record, NDT report, painting report, PWHT & Hydrotest report - MDR (Manufacturing Data Record)
  • 7. Code/Standard/Specification Must understand on the following: • Variety of code i.e. material, general requirements, testing procedure • Product application: structure, pressure vessel, pipeline, piping process, storage tank etc. • International published i.e. AS, ASTM, API, AWS, ASME, BS, DIN, EN, EEMUA, ISO, JIS, KS, SNI • Client’s Specification: Total, Shell, Chevron, Exxon, ENI • Third party/class requirements i.e. ABS, LR, GL, BV, BKI, DNV
  • 8. Material Inspection To check the following: • Surface condition check i.e. mill scale, material damage, rusty, coating protection • Dimension check i.e. length, width, thickness, diameter • Purchase/Delivery Order, hard stamp • Material certificates check
  • 10. Welding Procedure & welder qualification test PWPS Prepare test coupon & Record parameters NDT DT WPS Result Acc Reject PQR Propose Welder Prepare test coupon NDT DT Result Welder Certificate Acc Reject
  • 11. Welding Inspection To check the following: • Before welding: approved procedures in place, material, consumables & equipments/tools certificate available, joint prep & preheat within tolerance • During welding: control parameters i.e. HI, interpass temp, PWHT • After welding: visual check
  • 12. Welding Inspection Variables to be control & monitor during production weld: • Material group i.e. specification, thickness, diameter • Joint design, edge preparation • Welding position & progression • Welding parameters: voltage, current, travel speed, Heat Input • Preheat & interpass temperature • Post weld heat treatment
  • 13. WPS (Welding Procedure Specification)
  • 14. Visual Inspection To check the following: • Weld bead, toe blend, weld consistency, arc strike, spatter, grinding mark, mechanical damage, surface colour, misalignment, angular distortion, longitudinal distortion • Refer to the acceptance criteria as per code/standard i.e. AWS D1.1, API 1104, ASME IX, DNV OS F101 etc.
  • 15. NDT Inspection • NDT methods: RT, UT, MT/PT • Basic testing • Procedure Qualification Test • Approval NDT procedure • Acceptance criteria
  • 16. Painting/Coating Inspection • Type: Paints, HSS, 3LPP, Concrete • Procedure qualification test • Painting inspection i.e. DFT, pull test, salt test • Acceptance criteria
  • 17. Qaulity/Welding Inspection during offshore pipeline & platform installation Any question?