Construction & Demolition
Waste Management

Prepared By :
Ravi Kumar
Ankan Bairagi
Waste
Waste, or rubbish, garbage, depending on the type
of material or the regional terminology, is an
unwanted or undesired material or substance. It is
a unavoidable by-product of most of the human
activity.
Classification of Waste
Residential

Waste

Industrial
Commercial

Construction
and Demolition
Institutional
Municipal
Services
Agricultural
Construction and Demolition
Waste building materials, dredging materials
that are produced in the process of constructions,
remodeling, repair, or demolition of residential
buildings, commercial buildings and other structure
and pavements.
Construction & Demolition Waste Consist of
 Concrete
 Bricks

 Timber
 Sanitary

 Glasses
 Steel

 Plastic

ware
Present Indian Scenario of Construction and
Demolition Waste
14.5 MT Out Of 48 MT of total solid waste generated
per annum

Ref:-Dr., Asokan Pappu and Dr., Mohini Saxena and Dr., Shyam R. Asolekar (2007) Solid wastes
generation in India and their recycling potential in building materials. Indian Journal Of Environmental
Protection . pp. 2311-2321.
Composition of Construction &
Demolition Waste in India
5%

2% 2% 1%

25%
65%

Concrete
Bricks & Tiles
Wood
Metals
Others
Plastic

Ref:-Prof. S.K. Bhattacharyya, A.K. Minocha, Mridul Garg, Jaswinder Singh, Neeraj Jain, S. Maiti & S.K.
Singh, GAP0072 (DST Project), Demolition Wastes as Raw Materials for Sustainable Construction
Products, CSIR-CBRI News Letter,Vol-33 No-2 April-June 2013,pp. 1-2
Reasons For Increase of Construction &
Demolition Waste
 Many

old buildings, concrete pavements, bridges
and other structures have overcome their age and
limit of use due to structural deterioration beyond
repairs and need to be demolished
 New construction for better economic growth
 Structures are turned into debris resulting from
natural disasters like earthquake, cyclone and floods
etc.
What to do?
 Store at

source

◦ appropriate storage space
 Segregate

 Then?
Hierarchy for C & D waste management
Reduction of Waste







Ensuring materials are ordered on an “as needed”
basis to prevent over supply to site;
Minimize the creation of excessive scrap waste on
site;
Ensuring correct storage and handling of
construction materials to minimize generation of
damaged materials/waste;
Ensuring correct sequencing of operations and
assigning individual responsibility
Construction Waste Recycling
When considering a recyclable material, three
major areas need to be taken in to account are:
 Economy

 Compatibility with other materials
 Material properties
Sorting Process of Construction & Demolition
Waste

Chemical
Mineralogical
Appraisal

Mechanical
Sorting
Chemical-Mineralogical Appraisal
 Recognizes particular

grain size

X-Ray Fluorescence - Invest chemical composition in
terms of major elements.
X-Ray Diffractometry - Recognizes the constitute
mineralogical phases
Mechanical Sorting Process
 Bar

Screening
 Magnetic Separation
 Air Classifier
Recycling and Reuse






Reuse
(at
site)
of
bricks,
stone
slabs, timber, conduits, piping railings etc. to the
extent possible and depending upon their condition;
Plastics, broken glass, scrap metal etc. can be used
by recycling industries;
Rubble, brick bats, broken plaster/concrete pieces
etc. can be used for building activity, such
as, leveling, under coat of lanes where the traffic
does not constitute of heavy moving loads;
Contd..





Larger unusable pieces can be sent for filling up
low-lying areas;
Fine material, such as, sand, dust etc. can be used
as cover material over sanitary landfill.
Excavated soil can also be used creatively in the
landscaping of developments and for the
construction of embankments and screening/noise
abatement berms in civil engineering projects.
Recovery and Landfill






Conversion of non-recyclable waste material into
usable heat in form of fuel or electricity.
Industrial Waste Stabilizer- Material having no value in
reuse, although employed for beneficial use in
stabilization
Reuse public fill at public filling areas for reclamation.
Landfill is the least preferred option although if
required it should done after considering all the laws
and regulation.
Main Issue for Construction & Demolition
Waste Management


Absence of segregation of waste at source



Lack of appropriately located recycling facilities



Indifferent attitude of citizens toward waste
management due to lack of awareness.



Illegal landfill practices done by contractor for saving
money.
Key Requirement of Waste Management Plan










Types, quantities and qualities of wastes
Measures for reducing waste generation
On-site waste sorting
On-site and off-site reuse
Areas for waste storage
Quantities of wastes requiring off-site disposal
Monitoring and auditing program
Case Study 1: State Offices at Butterfield
Way, Sacramento, CA
 The

site work construction phase for the California
Franchise Tax Board’s State Offices at Butterfield
Way realized tremendous financial benefits from
recycling C&D debris. This led the project team to
an extremely high 99.6% (by weight) C&D waste
diversion rate for this phase. Sixty-nine percent of
this waste (over 15,000 tons) was recycled, stored
and reutilized on-site.
Conclusion


It has been established that materials & components
from demolished buildings are being reused for new
construction
works
as
well
as
renovation
projects, especially by low- income communities in
developing countries.



In developing countries most of the demolition rubble is
dumped, the developed world has now started to recycle
it into aggregate for non-structural concrete.
Contd..


It is hoped that recycling waste materials for use in the
building will cut down costs of producing new raw

materials thereby reducing consumption of natural
resources like energy & reduces usage of landfills.


As sorting and recycling facilities become more wide
spread and better developed it will be easier to redirect

our waste from landfill.
References
 Dr.,

Asokan Pappu and Dr., Mohini Saxena and
Dr., Shyam R. Asolekar (2007) Solid wastes
generation in India and their recycling potential in
building materials.Indian Journal Of Environmental
Protection . pp. 2311-2321
 L.Y.Shen,
D
Drew,
and
C.M.
Tam, (2004), Construction Waste recycling, Journal
of Construction Engineering and Management,4,Vol
130,pp 472-481
Contd..


Nixon, P.J., Recycled Concrete as an aggregate for
concrete, a review Materials and Structures, nr.
65, September/October 1978, pp 371–378
 National Construction and Demolition Waste Council Annual Report 2002/2003 and Annual Report 2004/2005
 Prof. S.K. Bhattacharyya, A.K. Minocha, Mridul
Garg, Jaswinder Singh, Neeraj Jain, S. Maiti & S.K.
Singh, GAP0072 (DST Project), Demolition Wastes as
Raw
Materials
for
Sustainable
Construction
Products, CSIR-CBRI News Letter,Vol-33 No-2 AprilJune 2013,pp. 1-2.
The Choice Is Yours

To Landfill

To Recycle

THANK YOU

More Related Content

What's hot

Construction and demolition waste recycling
Construction and demolition waste recyclingConstruction and demolition waste recycling
Construction and demolition waste recycling
Anand Vallala
 
Re use of demolished concrete in construction
Re use of demolished concrete in construction Re use of demolished concrete in construction
Re use of demolished concrete in construction
adnankhan44s
 

What's hot (20)

Application of construction demolition waste.
Application of construction demolition waste.Application of construction demolition waste.
Application of construction demolition waste.
 
Construction & demolition waste management
Construction & demolition waste managementConstruction & demolition waste management
Construction & demolition waste management
 
Construction and demolition waste
Construction and demolition wasteConstruction and demolition waste
Construction and demolition waste
 
Construction and demolition waste recycling
Construction and demolition waste recyclingConstruction and demolition waste recycling
Construction and demolition waste recycling
 
Construction and demolition waste ppt
Construction and demolition waste pptConstruction and demolition waste ppt
Construction and demolition waste ppt
 
Construction and demolition waste in India
Construction and demolition waste in IndiaConstruction and demolition waste in India
Construction and demolition waste in India
 
Recycling and reuse of demolished concrete
Recycling and reuse of demolished concreteRecycling and reuse of demolished concrete
Recycling and reuse of demolished concrete
 
The Role of Environmental Impact in Building Material’s Selection
The Role of Environmental Impact in Building Material’s SelectionThe Role of Environmental Impact in Building Material’s Selection
The Role of Environmental Impact in Building Material’s Selection
 
reuse and recycle of construction material
reuse and recycle of construction materialreuse and recycle of construction material
reuse and recycle of construction material
 
Re use of demolished concrete in construction
Re use of demolished concrete in construction Re use of demolished concrete in construction
Re use of demolished concrete in construction
 
Construction & Demolition Waste
Construction & Demolition WasteConstruction & Demolition Waste
Construction & Demolition Waste
 
Construction & demolition waste
Construction & demolition wasteConstruction & demolition waste
Construction & demolition waste
 
reuse of c&d waste
reuse  of c&d wastereuse  of c&d waste
reuse of c&d waste
 
Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)
 
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’sConstruction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
 
Muncipal Solid Waste Management
Muncipal Solid Waste ManagementMuncipal Solid Waste Management
Muncipal Solid Waste Management
 
Solid waste part-i
Solid waste part-iSolid waste part-i
Solid waste part-i
 
Building materials and environmental impact
Building materials and environmental impactBuilding materials and environmental impact
Building materials and environmental impact
 
Recycled materials
Recycled materialsRecycled materials
Recycled materials
 
Construction waste management plan
Construction waste management planConstruction waste management plan
Construction waste management plan
 

Similar to C & d waste management in india

solid seminar.pptx hhfyyeukkryydudirhdiidg
solid seminar.pptx hhfyyeukkryydudirhdiidgsolid seminar.pptx hhfyyeukkryydudirhdiidg
solid seminar.pptx hhfyyeukkryydudirhdiidg
0o24680p
 
Mechanical Properties of Recycled Aggregate
Mechanical Properties of Recycled AggregateMechanical Properties of Recycled Aggregate
Mechanical Properties of Recycled Aggregate
ijtsrd
 

Similar to C & d waste management in india (20)

solid seminar.pptx hhfyyeukkryydudirhdiidg
solid seminar.pptx hhfyyeukkryydudirhdiidgsolid seminar.pptx hhfyyeukkryydudirhdiidg
solid seminar.pptx hhfyyeukkryydudirhdiidg
 
C & D Waste Material Management in Construction Industry of Nagpur Region
C & D Waste Material Management in Construction Industry of Nagpur RegionC & D Waste Material Management in Construction Industry of Nagpur Region
C & D Waste Material Management in Construction Industry of Nagpur Region
 
Construction Waste Minimization
Construction Waste MinimizationConstruction Waste Minimization
Construction Waste Minimization
 
Waste Management of Construction and Demolition Material towards Sustainable ...
Waste Management of Construction and Demolition Material towards Sustainable ...Waste Management of Construction and Demolition Material towards Sustainable ...
Waste Management of Construction and Demolition Material towards Sustainable ...
 
Climate change and green buildings
Climate change and green buildingsClimate change and green buildings
Climate change and green buildings
 
Natural Resources In Construction Geo Cdi Final
Natural Resources In Construction Geo Cdi FinalNatural Resources In Construction Geo Cdi Final
Natural Resources In Construction Geo Cdi Final
 
IRJET- Planning and Designing of Residential Building by using Sustainable Ma...
IRJET- Planning and Designing of Residential Building by using Sustainable Ma...IRJET- Planning and Designing of Residential Building by using Sustainable Ma...
IRJET- Planning and Designing of Residential Building by using Sustainable Ma...
 
Experimental Research on Strength of Demolished Construction Waste as Partial...
Experimental Research on Strength of Demolished Construction Waste as Partial...Experimental Research on Strength of Demolished Construction Waste as Partial...
Experimental Research on Strength of Demolished Construction Waste as Partial...
 
Mechanical Properties of Recycled Aggregate
Mechanical Properties of Recycled AggregateMechanical Properties of Recycled Aggregate
Mechanical Properties of Recycled Aggregate
 
Use of scc and rca for sustainable construction –
Use of scc and rca for sustainable construction – Use of scc and rca for sustainable construction –
Use of scc and rca for sustainable construction –
 
Use of scc and rca for sustainable construction –
Use of scc and rca for sustainable construction – Use of scc and rca for sustainable construction –
Use of scc and rca for sustainable construction –
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentation
 
Low cost building materials
Low cost building materials Low cost building materials
Low cost building materials
 
Low cost building materials
Low cost building materialsLow cost building materials
Low cost building materials
 
Physical Properties of Construction & Demolished Waste Concrete
Physical Properties of Construction & Demolished Waste ConcretePhysical Properties of Construction & Demolished Waste Concrete
Physical Properties of Construction & Demolished Waste Concrete
 
C45020914
C45020914C45020914
C45020914
 
RECYCLING SOLID CONCRETE WASTE
RECYCLING SOLID CONCRETE WASTERECYCLING SOLID CONCRETE WASTE
RECYCLING SOLID CONCRETE WASTE
 
Construction and Demolition Waste Reduction in Austin, TX: A Review of Best P...
Construction and Demolition Waste Reduction in Austin, TX: A Review of Best P...Construction and Demolition Waste Reduction in Austin, TX: A Review of Best P...
Construction and Demolition Waste Reduction in Austin, TX: A Review of Best P...
 
IRJET- A Review on Behaviour of ECO Green Concrete in Construction Industry
IRJET- A Review on Behaviour of ECO Green Concrete in Construction IndustryIRJET- A Review on Behaviour of ECO Green Concrete in Construction Industry
IRJET- A Review on Behaviour of ECO Green Concrete in Construction Industry
 
Concrete waste as building material
Concrete waste as building materialConcrete waste as building material
Concrete waste as building material
 

Recently uploaded

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Recently uploaded (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 

C & d waste management in india

  • 1. Construction & Demolition Waste Management Prepared By : Ravi Kumar Ankan Bairagi
  • 2. Waste Waste, or rubbish, garbage, depending on the type of material or the regional terminology, is an unwanted or undesired material or substance. It is a unavoidable by-product of most of the human activity.
  • 3. Classification of Waste Residential Waste Industrial Commercial Construction and Demolition Institutional Municipal Services Agricultural
  • 4. Construction and Demolition Waste building materials, dredging materials that are produced in the process of constructions, remodeling, repair, or demolition of residential buildings, commercial buildings and other structure and pavements.
  • 5. Construction & Demolition Waste Consist of  Concrete  Bricks  Timber  Sanitary  Glasses  Steel  Plastic ware
  • 6. Present Indian Scenario of Construction and Demolition Waste 14.5 MT Out Of 48 MT of total solid waste generated per annum Ref:-Dr., Asokan Pappu and Dr., Mohini Saxena and Dr., Shyam R. Asolekar (2007) Solid wastes generation in India and their recycling potential in building materials. Indian Journal Of Environmental Protection . pp. 2311-2321.
  • 7. Composition of Construction & Demolition Waste in India 5% 2% 2% 1% 25% 65% Concrete Bricks & Tiles Wood Metals Others Plastic Ref:-Prof. S.K. Bhattacharyya, A.K. Minocha, Mridul Garg, Jaswinder Singh, Neeraj Jain, S. Maiti & S.K. Singh, GAP0072 (DST Project), Demolition Wastes as Raw Materials for Sustainable Construction Products, CSIR-CBRI News Letter,Vol-33 No-2 April-June 2013,pp. 1-2
  • 8. Reasons For Increase of Construction & Demolition Waste  Many old buildings, concrete pavements, bridges and other structures have overcome their age and limit of use due to structural deterioration beyond repairs and need to be demolished  New construction for better economic growth  Structures are turned into debris resulting from natural disasters like earthquake, cyclone and floods etc.
  • 9. What to do?  Store at source ◦ appropriate storage space  Segregate  Then?
  • 10. Hierarchy for C & D waste management
  • 11. Reduction of Waste     Ensuring materials are ordered on an “as needed” basis to prevent over supply to site; Minimize the creation of excessive scrap waste on site; Ensuring correct storage and handling of construction materials to minimize generation of damaged materials/waste; Ensuring correct sequencing of operations and assigning individual responsibility
  • 12. Construction Waste Recycling When considering a recyclable material, three major areas need to be taken in to account are:  Economy  Compatibility with other materials  Material properties
  • 13. Sorting Process of Construction & Demolition Waste Chemical Mineralogical Appraisal Mechanical Sorting
  • 14. Chemical-Mineralogical Appraisal  Recognizes particular grain size X-Ray Fluorescence - Invest chemical composition in terms of major elements. X-Ray Diffractometry - Recognizes the constitute mineralogical phases
  • 15. Mechanical Sorting Process  Bar Screening  Magnetic Separation  Air Classifier
  • 16. Recycling and Reuse    Reuse (at site) of bricks, stone slabs, timber, conduits, piping railings etc. to the extent possible and depending upon their condition; Plastics, broken glass, scrap metal etc. can be used by recycling industries; Rubble, brick bats, broken plaster/concrete pieces etc. can be used for building activity, such as, leveling, under coat of lanes where the traffic does not constitute of heavy moving loads;
  • 17. Contd..    Larger unusable pieces can be sent for filling up low-lying areas; Fine material, such as, sand, dust etc. can be used as cover material over sanitary landfill. Excavated soil can also be used creatively in the landscaping of developments and for the construction of embankments and screening/noise abatement berms in civil engineering projects.
  • 18. Recovery and Landfill     Conversion of non-recyclable waste material into usable heat in form of fuel or electricity. Industrial Waste Stabilizer- Material having no value in reuse, although employed for beneficial use in stabilization Reuse public fill at public filling areas for reclamation. Landfill is the least preferred option although if required it should done after considering all the laws and regulation.
  • 19. Main Issue for Construction & Demolition Waste Management  Absence of segregation of waste at source  Lack of appropriately located recycling facilities  Indifferent attitude of citizens toward waste management due to lack of awareness.  Illegal landfill practices done by contractor for saving money.
  • 20. Key Requirement of Waste Management Plan        Types, quantities and qualities of wastes Measures for reducing waste generation On-site waste sorting On-site and off-site reuse Areas for waste storage Quantities of wastes requiring off-site disposal Monitoring and auditing program
  • 21. Case Study 1: State Offices at Butterfield Way, Sacramento, CA  The site work construction phase for the California Franchise Tax Board’s State Offices at Butterfield Way realized tremendous financial benefits from recycling C&D debris. This led the project team to an extremely high 99.6% (by weight) C&D waste diversion rate for this phase. Sixty-nine percent of this waste (over 15,000 tons) was recycled, stored and reutilized on-site.
  • 22. Conclusion  It has been established that materials & components from demolished buildings are being reused for new construction works as well as renovation projects, especially by low- income communities in developing countries.  In developing countries most of the demolition rubble is dumped, the developed world has now started to recycle it into aggregate for non-structural concrete.
  • 23. Contd..  It is hoped that recycling waste materials for use in the building will cut down costs of producing new raw materials thereby reducing consumption of natural resources like energy & reduces usage of landfills.  As sorting and recycling facilities become more wide spread and better developed it will be easier to redirect our waste from landfill.
  • 24. References  Dr., Asokan Pappu and Dr., Mohini Saxena and Dr., Shyam R. Asolekar (2007) Solid wastes generation in India and their recycling potential in building materials.Indian Journal Of Environmental Protection . pp. 2311-2321  L.Y.Shen, D Drew, and C.M. Tam, (2004), Construction Waste recycling, Journal of Construction Engineering and Management,4,Vol 130,pp 472-481
  • 25. Contd..  Nixon, P.J., Recycled Concrete as an aggregate for concrete, a review Materials and Structures, nr. 65, September/October 1978, pp 371–378  National Construction and Demolition Waste Council Annual Report 2002/2003 and Annual Report 2004/2005  Prof. S.K. Bhattacharyya, A.K. Minocha, Mridul Garg, Jaswinder Singh, Neeraj Jain, S. Maiti & S.K. Singh, GAP0072 (DST Project), Demolition Wastes as Raw Materials for Sustainable Construction Products, CSIR-CBRI News Letter,Vol-33 No-2 AprilJune 2013,pp. 1-2.
  • 26. The Choice Is Yours To Landfill To Recycle THANK YOU