Sudan is one of the largest countries in Africa.
In July 2011 south Sudan was separated and
became an independent country.
Sudan is bordered by seven countries which are
Egypt, Libya, Chad, Central Africa, South of
Sudan, Ethiopia, Eritrea in addition to the Red
Sea in the east.
Republic of SUDAN - Ministry of Water Resources & Electricity
Area :
1.89 M Sq. Km
Population :
33 Million
Capital :
Khartoum
GDP (2011):
66 Billion Dollars
3
Republic of SUDAN - Ministry of Water Resources & Electricity
The supply of electric energy in
Sudan started in Khartoum the
capital of Sudan in the year
1908.
From 2010 the Ministry of
Water Resources and Electricity
became the responsible state
body for the electric power
sector in Sudan.
4
Republic of SUDAN - Ministry of Water Resources & Electricity
THE MINISTER
Public and Private Companies
Technical Organ for Electricity
Regulation and Control
Dams implementation unit
Kinana &Rahad Implementation
Corporation
Ministerial Council
Consultant Council
Undersecretary
General Directorate for
Generating Electricity
using Nuclear, Renewable,
and Alterative Energy
General
Directorate for
Policies, Planning
and Projects
General
Directorate for
Financial and
Human
Resources
General Directorate
for International
Relations
General Directorate
for Investment,
Finance and
Contracts
Electric Power Sector Structure in Sudan
Sudanese Hydro
Generation Company
Sudanese Thermal
Generation Company
Sudanese Electricity
Transmission
Company
Sudanese Electricity
Distribution Company
Marowe Dam Company
5
Republic of SUDAN - Ministry of Water Resources & Electricity
8
The Sudan electricity generation system
comprises approximately 8,560 km of high
voltage transmission lines.
In addition, fourteen isolated centres are
served by thermal generating plants and local
distribution networks.
Republic of SUDAN - Ministry of Water Resources & Electricity
Renewable energy resources studies.
3 Wind Energy generation projects with a
total capacity of 320 MW
4 Solar Energy generation projects with a
total capacity of 20 MW
13
Republic of SUDAN - Ministry of Water Resources & Electricity
Resource studies are been carried out to
pin point future generation project.
The available studies:
◦ Wind Atlas
◦ Solar Atlas
The ongoing studies:
◦ Geothermal Energy Geo-scientific Study
◦ Biomass resources study
14
Republic of SUDAN - Ministry of Water Resources & Electricity
Average wind speed 4.2
– 8.1 meter/second at
80 meters above
ground level (agl)
Areas with highest wind
speed:
◦ Red Sea
◦ Northern Sudan (Dongola)
◦ Jabel Marra Mountains in
western Sudan
15
Republic of SUDAN - Ministry of Water Resources & Electricity
Average daily solar
irradiation: 5.8 – 7.2
kWh/m2
The solar radiation
increases in northern
and west-northern
areas and decreases
towards the south
16
Republic of SUDAN - Ministry of Water Resources & Electricity
10 MW Khartoum Photovoltaic Power Plant
5 MW Nyala Photovoltaic Power Plant
3 MW Al Fashir Photovoltaic Power Plant
2 MW Al Geniena Photovoltaic Power Plant
23
Republic of SUDAN - Ministry of Water Resources & Electricity
Capacity: 10 MW
Location: Khartoum
The average annual solar
irradiation: 2,398 kWh/m2
Connected to the National
Grid
Estimated commission date:
2014
Status: Tendering phase.
24
Republic of SUDAN - Ministry of Water Resources & Electricity
Capacity: 5 MW
Location: Nyala
The average annual solar
irradiation: 2,330 kWh/m2
Connected to isolated grid
Estimated commission
date : 2014
Status: Tendering phase.
25
Republic of SUDAN - Ministry of Water Resources & Electricity
Capacity: 3 MW
Location: Al Fashir
The average annual solar
irradiation: 2,370 kWh/m2
Connected to isolated grid
Estimated commission date:
2014
Status: Tendering phase.
26
Republic of SUDAN - Ministry of Water Resources & Electricity
Capacity: 2 MW
Location: Al Geniena
The average annual solar
irradiation: 2,370 kWh/m2
Connected to isolated grid
Estimated commission
date: 2014
Status: Tendering phase.
27
Republic of SUDAN - Ministry of Water Resources & Electricity
Target: 1.1million solar home system(SHS)
Period: 2012-2031
Beneficiaries: 5.5 million, 16% of population
Budget: 400 million US $
Share in rural electrification rate 26% in 20
years
29
Republic of SUDAN - Ministry of Water Resources & Electricity
Khartoum 50 MW waste to energy project,
feasibility study completed.
Feasibility Study To assess the production
and utilization of biogas for power
generation, feasibility study ongoing.
31
Republic of SUDAN - Ministry of Water Resources & Electricity
Renewable energy Master Plan based on
resource studies.
Geothermal Energy Geo-scientific Study in
Red Sea and North Darfur areas (Bayuda
area study completed).
Republic of SUDAN - Ministry of Water Resources & Electricity
32
33
Eng. Ahmed Altaif
Renewable Energy Director
Ministry of Water Resources and Electricity – Sudan
Email: aaltaif@gmail.com
Thank you