HSE Monthly Dashboard February 2023.pdf

  1. HSE Dashboard- February 2023 Health Safety & Environment -HRH March 16, 2023 1
  2. HSE Performance Indicators of Various sites and offices: February 2023 LTIF SVR HR Environmental LOST TIME INCIDENT FREQUENCY RATE (LTIF) SEVERITY RATE (SVR) HEALTH RATE (HR) Incident 2 1 100 98.1 98.1 40 0.8 0.6 50 1 0.4 20 0.2 Jan-23 Feb-23 0 0 0 0 0 0 Jan-23 Feb-23 0 0 January-23 February-23 0 0 Jan-23 Feb-23 March 16, 2023 2
  3. Incident Summary- February 2023 - Manufacturing Plant, Khurda  On 03/03/23 at 07.35 PM grinding activity was carried out by one of the grinder on lower shell at Bay 2 Column No C-9.  Just adjacent to the hot work area combustible materials like (Dye Penetrant for NDT with developer, wastes clothes dipped in thinner, carton box) were kept.  During grinding activity some spatter got contacted with the waste clothes dipped in thinner and immediately the clothes caught fire.  The heat generated from the fire caused formation of gases inside the developer bottle and gradually lead to its explosion.  One of the gas cutter acted promptly on the arising situation and rushed with CO2 fire extinguisher (SMS/CO2/27) stored nearby and extinguished the fire.  No personal injury or damage to property was reported. The gas cutter operated this Co2 extinguisher. Grinder was engaged in grinding activity on this lower shell segment Dye Penetrant for NDT with developer, wastes clothes dipped in thinner, carton box were kept here March 16, 2023 3
  4. Incident Summary- February 2023  On 28/1/23 at 3.30 pm (approx.) One of the grinder was engaged in Grinding activity of lower hood in front of the painting/blasting booth over the trolley .  The grinder didn’t notice the empty paint drum which was kept nearby and started grinding activity.  Some of the spatters generated during the grinding activity came in contact with paint drum with residual paint and immediately caught fire.  One of the welder who was working near by acted promptly on the arising situation and rushed towards DCP fire extinguisher stored nearby and extinguished the fire.  No personal injury or damage to property was reported. -Manufacturing Plant, Mancheswar Empty paint drum was kept near to trolley The grinder grinding the job( Lower hood) by standing over the trolley. March 16, 2023 4
  5. Incident Summary- February 2023  On 30/1/23 at 12.20 pm one welder was performing tig welding near the new shop on LF Roof top section which was kept on a bench.  As per the standard the activity was being performed holding filler metal in left hand and torch in right hand with appropriate PPE’s.  One the left side of the welder, an apprentice trainee was doing his work.  The welder turned his left hand holding the hot filler metal to change his position and at the same time the trainee also turned.  Due to which the hot filler metal touched the trainee’s left eyelid.  Immediately first aid was administered to the IP who sustained a burn injury and was sent to hospital for further consultation and treatment. -Manufacturing Plant, Mancheswar IP wasstandinghere nearto leftside The Welder was in this position March 16, 2023 5
  6. Incident Summary- February 2023 Manufacturing Expansion Project, Khurda  On 11/2/23 at 9.59 AM two riggers were engaged for fit up of side wall sag angle at Grid H, Column No 17.  During the fit up of side wall sag angle the top notching end of the sag angles were fixed and the bottom notching end of the sag angles were left out without fit-up.  While one of the rigger fitted this sag angle and tried to insert the next sag angle by applying force on the purlin the pressed end of the previously fitted sag angle got opened up.  After loosening from the sag angle slot, the sag angle hit the column beam and got deflected while falling down  Due to this deflection the sag angle flew away from the line of fire and fell on the ground nearby one personnel who just passing by.  No personal injury was reported. Top end of the sag angles is fixed and the bottom end of the sag angles is fitted later During fit up of next sag angle by applying force on All activity on elevated platforms was stopped the purlin the top notching end of the previously immediately and stand down was conducted fitted sag angle got opened up and fell on the with site team for adequate communication ground and prevention of such incidents in future. March 16, 2023 6
  7. NearssMiss,andFirstFirstAidAid&CasesFire–Incidents-February2021February2023 Project/ Office RSP Slab caster & LF RVNL- Howrah TSL Jamshedpur FWP(RINL) Manufacturing Plant- BBSR Manufacturing Plant- Mancheswar Expansion Project-Khurda EA Project Sites SMS Gurgaon Office SMS Pune Office SMS Kolkata Office Near Miss/Incidents 0 0 0 0 1 0 1 0 0 0 0 First Aid Cases 0 0 0 0 0 0 0 0 0 0 0 Fire Incidents 0 0 0 0 0 0 0 0 0 0 0 -2023 Near Miss, First Aid & Fire Incidents 3 2 2 1 1 1 1 1 0 0 Jan-23 Feb-23 Near Miss/Incidents First Aid Fire Incident March 16, 2023 7
  8. Unsafe Act/ Unsafe Condition –Till February 2023 Project/ Office RVNL- Howrah- Phase 2 Manufacturing Plant-Mancheswar TSL- Jamshedpur Khurda Expansion Project Manufacturi ng Plant- BBSR RSP EA Project Sites SMS Gurgaon Office SMS Pune Office SMS Kolkata Office Substation Sites Unsafe Act/Unsafe Condition 10 78 3 205 112 127 0 25 7 4 142 Closed Observation 4 76 3 200 109 124 0 18 0 0 116 Open observation > 30 days 0 2 0 1 3 3 0 7 7 0 26 UA/UC Tracker- February 2023 Poor Housekeeping SOP Violation 35 30 25 20 15 1 0 5 0 23 29 54 20 88 556 23 2212 211 22 1 12 5 56 6 7 5 5 3 3 4 5 3 6 3 3 1234 1 1 1 1 1 2 1 2 3 1 1 1 1 1 2 2 24 1 2 1 2 1 11 10 10 12 13 9 6 3 1 1 3 1 1 1 6 March 16, 2023 8 Electrical- LV Improper Usage of PPE's Fall from Height Slip Trip and Fall BBS Rotating Machinery Pressurised gas vessel Material Handling Fire
  9. Hazard Analysis– February 2023 Hazard Analysis- Project Sites & Office Locations 70 60 60 50 Fall from Height Slip Trip and Fall BBS Rotating Machinery Pressurised gas vessel Fire Material Handling Top 4 Hazards 35 30 56 17 6 6 3 1 1 40 30 20 10 0 41 March 16, 2023 9 Poor Housekeeping SOP Violation Electrical- LV Improper Usage of PPE's
  10. 20 15 10 5 0 Hazard Analysis– February 2023 Hazard Analysis- Manufacturing Plants (Khurda & Mancheswar) 25 22 12 11 11 10 4 4 3 2 2 2 Top 4 Hazards Electrical- LV BBS Material Handling Fire Slip Trip and Fall Pressurised gas vessel Rotating Machinery March 16, 2023 10 Poor Housekeeping Improper Usage of PPE's SOP Violation Fall from Height
  11. Sub-Contractor HSE Performance- Trend Analysis RVNL-Howrah phase 2 Sub-Contractor HSE Evaluation Trend Faridabad Substation Sub-Contractor HSE Evaluation Trend 80 100 75 69 71 90 70 66 61 80 60 70 50 60 55 55 52 4 0 4 5 50 30 4 0 20 30 10 20 10 0 0 Edifice Sami Engg. MCC PratapBuilders(Faridabad) Jan-23 Feb-23 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Khurda Plant Expansion Sub- Contractor HSE Evaluation Trend RSP Project Sub-Contractor HSE Evaluation Trend 100 80 83 72 71 66 74 7475 61 79 81 78 72 73 80 71 7469 7171 68 66 69 60 56 54 4 9 57 53 60 4 6 51 51 49 38 4 0 37 40 20 20 0 0 Shilpa Associate SK Enterprises Unistar Co. BIPPL ENKEBEE VK Enterprises Ratna Infrastructures Kejriwal Associates Interarch Nov-22 Dec-22 Jan-23 Feb-23 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 March 16, 2023 11
  12. Sub-Contractor HSE Performance- Trend Analysis GETCO- Babarzar Sub-Contractor HSE Evaluation Trend GETCO- Ghiyavad Sub-Contractor HSE Evaluation Trend 100 100 80 8 0 60 60 55 56 58 55 58 58 56 60 4 0 4 0 20 20 0 0 Perfect Power Arjun Enterprises Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 GETCO- Bhesan Sub-Contractor HSE Evaluation Trend GETCO- Pathkhilori Sub-Contractor HSE Evaluation Trend 100 100 80 80 67 65 65 60 59 59 56 60 4 0 4 0 20 20 0 0 Arjun Enterprises Shree Ganesh Fabricator Vaman Control Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Dec-22 Jan-23 Feb-23 March 16, 2023 12
  13. Sub-Contractor HSE Performance- Trend Analysis GETCO- Bhildi Sub-Contractor HSE Evaluation Trend GETCO-Kalawad Sub-Contractor HSE Evaluation Trend 100 100 80 80 71 65 65 60 60 4 0 4 0 20 20 0 0 Pruthvi Construction Mega Project Jan-23 Feb-23 Feb-23 GETCO-Mera Sub-Contractor HSE Evaluation Trend MSETCL- Babhaleshwar Sub-Contractor HSE Evaluation Trend 100 100 80 80 71 59 60 67 67 62 62 62 62 56 56 60 4 0 4 0 20 20 0 0 Vaaman Controls Terratech ENSTECH Technologies Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 March 16, 2023 13
  14. HSE Events National Safety Week-2023 -Expansion Project, Khurda - Manufacturing Plant , Mancheswar March 16, 2023 14 -RVNL Coaching Depot, Howrah - RINL-FWP , Raebareli
  15. HSE Events National Safety Week-2023 - GETCO Project, Pathkhilori -GETCO Project, Kalawad March 16, 2023 15 - GETCO Project, Mera -GETCO Project, Bhildi
  16. HSE Events National Safety Week-2023 March 16, 2023 16 RSP Project, Rourkela , Tree Plantation by Mr. Greiner
  17. HSEEvents National Safety Week-2023 Manufacturing Plant, Khurda March 16, 2023 17
  18. SMS group Corporate HSE Survey- Insights March 16, 2023 18 3.73 3.64 3.74 3.61 3.62 3.68 3.70 Average values 3.54 3.56 3.55 3.37 3.27 3.34 3.42 Average values Global result Entity result
  19. SMS group Corporate HSE Survey- Insights SMS India Pvt. Ltd. SMS India Pvt. Ltd. Total Werte in office & administration in workshop/production on construction site Mittelwert von Health and safety are non-negotiable at SMS group / the entity I work for Mittelwert von I am familiar with SMS group's health and safety policies Mittelwert von SMS group / the entity I work for provides its employees with resources to create a healthy and safe work environment Mittelwert von SMS group / the entity I work for carries out regular activities, events and programs aimed at safety and improving the quality of life of its employees. Mittelwert von SMS group / the entity I work for encourages its employees to contribute to health and safety with ideas and actions Mittelwert von The leaders I am working for, promote resources to ensure a healthy and safe work environment for the team and for myself Mittelwert von My direct supervisor/line manager cares about my personal health, safety & wellbeing 3.73 3.58 3.89 3.73 3.60 3.68 3.92 3.64 3.73 3.75 3.83 3.74 3.61 3.57 3.64 3.61 3.59 3.65 3.65 3.83 3.62 3.66 3.80 3.68 3.69 3.64 3.76 3.70 March 16, 2023 19
  20. Thank you !