Tool-Box Talk
Top 7 Reasons Why Work Orders are not
Closed Out Accurately"
(How to get people to close out work orders the right way)
By Ricky Smith CMRP
Over the past 30 years I have seen very few companies who truly take action to
ensure work order data is input accurate resulting in Maintenance and Reliability
KPIs. - Ricky Smith CMRP
Objective of Work Order Close Out:
Closing out work orders accurately is critical for leadership to make the “right decisions at the
right time with accurate data” and it can only occur if work orders are “Closed with the Right
Information/Data”.
If metrics and Key Performance Indicators are so important where are people pulling the data
from without their work orders having the right data on them when they are closed into that
dark hole called the CMMS or EAM.
Without good data you are lost and probably are making decisions based on passion and not
facts. If you were to parachute out the back of an aircraft at 20,000Ft would you know where
you are? Unless you had a GPS, you would be lost. Most companies have this same
problem. They do not know where they are or how to get to the destination they wanted to
arrive at.
Example: If you had three days to travel to Washington, DC but had no idea where you were
or which direction to go, admit it you will never arrive on time or even at the right location. In
maintenance we are the same way. Without accurate data we are lost and making
decisions based on lack of accurate data.
“Your System is Perfectly Designed to Give you the Results you Get”
- W. Deming
Copyright 2020 – World Class Maintenance
Let’s look at the reasons people do not input the data so reports can be generated to tell us
where we are, are the making process, when we arrive at our destination,
Reason #1: No one inputs the data Accurately / Consistently into the CMMS/EAM. Admit it,
no one can make the right decisions without accurate data. I always ask the question who is
in charge? “I guess no one or everyone so follow the process, and measure the process”
Solution: Begin by identifying 2-3 metrics with a group of maintenance team members. Identify the
inputs in the CMMS or EAM which will provide the data for the metrics you requested. Train all
people who input the data and tell them why the data is so important. A Standard Operating
Procedure would be a great way to begin.
Reason #2: No one cares about the data; all they want to do is report the data corporate
wants such as PM Compliance, Schedule Compliance, Uptime, Downtime, etc.
Solution: Begin measuring the data you need to manage with such as Mean Time Between
Failure, Mean Time Between Repair, % of Planned Work, % of Rework, etc. and post them all to
see. Never make a negative remark about any data even if it is bad. “The data is the data”.
We want to focus our energy on how to improve the process, so the data shows increase in
performance. It is like on a football team, no one would care to play very well if they had no data or
scoreboard. Give your people a scoreboard, let them spread rumors about them for a week and
then tell them what the data says and ask for recommendations to improve the data. Never beat up
anyone over bad data or you will get great data from now on however nothing changes. The
problems still exist.
Copyright 2020 – World Class Maintenance
Reason #3: No one knows how to trend data, so they are afraid to show data in
an ineffective manner.
Solution: If you do not know how to trend specific data then ask an expert. Never allow this
issue to hold you back. Do your research; send me an email, read book, anything but move
forward and collect accurate data and disseminate the data with good metrics. We are data rich
but analysis poor, time to change that philosophy.
Reason #4: It is difficult to collect the data required.
Solution: Make accurate data collection a requirement and hold people accountable. Develop a
RACI Chart which determines roles and responsibilities of specific people.
Reason #5: You know the data is bad so why show it to everyone.
Solution: I wish I had a dollar for every time someone made that statement and I would be a rich
man. People will do what you inspire them to do and want you measure. If you do not like the data
change your actions or process.
“In the Absence of Accurate Data, you have someone’s Opinion”
Copyright 2020 – World Class Maintenance
Reason #6: Getting accurate data is impossible.
Solution: You should identify key people who influence others. Get them on your side and
make them a part of your KPI Development Team using RACI as stated earlier. When you
report the data talk to people and explain what the data is doing and why. Most of the time you
will get false / no valid information until everyone gets engaged.
PM RACI / KPI Example Chart
Reason #7: Our Maintenance Planner do not have time to ensure “Work Orders
are Closed Accurately” because they busy with other personnel’s jobs.
- Assisting Techs with locating Parts (Maintenance Supervisor’s Job)
- Attending Non-Value-Added Meetings (Maintenance Scheduling and Safety meetings
should be the only meetings they attend)
- Planners are turning wrenches (Planners must only focus Planning and Scheduling)
- Assisting Techs locate information (Maintenance Supervisor’s Job)
- Solution: Schedule one Maintenance Technician for 2-4 hours every week (change
technician every 4 weeks) to assist the Maintenance Planner in the following:
- Writing or modifying Maintenance Procedures based on upcoming scheduled work
- Scoping jobs
- Staging and Securing Parts for next week’s work
- Assist in Planning Work Orders
- Review Data from closed work orders to determine the following:
- Report trends in EM / Urgent Labor Hours and identifying the Cause/Causes by Reason
Codes
- Identifying Causes of Rework using RCA if required

More Related Content

What's hot

Process management (improvement)
Process management (improvement)Process management (improvement)
Process management (improvement)
Faisal Syukrillah
 

What's hot (20)

Day In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance ManagerDay In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance Manager
 
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceThe 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Planning And Scheduling Proactively
Planning And Scheduling ProactivelyPlanning And Scheduling Proactively
Planning And Scheduling Proactively
 
Precision Maintenance
Precision MaintenancePrecision Maintenance
Precision Maintenance
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Senior Capstone Presentation: Process Improvement Plan
Senior Capstone Presentation: Process Improvement PlanSenior Capstone Presentation: Process Improvement Plan
Senior Capstone Presentation: Process Improvement Plan
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
Maintenance Planning and Scheduling Maturity Matrix #2 of 2Maintenance Planning and Scheduling Maturity Matrix #2 of 2
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
 
Developing Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 daysDeveloping Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 days
 
Prioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuffPrioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuff
 
Viziya
Viziya Viziya
Viziya
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity Matrix
 
The Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset ReliabilityThe Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset Reliability
 
Why People do not understand the P-F Curve
Why People do not understand the P-F CurveWhy People do not understand the P-F Curve
Why People do not understand the P-F Curve
 
Process management (improvement)
Process management (improvement)Process management (improvement)
Process management (improvement)
 
6 sigma introduction
6 sigma introduction6 sigma introduction
6 sigma introduction
 
How processes masquerading as projects are hurting your business v4
How processes masquerading as projects are hurting your business v4How processes masquerading as projects are hurting your business v4
How processes masquerading as projects are hurting your business v4
 

Similar to Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately

The challenges of big data, how data capable is your business? DQM Group
The challenges of big data, how data capable is your business? DQM Group  The challenges of big data, how data capable is your business? DQM Group
The challenges of big data, how data capable is your business? DQM Group
Internet World
 
5StaffingMetricsForYourWorkweek
5StaffingMetricsForYourWorkweek5StaffingMetricsForYourWorkweek
5StaffingMetricsForYourWorkweek
Eric Scalese
 
BIG DATA WORKBOOK OCT 2015
BIG DATA WORKBOOK OCT 2015BIG DATA WORKBOOK OCT 2015
BIG DATA WORKBOOK OCT 2015
Fiona Lew
 

Similar to Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately (20)

4 Barriers to creating predictive talent analytics and how to overcome them
4 Barriers to creating predictive talent analytics and how to overcome them4 Barriers to creating predictive talent analytics and how to overcome them
4 Barriers to creating predictive talent analytics and how to overcome them
 
Top 25 Big Data Interview Questions and Answers
Top 25 Big Data Interview Questions and Answers Top 25 Big Data Interview Questions and Answers
Top 25 Big Data Interview Questions and Answers
 
Analysis of how to start thinking like a data scientist by thomas c. redman
Analysis of how to start thinking like a data scientist by thomas c. redmanAnalysis of how to start thinking like a data scientist by thomas c. redman
Analysis of how to start thinking like a data scientist by thomas c. redman
 
10.09.14 glassdoor webinar_all_slides
10.09.14 glassdoor webinar_all_slides10.09.14 glassdoor webinar_all_slides
10.09.14 glassdoor webinar_all_slides
 
The challenges of big data, how data capable is your business? DQM Group
The challenges of big data, how data capable is your business? DQM Group  The challenges of big data, how data capable is your business? DQM Group
The challenges of big data, how data capable is your business? DQM Group
 
Embracing data science
Embracing data scienceEmbracing data science
Embracing data science
 
Fruitful Data's 7 steps to improving your not-for-profit organisation's CRM data
Fruitful Data's 7 steps to improving your not-for-profit organisation's CRM dataFruitful Data's 7 steps to improving your not-for-profit organisation's CRM data
Fruitful Data's 7 steps to improving your not-for-profit organisation's CRM data
 
Data Driven Product Management - ProductTank Boston Feb '14
Data Driven Product Management - ProductTank Boston Feb '14Data Driven Product Management - ProductTank Boston Feb '14
Data Driven Product Management - ProductTank Boston Feb '14
 
Data driven in social meet up 20 minutes
Data driven in social meet up 20 minutesData driven in social meet up 20 minutes
Data driven in social meet up 20 minutes
 
Dit yvol5iss33
Dit yvol5iss33Dit yvol5iss33
Dit yvol5iss33
 
5StaffingMetricsForYourWorkweek
5StaffingMetricsForYourWorkweek5StaffingMetricsForYourWorkweek
5StaffingMetricsForYourWorkweek
 
Building an Effective Data Management Strategy
Building an Effective Data Management StrategyBuilding an Effective Data Management Strategy
Building an Effective Data Management Strategy
 
BIG DATA WORKBOOK OCT 2015
BIG DATA WORKBOOK OCT 2015BIG DATA WORKBOOK OCT 2015
BIG DATA WORKBOOK OCT 2015
 
Applying Data Quality Best Practices at Big Data Scale
Applying Data Quality Best Practices at Big Data ScaleApplying Data Quality Best Practices at Big Data Scale
Applying Data Quality Best Practices at Big Data Scale
 
Driving Insights with Tableau
Driving Insights with TableauDriving Insights with Tableau
Driving Insights with Tableau
 
How to Start Being a Data Driven Business
How to Start Being a Data Driven BusinessHow to Start Being a Data Driven Business
How to Start Being a Data Driven Business
 
Analytics Isn’t Enough To Create A Data–Driven Culture
Analytics Isn’t Enough To Create A Data–Driven CultureAnalytics Isn’t Enough To Create A Data–Driven Culture
Analytics Isn’t Enough To Create A Data–Driven Culture
 
Big dataplatform operationalstrategy
Big dataplatform operationalstrategyBig dataplatform operationalstrategy
Big dataplatform operationalstrategy
 
You may not need big data after all
You may not need big data after all You may not need big data after all
You may not need big data after all
 
KETL Quick guide to data analytics
KETL Quick guide to data analytics KETL Quick guide to data analytics
KETL Quick guide to data analytics
 

More from Ricky Smith CMRP, CMRT

More from Ricky Smith CMRP, CMRT (20)

Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
 
How to Optimize your CMMS viewer copy
How to Optimize your CMMS  viewer copyHow to Optimize your CMMS  viewer copy
How to Optimize your CMMS viewer copy
 
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochurePreventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
 
Tool Box Talk - CMRP exam recommendations
Tool Box Talk - CMRP exam recommendationsTool Box Talk - CMRP exam recommendations
Tool Box Talk - CMRP exam recommendations
 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Recently uploaded (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 

Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately

  • 1. Tool-Box Talk Top 7 Reasons Why Work Orders are not Closed Out Accurately" (How to get people to close out work orders the right way) By Ricky Smith CMRP Over the past 30 years I have seen very few companies who truly take action to ensure work order data is input accurate resulting in Maintenance and Reliability KPIs. - Ricky Smith CMRP Objective of Work Order Close Out: Closing out work orders accurately is critical for leadership to make the “right decisions at the right time with accurate data” and it can only occur if work orders are “Closed with the Right Information/Data”. If metrics and Key Performance Indicators are so important where are people pulling the data from without their work orders having the right data on them when they are closed into that dark hole called the CMMS or EAM. Without good data you are lost and probably are making decisions based on passion and not facts. If you were to parachute out the back of an aircraft at 20,000Ft would you know where you are? Unless you had a GPS, you would be lost. Most companies have this same problem. They do not know where they are or how to get to the destination they wanted to arrive at. Example: If you had three days to travel to Washington, DC but had no idea where you were or which direction to go, admit it you will never arrive on time or even at the right location. In maintenance we are the same way. Without accurate data we are lost and making decisions based on lack of accurate data. “Your System is Perfectly Designed to Give you the Results you Get” - W. Deming
  • 2. Copyright 2020 – World Class Maintenance Let’s look at the reasons people do not input the data so reports can be generated to tell us where we are, are the making process, when we arrive at our destination, Reason #1: No one inputs the data Accurately / Consistently into the CMMS/EAM. Admit it, no one can make the right decisions without accurate data. I always ask the question who is in charge? “I guess no one or everyone so follow the process, and measure the process” Solution: Begin by identifying 2-3 metrics with a group of maintenance team members. Identify the inputs in the CMMS or EAM which will provide the data for the metrics you requested. Train all people who input the data and tell them why the data is so important. A Standard Operating Procedure would be a great way to begin. Reason #2: No one cares about the data; all they want to do is report the data corporate wants such as PM Compliance, Schedule Compliance, Uptime, Downtime, etc. Solution: Begin measuring the data you need to manage with such as Mean Time Between Failure, Mean Time Between Repair, % of Planned Work, % of Rework, etc. and post them all to see. Never make a negative remark about any data even if it is bad. “The data is the data”. We want to focus our energy on how to improve the process, so the data shows increase in performance. It is like on a football team, no one would care to play very well if they had no data or scoreboard. Give your people a scoreboard, let them spread rumors about them for a week and then tell them what the data says and ask for recommendations to improve the data. Never beat up anyone over bad data or you will get great data from now on however nothing changes. The problems still exist.
  • 3. Copyright 2020 – World Class Maintenance Reason #3: No one knows how to trend data, so they are afraid to show data in an ineffective manner. Solution: If you do not know how to trend specific data then ask an expert. Never allow this issue to hold you back. Do your research; send me an email, read book, anything but move forward and collect accurate data and disseminate the data with good metrics. We are data rich but analysis poor, time to change that philosophy. Reason #4: It is difficult to collect the data required. Solution: Make accurate data collection a requirement and hold people accountable. Develop a RACI Chart which determines roles and responsibilities of specific people. Reason #5: You know the data is bad so why show it to everyone. Solution: I wish I had a dollar for every time someone made that statement and I would be a rich man. People will do what you inspire them to do and want you measure. If you do not like the data change your actions or process. “In the Absence of Accurate Data, you have someone’s Opinion”
  • 4. Copyright 2020 – World Class Maintenance Reason #6: Getting accurate data is impossible. Solution: You should identify key people who influence others. Get them on your side and make them a part of your KPI Development Team using RACI as stated earlier. When you report the data talk to people and explain what the data is doing and why. Most of the time you will get false / no valid information until everyone gets engaged. PM RACI / KPI Example Chart Reason #7: Our Maintenance Planner do not have time to ensure “Work Orders are Closed Accurately” because they busy with other personnel’s jobs. - Assisting Techs with locating Parts (Maintenance Supervisor’s Job) - Attending Non-Value-Added Meetings (Maintenance Scheduling and Safety meetings should be the only meetings they attend) - Planners are turning wrenches (Planners must only focus Planning and Scheduling) - Assisting Techs locate information (Maintenance Supervisor’s Job) - Solution: Schedule one Maintenance Technician for 2-4 hours every week (change technician every 4 weeks) to assist the Maintenance Planner in the following: - Writing or modifying Maintenance Procedures based on upcoming scheduled work - Scoping jobs - Staging and Securing Parts for next week’s work - Assist in Planning Work Orders - Review Data from closed work orders to determine the following: - Report trends in EM / Urgent Labor Hours and identifying the Cause/Causes by Reason Codes - Identifying Causes of Rework using RCA if required