LESSONS
 LEARNED ON A

LEED
PROJECT
?
YOUR VISION
   OF LEED
Choose the next step
LEED-NC   14789 1870
          Registered   Certified


LEED-EB   3484 268
          Registered   Certified


LEED-CI   454   144
          Registered   Certified   as of May 2009
LEED-Retail Pilot
Sports Basement   San Francisco, California
Overview

• Dense urban neighborhood


• Rehab abandoned factory building


• Budget blown on seismic upgrades


• Full block site


• Potential solar access


• Extensive sidewalk to replace
LEED Categories

! Sustainable Sites: 14 Points
! Water Efficiency: 5
! Energy & Atmosphere: 17
! Materials & Resources: 13
! Indoor Environmental Quality: 15
! Innovation & Design Process: 5
Category: Sustainable Sites
• Prerequisite: Construction Activity Pollution Prevention

• Credit 1 Site Selection                 • Credit 5.1 Protect or Restore
                                            Habitat
• Credit 2 Development Density
                                          • Credit 5.2 Maximize Open Space
• Credit 3 Brownfield Redevelopment
                                          • Credit 6.1 Stormwater, Quantity
• Credit 4.1 Public Transit Access
                                          • Credit 6.2 Stormwater, Quality
• Credit 4.2 Bicycle Storage &
  Changing Rooms                          • Credit 7.1 Heat Island Effect, Non-
                                            Roof
• Credit 4.3 Alternative
  Transportation, Low-Emitting and        • Credit 7.2 Heat Island Effect, Roof
  Fuel-Efficient Vehicles
                                          • Credit 8 Light Pollution Reduction
• Credit 4.4 Alternative
  Transportation, Parking Capacity
Category: Sustainable Sites                                  Obvious Points
• Prerequisite: Construction Activity Pollution Prevention

• Credit 1 Site Selection                 • Credit 5.1 Protect or Restore
                                            Habitat
• Credit 2 Development Density
                                          • Credit 5.2 Maximize Open Space
• Credit 3 Brownfield Redevelopment
                                          • Credit 6.1 Stormwater, Quantity
• Credit 4.1 Public Transit Access
                                          • Credit 6.2 Stormwater, Quality
• Credit 4.2 Bicycle Storage &
  Changing Rooms                          • Credit 7.1 Heat Island Effect, Non-
                                            Roof
• Credit 4.3 Alternative
  Transportation, Low-Emitting and        • Credit 7.2 Heat Island Effect, Roof
  Fuel-Efficient Vehicles
                                          • Credit 8 Light Pollution Reduction
• Credit 4.4 Alternative
  Transportation, Parking Capacity
Category: Sustainable Sites                           Impossible Points
• Prerequisite: Construction Activity Pollution Prevention

• Credit 1 Site Selection                 • Credit 5.1 Protect or Restore
                                            Habitat
• Credit 2 Development Density
                                          • Credit 5.2 Maximize Open Space
• Credit 3 Brownfield Redevelopment
                                          • Credit 6.1 Stormwater, Quantity
• Credit 4.1 Public Transit Access
                                          • Credit 6.2 Stormwater, Quality
• Credit 4.2 Bicycle Storage &
  Changing Rooms                          • Credit 7.1 Heat Island Effect, Non-
                                            Roof
• Credit 4.3 Alternative
  Transportation, Low-Emitting and        • Credit 7.2 Heat Island Effect, Roof
  Fuel-Efficient Vehicles
                                          • Credit 8 Light Pollution Reduction
• Credit 4.4 Alternative
  Transportation, Parking Capacity
Category: Sustainable Sites                           Remaining Points
• Prerequisite: Construction Activity Pollution Prevention

• Credit 1 Site Selection                 • Credit 5.1 Protect or Restore
                                            Habitat
• Credit 2 Development Density
                                          • Credit 5.2 Maximize Open Space
• Credit 3 Brownfield Redevelopment
                                          • Credit 6.1 Stormwater, Quantity
• Credit 4.1 Public Transit Access
                                          • Credit 6.2 Stormwater, Quality
• Credit 4.2 Bicycle Storage &
  Changing Rooms                          • Credit 7.1 Heat Island Effect, Non-
                                            Roof
• Credit 4.3 Alternative
  Transportation, Low-Emitting and        • Credit 7.2 Heat Island Effect, Roof
  Fuel-Efficient Vehicles
                                          • Credit 8 Light Pollution Reduction
• Credit 4.4 Alternative
  Transportation, Parking Capacity
Category: Water Efficiency
• Prerequisite: None

• Credit 1.1 Water Efficient Landscaping, Reduce by 50%

• Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation

• Credit 2 Innovative Wastewater Technologies

• Credit 3.1 Water Use Reduction, 20% Reduction

• Credit 3.2 Water Use Reduction, 30% Reduction
Category: Water Efficiency                               Obvious Points
• Prerequisite: None

• Credit 1.1 Water Efficient Landscaping, Reduce by 50%

• Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation

• Credit 2 Innovative Wastewater Technologies

• Credit 3.1 Water Use Reduction, 20% Reduction

• Credit 3.2 Water Use Reduction, 30% Reduction
Category: Water Efficiency                            Impossible Points
• Prerequisite: None

• Credit 1.1 Water Efficient Landscaping, Reduce by 50%

• Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation

• Credit 2 Innovative Wastewater Technologies

• Credit 3.1 Water Use Reduction, 20% Reduction

• Credit 3.2 Water Use Reduction, 30% Reduction
Category: Water Efficiency                            Remaining Points
• Prerequisite: None

• Credit 1.1 Water Efficient Landscaping, Reduce by 50%

• Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation

• Credit 2 Innovative Wastewater Technologies

• Credit 3.1 Water Use Reduction, 20% Reduction

• Credit 3.2 Water Use Reduction, 30% Reduction
Category: Energy & Atmosphere
• Prerequisite 1: Fundamental Commissioning of the Building Energy Systems
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Fundamental Refrigerant Management


• Credit 1 Optimize Energy Performance (10 points)

• Credit 2 On-Site Renewable Energy (3 points)

• Credit 3 Enhanced Commissioning

• Credit 4 Enhanced Refrigerant Management

• Credit 5 Measurement & Verification

• Credit 6 Green Power
Category: Energy & Atmosphere                         Obvious Points
• Prerequisite 1: Fundamental Commissioning of the Building Energy Systems
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Fundamental Refrigerant Management


• Credit 1 Optimize Energy Performance (10 points)

• Credit 2 On-Site Renewable Energy (3 points)

• Credit 3 Enhanced Commissioning

• Credit 4 Enhanced Refrigerant Management

• Credit 5 Measurement & Verification

• Credit 6 Green Power
Category: Energy & Atmosphere                        Impossible Points
• Prerequisite 1: Fundamental Commissioning of the Building Energy Systems
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Fundamental Refrigerant Management


• Credit 1 Optimize Energy Performance (10 points)

• Credit 2 On-Site Renewable Energy (3 points)

• Credit 3 Enhanced Commissioning

• Credit 4 Enhanced Refrigerant Management

• Credit 5 Measurement & Verification

• Credit 6 Green Power
Category: Energy & Atmosphere                       Remaining Points
• Prerequisite 1: Fundamental Commissioning of the Building Energy Systems
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Fundamental Refrigerant Management


• Credit 1 Optimize Energy Performance (7 points)

• Credit 2 On-Site Renewable Energy (1 point)

• Credit 3 Enhanced Commissioning

• Credit 4 Enhanced Refrigerant Management

• Credit 5 Measurement & Verification

• Credit 6 Green Power
Category: Materials & Resources
• Prerequisite: Storage & Collection of Recyclables

• Credit 1.1 75% Building Reuse          • Credit 4.1 Recycled Content, 10%
                                            (post-consumer + 1⁄2 pre-consumer)


• Credit 1.2 100% Building Reuse         • Credit 4.2 Recycled Content, 20%
• Credit 1.3 Building Reuse, 50% of
                                         • Credit 5.1 Regional Regionally      Materials, 10%
  Interior Non-Structural Elements         Extracted, Processed & Manufactured



• Credit 2.1 Construction Waste          • Credit 5.2 Regional Materials, 20%
  Management, Divert 50%
                                         • Credit 6 Rapidly Renewable
• Credit 2.2 Construction Waste            Materials
  Management, Divert 75%
                                         • Credit 7 Certified Wood
• Credit 3.1 Materials Reuse, 5%

• Credit 3.2 Materials Reuse,10%
Category: Materials & Resources                                     Obvious Points
• Prerequisite: Storage & Collection of Recyclables

• Credit 1.1 75% Building Reuse          • Credit 4.1 Recycled Content, 10%
                                            (post-consumer + 1⁄2 pre-consumer)


• Credit 1.2 100% Building Reuse         • Credit 4.2 Recycled Content, 20%
• Credit 1.3 Building Reuse, 50% of
                                         • Credit 5.1 Regional Regionally      Materials, 10%
  Interior Non-Structural Elements         Extracted, Processed & Manufactured



• Credit 2.1 Construction Waste          • Credit 5.2 Regional Materials, 20%
  Management, Divert 50%
                                         • Credit 6 Rapidly Renewable
• Credit 2.2 Construction Waste            Materials
  Management, Divert 75%
                                         • Credit 7 Certified Wood
• Credit 3.1 Materials Reuse, 5%

• Credit 3.2 Materials Reuse,10%
Category: Materials & Resources                              Impossible Points
• Prerequisite: Storage & Collection of Recyclables

• Credit 1.1 75% Building Reuse          • Credit 4.1 Recycled Content, 10%
                                            (post-consumer + 1⁄2 pre-consumer)


• Credit 1.2 100% Building Reuse         • Credit 4.2 Recycled Content, 20%
• Credit 1.3 Building Reuse, 50% of
                                         • Credit 5.1 Regional Regionally      Materials, 10%
  Interior Non-Structural Elements         Extracted, Processed & Manufactured



• Credit 2.1 Construction Waste          • Credit 5.2 Regional Materials, 20%
  Management, Divert 50%
                                         • Credit 6 Rapidly Renewable
• Credit 2.2 Construction Waste            Materials
  Management, Divert 75%
                                         • Credit 7 Certified Wood
• Credit 3.1 Materials Reuse, 5%

• Credit 3.2 Materials Reuse,10%
Category: Materials & Resources                              Remaining Points
• Prerequisite: Storage & Collection of Recyclables

• Credit 1.1 75% Building Reuse          • Credit 4.1 Recycled Content, 10%
                                            (post-consumer + 1⁄2 pre-consumer)


• Credit 1.2 100% Building Reuse         • Credit 4.2 Recycled Content, 20%
• Credit 1.3 Building Reuse, 50% of
                                         • Credit 5.1 Regional Regionally      Materials, 10%
  Interior Non-Structural Elements         Extracted, Processed & Manufactured



• Credit 2.1 Construction Waste          • Credit 5.2 Regional Materials, 20%
  Management, Divert 50%
                                         • Credit 6 Rapidly Renewable
• Credit 2.2 Construction Waste            Materials
  Management, Divert 75%
                                         • Credit 7 Certified Wood
• Credit 3.1 Materials Reuse, 5%

• Credit 3.2 Materials Reuse,10%
Category: Indoor Environmental Quality
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 Outdoor Air Monitoring       • Credit 5 Indoor Chemical &
                                          Pollutant Source Control
• Credit 2 Increased Ventilation
                                        • Credit 6.1 Lighting Controls
• Credit 3.1 IAQ Management Plan,
  During Construction
                                        • Credit 6.2 Thermal Controls
• Credit 3.2 IAQ Management Plan,
  Before Occupancy                      • Credit 7.1 Thermal Design

• Credit 4.1 Low-Emitting Adhesives     • Credit 7.2 Thermal Verification

• Credit 4.2 Low-Emitting Paints        • Credit 8.1 Daylight & Views, 75%

• Credit 4.3 Low-Emitting Carpeting     • Credit 8.2 Daylight & Views, 90%

• Credit 4.4 Low-Emitting Composite
  Wood & Agrifiber
Category: IEQ                                          Obvious Points
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 Outdoor Air Monitoring       • Credit 5 Indoor Chemical &
                                          Pollutant Source Control
• Credit 2 Increased Ventilation
                                        • Credit 6.1 Lighting Controls
• Credit 3.1 IAQ Management Plan,
  During Construction
                                        • Credit 6.2 Thermal Controls
• Credit 3.2 IAQ Management Plan,
  Before Occupancy                      • Credit 7.1 Thermal Design

• Credit 4.1 Low-Emitting Adhesives     • Credit 7.2 Thermal Verification

• Credit 4.2 Low-Emitting Paints        • Credit 8.1 Daylight & Views, 75%

• Credit 4.3 Low-Emitting Carpeting     • Credit 8.2 Daylight & Views, 90%

• Credit 4.4 Low-Emitting Composite
  Wood & Agrifiber
Category: IEQ                                      Impossible Points
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 Outdoor Air Monitoring       • Credit 5 Indoor Chemical &
                                          Pollutant Source Control
• Credit 2 Increased Ventilation
                                        • Credit 6.1 Lighting Controls
• Credit 3.1 IAQ Management Plan,
  During Construction
                                        • Credit 6.2 Thermal Controls
• Credit 3.2 IAQ Management Plan,
  Before Occupancy                      • Credit 7.1 Thermal Design

• Credit 4.1 Low-Emitting Adhesives     • Credit 7.2 Thermal Verification

• Credit 4.2 Low-Emitting Paints        • Credit 8.1 Daylight & Views, 75%

• Credit 4.3 Low-Emitting Carpeting     • Credit 8.2 Daylight & Views, 90%

• Credit 4.4 Low-Emitting Composite
  Wood & Agrifiber
Category: IEQ                                       Remaining Points
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 Outdoor Air Monitoring       • Credit 5 Indoor Chemical &
                                          Pollutant Source Control
• Credit 2 Increased Ventilation
                                        • Credit 6.1 Lighting Controls
• Credit 3.1 IAQ Management Plan,
  During Construction
                                        • Credit 6.2 Thermal Controls
• Credit 3.2 IAQ Management Plan,
  Before Occupancy                      • Credit 7.1 Thermal Design

• Credit 4.1 Low-Emitting Adhesives     • Credit 7.2 Thermal Verification

• Credit 4.2 Low-Emitting Paints        • Credit 8.1 Daylight & Views, 75%

• Credit 4.3 Low-Emitting Carpeting     • Credit 8.2 Daylight & Views, 90%

• Credit 4.4 Low-Emitting Composite
  Wood & Agrifiber
Category: Innovation & Design
• Prerequisite: None

• Credit 1.1 Innovation in Design

• Credit 1.2 Innovation in Design

• Credit 1.3 Innovation in Design

• Credit 1.4 Innovation in Design

• Credit 2 LEED Accredited Professional
Category: Innovation & Design                            Obvious Points
• Prerequisite: None

• Credit 1.1 Innovation in Design: Retail Fixtures

• Credit 1.2 Innovation in Design: Pilot Participation

• Credit 1.3 Innovation in Design: Community Programs

• Credit 1.4 Innovation in Design: Advanced Energy Management

• Credit 2 LEED Accredited Professional
LEED-EB
Unico Tower   San Francisco, California
Overview

• Class A office tower/retail space


• 33 stories


• 402,500 rentable square feet


• Built in 1972


• Dense urban location
Category: Sustainable Sites
• Prerequisite 1: Erosion & Sedimentation Control
• Prerequisite 2: Age of Building

• Credit 1.1-2! Plan for Green Site!     • 5.1! Stormwater Mgmt - 25%!

• 2!    High Density Building            • 5.2! Stormwater Mgmt - 50%!

• 3.1! Public Transit Access             • 6.1! Heat Island - Non-Roof!

• 3.2! Bicycle Storage & Changing        • 6.2! Heat Island - Roof!
  Rooms
                                         • 7!       Light Pollution Reduction
• 3.3! Alternative Vehicles!

• 3.4! Car Pooling & Telecommuting

• 4.1! Protect or Restore Open
  Space, 50%!

• 4.2! Protect or Restore Open
  Space, 75%!
Category: Sustainable Sites                                Obvious Points
• Prerequisite 1: Erosion & Sedimentation Control
• Prerequisite 2: Age of Building

• Credit 1.1-2! Plan for Green Site!     • 5.1! Stormwater Mgmt - 25%!

• 2!    High Density Building            • 5.2! Stormwater Mgmt - 50%!

• 3.1! Public Transit Access             • 6.1! Heat Island - Non-Roof!

• 3.2! Bicycle Storage & Changing        • 6.2! Heat Island - Roof!
  Rooms
                                         • 7!       Light Pollution Reduction
• 3.3! Alternative Vehicles!

• 3.4! Car Pooling & Telecommuting

• 4.1! Protect or Restore Open
  Space, 50%!

• 4.2! Protect or Restore Open
  Space, 75%!
Category: Sustainable Sites                            Impossible Points
• Prerequisite 1: Erosion & Sedimentation Control
• Prerequisite 2: Age of Building

• Credit 1.1-2! Plan for Green Site!     • 5.1! Stormwater Mgmt - 25%!

• 2!    High Density Building            • 5.2! Stormwater Mgmt - 50%!

• 3.1! Public Transit Access             • 6.1! Heat Island - Non-Roof!

• 3.2! Bicycle Storage & Changing        • 6.2! Heat Island - Roof!
  Rooms
                                         • 7!       Light Pollution Reduction
• 3.3! Alternative Vehicles!

• 3.4! Car Pooling & Telecommuting

• 4.1! Protect or Restore Open
  Space, 50%!

• 4.2! Protect or Restore Open
  Space, 75%!
Category: Sustainable Sites                             Remaining Points
• Prerequisite 1: Erosion & Sedimentation Control
• Prerequisite 2: Age of Building

• Credit 1.1-2! Plan for Green Site!     • 5.1! Stormwater Mgmt - 25%!

• 2!    High Density Building            • 5.2! Stormwater Mgmt - 50%!

• 3.1! Public Transit Access             • 6.1! Heat Island - Non-Roof!

• 3.2! Bicycle Storage & Changing        • 6.2! Heat Island - Roof!
  Rooms
                                         • 7!       Light Pollution Reduction
• 3.3! Alternative Vehicles!

• 3.4! Car Pooling & Telecommuting

• 4.1! Protect or Restore Open
  Space, 50%!

• 4.2! Protect or Restore Open
  Space, 75%!
Category: Water Efficiency
• Prerequisite 1: Minimum Water Efficiency
• Prerequisite 2: Discharge Water Compliance

• Credit 1.1!   Water Efficient Landscaping - Reduce Potable Water Use by
  50%

• Credit 1.2!   Water Efficient Landscaping - Reduce Potable Water Use by
  95%

• Credit 2! Innovative Wastewater Technologies!

• Credit 3.1!   Water Use Reduction - 10% Reduction!

• Credit 3.2!   Water Use Reduction - 20% Reduction!
Category: Water Efficiency                              Obvious Points
• Prerequisite 1: Minimum Water Efficiency
• Prerequisite 2: Discharge Water Compliance

• Credit 1.1!   Water Efficient Landscaping - Reduce Potable Water Use by
  50%

• Credit 1.2!   Water Efficient Landscaping - Reduce Potable Water Use by
  95%

• Credit 2! Innovative Wastewater Technologies!

• Credit 3.1!   Water Use Reduction - 10% Reduction!

• Credit 3.2!   Water Use Reduction - 20% Reduction!
Category: Water Efficiency                          Impossible Points
• Prerequisite 1: Minimum Water Efficiency
• Prerequisite 2: Discharge Water Compliance

• Credit 1.1!   Water Efficient Landscaping - Reduce Potable Water Use by
  50%

• Credit 1.2!   Water Efficient Landscaping - Reduce Potable Water Use by
  95%

• Credit 2! Innovative Wastewater Technologies!

• Credit 3.1!   Water Use Reduction - 10% Reduction!

• Credit 3.2!   Water Use Reduction - 20% Reduction!
Category: Water Efficiency                          Remaining Points
• Prerequisite 1: Minimum Water Efficiency
• Prerequisite 2: Discharge Water Compliance

• Credit 1.1!   Water Efficient Landscaping - Reduce Potable Water Use by
  50%

• Credit 1.2!   Water Efficient Landscaping - Reduce Potable Water Use by
  95%

• Credit 2! Innovative Wastewater Technologies!

• Credit 3.1!   Water Use Reduction - 10% Reduction!

• Credit 3.2!   Water Use Reduction - 20% Reduction!
Category: Energy & Atmosphere
• Prerequisite 1: Existing Building Commissioning
• Prerequisite 2: Minimum Energy Performance - Energy Star 60
• Prerequisite 3: Ozone Protection


• Credit 1! Optimize Energy - Energy   • 3.2! Systems Maintenance!
  Star 63 or >
                                       • 3.3! Systems Monitoring
• 2.1! Renewable Energy - 3-15%!
                                       • 4!     !   Ozone Protection!
• 2.2! Renewable Energy - 6-30%!
                                       • 5.1-3! erformance Measurement -
                                              P
• 2.3! Renewable Energy - 9-45%!         Enhanced Metering

• 2.4! Renewable Energy -
  12-60%!

• 3.1! Operation - Staff Education!
Category: Energy & Atmosphere                         Obvious Points
• Prerequisite 1: Existing Building Commissioning
• Prerequisite 2: Minimum Energy Performance - Energy Star 60
• Prerequisite 3: Ozone Protection


• Credit 1! Optimize Energy - Energy   • 3.2! Systems Maintenance!
  Star 63 or >
                                       • 3.3! Systems Monitoring
• 2.1! Renewable Energy - 3-15%!
                                       • 4!     !   Ozone Protection!
• 2.2! Renewable Energy - 6-30%!
                                       • 5.1-3! erformance Measurement -
                                              P
• 2.3! Renewable Energy - 9-45%!         Enhanced Metering

• 2.4! Renewable Energy -
  12-60%!

• 3.1! Operation - Staff Education!
Category: Energy & Atmosphere                       Impossible Points
• Prerequisite 1: Existing Building Commissioning
• Prerequisite 2: Minimum Energy Performance - Energy Star 60
• Prerequisite 3: Ozone Protection


• Credit 1! Optimize Energy - Energy   • 3.2! Systems Maintenance!
  Star 63 or >
                                       • 3.3! Systems Monitoring
• 2.1! Renewable Energy - 3-15%!
                                       • 4!     !   Ozone Protection!
• 2.2! Renewable Energy - 6-30%!
                                       • 5.1-3! erformance Measurement -
                                              P
• 2.3! Renewable Energy - 9-45%!         Enhanced Metering

• 2.4! Renewable Energy -
  12-60%!

• 3.1! Operation - Staff Education!
Category: Energy & Atmosphere                       Remaining Points
• Prerequisite 1: Existing Building Commissioning
• Prerequisite 2: Minimum Energy Performance - Energy Star 60
• Prerequisite 3: Ozone Protection


• Credit 1! Optimize Energy - Energy   • 3.2! Systems Maintenance!
  Star 63 or >
                                       • 3.3! Systems Monitoring
• 2.1! Renewable Energy - 3-15%!
                                       • 4!     !   Ozone Protection!
• 2.2! Renewable Energy - 6-30%!
                                       • 5.1-3! erformance Measurement -
                                              P
• 2.3! Renewable Energy - 9-45%!         Enhanced Metering

• 2.4! Renewable Energy -
  12-60%!

• 3.1! Operation - Staff Education!
Category: Materials & Resources
• Prerequisite 1.1: Source Reduction & Waste Stream Audit
• Prerequisite 1.2: Source Reduction & Management - Storage & Collection
• Prerequisite 2: Reduced Mercury in Light Bulbs

• Credit 1.1! Construction Waste        • 4.1! Sustainable Cleaning
  Management - 50%                        Products & Materials - 30%

• 1.2! Construction Waste               • 4.2! Sustainable Cleaning
  Management - 75%                        Products & Materials - 60%

• 2.1-2 !   Optimize Use of             • Credit 4.3! Sustainable Cleaning
  Alternative Materials - 10-50%          Products & Materials - 90%

• 3.1! Optimize Use of IAQ              • Credit 5.1! Occupant Recycling -
  Compliant Products - 45%                30/40/50% of Total Waste Stream

• 3.2! Optimize Use of IAQ              • Credit 6! Additional Reduced
  Compliant Products - 90%                Mercury in Light Bulbs
Category: Materials & Resources                        Obvious Points
• Prerequisite 1.1: Source Reduction & Waste Stream Audit
• Prerequisite 1.2: Source Reduction & Management - Storage & Collection
• Prerequisite 2: Reduced Mercury in Light Bulbs

• Credit 1.1! Construction Waste        • 4.1! Sustainable Cleaning
  Management - 50%                        Products & Materials - 30%

• 1.2! Construction Waste               • 4.2! Sustainable Cleaning
  Management - 75%                        Products & Materials - 60%

• 2.1-2 !   Optimize Use of             • Credit 4.3! Sustainable Cleaning
  Alternative Materials - 10-50%          Products & Materials - 90%

• 3.1! Optimize Use of IAQ              • Credit 5.1! Occupant Recycling -
  Compliant Products - 45%                30/40/50% of Total Waste Stream

• 3.2! Optimize Use of IAQ              • Credit 6! Additional Reduced
  Compliant Products - 90%                Mercury in Light Bulbs
Category: Materials & Resources                    Impossible Points
• Prerequisite 1.1: Source Reduction & Waste Stream Audit
• Prerequisite 1.2: Source Reduction & Management - Storage & Collection
• Prerequisite 2: Reduced Mercury in Light Bulbs

• Credit 1.1! Construction Waste        • 4.1! Sustainable Cleaning
  Management - 50%                        Products & Materials - 30%

• 1.2! Construction Waste               • 4.2! Sustainable Cleaning
  Management - 75%                        Products & Materials - 60%

• 2.1-2 !   Optimize Use of             • Credit 4.3! Sustainable Cleaning
  Alternative Materials - 10-50%          Products & Materials - 90%

• 3.1! Optimize Use of IAQ              • Credit 5.1! Occupant Recycling -
  Compliant Products - 45%                30/40/50% of Total Waste Stream

• 3.2! Optimize Use of IAQ              • Credit 6! Additional Reduced
  Compliant Products - 90%                Mercury in Light Bulbs
Category: Materials & Resources                    Remaining Points
• Prerequisite 1.1: Source Reduction & Waste Stream Audit
• Prerequisite 1.2: Source Reduction & Management - Storage & Collection
• Prerequisite 2: Reduced Mercury in Light Bulbs

• Credit 1.1! Construction Waste        • 4.1! Sustainable Cleaning
  Management - 50%                        Products & Materials - 30%

• 1.2! Construction Waste               • 4.2! Sustainable Cleaning
  Management - 75%                        Products & Materials - 60%

• 2.1-2 !   Optimize Use of             • Credit 4.3! Sustainable Cleaning
  Alternative Materials - 10-50%          Products & Materials - 90%

• 3.1! Optimize Use of IAQ              • Credit 5.1! Occupant Recycling -
  Compliant Products - 45%                30/40/50% of Total Waste Stream

• 3.2! Optimize Use of IAQ              • Credit 6! Additional Reduced
  Compliant Products - 90%                Mercury in Light Bulbs
Category: Indoor Environmental Quality
•   Prerequisite 1: Outside Air Introduction & Exhaust Systems
•   Prerequisite 2: Environmental Tobacco Smoke (ETS) Control
•   Prerequisite 3: Asbestos Removal or Encapsulation
•   Prerequisite 4: PCB Removal
• Credit 1! Outside Air Monitoring!     • 7.1! Thermal Comfort!
• 2!     Increased Ventilation!         • 7.2! Monitoring System!
• 3!    Construction IAQ Mgmt           • 8.1-2! aylight for 50/75% !
                                               D
  Plan!
                                        • 8.3-4!Views for 45/90%!
• 4.1! Documenting Impact -
  Absenteeism & Healthcare Cost!        • 9!     !   Contemporary IAQ!
• 4.2! Documenting Other Impacts        • 10.1! Entryway Systems!
• 5.1! Reduce Particulates in Air!      • 10.2! Isolate Janitorial Closets!
• 5.2! Isolate Copy/Print Room!         • 10.3! Green Cleaning Policy
• 6.1! Lighting Control!                • 10.4-5 !   Green Pest Mgmt!
• 6.2! Temperature Control!             • 10.6! Green Cleaning Equipment
Category: IEQ                                             Obvious Points
•   Prerequisite 1: Outside Air Introduction & Exhaust Systems
•   Prerequisite 2: Environmental Tobacco Smoke (ETS) Control
•   Prerequisite 3: Asbestos Removal or Encapsulation
•   Prerequisite 4: PCB Removal
• Credit 1! Outside Air Monitoring!     • 7.1! Thermal Comfort!
• 2!     Increased Ventilation!         • 7.2! Monitoring System!
• 3!    Construction IAQ Mgmt           • 8.1-2! aylight for 50/75% !
                                               D
  Plan!
                                        • 8.3-4!Views for 45/90%!
• 4.1! Documenting Impact -
  Absenteeism & Healthcare Cost!        • 9!     !   Contemporary IAQ!
• 4.2! Documenting Other Impacts        • 10.1! Entryway Systems!
• 5.1! Reduce Particulates in Air!      • 10.2! Isolate Janitorial Closets!
• 5.2! Isolate Copy/Print Room!         • 10.3! Green Cleaning Policy
• 6.1! Lighting Control!                • 10.4-5 !   Green Pest Mgmt!
• 6.2! Temperature Control!             • 10.6! Green Cleaning Equipment
Category: IEQ                                         Impossible Points
•   Prerequisite 1: Outside Air Introduction & Exhaust Systems
•   Prerequisite 2: Environmental Tobacco Smoke (ETS) Control
•   Prerequisite 3: Asbestos Removal or Encapsulation
•   Prerequisite 4: PCB Removal
• Credit 1! Outside Air Monitoring!     • 7.1! Thermal Comfort!
• 2!     Increased Ventilation!         • 7.2! Monitoring System!
• 3!    Construction IAQ Mgmt           • 8.1-2! aylight for 50/75% !
                                               D
  Plan!
                                        • 8.3-4!Views for 45/90%!
• 4.1! Documenting Impact -
  Absenteeism & Healthcare Cost!        • 9!     !   Contemporary IAQ!
• 4.2! Documenting Other Impacts        • 10.1! Entryway Systems!
• 5.1! Reduce Particulates in Air!      • 10.2! Isolate Janitorial Closets!
• 5.2! Isolate Copy/Print Room!         • 10.3! Green Cleaning Policy
• 6.1! Lighting Control!                • 10.4-5 !   Green Pest Mgmt!
• 6.2! Temperature Control!             • 10.6! Green Cleaning Equipment
Category: IEQ                                          Remaining Points
•   Prerequisite 1: Outside Air Introduction & Exhaust Systems
•   Prerequisite 2: Environmental Tobacco Smoke (ETS) Control
•   Prerequisite 3: Asbestos Removal or Encapsulation
•   Prerequisite 4: PCB Removal
• Credit 1! Outside Air Monitoring!     • 7.1! Thermal Comfort!
• 2!     Increased Ventilation!         • 7.2! Monitoring System!
• 3!    Construction IAQ Mgmt           • 8.1-2! aylight for 50/75% !
                                               D
  Plan!
                                        • 8.3-4!Views for 45/90%!
• 4.1! Documenting Impact -
  Absenteeism & Healthcare Cost!        • 9!     !   Contemporary IAQ!
• 4.2! Documenting Other Impacts        • 10.1! Entryway Systems!
• 5.1! Reduce Particulates in Air!      • 10.2! Isolate Janitorial Closets!
• 5.2! Isolate Copy/Print Room!         • 10.3! Green Cleaning Policy
• 6.1! Lighting Control!                • 10.4-5 !   Green Pest Mgmt!
• 6.2! Temperature Control!             • 10.6! Green Cleaning Equipment
Category: Innovation & Design
• Prerequisite: None

• Credit 1.1 Innovation in Design

• Credit 1.2 Innovation in Design

• Credit 1.3 Innovation in Design

• Credit 2 LEED Accredited Professional
Category: Innovation & Design                             Obvious Points
• Prerequisite: None

• Credit 1.1 Innovation in Design: recycled glass fountain in lobby

• Credit 1.2 Innovation in Design: motion sensors in stairwells

• Credit 1.3 Innovation in Design: high efficiency air handling units

• Credit 2 LEED Accredited Professional
LEED-CI
Full Bloom Bakery   Menlo Park, California
Overview

• Existing bakery facility


• Moving from smaller location


• Moving existing (old) equipment


• Suburban location
Category: Sustainable Sites
• Prerequisite: None
! Credit 1! LEED Certified Building   • Credit 2" Development Density and
  or pick 3 features:!                 Community Connectivity"

  Brownfield Redevelopment            • Credit 3.1"   Public Transit Access
  Stormwater: Rate and Quantity!
  Stormwater: Treatment!
  Heat Island Reduction, Non-Roof!   • Credit 3.2" Bicycle Storage &
  Heat-Island Reduction, Roof          Changing Rooms
  Light Pollution Reduction
  Irrigation: Reduce by 50%!         • Credit 3.3"   Parking Availability"
  Irrigation: No Potable Use
  Innovative Wastewater
  Reduce Water Use: 20%
  Onsite Renewable Energy!
  Other Quantifiable Performance!
Category: Sustainable Sites                          Obvious Points
• Prerequisite: None
! Credit 1! LEED Certified Building   • Credit 2" Development Density and
  or pick 3 features:!                 Community Connectivity"

  Brownfield Redevelopment            • Credit 3.1"   Public Transit Access
  Stormwater: Rate and Quantity!
  Stormwater: Treatment!
  Heat Island Reduction, Non-Roof!   • Credit 3.2" Bicycle Storage &
  Heat-Island Reduction, Roof          Changing Rooms
  Light Pollution Reduction
  Irrigation: Reduce by 50%!         • Credit 3.3"   Parking Availability"
  Irrigation: No Potable Use
  Innovative Wastewater
  Reduce Water Use: 20%
  Onsite Renewable Energy!
  Other Quantifiable Performance!
Category: Sustainable Sites                     Impossible Points
• Prerequisite: None
! Credit 1! LEED Certified Building   • Credit 2" Development Density and
  or pick 3 features:!                 Community Connectivity"

  Brownfield Redevelopment            • Credit 3.1"   Public Transit Access
  Stormwater: Rate and Quantity!
  Stormwater: Treatment!
  Heat Island Reduction, Non-Roof!   • Credit 3.2" Bicycle Storage &
  Heat-Island Reduction, Roof          Changing Rooms
  Light Pollution Reduction
  Irrigation: Reduce by 50%!         • Credit 3.3"   Parking Availability"
  Irrigation: No Potable Use
  Innovative Wastewater
  Reduce Water Use: 20%
  Onsite Renewable Energy!
  Other Quantifiable Performance!
Category: Sustainable Sites                      Remaining Points
• Prerequisite: None
! Credit 1! LEED Certified Building   • Credit 2" Development Density and
  or pick 3 features:!                 Community Connectivity"

  Brownfield Redevelopment            • Credit 3.1"   Public Transit Access
  Stormwater: Rate and Quantity!
  Stormwater: Treatment!
  Heat Island Reduction, Non-Roof!   • Credit 3.2" Bicycle Storage &
  Heat-Island Reduction, Roof          Changing Rooms
  Light Pollution Reduction
  Irrigation: Reduce by 50%!         • Credit 3.3"   Parking Availability"
  Irrigation: No Potable Use
  Innovative Wastewater
  Reduce Water Use: 20%
  Onsite Renewable Energy!
  Other Quantifiable Performance!
Category: Water Efficiency
• Prerequisite: None


• Credit 1.1!   Water Use Reduction - 20% Reduction!

• Credit 1.2!   Water Use Reduction - 30% Reduction!
Category: Water Efficiency                              Obvious Points
• Prerequisite: None


• Credit 1.1!   Water Use Reduction - 20% Reduction!

• Credit 1.2!   Water Use Reduction - 30% Reduction!
Category: Water Efficiency                         Impossible Points
• Prerequisite: None


• Credit 1.1!   Water Use Reduction - 20% Reduction!

• Credit 1.2!   Water Use Reduction - 30% Reduction!
Category: Water Efficiency                          Remaining Points
• Prerequisite: None


• Credit 1.1!   Water Use Reduction - 20% Reduction!

• Credit 1.2!   Water Use Reduction - 30% Reduction!
Category: Energy & Atmosphere
• Prerequisite 1: Fundamental Commissioning
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Ozone Protection


• Credit 1.1! Optimize Energy          • Credit 2! Enhanced
  Performance - Lighting Power!          Commissioning!

• Credit 1.2! Optimize Energy          • Credit 3! Energy Use,
  Performance - Lighting Controls!       Measurement & Payment
                                         Accountability!
• Credit 1.3! Optimize Energy
  Performance - HVAC!                  • Credit 4 !Green Power!

• Credit 1.4! Optimize Energy
  Performance - Equipment and
  Appliances!
Category: Energy & Atmosphere                        Obvious Points
• Prerequisite 1: Fundamental Commissioning
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Ozone Protection


• Credit 1.1! Optimize Energy          • Credit 2! Enhanced
  Performance - Lighting Power!          Commissioning!

• Credit 1.2! Optimize Energy          • Credit 3! Energy Use,
  Performance - Lighting Controls!       Measurement & Payment
                                         Accountability!
• Credit 1.3! Optimize Energy
  Performance - HVAC!                  • Credit 4 !Green Power!

• Credit 1.4! Optimize Energy
  Performance - Equipment and
  Appliances!
Category: Energy & Atmosphere                     Impossible Points
• Prerequisite 1: Fundamental Commissioning
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Ozone Protection


• Credit 1.1! Optimize Energy          • Credit 2! Enhanced
  Performance - Lighting Power!          Commissioning!

• Credit 1.2! Optimize Energy          • Credit 3! Energy Use,
  Performance - Lighting Controls!       Measurement & Payment
                                         Accountability!
• Credit 1.3! Optimize Energy
  Performance - HVAC!                  • Credit 4 !Green Power!

• Credit 1.4! Optimize Energy
  Performance - Equipment and
  Appliances!
Category: Energy & Atmosphere                     Remaining Points
• Prerequisite 1: Fundamental Commissioning
• Prerequisite 2: Minimum Energy Performance
• Prerequisite 3: Ozone Protection


• Credit 1.1! Optimize Energy          • Credit 2! Enhanced
  Performance - Lighting Power!          Commissioning!

• Credit 1.2! Optimize Energy          • Credit 3! Energy Use,
  Performance - Lighting Controls!       Measurement & Payment
                                         Accountability!
• Credit 1.3! Optimize Energy
  Performance - HVAC!                  • Credit 4 !Green Power!

• Credit 1.4! Optimize Energy
  Performance - Equipment and
  Appliances!
Category: Materials & Resources
• Prerequisite 1: Storage and Collection of Recyclables

• Credit 1.1!   Long Term Lease!         • 3.3! Resource Reuse, 30%
                                           Furniture and Furnishings!
• 1.2! Reuse 40% of Interior Non-
  Structural Components!                 • 4.1" Recycled Content, 10%
                                           (post-consumer + 1/2 pre-consumer)


• 1.3! Reuse 60% of Interior Non-        • 4.2! Recycled Content, 20%
  Structural Components!
                                         • 5.1! Regional Materials, 20%!
• 2.1! Construction Waste
  Management, 50%!
                                         • 5.2! Regional Materials, 10% Extracted
                                            and Manufactured Regionally
• 2.2! Construction Waste
  Management, 75%!                       • 6!  Rapidly Renewable
                                           Materials!
• 3.1! Resource Reuse, 5%!
                                         • 7!        Certified Wood!
• 3.2! Resource Reuse, 10%!
Category: Materials & Resources                                     Obvious Points
• Prerequisite 1: Storage and Collection of Recyclables

• Credit 1.1!   Long Term Lease!         • 3.3! Resource Reuse, 30%
                                           Furniture and Furnishings!
• 1.2! Reuse 40% of Interior Non-
  Structural Components!                 • 4.1" Recycled Content, 10%
                                           (post-consumer + 1/2 pre-consumer)


• 1.3! Reuse 60% of Interior Non-        • 4.2! Recycled Content, 20%
  Structural Components!
                                         • 5.1! Regional Materials, 20%!
• 2.1! Construction Waste
  Management, 50%!
                                         • 5.2! Regional Materials, 10% Extracted
                                            and Manufactured Regionally
• 2.2! Construction Waste
  Management, 75%!                       • 6!  Rapidly Renewable
                                           Materials!
• 3.1! Resource Reuse, 5%!
                                         • 7!        Certified Wood!
• 3.2! Resource Reuse, 10%!
Category: Materials & Resources                              Impossible Points
• Prerequisite 1: Storage and Collection of Recyclables

• Credit 1.1!   Long Term Lease!         • 3.3! Resource Reuse, 30%
                                           Furniture and Furnishings!
• 1.2! Reuse 40% of Interior Non-
  Structural Components!                 • 4.1" Recycled Content, 10%
                                           (post-consumer + 1/2 pre-consumer)


• 1.3! Reuse 60% of Interior Non-        • 4.2! Recycled Content, 20%
  Structural Components!
                                         • 5.1! Regional Materials, 20%!
• 2.1! Construction Waste
  Management, 50%!
                                         • 5.2! Regional Materials, 10% Extracted
                                            and Manufactured Regionally
• 2.2! Construction Waste
  Management, 75%!                       • 6!  Rapidly Renewable
                                           Materials!
• 3.1! Resource Reuse, 5%!
                                         • 7!        Certified Wood!
• 3.2! Resource Reuse, 10%!
Category: Materials & Resources                              Remaining Points
• Prerequisite 1: Storage and Collection of Recyclables

• Credit 1.1!   Long Term Lease!         • 3.3! Resource Reuse, 30%
                                           Furniture and Furnishings!
• 1.2! Reuse 40% of Interior Non-
  Structural Components!                 • 4.1" Recycled Content, 10%
                                           (post-consumer + 1/2 pre-consumer)


• 1.3! Reuse 60% of Interior Non-        • 4.2! Recycled Content, 20%
  Structural Components!
                                         • 5.1! Regional Materials, 20%!
• 2.1! Construction Waste
  Management, 50%!
                                         • 5.2! Regional Materials, 10% Extracted
                                            and Manufactured Regionally
• 2.2! Construction Waste
  Management, 75%!                       • 6!  Rapidly Renewable
                                           Materials!
• 3.1! Resource Reuse, 5%!
                                         • 7!        Certified Wood!
• 3.2! Resource Reuse, 10%!
Category: Indoor Environmental Quality
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 !Outside Air Monitoring!   • 4.5! Low-Emitting Furniture!
• 2!   Increased Ventilation!         • 5!   Indoor Pollutant Source
                                        Control!
• 3.1!Construction!
         Construction IAQ Mgmt Plan
  During
                                      • 6.1! Lighting Controls
• 3.2" Construction IAQ Mgmt Plan     • 6.2! Temperature Controls
  Before Occupancy "


• 4.1! Low-Emitting Adhesives !       • 7.1! Thermal Comfort !

• 4.2! Low-Emitting Paints!           • 7.2! Thermal Comfort - Monitoring

• 4.3! Low-Emitting Carpeting!        • 8.1! Daylight 75% of Spaces!

• 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces!
                                   • 8.3! Views 90% of Seated Spaces
Category: IEQ                                          Obvious Points
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 !Outside Air Monitoring!   • 4.5! Low-Emitting Furniture!
• 2!   Increased Ventilation!         • 5!   Indoor Pollutant Source
                                        Control!
• 3.1!Construction!
         Construction IAQ Mgmt Plan
  During
                                      • 6.1! Lighting Controls
• 3.2" Construction IAQ Mgmt Plan     • 6.2! Temperature Controls
  Before Occupancy "


• 4.1! Low-Emitting Adhesives !       • 7.1! Thermal Comfort !

• 4.2! Low-Emitting Paints!           • 7.2! Thermal Comfort - Monitoring

• 4.3! Low-Emitting Carpeting!        • 8.1! Daylight 75% of Spaces!

• 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces!
                                   • 8.3! Views 90% of Seated Spaces
Category: IEQ                                      Impossible Points
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 !Outside Air Monitoring!   • 4.5! Low-Emitting Furniture!
• 2!   Increased Ventilation!         • 5!   Indoor Pollutant Source
                                        Control!
• 3.1!Construction!
         Construction IAQ Mgmt Plan
  During
                                      • 6.1! Lighting Controls
• 3.2" Construction IAQ Mgmt Plan     • 6.2! Temperature Controls
  Before Occupancy "


• 4.1! Low-Emitting Adhesives !       • 7.1! Thermal Comfort !

• 4.2! Low-Emitting Paints!           • 7.2! Thermal Comfort - Monitoring

• 4.3! Low-Emitting Carpeting!        • 8.1! Daylight 75% of Spaces!

• 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces!
                                   • 8.3! Views 90% of Seated Spaces
Category: IEQ                                      Remaining Points
• Prerequisite 1: Minimum IAQ Performance
• Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

• Credit 1 !Outside Air Monitoring!   • 4.5! Low-Emitting Furniture!
• 2!   Increased Ventilation!         • 5!   Indoor Pollutant Source
                                        Control!
• 3.1!Construction!
         Construction IAQ Mgmt Plan
  During
                                      • 6.1! Lighting Controls
• 3.2" Construction IAQ Mgmt Plan     • 6.2! Temperature Controls
  Before Occupancy "


• 4.1! Low-Emitting Adhesives !       • 7.1! Thermal Comfort !

• 4.2! Low-Emitting Paints!           • 7.2! Thermal Comfort - Monitoring

• 4.3! Low-Emitting Carpeting!        • 8.1! Daylight 75% of Spaces!

• 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces!
                                   • 8.3! Views 90% of Seated Spaces
Category: Innovation & Design
• Prerequisite: None

• Credit 1.1 Innovation in Design

• Credit 1.2 Innovation in Design

• Credit 1.3 Innovation in Design

• Credit 2 LEED Accredited Professional
Category: Innovation & Design                            Obvious Points
• Prerequisite: None

• Credit 1.1 Innovation in Design: composting

• Credit 1.2 Innovation in Design: organic ingredients and products

• Credit 1.3 Innovation in Design: organic food in employee cafe

• Credit 2 LEED Accredited Professional
?
QUESTIONS



     organicarchitect

Contenu connexe

Tendances

LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htmFathi Nada
 
LEED v4 Transformation
LEED v4 TransformationLEED v4 Transformation
LEED v4 TransformationOC_Composites
 
LEED for Interior Designer
LEED  for Interior DesignerLEED  for Interior Designer
LEED for Interior DesignerSusann Geithner
 
LEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood DevelopmentLEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood DevelopmentConor Merrigan
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED APRob Freeman
 
Cost/Benefit Analysis of LEED-NC & LEED-EB
Cost/Benefit Analysis of LEED-NC & LEED-EBCost/Benefit Analysis of LEED-NC & LEED-EB
Cost/Benefit Analysis of LEED-NC & LEED-EBkinjalmadiyar
 
LEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable ChoiceLEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable ChoiceRenewable Choice Energy
 
Leed certification
Leed certificationLeed certification
Leed certificationbronzecs
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Scott Bowman
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGeoffrey Lewis
 
LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting Rob Freeman
 

Tendances (20)

LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htm
 
LEED Introduction
LEED IntroductionLEED Introduction
LEED Introduction
 
Leed The Basics
Leed   The BasicsLeed   The Basics
Leed The Basics
 
03 USGBC 090816
03 USGBC 09081603 USGBC 090816
03 USGBC 090816
 
LEED
LEEDLEED
LEED
 
LEED GA Exam Prep
LEED GA Exam PrepLEED GA Exam Prep
LEED GA Exam Prep
 
LEED v4 Transformation
LEED v4 TransformationLEED v4 Transformation
LEED v4 Transformation
 
LEED for Interior Designer
LEED  for Interior DesignerLEED  for Interior Designer
LEED for Interior Designer
 
LEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood DevelopmentLEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood Development
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED AP
 
Cost/Benefit Analysis of LEED-NC & LEED-EB
Cost/Benefit Analysis of LEED-NC & LEED-EBCost/Benefit Analysis of LEED-NC & LEED-EB
Cost/Benefit Analysis of LEED-NC & LEED-EB
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
Leed for SWE WE 14
 
LEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable ChoiceLEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable Choice
 
Leed certification
Leed certificationLeed certification
Leed certification
 
Understanding LEED
Understanding LEEDUnderstanding LEED
Understanding LEED
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
Leed nd drcog
Leed nd drcogLeed nd drcog
Leed nd drcog
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
 
LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting
 

En vedette

WNY LEED Projects June2010
WNY LEED Projects June2010WNY LEED Projects June2010
WNY LEED Projects June2010Roxanne Kujawa
 
Building Green in China
Building Green in ChinaBuilding Green in China
Building Green in ChinaJohn Wong
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building MaterialsAkash Hirpara
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGgatti Teja
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsTerri Meyer Boake
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Rupesh Chaurasia
 
العمارة الذكية و العمارة المستدامة
العمارة الذكية و العمارة المستدامةالعمارة الذكية و العمارة المستدامة
العمارة الذكية و العمارة المستدامةAhmed SHoukry ELhfnawy
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Vinay M
 
Architectural Professional Practice - Design
Architectural Professional Practice - DesignArchitectural Professional Practice - Design
Architectural Professional Practice - DesignGalala University
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 

En vedette (16)

WNY LEED Projects June2010
WNY LEED Projects June2010WNY LEED Projects June2010
WNY LEED Projects June2010
 
Green Hospitality
Green HospitalityGreen Hospitality
Green Hospitality
 
Building Green in China
Building Green in ChinaBuilding Green in China
Building Green in China
 
Return on Investment for Green - LEED Projects
Return on Investment for Green - LEED ProjectsReturn on Investment for Green - LEED Projects
Return on Investment for Green - LEED Projects
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building Materials
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment Systems
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
 
Low energy building
Low energy building Low energy building
Low energy building
 
LEED green buildings
LEED green buildingsLEED green buildings
LEED green buildings
 
العمارة الذكية و العمارة المستدامة
العمارة الذكية و العمارة المستدامةالعمارة الذكية و العمارة المستدامة
العمارة الذكية و العمارة المستدامة
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
Architectural Professional Practice - Design
Architectural Professional Practice - DesignArchitectural Professional Practice - Design
Architectural Professional Practice - Design
 
Green building
Green buildingGreen building
Green building
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 

Similaire à LEED Project Case Studies

Poly prep lower school leed certification
Poly prep lower school leed certificationPoly prep lower school leed certification
Poly prep lower school leed certificationjpetr0s
 
Nyc office of emergency management leed certification
Nyc office of emergency management leed certificationNyc office of emergency management leed certification
Nyc office of emergency management leed certificationjpetr0s
 
Sustainable Site Design
Sustainable Site DesignSustainable Site Design
Sustainable Site Designemilydean
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green buildingMamdooh Amin
 
Leed 2009 new constru chk list
Leed 2009 new constru chk listLeed 2009 new constru chk list
Leed 2009 new constru chk listJ C
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
TRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.pptTRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.pptUrviKhatri4
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Eb Healthcare & Leed
Eb Healthcare & LeedEb Healthcare & Leed
Eb Healthcare & LeedAndrej_M
 
2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbf2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbfEllieNowels
 
Leed 2009 for commercial interiors ci2009 checklist
Leed 2009 for commercial interiors  ci2009 checklistLeed 2009 for commercial interiors  ci2009 checklist
Leed 2009 for commercial interiors ci2009 checklistFathi Nada
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownBrian Sipes
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated ManualTom_Pritscher
 
GREEN_RATING_SYSTEM.pptx
GREEN_RATING_SYSTEM.pptxGREEN_RATING_SYSTEM.pptx
GREEN_RATING_SYSTEM.pptxssuserb57bd0
 
Cbn sep8 brownfields workshop final
Cbn sep8 brownfields workshop final Cbn sep8 brownfields workshop final
Cbn sep8 brownfields workshop final ONEIA
 

Similaire à LEED Project Case Studies (20)

Poly prep lower school leed certification
Poly prep lower school leed certificationPoly prep lower school leed certification
Poly prep lower school leed certification
 
Nyc office of emergency management leed certification
Nyc office of emergency management leed certificationNyc office of emergency management leed certification
Nyc office of emergency management leed certification
 
Sustainable Site Design
Sustainable Site DesignSustainable Site Design
Sustainable Site Design
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green building
 
Leed 2009 new constru chk list
Leed 2009 new constru chk listLeed 2009 new constru chk list
Leed 2009 new constru chk list
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
TRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.pptTRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.ppt
 
Minnesota Brightfields Study Results
Minnesota Brightfields Study ResultsMinnesota Brightfields Study Results
Minnesota Brightfields Study Results
 
BUDMA 2011
BUDMA 2011BUDMA 2011
BUDMA 2011
 
Green buildings
Green buildings  Green buildings
Green buildings
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
Eb Healthcare & Leed
Eb Healthcare & LeedEb Healthcare & Leed
Eb Healthcare & Leed
 
2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbf2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbf
 
Leed 2009 for commercial interiors ci2009 checklist
Leed 2009 for commercial interiors  ci2009 checklistLeed 2009 for commercial interiors  ci2009 checklist
Leed 2009 for commercial interiors ci2009 checklist
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated Manual
 
Erik caldwell clean generation program pp 04162010
Erik caldwell  clean generation program pp 04162010Erik caldwell  clean generation program pp 04162010
Erik caldwell clean generation program pp 04162010
 
Erik caldwell clean generation program pp 04162010
Erik caldwell  clean generation program pp 04162010Erik caldwell  clean generation program pp 04162010
Erik caldwell clean generation program pp 04162010
 
GREEN_RATING_SYSTEM.pptx
GREEN_RATING_SYSTEM.pptxGREEN_RATING_SYSTEM.pptx
GREEN_RATING_SYSTEM.pptx
 
Cbn sep8 brownfields workshop final
Cbn sep8 brownfields workshop final Cbn sep8 brownfields workshop final
Cbn sep8 brownfields workshop final
 

Plus de organicARCHITECT

Hidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance SchoolsHidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance SchoolsorganicARCHITECT
 
Missed Opportunities in Greening Hospitality
Missed Opportunities in Greening HospitalityMissed Opportunities in Greening Hospitality
Missed Opportunities in Greening HospitalityorganicARCHITECT
 
Detroit, Dallas & Despotism
Detroit, Dallas & DespotismDetroit, Dallas & Despotism
Detroit, Dallas & DespotismorganicARCHITECT
 

Plus de organicARCHITECT (6)

Hidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance SchoolsHidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance Schools
 
The Myth of Sisyphus
The Myth of SisyphusThe Myth of Sisyphus
The Myth of Sisyphus
 
Missed Opportunities in Greening Hospitality
Missed Opportunities in Greening HospitalityMissed Opportunities in Greening Hospitality
Missed Opportunities in Greening Hospitality
 
Problems & Solutions
Problems & SolutionsProblems & Solutions
Problems & Solutions
 
Detroit, Dallas & Despotism
Detroit, Dallas & DespotismDetroit, Dallas & Despotism
Detroit, Dallas & Despotism
 
Spills, Sins & Starbucks
Spills, Sins & StarbucksSpills, Sins & Starbucks
Spills, Sins & Starbucks
 

Dernier

DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一D SSS
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Apresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoApresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoCarolTelles6
 
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...ttt fff
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一diploma 1
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作7tz4rjpd
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 

Dernier (20)

DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Apresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoApresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus Rizzo
 
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 

LEED Project Case Studies

  • 1. LESSONS LEARNED ON A LEED PROJECT
  • 2. ? YOUR VISION OF LEED
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40. LEED-NC 14789 1870 Registered Certified LEED-EB 3484 268 Registered Certified LEED-CI 454 144 Registered Certified as of May 2009
  • 41. LEED-Retail Pilot Sports Basement San Francisco, California
  • 42. Overview • Dense urban neighborhood • Rehab abandoned factory building • Budget blown on seismic upgrades • Full block site • Potential solar access • Extensive sidewalk to replace
  • 43.
  • 44. LEED Categories ! Sustainable Sites: 14 Points ! Water Efficiency: 5 ! Energy & Atmosphere: 17 ! Materials & Resources: 13 ! Indoor Environmental Quality: 15 ! Innovation & Design Process: 5
  • 45. Category: Sustainable Sites • Prerequisite: Construction Activity Pollution Prevention • Credit 1 Site Selection • Credit 5.1 Protect or Restore Habitat • Credit 2 Development Density • Credit 5.2 Maximize Open Space • Credit 3 Brownfield Redevelopment • Credit 6.1 Stormwater, Quantity • Credit 4.1 Public Transit Access • Credit 6.2 Stormwater, Quality • Credit 4.2 Bicycle Storage & Changing Rooms • Credit 7.1 Heat Island Effect, Non- Roof • Credit 4.3 Alternative Transportation, Low-Emitting and • Credit 7.2 Heat Island Effect, Roof Fuel-Efficient Vehicles • Credit 8 Light Pollution Reduction • Credit 4.4 Alternative Transportation, Parking Capacity
  • 46. Category: Sustainable Sites Obvious Points • Prerequisite: Construction Activity Pollution Prevention • Credit 1 Site Selection • Credit 5.1 Protect or Restore Habitat • Credit 2 Development Density • Credit 5.2 Maximize Open Space • Credit 3 Brownfield Redevelopment • Credit 6.1 Stormwater, Quantity • Credit 4.1 Public Transit Access • Credit 6.2 Stormwater, Quality • Credit 4.2 Bicycle Storage & Changing Rooms • Credit 7.1 Heat Island Effect, Non- Roof • Credit 4.3 Alternative Transportation, Low-Emitting and • Credit 7.2 Heat Island Effect, Roof Fuel-Efficient Vehicles • Credit 8 Light Pollution Reduction • Credit 4.4 Alternative Transportation, Parking Capacity
  • 47. Category: Sustainable Sites Impossible Points • Prerequisite: Construction Activity Pollution Prevention • Credit 1 Site Selection • Credit 5.1 Protect or Restore Habitat • Credit 2 Development Density • Credit 5.2 Maximize Open Space • Credit 3 Brownfield Redevelopment • Credit 6.1 Stormwater, Quantity • Credit 4.1 Public Transit Access • Credit 6.2 Stormwater, Quality • Credit 4.2 Bicycle Storage & Changing Rooms • Credit 7.1 Heat Island Effect, Non- Roof • Credit 4.3 Alternative Transportation, Low-Emitting and • Credit 7.2 Heat Island Effect, Roof Fuel-Efficient Vehicles • Credit 8 Light Pollution Reduction • Credit 4.4 Alternative Transportation, Parking Capacity
  • 48. Category: Sustainable Sites Remaining Points • Prerequisite: Construction Activity Pollution Prevention • Credit 1 Site Selection • Credit 5.1 Protect or Restore Habitat • Credit 2 Development Density • Credit 5.2 Maximize Open Space • Credit 3 Brownfield Redevelopment • Credit 6.1 Stormwater, Quantity • Credit 4.1 Public Transit Access • Credit 6.2 Stormwater, Quality • Credit 4.2 Bicycle Storage & Changing Rooms • Credit 7.1 Heat Island Effect, Non- Roof • Credit 4.3 Alternative Transportation, Low-Emitting and • Credit 7.2 Heat Island Effect, Roof Fuel-Efficient Vehicles • Credit 8 Light Pollution Reduction • Credit 4.4 Alternative Transportation, Parking Capacity
  • 49. Category: Water Efficiency • Prerequisite: None • Credit 1.1 Water Efficient Landscaping, Reduce by 50% • Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation • Credit 2 Innovative Wastewater Technologies • Credit 3.1 Water Use Reduction, 20% Reduction • Credit 3.2 Water Use Reduction, 30% Reduction
  • 50. Category: Water Efficiency Obvious Points • Prerequisite: None • Credit 1.1 Water Efficient Landscaping, Reduce by 50% • Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation • Credit 2 Innovative Wastewater Technologies • Credit 3.1 Water Use Reduction, 20% Reduction • Credit 3.2 Water Use Reduction, 30% Reduction
  • 51. Category: Water Efficiency Impossible Points • Prerequisite: None • Credit 1.1 Water Efficient Landscaping, Reduce by 50% • Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation • Credit 2 Innovative Wastewater Technologies • Credit 3.1 Water Use Reduction, 20% Reduction • Credit 3.2 Water Use Reduction, 30% Reduction
  • 52. Category: Water Efficiency Remaining Points • Prerequisite: None • Credit 1.1 Water Efficient Landscaping, Reduce by 50% • Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation • Credit 2 Innovative Wastewater Technologies • Credit 3.1 Water Use Reduction, 20% Reduction • Credit 3.2 Water Use Reduction, 30% Reduction
  • 53. Category: Energy & Atmosphere • Prerequisite 1: Fundamental Commissioning of the Building Energy Systems • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Fundamental Refrigerant Management • Credit 1 Optimize Energy Performance (10 points) • Credit 2 On-Site Renewable Energy (3 points) • Credit 3 Enhanced Commissioning • Credit 4 Enhanced Refrigerant Management • Credit 5 Measurement & Verification • Credit 6 Green Power
  • 54. Category: Energy & Atmosphere Obvious Points • Prerequisite 1: Fundamental Commissioning of the Building Energy Systems • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Fundamental Refrigerant Management • Credit 1 Optimize Energy Performance (10 points) • Credit 2 On-Site Renewable Energy (3 points) • Credit 3 Enhanced Commissioning • Credit 4 Enhanced Refrigerant Management • Credit 5 Measurement & Verification • Credit 6 Green Power
  • 55. Category: Energy & Atmosphere Impossible Points • Prerequisite 1: Fundamental Commissioning of the Building Energy Systems • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Fundamental Refrigerant Management • Credit 1 Optimize Energy Performance (10 points) • Credit 2 On-Site Renewable Energy (3 points) • Credit 3 Enhanced Commissioning • Credit 4 Enhanced Refrigerant Management • Credit 5 Measurement & Verification • Credit 6 Green Power
  • 56. Category: Energy & Atmosphere Remaining Points • Prerequisite 1: Fundamental Commissioning of the Building Energy Systems • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Fundamental Refrigerant Management • Credit 1 Optimize Energy Performance (7 points) • Credit 2 On-Site Renewable Energy (1 point) • Credit 3 Enhanced Commissioning • Credit 4 Enhanced Refrigerant Management • Credit 5 Measurement & Verification • Credit 6 Green Power
  • 57. Category: Materials & Resources • Prerequisite: Storage & Collection of Recyclables • Credit 1.1 75% Building Reuse • Credit 4.1 Recycled Content, 10% (post-consumer + 1⁄2 pre-consumer) • Credit 1.2 100% Building Reuse • Credit 4.2 Recycled Content, 20% • Credit 1.3 Building Reuse, 50% of • Credit 5.1 Regional Regionally Materials, 10% Interior Non-Structural Elements Extracted, Processed & Manufactured • Credit 2.1 Construction Waste • Credit 5.2 Regional Materials, 20% Management, Divert 50% • Credit 6 Rapidly Renewable • Credit 2.2 Construction Waste Materials Management, Divert 75% • Credit 7 Certified Wood • Credit 3.1 Materials Reuse, 5% • Credit 3.2 Materials Reuse,10%
  • 58. Category: Materials & Resources Obvious Points • Prerequisite: Storage & Collection of Recyclables • Credit 1.1 75% Building Reuse • Credit 4.1 Recycled Content, 10% (post-consumer + 1⁄2 pre-consumer) • Credit 1.2 100% Building Reuse • Credit 4.2 Recycled Content, 20% • Credit 1.3 Building Reuse, 50% of • Credit 5.1 Regional Regionally Materials, 10% Interior Non-Structural Elements Extracted, Processed & Manufactured • Credit 2.1 Construction Waste • Credit 5.2 Regional Materials, 20% Management, Divert 50% • Credit 6 Rapidly Renewable • Credit 2.2 Construction Waste Materials Management, Divert 75% • Credit 7 Certified Wood • Credit 3.1 Materials Reuse, 5% • Credit 3.2 Materials Reuse,10%
  • 59. Category: Materials & Resources Impossible Points • Prerequisite: Storage & Collection of Recyclables • Credit 1.1 75% Building Reuse • Credit 4.1 Recycled Content, 10% (post-consumer + 1⁄2 pre-consumer) • Credit 1.2 100% Building Reuse • Credit 4.2 Recycled Content, 20% • Credit 1.3 Building Reuse, 50% of • Credit 5.1 Regional Regionally Materials, 10% Interior Non-Structural Elements Extracted, Processed & Manufactured • Credit 2.1 Construction Waste • Credit 5.2 Regional Materials, 20% Management, Divert 50% • Credit 6 Rapidly Renewable • Credit 2.2 Construction Waste Materials Management, Divert 75% • Credit 7 Certified Wood • Credit 3.1 Materials Reuse, 5% • Credit 3.2 Materials Reuse,10%
  • 60. Category: Materials & Resources Remaining Points • Prerequisite: Storage & Collection of Recyclables • Credit 1.1 75% Building Reuse • Credit 4.1 Recycled Content, 10% (post-consumer + 1⁄2 pre-consumer) • Credit 1.2 100% Building Reuse • Credit 4.2 Recycled Content, 20% • Credit 1.3 Building Reuse, 50% of • Credit 5.1 Regional Regionally Materials, 10% Interior Non-Structural Elements Extracted, Processed & Manufactured • Credit 2.1 Construction Waste • Credit 5.2 Regional Materials, 20% Management, Divert 50% • Credit 6 Rapidly Renewable • Credit 2.2 Construction Waste Materials Management, Divert 75% • Credit 7 Certified Wood • Credit 3.1 Materials Reuse, 5% • Credit 3.2 Materials Reuse,10%
  • 61. Category: Indoor Environmental Quality • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 Outdoor Air Monitoring • Credit 5 Indoor Chemical & Pollutant Source Control • Credit 2 Increased Ventilation • Credit 6.1 Lighting Controls • Credit 3.1 IAQ Management Plan, During Construction • Credit 6.2 Thermal Controls • Credit 3.2 IAQ Management Plan, Before Occupancy • Credit 7.1 Thermal Design • Credit 4.1 Low-Emitting Adhesives • Credit 7.2 Thermal Verification • Credit 4.2 Low-Emitting Paints • Credit 8.1 Daylight & Views, 75% • Credit 4.3 Low-Emitting Carpeting • Credit 8.2 Daylight & Views, 90% • Credit 4.4 Low-Emitting Composite Wood & Agrifiber
  • 62. Category: IEQ Obvious Points • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 Outdoor Air Monitoring • Credit 5 Indoor Chemical & Pollutant Source Control • Credit 2 Increased Ventilation • Credit 6.1 Lighting Controls • Credit 3.1 IAQ Management Plan, During Construction • Credit 6.2 Thermal Controls • Credit 3.2 IAQ Management Plan, Before Occupancy • Credit 7.1 Thermal Design • Credit 4.1 Low-Emitting Adhesives • Credit 7.2 Thermal Verification • Credit 4.2 Low-Emitting Paints • Credit 8.1 Daylight & Views, 75% • Credit 4.3 Low-Emitting Carpeting • Credit 8.2 Daylight & Views, 90% • Credit 4.4 Low-Emitting Composite Wood & Agrifiber
  • 63. Category: IEQ Impossible Points • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 Outdoor Air Monitoring • Credit 5 Indoor Chemical & Pollutant Source Control • Credit 2 Increased Ventilation • Credit 6.1 Lighting Controls • Credit 3.1 IAQ Management Plan, During Construction • Credit 6.2 Thermal Controls • Credit 3.2 IAQ Management Plan, Before Occupancy • Credit 7.1 Thermal Design • Credit 4.1 Low-Emitting Adhesives • Credit 7.2 Thermal Verification • Credit 4.2 Low-Emitting Paints • Credit 8.1 Daylight & Views, 75% • Credit 4.3 Low-Emitting Carpeting • Credit 8.2 Daylight & Views, 90% • Credit 4.4 Low-Emitting Composite Wood & Agrifiber
  • 64. Category: IEQ Remaining Points • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 Outdoor Air Monitoring • Credit 5 Indoor Chemical & Pollutant Source Control • Credit 2 Increased Ventilation • Credit 6.1 Lighting Controls • Credit 3.1 IAQ Management Plan, During Construction • Credit 6.2 Thermal Controls • Credit 3.2 IAQ Management Plan, Before Occupancy • Credit 7.1 Thermal Design • Credit 4.1 Low-Emitting Adhesives • Credit 7.2 Thermal Verification • Credit 4.2 Low-Emitting Paints • Credit 8.1 Daylight & Views, 75% • Credit 4.3 Low-Emitting Carpeting • Credit 8.2 Daylight & Views, 90% • Credit 4.4 Low-Emitting Composite Wood & Agrifiber
  • 65. Category: Innovation & Design • Prerequisite: None • Credit 1.1 Innovation in Design • Credit 1.2 Innovation in Design • Credit 1.3 Innovation in Design • Credit 1.4 Innovation in Design • Credit 2 LEED Accredited Professional
  • 66. Category: Innovation & Design Obvious Points • Prerequisite: None • Credit 1.1 Innovation in Design: Retail Fixtures • Credit 1.2 Innovation in Design: Pilot Participation • Credit 1.3 Innovation in Design: Community Programs • Credit 1.4 Innovation in Design: Advanced Energy Management • Credit 2 LEED Accredited Professional
  • 67. LEED-EB Unico Tower San Francisco, California
  • 68. Overview • Class A office tower/retail space • 33 stories • 402,500 rentable square feet • Built in 1972 • Dense urban location
  • 69.
  • 70. Category: Sustainable Sites • Prerequisite 1: Erosion & Sedimentation Control • Prerequisite 2: Age of Building • Credit 1.1-2! Plan for Green Site! • 5.1! Stormwater Mgmt - 25%! • 2! High Density Building • 5.2! Stormwater Mgmt - 50%! • 3.1! Public Transit Access • 6.1! Heat Island - Non-Roof! • 3.2! Bicycle Storage & Changing • 6.2! Heat Island - Roof! Rooms • 7! Light Pollution Reduction • 3.3! Alternative Vehicles! • 3.4! Car Pooling & Telecommuting • 4.1! Protect or Restore Open Space, 50%! • 4.2! Protect or Restore Open Space, 75%!
  • 71. Category: Sustainable Sites Obvious Points • Prerequisite 1: Erosion & Sedimentation Control • Prerequisite 2: Age of Building • Credit 1.1-2! Plan for Green Site! • 5.1! Stormwater Mgmt - 25%! • 2! High Density Building • 5.2! Stormwater Mgmt - 50%! • 3.1! Public Transit Access • 6.1! Heat Island - Non-Roof! • 3.2! Bicycle Storage & Changing • 6.2! Heat Island - Roof! Rooms • 7! Light Pollution Reduction • 3.3! Alternative Vehicles! • 3.4! Car Pooling & Telecommuting • 4.1! Protect or Restore Open Space, 50%! • 4.2! Protect or Restore Open Space, 75%!
  • 72. Category: Sustainable Sites Impossible Points • Prerequisite 1: Erosion & Sedimentation Control • Prerequisite 2: Age of Building • Credit 1.1-2! Plan for Green Site! • 5.1! Stormwater Mgmt - 25%! • 2! High Density Building • 5.2! Stormwater Mgmt - 50%! • 3.1! Public Transit Access • 6.1! Heat Island - Non-Roof! • 3.2! Bicycle Storage & Changing • 6.2! Heat Island - Roof! Rooms • 7! Light Pollution Reduction • 3.3! Alternative Vehicles! • 3.4! Car Pooling & Telecommuting • 4.1! Protect or Restore Open Space, 50%! • 4.2! Protect or Restore Open Space, 75%!
  • 73. Category: Sustainable Sites Remaining Points • Prerequisite 1: Erosion & Sedimentation Control • Prerequisite 2: Age of Building • Credit 1.1-2! Plan for Green Site! • 5.1! Stormwater Mgmt - 25%! • 2! High Density Building • 5.2! Stormwater Mgmt - 50%! • 3.1! Public Transit Access • 6.1! Heat Island - Non-Roof! • 3.2! Bicycle Storage & Changing • 6.2! Heat Island - Roof! Rooms • 7! Light Pollution Reduction • 3.3! Alternative Vehicles! • 3.4! Car Pooling & Telecommuting • 4.1! Protect or Restore Open Space, 50%! • 4.2! Protect or Restore Open Space, 75%!
  • 74. Category: Water Efficiency • Prerequisite 1: Minimum Water Efficiency • Prerequisite 2: Discharge Water Compliance • Credit 1.1! Water Efficient Landscaping - Reduce Potable Water Use by 50% • Credit 1.2! Water Efficient Landscaping - Reduce Potable Water Use by 95% • Credit 2! Innovative Wastewater Technologies! • Credit 3.1! Water Use Reduction - 10% Reduction! • Credit 3.2! Water Use Reduction - 20% Reduction!
  • 75. Category: Water Efficiency Obvious Points • Prerequisite 1: Minimum Water Efficiency • Prerequisite 2: Discharge Water Compliance • Credit 1.1! Water Efficient Landscaping - Reduce Potable Water Use by 50% • Credit 1.2! Water Efficient Landscaping - Reduce Potable Water Use by 95% • Credit 2! Innovative Wastewater Technologies! • Credit 3.1! Water Use Reduction - 10% Reduction! • Credit 3.2! Water Use Reduction - 20% Reduction!
  • 76. Category: Water Efficiency Impossible Points • Prerequisite 1: Minimum Water Efficiency • Prerequisite 2: Discharge Water Compliance • Credit 1.1! Water Efficient Landscaping - Reduce Potable Water Use by 50% • Credit 1.2! Water Efficient Landscaping - Reduce Potable Water Use by 95% • Credit 2! Innovative Wastewater Technologies! • Credit 3.1! Water Use Reduction - 10% Reduction! • Credit 3.2! Water Use Reduction - 20% Reduction!
  • 77. Category: Water Efficiency Remaining Points • Prerequisite 1: Minimum Water Efficiency • Prerequisite 2: Discharge Water Compliance • Credit 1.1! Water Efficient Landscaping - Reduce Potable Water Use by 50% • Credit 1.2! Water Efficient Landscaping - Reduce Potable Water Use by 95% • Credit 2! Innovative Wastewater Technologies! • Credit 3.1! Water Use Reduction - 10% Reduction! • Credit 3.2! Water Use Reduction - 20% Reduction!
  • 78. Category: Energy & Atmosphere • Prerequisite 1: Existing Building Commissioning • Prerequisite 2: Minimum Energy Performance - Energy Star 60 • Prerequisite 3: Ozone Protection • Credit 1! Optimize Energy - Energy • 3.2! Systems Maintenance! Star 63 or > • 3.3! Systems Monitoring • 2.1! Renewable Energy - 3-15%! • 4! ! Ozone Protection! • 2.2! Renewable Energy - 6-30%! • 5.1-3! erformance Measurement - P • 2.3! Renewable Energy - 9-45%! Enhanced Metering • 2.4! Renewable Energy - 12-60%! • 3.1! Operation - Staff Education!
  • 79. Category: Energy & Atmosphere Obvious Points • Prerequisite 1: Existing Building Commissioning • Prerequisite 2: Minimum Energy Performance - Energy Star 60 • Prerequisite 3: Ozone Protection • Credit 1! Optimize Energy - Energy • 3.2! Systems Maintenance! Star 63 or > • 3.3! Systems Monitoring • 2.1! Renewable Energy - 3-15%! • 4! ! Ozone Protection! • 2.2! Renewable Energy - 6-30%! • 5.1-3! erformance Measurement - P • 2.3! Renewable Energy - 9-45%! Enhanced Metering • 2.4! Renewable Energy - 12-60%! • 3.1! Operation - Staff Education!
  • 80. Category: Energy & Atmosphere Impossible Points • Prerequisite 1: Existing Building Commissioning • Prerequisite 2: Minimum Energy Performance - Energy Star 60 • Prerequisite 3: Ozone Protection • Credit 1! Optimize Energy - Energy • 3.2! Systems Maintenance! Star 63 or > • 3.3! Systems Monitoring • 2.1! Renewable Energy - 3-15%! • 4! ! Ozone Protection! • 2.2! Renewable Energy - 6-30%! • 5.1-3! erformance Measurement - P • 2.3! Renewable Energy - 9-45%! Enhanced Metering • 2.4! Renewable Energy - 12-60%! • 3.1! Operation - Staff Education!
  • 81. Category: Energy & Atmosphere Remaining Points • Prerequisite 1: Existing Building Commissioning • Prerequisite 2: Minimum Energy Performance - Energy Star 60 • Prerequisite 3: Ozone Protection • Credit 1! Optimize Energy - Energy • 3.2! Systems Maintenance! Star 63 or > • 3.3! Systems Monitoring • 2.1! Renewable Energy - 3-15%! • 4! ! Ozone Protection! • 2.2! Renewable Energy - 6-30%! • 5.1-3! erformance Measurement - P • 2.3! Renewable Energy - 9-45%! Enhanced Metering • 2.4! Renewable Energy - 12-60%! • 3.1! Operation - Staff Education!
  • 82. Category: Materials & Resources • Prerequisite 1.1: Source Reduction & Waste Stream Audit • Prerequisite 1.2: Source Reduction & Management - Storage & Collection • Prerequisite 2: Reduced Mercury in Light Bulbs • Credit 1.1! Construction Waste • 4.1! Sustainable Cleaning Management - 50% Products & Materials - 30% • 1.2! Construction Waste • 4.2! Sustainable Cleaning Management - 75% Products & Materials - 60% • 2.1-2 ! Optimize Use of • Credit 4.3! Sustainable Cleaning Alternative Materials - 10-50% Products & Materials - 90% • 3.1! Optimize Use of IAQ • Credit 5.1! Occupant Recycling - Compliant Products - 45% 30/40/50% of Total Waste Stream • 3.2! Optimize Use of IAQ • Credit 6! Additional Reduced Compliant Products - 90% Mercury in Light Bulbs
  • 83. Category: Materials & Resources Obvious Points • Prerequisite 1.1: Source Reduction & Waste Stream Audit • Prerequisite 1.2: Source Reduction & Management - Storage & Collection • Prerequisite 2: Reduced Mercury in Light Bulbs • Credit 1.1! Construction Waste • 4.1! Sustainable Cleaning Management - 50% Products & Materials - 30% • 1.2! Construction Waste • 4.2! Sustainable Cleaning Management - 75% Products & Materials - 60% • 2.1-2 ! Optimize Use of • Credit 4.3! Sustainable Cleaning Alternative Materials - 10-50% Products & Materials - 90% • 3.1! Optimize Use of IAQ • Credit 5.1! Occupant Recycling - Compliant Products - 45% 30/40/50% of Total Waste Stream • 3.2! Optimize Use of IAQ • Credit 6! Additional Reduced Compliant Products - 90% Mercury in Light Bulbs
  • 84. Category: Materials & Resources Impossible Points • Prerequisite 1.1: Source Reduction & Waste Stream Audit • Prerequisite 1.2: Source Reduction & Management - Storage & Collection • Prerequisite 2: Reduced Mercury in Light Bulbs • Credit 1.1! Construction Waste • 4.1! Sustainable Cleaning Management - 50% Products & Materials - 30% • 1.2! Construction Waste • 4.2! Sustainable Cleaning Management - 75% Products & Materials - 60% • 2.1-2 ! Optimize Use of • Credit 4.3! Sustainable Cleaning Alternative Materials - 10-50% Products & Materials - 90% • 3.1! Optimize Use of IAQ • Credit 5.1! Occupant Recycling - Compliant Products - 45% 30/40/50% of Total Waste Stream • 3.2! Optimize Use of IAQ • Credit 6! Additional Reduced Compliant Products - 90% Mercury in Light Bulbs
  • 85. Category: Materials & Resources Remaining Points • Prerequisite 1.1: Source Reduction & Waste Stream Audit • Prerequisite 1.2: Source Reduction & Management - Storage & Collection • Prerequisite 2: Reduced Mercury in Light Bulbs • Credit 1.1! Construction Waste • 4.1! Sustainable Cleaning Management - 50% Products & Materials - 30% • 1.2! Construction Waste • 4.2! Sustainable Cleaning Management - 75% Products & Materials - 60% • 2.1-2 ! Optimize Use of • Credit 4.3! Sustainable Cleaning Alternative Materials - 10-50% Products & Materials - 90% • 3.1! Optimize Use of IAQ • Credit 5.1! Occupant Recycling - Compliant Products - 45% 30/40/50% of Total Waste Stream • 3.2! Optimize Use of IAQ • Credit 6! Additional Reduced Compliant Products - 90% Mercury in Light Bulbs
  • 86. Category: Indoor Environmental Quality • Prerequisite 1: Outside Air Introduction & Exhaust Systems • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Prerequisite 3: Asbestos Removal or Encapsulation • Prerequisite 4: PCB Removal • Credit 1! Outside Air Monitoring! • 7.1! Thermal Comfort! • 2! Increased Ventilation! • 7.2! Monitoring System! • 3! Construction IAQ Mgmt • 8.1-2! aylight for 50/75% ! D Plan! • 8.3-4!Views for 45/90%! • 4.1! Documenting Impact - Absenteeism & Healthcare Cost! • 9! ! Contemporary IAQ! • 4.2! Documenting Other Impacts • 10.1! Entryway Systems! • 5.1! Reduce Particulates in Air! • 10.2! Isolate Janitorial Closets! • 5.2! Isolate Copy/Print Room! • 10.3! Green Cleaning Policy • 6.1! Lighting Control! • 10.4-5 ! Green Pest Mgmt! • 6.2! Temperature Control! • 10.6! Green Cleaning Equipment
  • 87. Category: IEQ Obvious Points • Prerequisite 1: Outside Air Introduction & Exhaust Systems • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Prerequisite 3: Asbestos Removal or Encapsulation • Prerequisite 4: PCB Removal • Credit 1! Outside Air Monitoring! • 7.1! Thermal Comfort! • 2! Increased Ventilation! • 7.2! Monitoring System! • 3! Construction IAQ Mgmt • 8.1-2! aylight for 50/75% ! D Plan! • 8.3-4!Views for 45/90%! • 4.1! Documenting Impact - Absenteeism & Healthcare Cost! • 9! ! Contemporary IAQ! • 4.2! Documenting Other Impacts • 10.1! Entryway Systems! • 5.1! Reduce Particulates in Air! • 10.2! Isolate Janitorial Closets! • 5.2! Isolate Copy/Print Room! • 10.3! Green Cleaning Policy • 6.1! Lighting Control! • 10.4-5 ! Green Pest Mgmt! • 6.2! Temperature Control! • 10.6! Green Cleaning Equipment
  • 88. Category: IEQ Impossible Points • Prerequisite 1: Outside Air Introduction & Exhaust Systems • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Prerequisite 3: Asbestos Removal or Encapsulation • Prerequisite 4: PCB Removal • Credit 1! Outside Air Monitoring! • 7.1! Thermal Comfort! • 2! Increased Ventilation! • 7.2! Monitoring System! • 3! Construction IAQ Mgmt • 8.1-2! aylight for 50/75% ! D Plan! • 8.3-4!Views for 45/90%! • 4.1! Documenting Impact - Absenteeism & Healthcare Cost! • 9! ! Contemporary IAQ! • 4.2! Documenting Other Impacts • 10.1! Entryway Systems! • 5.1! Reduce Particulates in Air! • 10.2! Isolate Janitorial Closets! • 5.2! Isolate Copy/Print Room! • 10.3! Green Cleaning Policy • 6.1! Lighting Control! • 10.4-5 ! Green Pest Mgmt! • 6.2! Temperature Control! • 10.6! Green Cleaning Equipment
  • 89. Category: IEQ Remaining Points • Prerequisite 1: Outside Air Introduction & Exhaust Systems • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Prerequisite 3: Asbestos Removal or Encapsulation • Prerequisite 4: PCB Removal • Credit 1! Outside Air Monitoring! • 7.1! Thermal Comfort! • 2! Increased Ventilation! • 7.2! Monitoring System! • 3! Construction IAQ Mgmt • 8.1-2! aylight for 50/75% ! D Plan! • 8.3-4!Views for 45/90%! • 4.1! Documenting Impact - Absenteeism & Healthcare Cost! • 9! ! Contemporary IAQ! • 4.2! Documenting Other Impacts • 10.1! Entryway Systems! • 5.1! Reduce Particulates in Air! • 10.2! Isolate Janitorial Closets! • 5.2! Isolate Copy/Print Room! • 10.3! Green Cleaning Policy • 6.1! Lighting Control! • 10.4-5 ! Green Pest Mgmt! • 6.2! Temperature Control! • 10.6! Green Cleaning Equipment
  • 90. Category: Innovation & Design • Prerequisite: None • Credit 1.1 Innovation in Design • Credit 1.2 Innovation in Design • Credit 1.3 Innovation in Design • Credit 2 LEED Accredited Professional
  • 91. Category: Innovation & Design Obvious Points • Prerequisite: None • Credit 1.1 Innovation in Design: recycled glass fountain in lobby • Credit 1.2 Innovation in Design: motion sensors in stairwells • Credit 1.3 Innovation in Design: high efficiency air handling units • Credit 2 LEED Accredited Professional
  • 92. LEED-CI Full Bloom Bakery Menlo Park, California
  • 93. Overview • Existing bakery facility • Moving from smaller location • Moving existing (old) equipment • Suburban location
  • 94.
  • 95. Category: Sustainable Sites • Prerequisite: None ! Credit 1! LEED Certified Building • Credit 2" Development Density and or pick 3 features:! Community Connectivity" Brownfield Redevelopment • Credit 3.1" Public Transit Access Stormwater: Rate and Quantity! Stormwater: Treatment! Heat Island Reduction, Non-Roof! • Credit 3.2" Bicycle Storage & Heat-Island Reduction, Roof Changing Rooms Light Pollution Reduction Irrigation: Reduce by 50%! • Credit 3.3" Parking Availability" Irrigation: No Potable Use Innovative Wastewater Reduce Water Use: 20% Onsite Renewable Energy! Other Quantifiable Performance!
  • 96. Category: Sustainable Sites Obvious Points • Prerequisite: None ! Credit 1! LEED Certified Building • Credit 2" Development Density and or pick 3 features:! Community Connectivity" Brownfield Redevelopment • Credit 3.1" Public Transit Access Stormwater: Rate and Quantity! Stormwater: Treatment! Heat Island Reduction, Non-Roof! • Credit 3.2" Bicycle Storage & Heat-Island Reduction, Roof Changing Rooms Light Pollution Reduction Irrigation: Reduce by 50%! • Credit 3.3" Parking Availability" Irrigation: No Potable Use Innovative Wastewater Reduce Water Use: 20% Onsite Renewable Energy! Other Quantifiable Performance!
  • 97. Category: Sustainable Sites Impossible Points • Prerequisite: None ! Credit 1! LEED Certified Building • Credit 2" Development Density and or pick 3 features:! Community Connectivity" Brownfield Redevelopment • Credit 3.1" Public Transit Access Stormwater: Rate and Quantity! Stormwater: Treatment! Heat Island Reduction, Non-Roof! • Credit 3.2" Bicycle Storage & Heat-Island Reduction, Roof Changing Rooms Light Pollution Reduction Irrigation: Reduce by 50%! • Credit 3.3" Parking Availability" Irrigation: No Potable Use Innovative Wastewater Reduce Water Use: 20% Onsite Renewable Energy! Other Quantifiable Performance!
  • 98. Category: Sustainable Sites Remaining Points • Prerequisite: None ! Credit 1! LEED Certified Building • Credit 2" Development Density and or pick 3 features:! Community Connectivity" Brownfield Redevelopment • Credit 3.1" Public Transit Access Stormwater: Rate and Quantity! Stormwater: Treatment! Heat Island Reduction, Non-Roof! • Credit 3.2" Bicycle Storage & Heat-Island Reduction, Roof Changing Rooms Light Pollution Reduction Irrigation: Reduce by 50%! • Credit 3.3" Parking Availability" Irrigation: No Potable Use Innovative Wastewater Reduce Water Use: 20% Onsite Renewable Energy! Other Quantifiable Performance!
  • 99. Category: Water Efficiency • Prerequisite: None • Credit 1.1! Water Use Reduction - 20% Reduction! • Credit 1.2! Water Use Reduction - 30% Reduction!
  • 100. Category: Water Efficiency Obvious Points • Prerequisite: None • Credit 1.1! Water Use Reduction - 20% Reduction! • Credit 1.2! Water Use Reduction - 30% Reduction!
  • 101. Category: Water Efficiency Impossible Points • Prerequisite: None • Credit 1.1! Water Use Reduction - 20% Reduction! • Credit 1.2! Water Use Reduction - 30% Reduction!
  • 102. Category: Water Efficiency Remaining Points • Prerequisite: None • Credit 1.1! Water Use Reduction - 20% Reduction! • Credit 1.2! Water Use Reduction - 30% Reduction!
  • 103. Category: Energy & Atmosphere • Prerequisite 1: Fundamental Commissioning • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Ozone Protection • Credit 1.1! Optimize Energy • Credit 2! Enhanced Performance - Lighting Power! Commissioning! • Credit 1.2! Optimize Energy • Credit 3! Energy Use, Performance - Lighting Controls! Measurement & Payment Accountability! • Credit 1.3! Optimize Energy Performance - HVAC! • Credit 4 !Green Power! • Credit 1.4! Optimize Energy Performance - Equipment and Appliances!
  • 104. Category: Energy & Atmosphere Obvious Points • Prerequisite 1: Fundamental Commissioning • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Ozone Protection • Credit 1.1! Optimize Energy • Credit 2! Enhanced Performance - Lighting Power! Commissioning! • Credit 1.2! Optimize Energy • Credit 3! Energy Use, Performance - Lighting Controls! Measurement & Payment Accountability! • Credit 1.3! Optimize Energy Performance - HVAC! • Credit 4 !Green Power! • Credit 1.4! Optimize Energy Performance - Equipment and Appliances!
  • 105. Category: Energy & Atmosphere Impossible Points • Prerequisite 1: Fundamental Commissioning • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Ozone Protection • Credit 1.1! Optimize Energy • Credit 2! Enhanced Performance - Lighting Power! Commissioning! • Credit 1.2! Optimize Energy • Credit 3! Energy Use, Performance - Lighting Controls! Measurement & Payment Accountability! • Credit 1.3! Optimize Energy Performance - HVAC! • Credit 4 !Green Power! • Credit 1.4! Optimize Energy Performance - Equipment and Appliances!
  • 106. Category: Energy & Atmosphere Remaining Points • Prerequisite 1: Fundamental Commissioning • Prerequisite 2: Minimum Energy Performance • Prerequisite 3: Ozone Protection • Credit 1.1! Optimize Energy • Credit 2! Enhanced Performance - Lighting Power! Commissioning! • Credit 1.2! Optimize Energy • Credit 3! Energy Use, Performance - Lighting Controls! Measurement & Payment Accountability! • Credit 1.3! Optimize Energy Performance - HVAC! • Credit 4 !Green Power! • Credit 1.4! Optimize Energy Performance - Equipment and Appliances!
  • 107. Category: Materials & Resources • Prerequisite 1: Storage and Collection of Recyclables • Credit 1.1! Long Term Lease! • 3.3! Resource Reuse, 30% Furniture and Furnishings! • 1.2! Reuse 40% of Interior Non- Structural Components! • 4.1" Recycled Content, 10% (post-consumer + 1/2 pre-consumer) • 1.3! Reuse 60% of Interior Non- • 4.2! Recycled Content, 20% Structural Components! • 5.1! Regional Materials, 20%! • 2.1! Construction Waste Management, 50%! • 5.2! Regional Materials, 10% Extracted and Manufactured Regionally • 2.2! Construction Waste Management, 75%! • 6! Rapidly Renewable Materials! • 3.1! Resource Reuse, 5%! • 7! Certified Wood! • 3.2! Resource Reuse, 10%!
  • 108. Category: Materials & Resources Obvious Points • Prerequisite 1: Storage and Collection of Recyclables • Credit 1.1! Long Term Lease! • 3.3! Resource Reuse, 30% Furniture and Furnishings! • 1.2! Reuse 40% of Interior Non- Structural Components! • 4.1" Recycled Content, 10% (post-consumer + 1/2 pre-consumer) • 1.3! Reuse 60% of Interior Non- • 4.2! Recycled Content, 20% Structural Components! • 5.1! Regional Materials, 20%! • 2.1! Construction Waste Management, 50%! • 5.2! Regional Materials, 10% Extracted and Manufactured Regionally • 2.2! Construction Waste Management, 75%! • 6! Rapidly Renewable Materials! • 3.1! Resource Reuse, 5%! • 7! Certified Wood! • 3.2! Resource Reuse, 10%!
  • 109. Category: Materials & Resources Impossible Points • Prerequisite 1: Storage and Collection of Recyclables • Credit 1.1! Long Term Lease! • 3.3! Resource Reuse, 30% Furniture and Furnishings! • 1.2! Reuse 40% of Interior Non- Structural Components! • 4.1" Recycled Content, 10% (post-consumer + 1/2 pre-consumer) • 1.3! Reuse 60% of Interior Non- • 4.2! Recycled Content, 20% Structural Components! • 5.1! Regional Materials, 20%! • 2.1! Construction Waste Management, 50%! • 5.2! Regional Materials, 10% Extracted and Manufactured Regionally • 2.2! Construction Waste Management, 75%! • 6! Rapidly Renewable Materials! • 3.1! Resource Reuse, 5%! • 7! Certified Wood! • 3.2! Resource Reuse, 10%!
  • 110. Category: Materials & Resources Remaining Points • Prerequisite 1: Storage and Collection of Recyclables • Credit 1.1! Long Term Lease! • 3.3! Resource Reuse, 30% Furniture and Furnishings! • 1.2! Reuse 40% of Interior Non- Structural Components! • 4.1" Recycled Content, 10% (post-consumer + 1/2 pre-consumer) • 1.3! Reuse 60% of Interior Non- • 4.2! Recycled Content, 20% Structural Components! • 5.1! Regional Materials, 20%! • 2.1! Construction Waste Management, 50%! • 5.2! Regional Materials, 10% Extracted and Manufactured Regionally • 2.2! Construction Waste Management, 75%! • 6! Rapidly Renewable Materials! • 3.1! Resource Reuse, 5%! • 7! Certified Wood! • 3.2! Resource Reuse, 10%!
  • 111. Category: Indoor Environmental Quality • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 !Outside Air Monitoring! • 4.5! Low-Emitting Furniture! • 2! Increased Ventilation! • 5! Indoor Pollutant Source Control! • 3.1!Construction! Construction IAQ Mgmt Plan During • 6.1! Lighting Controls • 3.2" Construction IAQ Mgmt Plan • 6.2! Temperature Controls Before Occupancy " • 4.1! Low-Emitting Adhesives ! • 7.1! Thermal Comfort ! • 4.2! Low-Emitting Paints! • 7.2! Thermal Comfort - Monitoring • 4.3! Low-Emitting Carpeting! • 8.1! Daylight 75% of Spaces! • 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces! • 8.3! Views 90% of Seated Spaces
  • 112. Category: IEQ Obvious Points • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 !Outside Air Monitoring! • 4.5! Low-Emitting Furniture! • 2! Increased Ventilation! • 5! Indoor Pollutant Source Control! • 3.1!Construction! Construction IAQ Mgmt Plan During • 6.1! Lighting Controls • 3.2" Construction IAQ Mgmt Plan • 6.2! Temperature Controls Before Occupancy " • 4.1! Low-Emitting Adhesives ! • 7.1! Thermal Comfort ! • 4.2! Low-Emitting Paints! • 7.2! Thermal Comfort - Monitoring • 4.3! Low-Emitting Carpeting! • 8.1! Daylight 75% of Spaces! • 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces! • 8.3! Views 90% of Seated Spaces
  • 113. Category: IEQ Impossible Points • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 !Outside Air Monitoring! • 4.5! Low-Emitting Furniture! • 2! Increased Ventilation! • 5! Indoor Pollutant Source Control! • 3.1!Construction! Construction IAQ Mgmt Plan During • 6.1! Lighting Controls • 3.2" Construction IAQ Mgmt Plan • 6.2! Temperature Controls Before Occupancy " • 4.1! Low-Emitting Adhesives ! • 7.1! Thermal Comfort ! • 4.2! Low-Emitting Paints! • 7.2! Thermal Comfort - Monitoring • 4.3! Low-Emitting Carpeting! • 8.1! Daylight 75% of Spaces! • 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces! • 8.3! Views 90% of Seated Spaces
  • 114. Category: IEQ Remaining Points • Prerequisite 1: Minimum IAQ Performance • Prerequisite 2: Environmental Tobacco Smoke (ETS) Control • Credit 1 !Outside Air Monitoring! • 4.5! Low-Emitting Furniture! • 2! Increased Ventilation! • 5! Indoor Pollutant Source Control! • 3.1!Construction! Construction IAQ Mgmt Plan During • 6.1! Lighting Controls • 3.2" Construction IAQ Mgmt Plan • 6.2! Temperature Controls Before Occupancy " • 4.1! Low-Emitting Adhesives ! • 7.1! Thermal Comfort ! • 4.2! Low-Emitting Paints! • 7.2! Thermal Comfort - Monitoring • 4.3! Low-Emitting Carpeting! • 8.1! Daylight 75% of Spaces! • 4.4! Low-Emitting Composite Wood • 8.2! Daylight 90% of Spaces! • 8.3! Views 90% of Seated Spaces
  • 115. Category: Innovation & Design • Prerequisite: None • Credit 1.1 Innovation in Design • Credit 1.2 Innovation in Design • Credit 1.3 Innovation in Design • Credit 2 LEED Accredited Professional
  • 116. Category: Innovation & Design Obvious Points • Prerequisite: None • Credit 1.1 Innovation in Design: composting • Credit 1.2 Innovation in Design: organic ingredients and products • Credit 1.3 Innovation in Design: organic food in employee cafe • Credit 2 LEED Accredited Professional
  • 117. ? QUESTIONS organicarchitect