Samuel's portfolio

Architecture Portfolio

PORT FOLIO
Samuel Zhang
CAL POLY POMONA ARCHITECTURE
ARCHITECTUREPROTFOLIO
SAMUELZHANG
CALIFORNIA STATE POLYTECHNIC
UNIVERSITY, POMONA
1599 E COLORADO BLVD.
PASADENA, CA 91106
P: 626.410.3852
E:kezhang1980@gmail.com
OBJECTIVE:Seeking a position as
Architect Designer
educational background
awards
2011-2015
2008-2011
2010
2014-2015
Cal Poly Pomona University / Bachelor of Architecture
Pasadena City College /
Pasadena City College /
Architecture Major
Walter Putnam Memorial Award
Cal Poly Pomona Design Studio Second Place
skills
languages
job history
IT / AutoCAD / Rhino / Sketch Up / Revit / Maxwell /
3MX STUDIO / Adobe Photoship / Illustrator / InDesign /
Microsoft Office / Hand drafting and Modeling /
Laser Cutting
English speak fluently and read / write
Chinese native language
2015-now
2011-2015
an ha architecture
howard johnson hotel
TABLE OF CONTENTS
Tessellation
Stadium
LA
Wellness Center
6 18
Hill
House
30
MedicalCommunity
Center
Samuel's portfolio
TS
Tessellation Stadium 01
The project is dimensioned to fit university and surrounding college
needs as well as to comply with North American Soccer standards.
It shall be defined as a compact contemporary project with visual
recognition factor, adding to the already recognizable campus
structure of the CLA building by Antoine Pedock, a visual anchor
point for the surrounding communities on the Southwest entry to
the campus. This facility is intended to offer an upscale solution for
already established sports such as college football but also for
European football, commonly know as soccer. The arena not only
accommodates state of the art stadium technology but also support
structures such as shops, restaurants and bars, to serve external
as well as local events.
Site
The stadium is located on the South end of the
campus in location of the existing soccer field.
Access will primarily come from S. University
Drive and W. Temple Avenue. Existing parking will
be tied in with a future expansion on the South
Side of Temple with an underground crossing. The
site is conveniently located near two major Traffic
arteries, the I-10 and I-57. The site is strategically
within a 4 mile radius of the original football stadi-
um site in the City of industry, Grand Crossing to
attract the same potential audience.
Site plan
Laser Cutting Site Model
UP Point
MP
MP
MP
Connection
11
Connection
2
Connection
3
A
B1 B2 B3
P
P
P
UP Point
P
P
P
C
D
E1 E2 E3
F1 F2 F3
G1 G2 G3
Concept
Glass Fiber Reinforced Concrete Panels
Compression Ring System
Fabric Roof System
Tension Ring System
Module
SKIN SYSTEMGlass Fiber Reinforced Concrete, Fabric
STRUCTURE SYSTEMTension and Compression Rings, Bracing System
GRANDSTANDS20,000 Spectator + 150 ADA Compliant Seats
PROGRAMSHOLLOW CAST CONCRETE FLOOR AND PRECAST CONCRETE
Exploded
CONNECTION 1, 3
PANELS CONNECTION
CONNECTION 5
CONNECTION 5 CONNECTION 3
CONNECTION 1
CONNECTION 4 CONNECTION 2CONNECTION 2
PANELS CONNECTION
CONNECTION 4CONNECTION 2
Connections
center
12
11
13
10
9
8
7
6
5
14
15
4
END1BAC
UNDERGROUNDPARKING
UNDERGROUND
PARKINGRAMP
FITNESSSTUDIO
SHOWER
SHOWER
MASSAGE
COACHOFFICE
CUS.
PRESSSTUDIO
POLICE
SECURITY
DOPING
OFFICE
BUILDING
OPPERATION
ITOFFICE
TOILET
TOILETTOILET
COACHOFFICE
FIRSTAID
FIELDENTRANCE
STORAGE
STORAGEFITNESSSTUDIO
PLAYERHOME
EQUIP.
DRESS
ROOM
SHOWERSHOWERMASSAGE
OFFICEOF
ARENA
STORAGE
WC
WC
DRESSING
ROOM
SAUNAAND
RELAXTIONPOOL
SAUNAAND
RELAXTIONPOOL
STORAGE
DRESSING
ROOM
EE
FF
GG
JJ
HH
II
centercenter
12
12
11
11
13
13
10
10
9
9
8
8
7
7
6
6
5
5
14
14
15
15
16
16
17
17
18
18
4
4
DD
KK
LL
MM
23
23
21
21
22
22
20
20
Q Q
O O
P P
END1
END1
B B
A A
C C
ENDEND
2
2
1
1
3
3
N N
19
19
CUSTODIAN
GIFT SHOP
ELE.
ELE.
CONCES.CONCOURSE
INFORMATION
CONCES.
CONCES.
CUSTODIAN
TOILET
POLICE
ENTRANCE
UP
UP
TICKET
TOILET
ELCTRICAL/
MECHANICAL
SECURITY
CUSTODIAN TOILET TOILET CONCES. CONCES. CONCES. TOILET TOILET
TICKET
ELE.
UPUP
ELE. POLICE POLICE
SECURITY SECURITYSTR.RESTAURANT
ELECTRICAL/
MECHANICAL
INFORMATION
CONCOURSE
TOILET TOILET TOILET
ELE.ELE.
SECURITYSECURITY
TICKET
ENTRANCE
UP
UP
RESTAURANT
CONCOURSE
ENTRANCE
STORAGE POLICE
TOILET STORAGE
ENTRANCE
SECURITY
SEATING AREA
TOILET
ELECTRICAL CONCOURSE
CONCES.
CONCES.
CONCES.
ELE.
UP
UP
POLICE
TICKET
ELE.
CUSTODIAN
TOILET
INFORMATION
CONCES. CONCES. CONCES.INFORMATION
EE
FF
GG
JJ
HH
II
centecrrcenterr
11122
12
11
11
13
13
10
10
9999
9
8
8
7
7
6
6
5
5
14
14
15
15
16
16
17
17
18
18
4
4
DD
KK
LL
MM
23
23
21
21
22
22
20
20
Q Q
O O
P P
END1
END1
B B
1
AAAA
11
1
AAAA
11
C C
ENDEND
2
2
1
1
3
3
N N
19
19
RESTAURANT
BAREQUIP.
RESTAURANT
BAREQUIP. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P.
ELE.ELE.
V.I.P. V.I.P. V.I.P. V.I.P. V.I.P.
UPDN
V.I.PV.I.PV.I.PV.I.PV.I.PV.I.P
DNUP
PRESS ROOMV.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P.
V.I.P.
DNUP
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P. ELE.
ELE.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
DNUP
BAR
RESTAURANT
V.I.P.V.I.P.V.I.P.V.I.P.
V.I.P.
UPDN
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
ELE.
ELE.
DN UP
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
V.I.P.
EQUIP.
RESTAURANT
ELE. ELE.
EE
FF
GG
JJ
HH
II
centerrcenterr
12
12
11
11
13
13
10
10
9
9
8
8
7
7
6
6
5
5
14
14
15
155
16
16
17
17
18
18
4
4
DD
KK
LL
MM
23
23
21
21
22
22
20
20
Q Q
O O
P P
END1
END1
B B
1
AA
11
1
AA
11
C C
ENDEND
2
2
1
1
3
3
N N
19
19
CONCES.TOILETTOILET
DN
TOILET
CONCES.
RESTAURANT
CONCES.
TOILET
TOILETCUS.
ELE.
DN
TOILET CONCES. CONCES. CONCES.
RESTAURANT
CONCES. TOILET TOILET CUS.
DN.
ELE.
ELE.
DN
TOILET
CONCES.
CONCES.
RESTAURANT
TOILET
DN
ELE.
ELE.
DN
ELE.
CONCES. CONCES.
RESTAURANT
CONCES. TOILET
ELE.ELE.
DN DN
TOILET
TOP OF ROOF
TOP OF STANDS
LEVEL 2
GROUND LEVEL
UNDERGROUND
V.I.P LEVEL
88’-0”
TOP OF ROOF
88’-0”
57’-6”
30’-0”
LEVEL 2
30’-0”
20’-0”
V.I.P LEVEL
20’-0”
0’-0”
GROUND LEVEL
0’-0”
-10’-0”
UNDERGROUND
-10’-0”
Revit Interior Rendering
Physical Model
Samuel's portfolio
LW
LA Wellness Center 02
There are so many leftover spaces in downtown LA. To high-
light the significance of these spaces, and the potential that
they hold to become something more useful and give opportu-
nities to transform those space into healthy environments. My
architectural strategy is to reuse one of those neglected
spaces and design an wellness center for the obesity people
and the community. My goal is to help people adapt to and
maintain a healthy lifestyle.
Art District
Skid Row
Metro Entrance
Subway Entrance
110 Freeway Entrance to The Site
Financial District
Historic Core
Bunker Hill
Populated Paces
Circulation to the site
Site
Site
CirculationFloor Layers
ShiftPrograms Interacting
Design Concept
Underground Parking
Patient Circulation
Employee & Emergency Circulation
Elevator
Biological Factors
Food Consumption
Individual Psychology
Individual Physical Activities
Circulations
Programs
Elevations
Section
Facade Fixings Detail
Frame Node Detail
Details
First Floor
Second Floor
Third Floor
Fourth Floor
Fifth Floor
Sixth Floor
Seventh Floor
Eighth Floor
Ninth Floor
Samuel's portfolio
Samuel's portfolio
Samuel's portfolio
HH
Hill House 03
The Hill house is designed for the Japanese artist. It locates on the
mountain slop. The Project used concrete fundation and wood
frame structure.
Samuel's portfolio
Model Making
Parking
Retaining wall
HILL HOUSE
GENERAL NOTES
SPECIFIC NOTES
Entry
Main Floor Elevation
10/31/12
24 x 36
1 / 8” = 1’ - 0”
Ke Zhang
4530’ 4535’ 4540’
4545’
4550’
4555’
4560’
48”-
0”
24’ - 0”
4530’
4535’
4540’
4545’
4550’
4555’
4560’
A 1.1
Title:
SITE PLAN
Drawing#
Size
Date
Originator Job#
Scale
Drawn By
Revision
SITE PLAN
1
0’ 4’ 8’ 16’ 32’
1/8" = 1'-0"
HILL HOUSE
GENERAL NOTES
SPECIFIC NOTES
Title:
FLOOR PLAN
Storage
Dining Room
1/4" = 1'-0"
Floor Plan
Patio
Kitchen
Living room
A4.1
2
10/31/12
24 x 36
1 / 4” = 1’ - 0”
Ke Zhang
A 2.1
Drawing#
Size
Date
Originator Job#
Scale
Drawn By
Revision
A4
.1
1
0’ 2’ 4’ 8’ 16’
1/4" = 1'-0"
Roof Plan
0’ 2’ 4’ 8’ 16’
Bath Room
1 2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
Slope
2%
Slope
2%
WOOD FLOOR
GAP FOR DRAINAGE
TREATED BAND
JOIST
INSULATION
STEEL BEAM
CORROSION-RESISTAN
BOLTS OR LAG SCREWS
PLYWOOD LAYER
1'-0"
0' - 4"
0'-1”
0' - 1"
0' - 3"
6X13 C CHANNEL JOIST
ROOF DECKING
WELL-ROUNDED GRAVEL BALLAST
METAL FASCIA
GALVANIZED METAL DAM
TREATED WOOD NAILER
SPLICING CEMENT
RIGID INSULATION
ROOFING MEMBRANE
CANT STRIP
0' - 6"
0' - 1"
0'-9"0'-1"
0'-4"
INSULATION
STEEL SHEAR
FLOOR SCREED ANGLE
WELDED TO BEAM
W 12X26 STEEL BEAM
WOOD FLOOR
FLOOR DECKING
C CHANNEL JOIST
TOP SET BASE
0'-11"
0'-6"
0' - 3"
0'-9"
1'-0"
CORROSION-RESISTAN
BOLTS OR LAG SCREWS
FLOOR DECK
WOOD FLOOR
SHEAR PLATE-FACE
STEEL BEAM
C HANNEL JOIST
INSULATION
CONCRETE RETAINING
WALL
0'-8"
0' - 7 "
0' - 3"
0'-9"
0'-1019/32"
WOOD FLOOR
GLAZING BEAD
SILL
0'-1"
0' - 5"
0' - 1"
INSULATION
JOIST
CORROSION-RESISTAN
BOLTS
BEAM
DECK
PLYWOOD
0'-3"
0'-9"
1'-0"
0'-1"
Originator Job #
Date
Size
Drawing # Revision #
Scale
Drawn By
Specific Notes
Gneral Notes
Courset
Project Name
Sheet Title
SAM
HILL
HOUSE
DETAIL
KE ZHANG
A9.1
11/20/12 1"=1'-0"
1" = 1'-0"
1
Callout of Section 1
1" = 1'-0"
2
Callout of Section 2
1" = 1'-0"
3
Callout of Section 3
1" = 1'-0"
4
Callout of Section 4
1" = 1'-0"
5
Callout of Section 5
WINDOW SILL
TILT&TURN Z SASH
1" = 1'-0"
6
Callout of Section 6
24" X 36"
PERFORATED PIPE
0'-7"
0' - 7 3/4"
1'-0"
1" = 1'-0"
7
Callout of Section 7
REINFORCEMENT REBAR
REBAR
0'-1"
REINFORCEMENT WIRE
REBAR
CONCRETE SLAB
1" = 1'-0"
8
Callout of Section 8
1'-0"
STUCO FINISHING
2%
4530’4535’4539’4546’4550’4552’
4530’4535’4539’4546’4550’4552’
Wood Beam
Wood Roof
Concrete Slab
Streel Fram
Concrete and Steel Footing
Polywood Wall
2%
2%
Concrete Footing
W 8X 24
1/4" = 1'-0"
Short Section
1/4" = 1'-0"
Long Section
Dining Room
Bed Room
Living Room
0’ 2’ 4’ 8’ 16’
0’ 2’ 4’ 8’ 16’
HILL HOUSE
GENERAL NOTES
SPECIFIC NOTES
Title:
SECTIONS
10/31/12
24 x 36
1 / 4” = 1’ - 0”
Ke Zhang
A 4.1
Drawing#
Size
Date
Originator Job#
Scale
Drawn By
Revision
Kitchen
PROTECTIVE LAYER
RIGID INSULATION
PLYWOOD
RIGID
INSULATION
2 X6 TOP PLATE
13'-11"2'-9"
1'-0"13'-1"6'-0"0'-10"1'-1"0'-4"
WATER TROUGH
W8 X 24-WIDE FLANGE
C JOIST SECTION
INSULATION
GYPSUM PLASTER
EXTORIER TILE
WOOD FLOOR
ANCHOR BOLT 9”
REINFORCE REBAR
PERFORATED PIPE
8" CONCRETE WALL
BLOCKING
Originator Job #
Date
Size
Drawing # Revision #
Scale
Drawn By
Specific Notes
Gneral Notes
Courset
Project Name
Sheet Title
1" = 1'-0"
Project Name
HILL
HOUSE
KE ZHANG
Author
A 4.2
11/14/12
KEYWALL SECTION
SCALE : 1”=1’-0”
HORIZONTAL STEEL
VERTICAL REINFORCING STEEL
2%
0’ 1’ 2’ 4’ 8’
MC
Medical Community Center 04
Yapmp Valley Medical Center has asked for assistance with the
repurposing of the existing building. The hospital is looking to the
future and developing a trategy to meet the needs of the diverse
community served. It is determined that the facility will serve as
an outpatient pavillion and provide community served. It is deter-
mined that the facility will serve as an outpatient pavilion and
provide a holistic approach to health and wellness. Several
services currently provided in the hospital and adjacent medical
office building will be relocated to suport this vision.
Samuel's portfolio
Parking
Site
N
Women Center
Cancer Center
Universal Clinic
New Programs and Circulation
Public
Private
Existing Building Envelop : Public Space VS. Private Space
Expandable Side
Expandable Spaces
N
Annual Flower
Noxious Weeds
Marjuana plant
Herbaceous Plant
Plants on the site
Site Plan
Floor Plan
Interior Rendering and Photoshop
Interior Rendering and Photoshop
PHOTOGRAPHY
Samuel's portfolio
THANK YOU

Recommandé

Skmap par
SkmapSkmap
Skmapmaridelossantos
979 vues62 diapositives
5500, 5514 Broadway 200, 202, 206 Ellwood par
5500, 5514  Broadway 200, 202, 206 Ellwood 5500, 5514  Broadway 200, 202, 206 Ellwood
5500, 5514 Broadway 200, 202, 206 Ellwood Marian Vargas Mendoza
257 vues23 diapositives
YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17 par
YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17
YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17YUMI CHEN
145 vues36 diapositives
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal par
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalSouthland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalBrendan O'Connor
3.2K vues33 diapositives
City of orlando db colonial ped overpass technical par
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technicalBrendan O'Connor
2.8K vues21 diapositives
Hadeel Ashour Architecture Portfolio 2013-2020 par
Hadeel Ashour Architecture Portfolio 2013-2020 Hadeel Ashour Architecture Portfolio 2013-2020
Hadeel Ashour Architecture Portfolio 2013-2020 Hadeel Ashour
49 vues31 diapositives

Contenu connexe

Similaire à Samuel's portfolio

SteveHerron-Portfolio_160208 par
SteveHerron-Portfolio_160208SteveHerron-Portfolio_160208
SteveHerron-Portfolio_160208Steven Herron
210 vues11 diapositives
Long Span Building Construction par
Long Span Building ConstructionLong Span Building Construction
Long Span Building ConstructionAsz My
11.8K vues28 diapositives
M3M Panipat - Download Brochure par
M3M Panipat - Download Brochure M3M Panipat - Download Brochure
M3M Panipat - Download Brochure simranpundeer
29 vues62 diapositives
WatsonMArch Portfolio par
WatsonMArch PortfolioWatsonMArch Portfolio
WatsonMArch PortfolioReva Watson
121 vues33 diapositives
San Jose Page 1 par
San Jose Page 1San Jose Page 1
San Jose Page 1whyarc
298 vues1 diapositive
Intertech Science Park Master Plan overview par
Intertech Science Park Master Plan overviewIntertech Science Park Master Plan overview
Intertech Science Park Master Plan overviewKim Mitchell
579 vues31 diapositives

Similaire à Samuel's portfolio(20)

Long Span Building Construction par Asz My
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
Asz My11.8K vues
M3M Panipat - Download Brochure par simranpundeer
M3M Panipat - Download Brochure M3M Panipat - Download Brochure
M3M Panipat - Download Brochure
simranpundeer29 vues
WatsonMArch Portfolio par Reva Watson
WatsonMArch PortfolioWatsonMArch Portfolio
WatsonMArch Portfolio
Reva Watson121 vues
San Jose Page 1 par whyarc
San Jose Page 1San Jose Page 1
San Jose Page 1
whyarc298 vues
Intertech Science Park Master Plan overview par Kim Mitchell
Intertech Science Park Master Plan overviewIntertech Science Park Master Plan overview
Intertech Science Park Master Plan overview
Kim Mitchell579 vues
Intertech masterplan presentation.pdf par Kim Mitchell
Intertech masterplan presentation.pdfIntertech masterplan presentation.pdf
Intertech masterplan presentation.pdf
Kim Mitchell11 vues
Paradise Sai Wonder Brochure - Zricks.com par Zricks.com
Paradise Sai Wonder Brochure - Zricks.comParadise Sai Wonder Brochure - Zricks.com
Paradise Sai Wonder Brochure - Zricks.com
Zricks.com82 vues
Item 7.1 art center study session par E'ville Eye
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
E'ville Eye1.1K vues
M3M- Latitude, Sec-65, Gurgaon par Bhoomi Online
M3M- Latitude, Sec-65, GurgaonM3M- Latitude, Sec-65, Gurgaon
M3M- Latitude, Sec-65, Gurgaon
Bhoomi Online119 vues
Ild arete 2 bhk apartment at 53 lakhs call for booking 9871822103 par Group 3 realtors
Ild arete 2 bhk apartment at 53 lakhs call for booking 9871822103Ild arete 2 bhk apartment at 53 lakhs call for booking 9871822103
Ild arete 2 bhk apartment at 53 lakhs call for booking 9871822103
Group 3 realtors205 vues
pearlyip_portfolio par Pearl Yip
pearlyip_portfoliopearlyip_portfolio
pearlyip_portfolio
Pearl Yip268 vues
Greville King Streets Final Concept Plans par Stonnington
Greville King Streets Final Concept Plans Greville King Streets Final Concept Plans
Greville King Streets Final Concept Plans
Stonnington1.4K vues
Gensler 2000 Avenue of the Stars par john_adams
Gensler 2000 Avenue of the StarsGensler 2000 Avenue of the Stars
Gensler 2000 Avenue of the Stars
john_adams713 vues

Dernier

My Creative Resume DIAPOS.pptx par
My Creative Resume DIAPOS.pptxMy Creative Resume DIAPOS.pptx
My Creative Resume DIAPOS.pptxBrayanQuispe23
18 vues82 diapositives
SS25 Fashion Key Items trend book par
SS25 Fashion Key Items trend bookSS25 Fashion Key Items trend book
SS25 Fashion Key Items trend bookPeclers Paris
169 vues4 diapositives
TISFLEET WEB DESIGN PROJECT par
TISFLEET WEB DESIGN PROJECTTISFLEET WEB DESIGN PROJECT
TISFLEET WEB DESIGN PROJECTRabius Sany
41 vues13 diapositives
Oregon Ducks 4 Spencer Webb Hoodie par
Oregon Ducks 4 Spencer Webb HoodieOregon Ducks 4 Spencer Webb Hoodie
Oregon Ducks 4 Spencer Webb Hoodiebrandshop1
13 vues1 diapositive
Free World aids day Template from Best presentation design agency par
Free World aids day Template from Best presentation design agencyFree World aids day Template from Best presentation design agency
Free World aids day Template from Best presentation design agencyslideceotemplates
8 vues10 diapositives
Figma Prototype A to Z.pdf par
Figma Prototype A to Z.pdfFigma Prototype A to Z.pdf
Figma Prototype A to Z.pdfAtiqur Rahaman
18 vues30 diapositives

Dernier(20)

SS25 Fashion Key Items trend book par Peclers Paris
SS25 Fashion Key Items trend bookSS25 Fashion Key Items trend book
SS25 Fashion Key Items trend book
Peclers Paris169 vues
TISFLEET WEB DESIGN PROJECT par Rabius Sany
TISFLEET WEB DESIGN PROJECTTISFLEET WEB DESIGN PROJECT
TISFLEET WEB DESIGN PROJECT
Rabius Sany41 vues
Oregon Ducks 4 Spencer Webb Hoodie par brandshop1
Oregon Ducks 4 Spencer Webb HoodieOregon Ducks 4 Spencer Webb Hoodie
Oregon Ducks 4 Spencer Webb Hoodie
brandshop113 vues
Free World aids day Template from Best presentation design agency par slideceotemplates
Free World aids day Template from Best presentation design agencyFree World aids day Template from Best presentation design agency
Free World aids day Template from Best presentation design agency
217 Drive - All on upper.pptx par vidstor282
217 Drive - All on upper.pptx217 Drive - All on upper.pptx
217 Drive - All on upper.pptx
vidstor28215 vues
The Report is Dead, Long Live the Report ! Communicating Usability Research F... par Centralis
The Report is Dead, Long Live the Report ! Communicating Usability Research F...The Report is Dead, Long Live the Report ! Communicating Usability Research F...
The Report is Dead, Long Live the Report ! Communicating Usability Research F...
Centralis5 vues

Samuel's portfolio

  • 1. PORT FOLIO Samuel Zhang CAL POLY POMONA ARCHITECTURE
  • 2. ARCHITECTUREPROTFOLIO SAMUELZHANG CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA 1599 E COLORADO BLVD. PASADENA, CA 91106 P: 626.410.3852 E:kezhang1980@gmail.com OBJECTIVE:Seeking a position as Architect Designer
  • 3. educational background awards 2011-2015 2008-2011 2010 2014-2015 Cal Poly Pomona University / Bachelor of Architecture Pasadena City College / Pasadena City College / Architecture Major Walter Putnam Memorial Award Cal Poly Pomona Design Studio Second Place skills languages job history IT / AutoCAD / Rhino / Sketch Up / Revit / Maxwell / 3MX STUDIO / Adobe Photoship / Illustrator / InDesign / Microsoft Office / Hand drafting and Modeling / Laser Cutting English speak fluently and read / write Chinese native language 2015-now 2011-2015 an ha architecture howard johnson hotel
  • 7. TS Tessellation Stadium 01 The project is dimensioned to fit university and surrounding college needs as well as to comply with North American Soccer standards. It shall be defined as a compact contemporary project with visual recognition factor, adding to the already recognizable campus structure of the CLA building by Antoine Pedock, a visual anchor point for the surrounding communities on the Southwest entry to the campus. This facility is intended to offer an upscale solution for already established sports such as college football but also for European football, commonly know as soccer. The arena not only accommodates state of the art stadium technology but also support structures such as shops, restaurants and bars, to serve external as well as local events.
  • 8. Site The stadium is located on the South end of the campus in location of the existing soccer field. Access will primarily come from S. University Drive and W. Temple Avenue. Existing parking will be tied in with a future expansion on the South Side of Temple with an underground crossing. The site is conveniently located near two major Traffic arteries, the I-10 and I-57. The site is strategically within a 4 mile radius of the original football stadi- um site in the City of industry, Grand Crossing to attract the same potential audience.
  • 10. UP Point MP MP MP Connection 11 Connection 2 Connection 3 A B1 B2 B3 P P P UP Point P P P C D E1 E2 E3 F1 F2 F3 G1 G2 G3 Concept Glass Fiber Reinforced Concrete Panels Compression Ring System Fabric Roof System Tension Ring System Module
  • 11. SKIN SYSTEMGlass Fiber Reinforced Concrete, Fabric STRUCTURE SYSTEMTension and Compression Rings, Bracing System GRANDSTANDS20,000 Spectator + 150 ADA Compliant Seats PROGRAMSHOLLOW CAST CONCRETE FLOOR AND PRECAST CONCRETE Exploded
  • 12. CONNECTION 1, 3 PANELS CONNECTION CONNECTION 5 CONNECTION 5 CONNECTION 3 CONNECTION 1 CONNECTION 4 CONNECTION 2CONNECTION 2 PANELS CONNECTION CONNECTION 4CONNECTION 2 Connections
  • 13. center 12 11 13 10 9 8 7 6 5 14 15 4 END1BAC UNDERGROUNDPARKING UNDERGROUND PARKINGRAMP FITNESSSTUDIO SHOWER SHOWER MASSAGE COACHOFFICE CUS. PRESSSTUDIO POLICE SECURITY DOPING OFFICE BUILDING OPPERATION ITOFFICE TOILET TOILETTOILET COACHOFFICE FIRSTAID FIELDENTRANCE STORAGE STORAGEFITNESSSTUDIO PLAYERHOME EQUIP. DRESS ROOM SHOWERSHOWERMASSAGE OFFICEOF ARENA STORAGE WC WC DRESSING ROOM SAUNAAND RELAXTIONPOOL SAUNAAND RELAXTIONPOOL STORAGE DRESSING ROOM EE FF GG JJ HH II centercenter 12 12 11 11 13 13 10 10 9 9 8 8 7 7 6 6 5 5 14 14 15 15 16 16 17 17 18 18 4 4 DD KK LL MM 23 23 21 21 22 22 20 20 Q Q O O P P END1 END1 B B A A C C ENDEND 2 2 1 1 3 3 N N 19 19 CUSTODIAN GIFT SHOP ELE. ELE. CONCES.CONCOURSE INFORMATION CONCES. CONCES. CUSTODIAN TOILET POLICE ENTRANCE UP UP TICKET TOILET ELCTRICAL/ MECHANICAL SECURITY CUSTODIAN TOILET TOILET CONCES. CONCES. CONCES. TOILET TOILET TICKET ELE. UPUP ELE. POLICE POLICE SECURITY SECURITYSTR.RESTAURANT ELECTRICAL/ MECHANICAL INFORMATION CONCOURSE TOILET TOILET TOILET ELE.ELE. SECURITYSECURITY TICKET ENTRANCE UP UP RESTAURANT CONCOURSE ENTRANCE STORAGE POLICE TOILET STORAGE ENTRANCE SECURITY SEATING AREA TOILET ELECTRICAL CONCOURSE CONCES. CONCES. CONCES. ELE. UP UP POLICE TICKET ELE. CUSTODIAN TOILET INFORMATION CONCES. CONCES. CONCES.INFORMATION
  • 14. EE FF GG JJ HH II centecrrcenterr 11122 12 11 11 13 13 10 10 9999 9 8 8 7 7 6 6 5 5 14 14 15 15 16 16 17 17 18 18 4 4 DD KK LL MM 23 23 21 21 22 22 20 20 Q Q O O P P END1 END1 B B 1 AAAA 11 1 AAAA 11 C C ENDEND 2 2 1 1 3 3 N N 19 19 RESTAURANT BAREQUIP. RESTAURANT BAREQUIP. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. ELE.ELE. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. UPDN V.I.PV.I.PV.I.PV.I.PV.I.PV.I.P DNUP PRESS ROOMV.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. DNUP V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. ELE. ELE. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. DNUP BAR RESTAURANT V.I.P.V.I.P.V.I.P.V.I.P. V.I.P. UPDN V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. ELE. ELE. DN UP V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. V.I.P. EQUIP. RESTAURANT ELE. ELE. EE FF GG JJ HH II centerrcenterr 12 12 11 11 13 13 10 10 9 9 8 8 7 7 6 6 5 5 14 14 15 155 16 16 17 17 18 18 4 4 DD KK LL MM 23 23 21 21 22 22 20 20 Q Q O O P P END1 END1 B B 1 AA 11 1 AA 11 C C ENDEND 2 2 1 1 3 3 N N 19 19 CONCES.TOILETTOILET DN TOILET CONCES. RESTAURANT CONCES. TOILET TOILETCUS. ELE. DN TOILET CONCES. CONCES. CONCES. RESTAURANT CONCES. TOILET TOILET CUS. DN. ELE. ELE. DN TOILET CONCES. CONCES. RESTAURANT TOILET DN ELE. ELE. DN ELE. CONCES. CONCES. RESTAURANT CONCES. TOILET ELE.ELE. DN DN TOILET
  • 15. TOP OF ROOF TOP OF STANDS LEVEL 2 GROUND LEVEL UNDERGROUND V.I.P LEVEL 88’-0” TOP OF ROOF 88’-0” 57’-6” 30’-0” LEVEL 2 30’-0” 20’-0” V.I.P LEVEL 20’-0” 0’-0” GROUND LEVEL 0’-0” -10’-0” UNDERGROUND -10’-0”
  • 19. LW LA Wellness Center 02 There are so many leftover spaces in downtown LA. To high- light the significance of these spaces, and the potential that they hold to become something more useful and give opportu- nities to transform those space into healthy environments. My architectural strategy is to reuse one of those neglected spaces and design an wellness center for the obesity people and the community. My goal is to help people adapt to and maintain a healthy lifestyle.
  • 20. Art District Skid Row Metro Entrance Subway Entrance 110 Freeway Entrance to The Site Financial District Historic Core Bunker Hill Populated Paces Circulation to the site Site Site
  • 22. Underground Parking Patient Circulation Employee & Emergency Circulation Elevator Biological Factors Food Consumption Individual Psychology Individual Physical Activities Circulations Programs
  • 25. Facade Fixings Detail Frame Node Detail Details
  • 26. First Floor Second Floor Third Floor Fourth Floor Fifth Floor Sixth Floor Seventh Floor Eighth Floor Ninth Floor
  • 30. HH Hill House 03 The Hill house is designed for the Japanese artist. It locates on the mountain slop. The Project used concrete fundation and wood frame structure.
  • 33. Parking Retaining wall HILL HOUSE GENERAL NOTES SPECIFIC NOTES Entry Main Floor Elevation 10/31/12 24 x 36 1 / 8” = 1’ - 0” Ke Zhang 4530’ 4535’ 4540’ 4545’ 4550’ 4555’ 4560’ 48”- 0” 24’ - 0” 4530’ 4535’ 4540’ 4545’ 4550’ 4555’ 4560’ A 1.1 Title: SITE PLAN Drawing# Size Date Originator Job# Scale Drawn By Revision SITE PLAN 1 0’ 4’ 8’ 16’ 32’ 1/8" = 1'-0" HILL HOUSE GENERAL NOTES SPECIFIC NOTES Title: FLOOR PLAN Storage Dining Room 1/4" = 1'-0" Floor Plan Patio Kitchen Living room A4.1 2 10/31/12 24 x 36 1 / 4” = 1’ - 0” Ke Zhang A 2.1 Drawing# Size Date Originator Job# Scale Drawn By Revision A4 .1 1 0’ 2’ 4’ 8’ 16’ 1/4" = 1'-0" Roof Plan 0’ 2’ 4’ 8’ 16’ Bath Room 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 A B C D E Slope 2% Slope 2%
  • 34. WOOD FLOOR GAP FOR DRAINAGE TREATED BAND JOIST INSULATION STEEL BEAM CORROSION-RESISTAN BOLTS OR LAG SCREWS PLYWOOD LAYER 1'-0" 0' - 4" 0'-1” 0' - 1" 0' - 3" 6X13 C CHANNEL JOIST ROOF DECKING WELL-ROUNDED GRAVEL BALLAST METAL FASCIA GALVANIZED METAL DAM TREATED WOOD NAILER SPLICING CEMENT RIGID INSULATION ROOFING MEMBRANE CANT STRIP 0' - 6" 0' - 1" 0'-9"0'-1" 0'-4" INSULATION STEEL SHEAR FLOOR SCREED ANGLE WELDED TO BEAM W 12X26 STEEL BEAM WOOD FLOOR FLOOR DECKING C CHANNEL JOIST TOP SET BASE 0'-11" 0'-6" 0' - 3" 0'-9" 1'-0" CORROSION-RESISTAN BOLTS OR LAG SCREWS FLOOR DECK WOOD FLOOR SHEAR PLATE-FACE STEEL BEAM C HANNEL JOIST INSULATION CONCRETE RETAINING WALL 0'-8" 0' - 7 " 0' - 3" 0'-9" 0'-1019/32" WOOD FLOOR GLAZING BEAD SILL 0'-1" 0' - 5" 0' - 1" INSULATION JOIST CORROSION-RESISTAN BOLTS BEAM DECK PLYWOOD 0'-3" 0'-9" 1'-0" 0'-1" Originator Job # Date Size Drawing # Revision # Scale Drawn By Specific Notes Gneral Notes Courset Project Name Sheet Title SAM HILL HOUSE DETAIL KE ZHANG A9.1 11/20/12 1"=1'-0" 1" = 1'-0" 1 Callout of Section 1 1" = 1'-0" 2 Callout of Section 2 1" = 1'-0" 3 Callout of Section 3 1" = 1'-0" 4 Callout of Section 4 1" = 1'-0" 5 Callout of Section 5 WINDOW SILL TILT&TURN Z SASH 1" = 1'-0" 6 Callout of Section 6 24" X 36" PERFORATED PIPE 0'-7" 0' - 7 3/4" 1'-0" 1" = 1'-0" 7 Callout of Section 7 REINFORCEMENT REBAR REBAR 0'-1" REINFORCEMENT WIRE REBAR CONCRETE SLAB 1" = 1'-0" 8 Callout of Section 8 1'-0" STUCO FINISHING 2% 4530’4535’4539’4546’4550’4552’ 4530’4535’4539’4546’4550’4552’ Wood Beam Wood Roof Concrete Slab Streel Fram Concrete and Steel Footing Polywood Wall 2% 2% Concrete Footing W 8X 24 1/4" = 1'-0" Short Section 1/4" = 1'-0" Long Section Dining Room Bed Room Living Room 0’ 2’ 4’ 8’ 16’ 0’ 2’ 4’ 8’ 16’ HILL HOUSE GENERAL NOTES SPECIFIC NOTES Title: SECTIONS 10/31/12 24 x 36 1 / 4” = 1’ - 0” Ke Zhang A 4.1 Drawing# Size Date Originator Job# Scale Drawn By Revision Kitchen
  • 35. PROTECTIVE LAYER RIGID INSULATION PLYWOOD RIGID INSULATION 2 X6 TOP PLATE 13'-11"2'-9" 1'-0"13'-1"6'-0"0'-10"1'-1"0'-4" WATER TROUGH W8 X 24-WIDE FLANGE C JOIST SECTION INSULATION GYPSUM PLASTER EXTORIER TILE WOOD FLOOR ANCHOR BOLT 9” REINFORCE REBAR PERFORATED PIPE 8" CONCRETE WALL BLOCKING Originator Job # Date Size Drawing # Revision # Scale Drawn By Specific Notes Gneral Notes Courset Project Name Sheet Title 1" = 1'-0" Project Name HILL HOUSE KE ZHANG Author A 4.2 11/14/12 KEYWALL SECTION SCALE : 1”=1’-0” HORIZONTAL STEEL VERTICAL REINFORCING STEEL 2% 0’ 1’ 2’ 4’ 8’
  • 36. MC Medical Community Center 04 Yapmp Valley Medical Center has asked for assistance with the repurposing of the existing building. The hospital is looking to the future and developing a trategy to meet the needs of the diverse community served. It is determined that the facility will serve as an outpatient pavillion and provide community served. It is deter- mined that the facility will serve as an outpatient pavilion and provide a holistic approach to health and wellness. Several services currently provided in the hospital and adjacent medical office building will be relocated to suport this vision.
  • 39. Women Center Cancer Center Universal Clinic New Programs and Circulation Public Private Existing Building Envelop : Public Space VS. Private Space Expandable Side Expandable Spaces
  • 40. N Annual Flower Noxious Weeds Marjuana plant Herbaceous Plant Plants on the site Site Plan