Lightning Protection: Securing Higher
Reliability and Meeting the New Standards
Sandia National Laboratories – 2016 Wind Turbine Blade Workshop
EMPOWERING YOU TO TAKE CHARGE Kim Bertelsen – Global Lightning Protection Services A/S
OUTLINE
1. Introduction
2. News on IEC 61400-24
3. Lightning Damage Analysis
4. Explanations on failure mechanisms
5. Robustness in design
6. Lightning Monitoring
7. Conclusions
We are a full service provider in Lightning
We provide solutions for:
Wind Energy AerospaceBuildings
and Plants
We are a global provider
We offer lightning solutions
for mission critical industries
and international customers.
• Established in 2007
• 42 employees
• Present in Denmark, China and USA
Our services & solutions
Infield
Inspection
Services
Engineering
Projects
Laboratory
Testing
High
Quality
Solutions
EMPOWERING YOU TO TAKE CHARGE
Lightning is predictable, controllable
and the risk is preventable.
IEC 61400-24
Wind turbines – Part 24 Lightning Protection
The	1st	edition	was	published	in	2010,	2nd	version	will	be	issued	as	a	Committee	Draft	
(CD)	in	October	2016	following	the	next	meeting	in	Lisbon,	Portugal
• Test	is	becoming	mandatory	including	High-voltage	test	and	High-current	physical	
damage	testing	– not	only	for	blades	but	for	the	entire	wind	turbine	application.
• Description	of	similarity	parameters	between	blade	types,	where	the	same	LP	system	
can	be	used	across	a	blade	family	without	requiring	retesting
• The	standard	includes	blade	exposure	definitions,	based	on	published	field	data
• Blade	zoning/Environmental	definitions	is	required
• Definition	of	lifetime	is	required
• Recognition	of	numerical	simulation,	but	requirements	for	modelling	verification
• Improved	risk	assessment	guidelines	including	winter	lightning	and	upward	initiated	
strikes.	
• Requirements	for	Lightning	Monitoring	– if	included
News on IEC 61400-24
Lightning Damages
Analysis
508 wind turbines (total power 997 MW) during 5
years operation in central USA
Blade length: 35 – 45 m; 304 damages
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Total	damages
Distance	 from	the	 tip	[m]
Fiberglass	blades
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Total	damages
Distance	 from	the	 tip	[m]
Fiberglass/CFC	blades
Source:	Anna	Candela	Garolera	et	al,	IEEE	paper
Lightning Damages
Analysis
§ Minor surface erosion on receptor
§ should be recorded as successful strikes.
§ This type of impact is not regarded as a damage,
but as wear and tear
§ The receptor itself needs to be replaced in time
§ Shells will need to be restored
§ Receptor durability and replaceability can be an
issue on severe sites with high lightning activity
Lightning Damages
Analysis
§ Damage in front of the tip receptor
§ Caused by insufficient insulation of
tip receptor parts inside the tip
§ Easy to repair, but difficult to
improve to avoid repetition.
Lightning Damages
Analysis
§ Most common damage close to the tip
§ Caused by insufficient insulation of
conductor system
§ Relatively easy to repair
§ Often the lightning system is left as it
was – resulting in same damage again
Lightning Damages
Analysis
§ Attachment through shell to lightning
cable - Shell delamination
§ Caused by insufficient insulation of
conductor system
§ Relatively easy to repair
§ Often the lightning system is left as it
was – resulting in same damage again
Lightning Damages
Analysis
§ More severe damage with broken
carbon structure
§ Caused by flash-over from lightning
cable to carbon structure – due to
missing coordination between the two
systems
§ Shells are detached requiring
significant repair work – eventually the
blade needs to be replaced
§ Difficult to improve system during
repair for avoiding repetition
Lightning Damages
Analysis
§ Strike to lightning cable through blade
shell resulting in trailing edge
delamination due to high pressure
inside the blade.
§ Caused by insufficient insulation of
conductor system
§ Significant repair
§ Difficult to improve system during
repair for avoiding repetition
Lightning Damages
Analysis
§ The analysis shows the distribution of
the lightning damages according to the
damage types described above.
§ It is observed that the most common
type of lightning damage is
delamination, followed by debonding
of the shells.
§ The shell- and tip detachment
occurred only in 2.8% of the cases.
Lightning Damages
Analysis
§ The analysis shows the distribution of
the lightning damages according to the
damage types described above.
§ It is observed that the most common
type of lightning damage is
delamination, followed by debonding
of the shells.
§ The shell- and tip detachment
occurred only in 2.8% of the cases.
Explanations on failure
mechanisms
§ The lightning event is divided into different stages:
§ Leader Inception – where the turbine develops
leaders due to high electric fields – and send
out leaders toward the incoming lightning.
§ Leaders Interception – where an incepted
leader connects with an cloud leader
§ Current conduction Phase
§ First Return Stroke
§ Subsequent Return strokes
§ Long Duration Stroke
Explanations on failure
mechanisms
Downward initiated strikes
Charging Inception Current conduction
Explanations on failure
mechanisms
Upward initiated strikes
Explanations on failure
mechanisms
§ Likelihood of upward lightning
increases with turbine effective
height
§ Often triggered by intra cloud
discharges
§ Will not appear on public
lightning detection and is
therefore not included in i.e.
§ NLDN from Vaisala
Explanations on failure
mechanisms
§ The root cause of most lightning damages are
lightning leader initiation from internal parts –
and not only from intended receptors
Down	condutorWeb/spar
Tip	receptor	base Tip	receptor
Initial	leader
Cable	overlamination
Explanations on failure
mechanisms
§ In testing the same
phenomenon is seem
like this
Explanations on failure
mechanisms
§ Or like this……
§ In this area there is no
receptors at all
Robustness in design
What is robustness?
§ Step 1:
§ We need to implement a LP system where the internal conductive part cannot
incept streamers – which requires careful insulation coordination
§ Only receptors can incept streamers – if the system should work.
§ The LP system needs to pass all high-voltage strike attachment tests and High-
current physical damage tests – to show a strong tip receptor design – as well as
a strong down conductor/interconnector system.
§ Step 2:
§ Robust LP systems need to be well tested to the limits - and beyond to define
design margins.
§ Lifetime tests must be carried out to document that no degradation is taking place
on non-replaceable parts – and to document wear and tear
§ The LP system needs to be maintained regularly based on life time definitions –
and based on accumulated impacts to the specific blade.
Robustness in design
Blade Zoning
§ GLPS has suggested a blade zoning concept to focus the efforts to the
near-tip area.
Robustness in design
GLPS solutions are inherently robust – and are designed and tested to be
electrically independent on the blade structure.
§ Fully tested, meeting the requirements in the future IEC standards:
§ 200 kA
§ 10 MJ/Ω
§ 3.500 C
§ On request a GLPS solution can meet extended requirements for longer life
time or i.e. winter lightning conditions
§ +200 kA
§ 20 MJ/Ω
§ 25.000 C
§ GLPS solutions comes with a component certificate and should always be
certified together with the specific blade type – new or existing.
Carbon- and Complex blades
§ Carbon blades and complex blade including sensors, deicing systems etc.
needs special attention.
§ No other electrical systems in the blade can be kept floating, but needs to be
carefully integrated into the lightning system.
Robustness in design
§ The tip solution should ideally be a premanufactured component, that utilizes
all the insulation and conductions capabilities need to demonstrate
robustness in test and real life operation.
Robustness in design
§ GLPS tip
Robustness in design
§ GLPS side receptor
Robustness in
design
§ The tip LP system tested
as a naked system without
blade shells.
§ The same test program as
for a final verification test
needs to be followed and
passed.
§ Here attachment to the
tip receptor
Robustness in
design
§ And here attachment to
the side receptor
Robustness in design
§ LP system implemented in a blade tip
Robustness in design
§ Glue is applied….
Robustness in design
§ Retrofit job almost done….
Robustness in design
§ Final verification test
Lightning Monitoring
Lightning Key Data® System
§ Avoid unnecessary inspections and
expensive downtime
§ Lightning Key Data® System measures
the lightning key figures when it strikes
and provides you with valuable data for
making the best decisions.
§ Peak current [kA]
§ Specific Energy [MJ/Ω]
§ Charge content [C]
§ Maximum rise time [kA/μs]
Lightning Monitoring
GPS	Antenna Power	Supply
SPDs
Power	supply	entry
Heavy	EMC	box
Comm.	output
Recorder	PCB
Sensor	cables	entry
Amplifiers Sensor	shielding	clamps
Lightning Monitoring
§ Measurement characteristics
§ Current amplitude: +/- 240kA
§ Frequency range (-3dB range): 30mHz - 1MHz
§ Sampling frequency: 10MHz
§ Time frame recorded: 1.5s
§ Length of recorded waveform: 15M samples
§ Trigger level: Adjustable
§ Pre trigger: 100ms
§ Measurement resolution: 16bit
§ Time stamp accuracy: GPS/1ms
§ Backup of data to internal industrial grade SD card
§ Four characteristic parameters calculated from the full waveform
§ Full data set available after each measurement
§ Continuous measurement in full resolution of two subsequent events
§ Recording of all three channels simultaneously
Lightning Monitoring
§ The control unit is supposed to be
installed in the hub – or in one of the
blade roots.
§ The sensors can be installed in
different positions depending on the
LP systems configuration
§ Inside blade root on down
conductor
§ On transfer system
§ Around blade
Lightning Monitoring
§ Final verification test
Lightning Monitoring
§ Parameter output
Lightning Monitoring
§ Parameter plots
Conclusions
§ Lightning is predictable, controllable and the risk is preventable.
§ A new version of the lightning standard IEC 61400-24 will be released soon.
§ Damages most often occurs to the outermost 1m of the blade, why this should be the
focus. The rest of the blade should not be forgotten – but protection is not so demanding.
§ Robustness in LP systems can be achieved in a good combination between design and
verification.
§ Blade with carbon fiber and complex blades with sensors and deicing systems needs
special attention
§ Online lightning monitoring is available
EMPOWERING YOU TO TAKE CHARGEThank you!
EMPOWERING YOU TO TAKE CHARGE
Contact us
Global Lightning
Protection Services A/S
HI-Park 445
DK-7400 Herning
Denmark
contact@global-lightning.com
+45 70 26 02 11
global-lightning.com

More Related Content

What's hot

Parte 1-nova-nr-12-roque
Parte 1-nova-nr-12-roqueParte 1-nova-nr-12-roque
Parte 1-nova-nr-12-roquePedro William
 
treinamento lixadeira
treinamento lixadeira treinamento lixadeira
treinamento lixadeira Ane Costa
 
Nr 12 - Principais tópicos
Nr 12 - Principais tópicosNr 12 - Principais tópicos
Nr 12 - Principais tópicosCIESP Oeste
 
48062868-Ficha-seguranca-rebarbadora.pdf
48062868-Ficha-seguranca-rebarbadora.pdf48062868-Ficha-seguranca-rebarbadora.pdf
48062868-Ficha-seguranca-rebarbadora.pdftjoana
 
NR-12 - Apresentacao.ppt
NR-12 - Apresentacao.pptNR-12 - Apresentacao.ppt
NR-12 - Apresentacao.pptBeatrizBauer2
 
NR13 Comentada e Atualizada.pdf
NR13 Comentada e Atualizada.pdfNR13 Comentada e Atualizada.pdf
NR13 Comentada e Atualizada.pdfssuser22319e
 
Treinamento trabalho em altura
Treinamento trabalho em altura Treinamento trabalho em altura
Treinamento trabalho em altura Hamilton Boss
 
NR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.ppt
NR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.pptNR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.ppt
NR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.pptCLADESGOMES1
 
Nr 12 (atualizada 2010)
Nr 12 (atualizada 2010)Nr 12 (atualizada 2010)
Nr 12 (atualizada 2010)Luiz Gustavo
 
Acidente com Lixadeira
Acidente com LixadeiraAcidente com Lixadeira
Acidente com Lixadeiraprevencaonline
 
movimentação e amarração de postes
movimentação e amarração de postesmovimentação e amarração de postes
movimentação e amarração de postesPedroHenriqueLimaSan1
 
NR 18 - carpintaria - serra circula.pdf
NR 18 - carpintaria - serra circula.pdfNR 18 - carpintaria - serra circula.pdf
NR 18 - carpintaria - serra circula.pdfLeandroSantos439837
 

What's hot (20)

Parte 1-nova-nr-12-roque
Parte 1-nova-nr-12-roqueParte 1-nova-nr-12-roque
Parte 1-nova-nr-12-roque
 
treinamento lixadeira
treinamento lixadeira treinamento lixadeira
treinamento lixadeira
 
Nr 12 - Principais tópicos
Nr 12 - Principais tópicosNr 12 - Principais tópicos
Nr 12 - Principais tópicos
 
Treinamento Retro.pdf
Treinamento Retro.pdfTreinamento Retro.pdf
Treinamento Retro.pdf
 
48062868-Ficha-seguranca-rebarbadora.pdf
48062868-Ficha-seguranca-rebarbadora.pdf48062868-Ficha-seguranca-rebarbadora.pdf
48062868-Ficha-seguranca-rebarbadora.pdf
 
11-Curso-NR-12-Básico.pdf
11-Curso-NR-12-Básico.pdf11-Curso-NR-12-Básico.pdf
11-Curso-NR-12-Básico.pdf
 
NR-12 - Apresentacao.ppt
NR-12 - Apresentacao.pptNR-12 - Apresentacao.ppt
NR-12 - Apresentacao.ppt
 
NR13 Comentada e Atualizada.pdf
NR13 Comentada e Atualizada.pdfNR13 Comentada e Atualizada.pdf
NR13 Comentada e Atualizada.pdf
 
Wind Turbine Inspection
Wind Turbine InspectionWind Turbine Inspection
Wind Turbine Inspection
 
Treinamento trabalho em altura
Treinamento trabalho em altura Treinamento trabalho em altura
Treinamento trabalho em altura
 
Apresentação nr12-senai-rev.052
Apresentação nr12-senai-rev.052Apresentação nr12-senai-rev.052
Apresentação nr12-senai-rev.052
 
Treinamento nr 12
Treinamento nr 12Treinamento nr 12
Treinamento nr 12
 
Acidente lixadeira
Acidente lixadeiraAcidente lixadeira
Acidente lixadeira
 
NR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.ppt
NR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.pptNR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.ppt
NR 12 - SEGURANÇA NO TRABALHO EM MÁQUINAS E EQUIPAMENTOS - Copia.ppt
 
sxdsaasTreinamento lixadeira
sxdsaasTreinamento lixadeirasxdsaasTreinamento lixadeira
sxdsaasTreinamento lixadeira
 
Nr 12 (atualizada 2010)
Nr 12 (atualizada 2010)Nr 12 (atualizada 2010)
Nr 12 (atualizada 2010)
 
Acidente com Lixadeira
Acidente com LixadeiraAcidente com Lixadeira
Acidente com Lixadeira
 
NR 12.pdf
NR 12.pdfNR 12.pdf
NR 12.pdf
 
movimentação e amarração de postes
movimentação e amarração de postesmovimentação e amarração de postes
movimentação e amarração de postes
 
NR 18 - carpintaria - serra circula.pdf
NR 18 - carpintaria - serra circula.pdfNR 18 - carpintaria - serra circula.pdf
NR 18 - carpintaria - serra circula.pdf
 

Viewers also liked

Keeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric metersKeeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric metersWindpower Engineering & Development
 
Lightning protection of windmill
Lightning protection of windmill Lightning protection of windmill
Lightning protection of windmill AKHIL G
 
Lightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishraLightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishraAmbuj Mishra
 
Blade Maintenance: Observations from the Field and Practical Solutions
Blade Maintenance: Observations from the Field and Practical SolutionsBlade Maintenance: Observations from the Field and Practical Solutions
Blade Maintenance: Observations from the Field and Practical SolutionsWindpower Engineering & Development
 
A study of transient characteristics of an actual wind turbine grounding syst...
A study of transient characteristics of an actual wind turbine grounding syst...A study of transient characteristics of an actual wind turbine grounding syst...
A study of transient characteristics of an actual wind turbine grounding syst...duncans50
 
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...Thorne & Derrick International
 
Full-field inspection of utility scale wind turbine blade
Full-field inspection of utility scale wind turbine blade Full-field inspection of utility scale wind turbine blade
Full-field inspection of utility scale wind turbine blade PEYMAN POOZESH
 
Construction d'un parc éolien
Construction d'un parc éolienConstruction d'un parc éolien
Construction d'un parc éolienJoyeux Nain
 
SEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water QsSEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water QsChen Yugin
 
Ppt 2 blue design
Ppt 2 blue designPpt 2 blue design
Ppt 2 blue designabin k raju
 
Erico Eritech Lightning Protection - IEC62305 Earthing Design Guide
Erico Eritech Lightning Protection - IEC62305 Earthing Design GuideErico Eritech Lightning Protection - IEC62305 Earthing Design Guide
Erico Eritech Lightning Protection - IEC62305 Earthing Design GuideThorne & Derrick International
 
Lightning protection and ground solutions for wireless networks
Lightning protection and ground solutions for wireless networksLightning protection and ground solutions for wireless networks
Lightning protection and ground solutions for wireless networksComms Connect
 
Mechanical & electrical engineering
Mechanical & electrical engineeringMechanical & electrical engineering
Mechanical & electrical engineeringZheng Chee Cham
 
Windmills in Greece
Windmills in GreeceWindmills in Greece
Windmills in GreeceNikos
 
Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]R. Bambang Widiatmoko
 
Electrical maintenance engineer kpi
Electrical maintenance engineer kpiElectrical maintenance engineer kpi
Electrical maintenance engineer kpiqewtiret
 

Viewers also liked (20)

Keeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric metersKeeping turbines and workers safe with lightning diverters and electric meters
Keeping turbines and workers safe with lightning diverters and electric meters
 
Lightning detection - strategies for monitoring & integrating into a blade ma...
Lightning detection - strategies for monitoring & integrating into a blade ma...Lightning detection - strategies for monitoring & integrating into a blade ma...
Lightning detection - strategies for monitoring & integrating into a blade ma...
 
Lightning protection of windmill
Lightning protection of windmill Lightning protection of windmill
Lightning protection of windmill
 
Lightning Protection for Wind Turbines
Lightning Protection for Wind TurbinesLightning Protection for Wind Turbines
Lightning Protection for Wind Turbines
 
Lightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishraLightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishra
 
Lightning protection
Lightning protectionLightning protection
Lightning protection
 
Blade Maintenance: Observations from the Field and Practical Solutions
Blade Maintenance: Observations from the Field and Practical SolutionsBlade Maintenance: Observations from the Field and Practical Solutions
Blade Maintenance: Observations from the Field and Practical Solutions
 
A study of transient characteristics of an actual wind turbine grounding syst...
A study of transient characteristics of an actual wind turbine grounding syst...A study of transient characteristics of an actual wind turbine grounding syst...
A study of transient characteristics of an actual wind turbine grounding syst...
 
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
 
Full-field inspection of utility scale wind turbine blade
Full-field inspection of utility scale wind turbine blade Full-field inspection of utility scale wind turbine blade
Full-field inspection of utility scale wind turbine blade
 
Construction d'un parc éolien
Construction d'un parc éolienConstruction d'un parc éolien
Construction d'un parc éolien
 
SEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water QsSEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water Qs
 
Ppt 2 blue design
Ppt 2 blue designPpt 2 blue design
Ppt 2 blue design
 
LED Lighting Protection
LED Lighting ProtectionLED Lighting Protection
LED Lighting Protection
 
Erico Eritech Lightning Protection - IEC62305 Earthing Design Guide
Erico Eritech Lightning Protection - IEC62305 Earthing Design GuideErico Eritech Lightning Protection - IEC62305 Earthing Design Guide
Erico Eritech Lightning Protection - IEC62305 Earthing Design Guide
 
Lightning protection and ground solutions for wireless networks
Lightning protection and ground solutions for wireless networksLightning protection and ground solutions for wireless networks
Lightning protection and ground solutions for wireless networks
 
Mechanical & electrical engineering
Mechanical & electrical engineeringMechanical & electrical engineering
Mechanical & electrical engineering
 
Windmills in Greece
Windmills in GreeceWindmills in Greece
Windmills in Greece
 
Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]
 
Electrical maintenance engineer kpi
Electrical maintenance engineer kpiElectrical maintenance engineer kpi
Electrical maintenance engineer kpi
 

Similar to Lightning Protection: Securing Higher Reliability and Meeting the New Standards

Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DCMahesh Chandra Manav
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Mahesh Chandra Manav
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsMahesh Chandra Manav
 
Design_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptDesign_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptSelvaPriyaAEEE2020
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Electrical safety presentation by jmv railway and invitation ireee2019 at ...
Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...
Electrical safety presentation by jmv railway and invitation ireee2019 at ...Mahesh Chandra Manav
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERRitesh Kumawat
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41Habib Ali Khan
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lpsMahesh Chandra Manav
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear StandardsBryan Johnson
 
SOLAR PART 2 (1)-SHOW.ppsx
SOLAR PART 2 (1)-SHOW.ppsxSOLAR PART 2 (1)-SHOW.ppsx
SOLAR PART 2 (1)-SHOW.ppsxMohanakumarMP3
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020nacetwincities
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyNSW Environment and Planning
 
Seleccion de cables para vfd
Seleccion de cables para vfdSeleccion de cables para vfd
Seleccion de cables para vfdDaniel García
 
SELECCIÓN DE CABLES PARA VDF
SELECCIÓN DE CABLES PARA VDFSELECCIÓN DE CABLES PARA VDF
SELECCIÓN DE CABLES PARA VDFDaniel García
 

Similar to Lightning Protection: Securing Higher Reliability and Meeting the New Standards (20)

Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DC
 
Ellis Patents Cable Cleats Guide - Black Book
Ellis Patents Cable Cleats Guide - Black BookEllis Patents Cable Cleats Guide - Black Book
Ellis Patents Cable Cleats Guide - Black Book
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
 
PD_Presentation_1.pdf
PD_Presentation_1.pdfPD_Presentation_1.pdf
PD_Presentation_1.pdf
 
Design_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptDesign_of_Power_Transformers.ppt
Design_of_Power_Transformers.ppt
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Electrical safety presentation by jmv railway and invitation ireee2019 at ...
Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...
Electrical safety presentation by jmv railway and invitation ireee2019 at ...
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
Cable tray manual
Cable tray manualCable tray manual
Cable tray manual
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
 
SOLAR PART 2 (1)-SHOW.ppsx
SOLAR PART 2 (1)-SHOW.ppsxSOLAR PART 2 (1)-SHOW.ppsx
SOLAR PART 2 (1)-SHOW.ppsx
 
SOLAR PART 2 (1).pptx
SOLAR PART 2 (1).pptxSOLAR PART 2 (1).pptx
SOLAR PART 2 (1).pptx
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
Seleccion de cables para vfd
Seleccion de cables para vfdSeleccion de cables para vfd
Seleccion de cables para vfd
 
SELECCIÓN DE CABLES PARA VDF
SELECCIÓN DE CABLES PARA VDFSELECCIÓN DE CABLES PARA VDF
SELECCIÓN DE CABLES PARA VDF
 
Ken Lee: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Ken Lee: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopKen Lee: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Ken Lee: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 

More from Sandia National Laboratories: Energy & Climate: Renewables

More from Sandia National Laboratories: Energy & Climate: Renewables (20)

M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339rM4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
 
Sand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lacSand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lac
 
11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt
 
10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS
 
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
 
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
 
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
 
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
 
22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
 
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
 
19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project
 
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
 
17 Salt Reconsolidation
17 Salt Reconsolidation17 Salt Reconsolidation
17 Salt Reconsolidation
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
 
15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project
 
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
 
13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...
 
12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data
 
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
 

Recently uploaded

Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 

Recently uploaded (20)

Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 

Lightning Protection: Securing Higher Reliability and Meeting the New Standards

  • 1. Lightning Protection: Securing Higher Reliability and Meeting the New Standards Sandia National Laboratories – 2016 Wind Turbine Blade Workshop EMPOWERING YOU TO TAKE CHARGE Kim Bertelsen – Global Lightning Protection Services A/S
  • 2. OUTLINE 1. Introduction 2. News on IEC 61400-24 3. Lightning Damage Analysis 4. Explanations on failure mechanisms 5. Robustness in design 6. Lightning Monitoring 7. Conclusions
  • 3. We are a full service provider in Lightning We provide solutions for: Wind Energy AerospaceBuildings and Plants
  • 4. We are a global provider We offer lightning solutions for mission critical industries and international customers. • Established in 2007 • 42 employees • Present in Denmark, China and USA
  • 5. Our services & solutions Infield Inspection Services Engineering Projects Laboratory Testing High Quality Solutions
  • 6. EMPOWERING YOU TO TAKE CHARGE Lightning is predictable, controllable and the risk is preventable.
  • 7. IEC 61400-24 Wind turbines – Part 24 Lightning Protection The 1st edition was published in 2010, 2nd version will be issued as a Committee Draft (CD) in October 2016 following the next meeting in Lisbon, Portugal • Test is becoming mandatory including High-voltage test and High-current physical damage testing – not only for blades but for the entire wind turbine application. • Description of similarity parameters between blade types, where the same LP system can be used across a blade family without requiring retesting • The standard includes blade exposure definitions, based on published field data • Blade zoning/Environmental definitions is required • Definition of lifetime is required • Recognition of numerical simulation, but requirements for modelling verification • Improved risk assessment guidelines including winter lightning and upward initiated strikes. • Requirements for Lightning Monitoring – if included News on IEC 61400-24
  • 8. Lightning Damages Analysis 508 wind turbines (total power 997 MW) during 5 years operation in central USA Blade length: 35 – 45 m; 304 damages 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Total damages Distance from the tip [m] Fiberglass blades 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Total damages Distance from the tip [m] Fiberglass/CFC blades Source: Anna Candela Garolera et al, IEEE paper
  • 9. Lightning Damages Analysis § Minor surface erosion on receptor § should be recorded as successful strikes. § This type of impact is not regarded as a damage, but as wear and tear § The receptor itself needs to be replaced in time § Shells will need to be restored § Receptor durability and replaceability can be an issue on severe sites with high lightning activity
  • 10. Lightning Damages Analysis § Damage in front of the tip receptor § Caused by insufficient insulation of tip receptor parts inside the tip § Easy to repair, but difficult to improve to avoid repetition.
  • 11. Lightning Damages Analysis § Most common damage close to the tip § Caused by insufficient insulation of conductor system § Relatively easy to repair § Often the lightning system is left as it was – resulting in same damage again
  • 12. Lightning Damages Analysis § Attachment through shell to lightning cable - Shell delamination § Caused by insufficient insulation of conductor system § Relatively easy to repair § Often the lightning system is left as it was – resulting in same damage again
  • 13. Lightning Damages Analysis § More severe damage with broken carbon structure § Caused by flash-over from lightning cable to carbon structure – due to missing coordination between the two systems § Shells are detached requiring significant repair work – eventually the blade needs to be replaced § Difficult to improve system during repair for avoiding repetition
  • 14. Lightning Damages Analysis § Strike to lightning cable through blade shell resulting in trailing edge delamination due to high pressure inside the blade. § Caused by insufficient insulation of conductor system § Significant repair § Difficult to improve system during repair for avoiding repetition
  • 15. Lightning Damages Analysis § The analysis shows the distribution of the lightning damages according to the damage types described above. § It is observed that the most common type of lightning damage is delamination, followed by debonding of the shells. § The shell- and tip detachment occurred only in 2.8% of the cases.
  • 16. Lightning Damages Analysis § The analysis shows the distribution of the lightning damages according to the damage types described above. § It is observed that the most common type of lightning damage is delamination, followed by debonding of the shells. § The shell- and tip detachment occurred only in 2.8% of the cases.
  • 17. Explanations on failure mechanisms § The lightning event is divided into different stages: § Leader Inception – where the turbine develops leaders due to high electric fields – and send out leaders toward the incoming lightning. § Leaders Interception – where an incepted leader connects with an cloud leader § Current conduction Phase § First Return Stroke § Subsequent Return strokes § Long Duration Stroke
  • 18. Explanations on failure mechanisms Downward initiated strikes Charging Inception Current conduction
  • 20. Explanations on failure mechanisms § Likelihood of upward lightning increases with turbine effective height § Often triggered by intra cloud discharges § Will not appear on public lightning detection and is therefore not included in i.e. § NLDN from Vaisala
  • 21. Explanations on failure mechanisms § The root cause of most lightning damages are lightning leader initiation from internal parts – and not only from intended receptors Down condutorWeb/spar Tip receptor base Tip receptor Initial leader Cable overlamination
  • 22. Explanations on failure mechanisms § In testing the same phenomenon is seem like this
  • 23. Explanations on failure mechanisms § Or like this…… § In this area there is no receptors at all
  • 24. Robustness in design What is robustness? § Step 1: § We need to implement a LP system where the internal conductive part cannot incept streamers – which requires careful insulation coordination § Only receptors can incept streamers – if the system should work. § The LP system needs to pass all high-voltage strike attachment tests and High- current physical damage tests – to show a strong tip receptor design – as well as a strong down conductor/interconnector system. § Step 2: § Robust LP systems need to be well tested to the limits - and beyond to define design margins. § Lifetime tests must be carried out to document that no degradation is taking place on non-replaceable parts – and to document wear and tear § The LP system needs to be maintained regularly based on life time definitions – and based on accumulated impacts to the specific blade.
  • 25. Robustness in design Blade Zoning § GLPS has suggested a blade zoning concept to focus the efforts to the near-tip area.
  • 26. Robustness in design GLPS solutions are inherently robust – and are designed and tested to be electrically independent on the blade structure. § Fully tested, meeting the requirements in the future IEC standards: § 200 kA § 10 MJ/Ω § 3.500 C § On request a GLPS solution can meet extended requirements for longer life time or i.e. winter lightning conditions § +200 kA § 20 MJ/Ω § 25.000 C § GLPS solutions comes with a component certificate and should always be certified together with the specific blade type – new or existing.
  • 27. Carbon- and Complex blades § Carbon blades and complex blade including sensors, deicing systems etc. needs special attention. § No other electrical systems in the blade can be kept floating, but needs to be carefully integrated into the lightning system.
  • 28. Robustness in design § The tip solution should ideally be a premanufactured component, that utilizes all the insulation and conductions capabilities need to demonstrate robustness in test and real life operation.
  • 30. Robustness in design § GLPS side receptor
  • 31. Robustness in design § The tip LP system tested as a naked system without blade shells. § The same test program as for a final verification test needs to be followed and passed. § Here attachment to the tip receptor
  • 32. Robustness in design § And here attachment to the side receptor
  • 33. Robustness in design § LP system implemented in a blade tip
  • 34. Robustness in design § Glue is applied….
  • 35. Robustness in design § Retrofit job almost done….
  • 36. Robustness in design § Final verification test
  • 37. Lightning Monitoring Lightning Key Data® System § Avoid unnecessary inspections and expensive downtime § Lightning Key Data® System measures the lightning key figures when it strikes and provides you with valuable data for making the best decisions. § Peak current [kA] § Specific Energy [MJ/Ω] § Charge content [C] § Maximum rise time [kA/μs]
  • 39. Lightning Monitoring § Measurement characteristics § Current amplitude: +/- 240kA § Frequency range (-3dB range): 30mHz - 1MHz § Sampling frequency: 10MHz § Time frame recorded: 1.5s § Length of recorded waveform: 15M samples § Trigger level: Adjustable § Pre trigger: 100ms § Measurement resolution: 16bit § Time stamp accuracy: GPS/1ms § Backup of data to internal industrial grade SD card § Four characteristic parameters calculated from the full waveform § Full data set available after each measurement § Continuous measurement in full resolution of two subsequent events § Recording of all three channels simultaneously
  • 40. Lightning Monitoring § The control unit is supposed to be installed in the hub – or in one of the blade roots. § The sensors can be installed in different positions depending on the LP systems configuration § Inside blade root on down conductor § On transfer system § Around blade
  • 41. Lightning Monitoring § Final verification test
  • 44. Conclusions § Lightning is predictable, controllable and the risk is preventable. § A new version of the lightning standard IEC 61400-24 will be released soon. § Damages most often occurs to the outermost 1m of the blade, why this should be the focus. The rest of the blade should not be forgotten – but protection is not so demanding. § Robustness in LP systems can be achieved in a good combination between design and verification. § Blade with carbon fiber and complex blades with sensors and deicing systems needs special attention § Online lightning monitoring is available
  • 45. EMPOWERING YOU TO TAKE CHARGEThank you!
  • 46. EMPOWERING YOU TO TAKE CHARGE
  • 47.
  • 48. Contact us Global Lightning Protection Services A/S HI-Park 445 DK-7400 Herning Denmark contact@global-lightning.com +45 70 26 02 11 global-lightning.com