SlideShare une entreprise Scribd logo
1  sur  43
Télécharger pour lire hors ligne
22/06/2012
Advantages of digital communication
Unlocking the potenitial of diagnostic information
Slide 1
Jeroen Wynants
22/06/2012
OpEx savings maintenance
Source: HPI market data 2003 Gulf publishing company
Instrument & valves
Mechanical equipment
Process equipment
Electrical equipment
22/06/2012
Customer survey and questionnaire
Which maintenance strategy to apply?
22/06/2012
Typical maintenance strategies
Corrective Maintenance
Device is maintained when it failed
> uncontrolled plant shutdowns
Preventive Maintenance
Device is periodically maintained to prevent failures
> controlled but high maintenance intervals
Condition Based Maintenance
Device detects when a maintenance is necessary
and notifies in advance
> controlled and optimized low maintenance intervals
Corrective
Maintenance
Preventive
Maintenance
Condition
based
Maintenance
Consequenceoffailure
Increasing effectiveness and efficiency
Costs
Availability
22/06/2012
Typical maintenance strategies
Corrective Maintenance
Device is maintained when it failed
> uncontrolled plant shutdowns
Preventive Maintenance
Device is periodically maintained to prevent failures
> controlled but high maintenance intervals
Condition Based Maintenance
Device detects when a maintenance is necessary
and notifies in advance
> controlled and optimized low maintenance intervals
Source: ARC Advisory Group
020406080100
Type of maintenance
65%
30%
5%
60% of preventive maintenance activities is unnecessary!
22/06/2012
Condition Based Maintenance
Device detects when a maintenance is necessary
and notifies in advance
-> controlled and optimized low maintenance intervals
Condition based maintenance strategy
Condition
Time
Failure occur
Reduction of
functional
reserve
Condition based
Initialized on condition
(basic diagnosis: diagnosis value 1 device
Pro-Active
Static analysis
‘Reference value’
• evaluation: <,>, =, hyst.,…
Predictive
Dynamic analysis
‘Reference trend’
• extrapolation, time, …
Condition based
Initialized on condition
(advanced diagnosis: correlated diagnostic values)
Pro-Active
Static analysis
‘Reference value’
• evaluation: <, >, =, hyst., .…
• Boolean logic (AND, OR, …)
• Methods algorithms,…
Predictive
Dynamic analysis
‘Reference trend’
• evaluation: <, >, =, hyst., .…
• Boolean logic (AND, OR, …)
• methods, algorithms,…
Condition based
Initialized on condition
(process diagnosis: correlated devices)
Pro-Active
Static analysis
‘Reference value’
• evaluation: <, >, =, hyst., .…
• Boolean logic (AND, OR, …)
• correlation algorithms,…
Predictive
Dynamic analyses
‘Reference trend’
• evaluation: <, >, =, hyst., .…
• Boolean logic (AND, OR, …)
• correlation, algorithms,…
Value
B-E-F
Value
B-E-F
Value
B-E-F
Value
B-E-F
Value
B-E-F
Value
B-E-F
22/06/2012
Service technician
diagnostics in automotive industry
Slide 7
Jaap Westeneng
Driver
Quality Manager
• As detailed as possible
• Includes suggestions for possible
remedies
• All information for safe driving
• Only essential information,
summary messages
• As early as possible
22/06/2012
Maintenance technician Process operator
diagnostics in process industry
Slide 8
Jaap Westeneng
Reliability Manager
• All information for safe operation
• Only essential information,
summary messages
• As early as possible
• As detailed as possible
• Includes suggestions for possible
remedies
22/06/2012
Challenges faced by today
 Difficult to get overview status of process.
 Operators are bombarded with nuisance alarms.
 Inconsistencies in diagnostics information from different
vendors and product classes.
 Different applications, terminals, interfaces with
unsynchronized data.
 Operators are integral part of control loops and need to take
decisions in critical situations.
22/06/2012
Status today
 Large part of the production and quality losses are
primarily result of operator error which can be prevented by
ensuring that the right information is available to the right
person at the right time.
Global process industry loses $ 20 billion, or 5 % of annual
production, due to unscheduled downtime and poor quality.
ARC estimates that almost 80 % of these losses are preventable and
40 % are primarily the result of operator error.
22/06/2012
Purpose of diagnostics
 Analyze status information (i.e. from field devices)
 With the objective of detecting causes for potential
malfunction.
Diagnostics form the basis to remove malfunctions
Value of diagnostics:
 Minimizes ad-hoc maintenance
 Enables proactive maintenance
 Minimizes unwanted plant shutdowns
 Enables event triggered inspections
 Forms the basis for Plant Asset Management
 Reduces costs
22/06/2012
NAMUR NE107
Standardisation of diagnostics
Slide 12
Jeroen Wynants
22/06/2012
NAMUR
NormenArbeitsgemeinschaft für Meß- Und Regeltechnik in der chemischen Industrie
NAMUR is an international association of users of automation in
process industries.
• Membership of NAMUR is open only to companies of the process
industries, provided that these companies are
• Manufacturers of chemical or pharmaceutical products, or
• Users of process plants which bear responsibility for operating these
plants, or
• Providers of services to chemical/pharmaceutical manufacturers
with or without plant operating responsibility;
• Also eligible for membership are organizations with a technical or
scientific purpose, e.g. scientific bodies, associations, universities
etc.
Slide 13
Jeroen Wynants
22/06/2012
NAMUR
 NAMUR promotes the interests of the process industry in the
field of automation
127 member companies
Slide 14
Jeroen Wynants
22/06/2012
NAMUR
• NAMUR promotes the interests of the process industry in the
field of automation, including
• Instrumentation with sensors and actuators
• Batch control, advanced process control, plant and process
monitoring,
• DCS, MES and Logistic systems
• Communication between process control equipment
• Process management, plant asset management and
• Electrical engineering
• Covering the whole plant life cycle from engineering,
procurement, installation, operation, and maintenance right
through to decommissioning,
Slide 15
Jeroen Wynants
22/06/2012
NAMUR Publications
• The results of the work carried out by NAMUR are published:
• In NAMUR recommendations (NE) and worksheets
• In presentations at the Annual General Meeting
• In publications which appear in technical journals
(e.g. atp, at, C&A, ChemManager, CIT, etz, GIT,process , P & A,
Messtech & Automation, SPS-Magazin, tm )
• In speeches made at workshops and conferences organized by
cooperating partners
(ARC, DECHEMA, GMA, GVC, ISA, WIB)
Slide 16
Jeroen Wynants
22/06/2012
NAMUR Recommendations
Slide 17
Jeroen Wynants
Current ranges for signal levels of digital transmitters
NE 43 (1988): Standardization of the Signal Level for Failure
Information
• Discrimination between process and failure information
• P based devices
NE 107 (2005): Self-Monitoring and diagnostics of Field Devices
Diagnostics
• Analyze status information (i.e. from field devices)
• With the objective of detecting causes for potential malfunction.
Diagnostics form the basis to remove malfunctions.
22/06/2012
NAMUR Recommendation NE107
Plant Asset Management - Evolution of diagnostics
NE107 Self-Monitoring and diagnostics of Field Devices
 diagnostics results must be reliable, bad diagnostic is worse
than none at all.
 The diagnostics results must always be viewed in the context of
the application.
 Each diagnostic information must be mapped to one of the four
categories (FMCS)
 The configuration of the mapping between the diagnostic and
the category should be free but predefined.
 The plant operator to see only the status signals.
 Detailed information can be read out by the device specialist.Slide 18
Jeroen Wynants
22/06/2012
NAMUR Categories (FMCS)
 Failure – F
 The device provides a non-valid output signal due to some
malfunction at the device level.
 Maintenance required – M
 Although the device is still able to provide a valid output signal,
the device is about to loose some of its functionality or capability
due to some external operation conditions. The maintenance can
be needed short-term or mid-term.
 Check function – C
 The device is temporary non-valid due to some activities,
maintenance activities on the device
 Off-specification – S
 The Device operates out of the specified measurement range
Slide 19
Jeroen Wynants
22/06/2012
NAMUR recommendations
Maintenance required
Out of specification
Check function
Failure
Diagnostics active
Diagnostics passive
Diagnostic symbols (NE 107)
Slide 20
Jeroen Wynants
22/06/2012
Detailed Device Diagnostics
e.g. Process Automation, Asset Management, Data Acquisition
HART / PROFIBUS / FOUNDATION Fieldbus
Detailed Diagnostic Events
Slide 21
Jeroen Wynants
22/06/2012
e.g. Process Automation, Asset Management, Data Acquisition
HART / PROFIBUS / FOUNDATION Fieldbus
Maintenance
Required Failure
Functional
Check
Out of
Specification
Condensed Status and Diagnostics
Plant Asset Management - Evolution of diagnostics
Slide 22
Jeroen Wynants
22/06/2012
NAMUR recommendations
Instrument diagnostics
e.g. SIL certified devices
(IEC 61508/61511)
Application diagnostics (NE 107)
e.g. Coriolis mass flow meter
Gas bubbles in the liquid, fouling, clogging, erosion, corrosion,
faulty mounting, external vibrations, pulsating flow, incomplete
filling
Application diagnostics are defined for flow -, level -, pressure -,
temperature measurements and control valves
Plant Asset Management - Evolution of diagnostics
Slide 23
Jeroen Wynants
22/06/2012
Connect diagnostic to
one status signal
NAMUR recommendations
On / off switch
diagnostics
Example: mass flowmeter
Coriolis mass flow meter
Gas bubbles in the liquid
Fouling, clogging
Erosion, corrosion
Faulty mounting
Asymmetry of measuring tubes
(dual tube only)
External vibrations
Pulsating flow
Incomplete filling
Application diagnostics (NE 107)
Plant Asset Management - Evolution of diagnostics
Slide 24
Jeroen Wynants
22/06/2012
Communication protocols
Slide 25
Jeroen Wynants
24/10/2012
Products Solutions Services
HART
Technology
Slide 26
Jeroen Wynants
22/06/2012
History
HART: Highway Addressable Remote Transducer
 1986 Developed by Rosemount
 1989 HART communication protocol made an open standard
 1993 Standards developed and supported enabled by HART
Communication Foundation in Austin, Texas, U.S.A
http://www.hartcomm.org
 2007 HART added to IEC-61158 International Standard for Fieldbus
 2008 HART 7 (Wireless) Specifications finalized.
 Most instruments in field today HART 5.
 HART 6 and later require prescribed testing to registration.
22/06/2012
HART facts
 Digital Frequency Shift Keying (FSK) based on the
Bell 202 telephone communication standard
 Transmission speed 1.2 kbit/s >> 1 transaction = 500
ms
 Binary 0 = 2200 Hz, Binary 1 = 1200 Hz
 Simple twisted pair 4-20mA wiring
 Analog channel for fastest possible data transfer of
control signal (main process value)
 Digital channel >> HART based transmission of device
parameters and diagnostic data to and from field
devices
 Frequency modulated signal on the 4-20 mA
current signal modulated
 Serial data transmission
22/06/2012
HART news and highlights
 Field-proven standard used by over 32 million devices around
the world
 Most instruments in field today HART 5 or HART 6
 More and more HART 7 devices are available but at the
moment mostly for WirelessHART communication
 Currently the HCF is working on a NE107 integration for the
HART specification >> improved diagnostics
22/06/2012
Diagnostics
 Acyclic access to diagnostics
 Commands for transmitting diagnostics data
 Command 0 (Read Unique Identifier): Universal Command,
supported by every HART device.
Response Code (2nd Byte): Field Device Malfunction + More Status
available
 Command 48 (Read Additional Transmitter Status): Common
Practice Command, containing the device status
Additional generic device status information
 Command 231: Manufacturer Specific Command
(Endress+Hauser) for transmission of diagnostics data
Transmission of failure number and NE107- Category (MFCS)
22/06/2012
HART topology overview
Controller
Point
to
Point
Multidrop
Remote I/O
Multiplexer
WirelessHART
24/10/2012
Products Solutions Services
PROFIBUS
Technology
Slide 32
Jeroen Wynants
22/06/2012
History
PROFIBUS: PROcess FIeldBUS
 1989 Standards developed and supported enabled by PROFIBUS Nutzer
Organisation (PNO)
http://www.profibus.com
 1995 Founding of PROFIBUS International
 1996 PROFIBUS PA (Process Automation)
 2000 Standard field devices for process automation, Profile 3.0
 2004 PROFIsafe, Condensed status and I&M functions, Profile 3.01
 2008 Device integration, fast parameter transmission, Profile 3.02
 Most instruments in field today have Profile 3.0 as a minimum
22/06/2012
PROFIBUS facts
 Two technologies:
 DP (Decentralized Periphery)
Transmission speed DP: up to 12Mbit/s
 PA (Process Automation)
Transmission speed PA: fixed 31.25kbit/s)
 Simple twisted pair + Shield
 DP: only communication, cable length up to 1200m
 PA: power and communication, cable length up to 1900m non-
ex, up to 1000m
22/06/2012
PROFIBUS news and highlights
 Successful fieldbus with more than 40 million devices
installed (6.8 million in process industries)
 Latest version PA Profile 3.02 introduces the NAMUR NE107:
 Mapping of diagnosis information on standardized and
accepted diagnostic categories (Condensed Status & Diagnosis
Messages)
22/06/2012
Diagnostics
 Continuous transmission of device status (STATUS)
 Event-triggered transmission of device status (diagnostics)
 Slot index for transmitting diagnostics data
Diagnostic
data
…
Calculation
of Status Byte
Calculation
of extended
diagnostics data
1
2
3
Slot
0
1 2 3 25
5
…
Index
0
255…
diagnostics
diagnosticsE
XTENSION
Physical Block
……
PROFIBUS diagnostics
Status (cyclic data exchange)
Diagnostic Parameter:
4 + 1 Byte (Quality code)
22/06/2012
PROFIBUS topology overview
PLC/DCS
Commissioning tool
PROFIBUS DP
T T
T
Remote I/O
T
PROFIBUS PA
24/10/2012
Products Solutions Services
FOUNDATION fieldbus
Technology
Slide 38
Jeroen Wynants
22/06/2012
Fieldbus Foundation
 1994 Standards developed and supported enabled by Fieldbus
Foundation
http://www.fieldbus.org
 1996 FOUNDATION Fieldbus H1
 1998 Registration of first H1 fieldbus products
 1999 High Speed Ethernet (HSE)
 2001 Registration of first HSE linking devices
 2005 Safety Instrumented Functions (SIF)
 2006 Diagnostic Profiles Specification according to NE107
FF History
22/06/2012
FF facts
Two technologies:
 HSE (High Speed Ethernet)
 H1 (Process Automation)
Transmission speed H1: fixed 31.25kbit/s)
 Simple twisted pair + Shield
 H1: power and communication, cable length up to
1900m non-ex, up to 1000m ex
22/06/2012
FF news and highlights
 FF912 introduces the NAMUR NE107:
 Mapping of diagnosis information on standardized and
accepted diagnostic categories (Condensed Status & Diagnosis
Messages)
22/06/2012
 Continuous transmission of device status (STATUS)
 Automatically and used for control (Status Propagation)
 Event-triggered transmission of device status (diagnostics)
 Device diagnostic can be reflected in different parts of a
FOUNDATION Fieldbus device
 Device specific diagnostic parameter
e.g. Transducer Block parameter
 Transducer Error
 Block error
 Alarms
Diagnostics
22/06/2012
FF topology overview
PLC/DCS Commissioning tool
T T
FF H1

Contenu connexe

Tendances

Strategies for Device Approval in China, India, South Korea and Australia
Strategies for Device Approval in China, India, South Korea and AustraliaStrategies for Device Approval in China, India, South Korea and Australia
Strategies for Device Approval in China, India, South Korea and AustraliaApril Bright
 
Design Controls: Building Objective Evidence and Process Architecture to Mee...
Design Controls: Building Objective Evidence and Process Architecture  to Mee...Design Controls: Building Objective Evidence and Process Architecture  to Mee...
Design Controls: Building Objective Evidence and Process Architecture to Mee...April Bright
 
Process and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsProcess and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsArta Doci
 
CAPA: Using Risk-Based Decision-Making Toward Closure
CAPA: Using Risk-Based Decision-Making Toward ClosureCAPA: Using Risk-Based Decision-Making Toward Closure
CAPA: Using Risk-Based Decision-Making Toward ClosureApril Bright
 
Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017
Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017
Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017April Bright
 
UDI: Where Do We Go From Here?
UDI: Where Do We Go From Here?UDI: Where Do We Go From Here?
UDI: Where Do We Go From Here?April Bright
 
TATA ELXSI Medical Devices
TATA ELXSI Medical DevicesTATA ELXSI Medical Devices
TATA ELXSI Medical DevicesHARSH WARDHAN
 
FDA Update and Q&A: UDI
FDA Update and Q&A: UDIFDA Update and Q&A: UDI
FDA Update and Q&A: UDIApril Bright
 
What Is It? Product Development vs. Product Management
What Is It? Product Development vs. Product Management What Is It? Product Development vs. Product Management
What Is It? Product Development vs. Product Management April Bright
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisAnas Momen
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System ValidationEric Silva
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_finalDuy Tan Geek
 
T Jull - Product Development for Point-of-Care Testing Systems
T Jull - Product Development for Point-of-Care Testing SystemsT Jull - Product Development for Point-of-Care Testing Systems
T Jull - Product Development for Point-of-Care Testing SystemsThomas Jull
 
Funding A Medical Device Startup In The Current Economy
Funding A Medical Device Startup In The Current EconomyFunding A Medical Device Startup In The Current Economy
Funding A Medical Device Startup In The Current EconomyMichael Weickert, Ph.D
 
Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...Rigoberto José Meléndez Cuauro
 
Post Market Clinical Surveillance, Experience of the Industry by S. Menzl - ...
Post Market Clinical Surveillance,  Experience of the Industry by S. Menzl - ...Post Market Clinical Surveillance,  Experience of the Industry by S. Menzl - ...
Post Market Clinical Surveillance, Experience of the Industry by S. Menzl - ...qserveconference2013
 
T Jull - Planning your aftersales strategy
T Jull - Planning your aftersales strategyT Jull - Planning your aftersales strategy
T Jull - Planning your aftersales strategyThomas Jull
 
Modernize the Orthopaedic Supply Chain: A Surgeon’s View
Modernize the Orthopaedic Supply Chain: A Surgeon’s ViewModernize the Orthopaedic Supply Chain: A Surgeon’s View
Modernize the Orthopaedic Supply Chain: A Surgeon’s ViewApril Bright
 
CSV - Computer System Validation
CSV - Computer System Validation CSV - Computer System Validation
CSV - Computer System Validation JayaKrishna161
 
Usability Validation Testing of Medical Devices and Software
Usability Validation Testing of Medical Devices and SoftwareUsability Validation Testing of Medical Devices and Software
Usability Validation Testing of Medical Devices and SoftwareUXPA Boston
 

Tendances (20)

Strategies for Device Approval in China, India, South Korea and Australia
Strategies for Device Approval in China, India, South Korea and AustraliaStrategies for Device Approval in China, India, South Korea and Australia
Strategies for Device Approval in China, India, South Korea and Australia
 
Design Controls: Building Objective Evidence and Process Architecture to Mee...
Design Controls: Building Objective Evidence and Process Architecture  to Mee...Design Controls: Building Objective Evidence and Process Architecture  to Mee...
Design Controls: Building Objective Evidence and Process Architecture to Mee...
 
Process and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsProcess and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation Elements
 
CAPA: Using Risk-Based Decision-Making Toward Closure
CAPA: Using Risk-Based Decision-Making Toward ClosureCAPA: Using Risk-Based Decision-Making Toward Closure
CAPA: Using Risk-Based Decision-Making Toward Closure
 
Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017
Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017
Leverage Computational Modeling and Simulation for Device Design - OMTEC 2017
 
UDI: Where Do We Go From Here?
UDI: Where Do We Go From Here?UDI: Where Do We Go From Here?
UDI: Where Do We Go From Here?
 
TATA ELXSI Medical Devices
TATA ELXSI Medical DevicesTATA ELXSI Medical Devices
TATA ELXSI Medical Devices
 
FDA Update and Q&A: UDI
FDA Update and Q&A: UDIFDA Update and Q&A: UDI
FDA Update and Q&A: UDI
 
What Is It? Product Development vs. Product Management
What Is It? Product Development vs. Product Management What Is It? Product Development vs. Product Management
What Is It? Product Development vs. Product Management
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_final
 
T Jull - Product Development for Point-of-Care Testing Systems
T Jull - Product Development for Point-of-Care Testing SystemsT Jull - Product Development for Point-of-Care Testing Systems
T Jull - Product Development for Point-of-Care Testing Systems
 
Funding A Medical Device Startup In The Current Economy
Funding A Medical Device Startup In The Current EconomyFunding A Medical Device Startup In The Current Economy
Funding A Medical Device Startup In The Current Economy
 
Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...Misión, Función y Estructura Organizacional de los Servicios del Departamento...
Misión, Función y Estructura Organizacional de los Servicios del Departamento...
 
Post Market Clinical Surveillance, Experience of the Industry by S. Menzl - ...
Post Market Clinical Surveillance,  Experience of the Industry by S. Menzl - ...Post Market Clinical Surveillance,  Experience of the Industry by S. Menzl - ...
Post Market Clinical Surveillance, Experience of the Industry by S. Menzl - ...
 
T Jull - Planning your aftersales strategy
T Jull - Planning your aftersales strategyT Jull - Planning your aftersales strategy
T Jull - Planning your aftersales strategy
 
Modernize the Orthopaedic Supply Chain: A Surgeon’s View
Modernize the Orthopaedic Supply Chain: A Surgeon’s ViewModernize the Orthopaedic Supply Chain: A Surgeon’s View
Modernize the Orthopaedic Supply Chain: A Surgeon’s View
 
CSV - Computer System Validation
CSV - Computer System Validation CSV - Computer System Validation
CSV - Computer System Validation
 
Usability Validation Testing of Medical Devices and Software
Usability Validation Testing of Medical Devices and SoftwareUsability Validation Testing of Medical Devices and Software
Usability Validation Testing of Medical Devices and Software
 

Similaire à Callibratie onderhoud en communicatie interfaces

Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overviewNidec Corporation
 
First time quality
First time qualityFirst time quality
First time qualityEWI
 
Predictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure GaugesPredictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure GaugesWIKA Instrument, LP
 
What is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoT
What is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoTWhat is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoT
What is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoTEmbitel Technologies (I) PVT LTD
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesalmassa group
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesalmassa group
 
Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...
Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...
Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...Ben Linders
 
Esperanto for Engineers, Technical Talk for Medical Engineers
Esperanto for Engineers, Technical Talk for Medical EngineersEsperanto for Engineers, Technical Talk for Medical Engineers
Esperanto for Engineers, Technical Talk for Medical EngineersPaul Blackett
 
Asset Management,A Maintenance Perspective
Asset Management,A Maintenance PerspectiveAsset Management,A Maintenance Perspective
Asset Management,A Maintenance PerspectiveSunil Rao
 
Company profile Felidae Systems
Company profile Felidae SystemsCompany profile Felidae Systems
Company profile Felidae SystemsManish Jain
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSchneider Electric
 
Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Brian King
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Sergey Mishin
 
Digital productivity is as easy as 1, 2, total insight final
Digital productivity is as easy as 1, 2, total insight finalDigital productivity is as easy as 1, 2, total insight final
Digital productivity is as easy as 1, 2, total insight finalYokogawa1
 
optimizationof production processes
optimizationof production processesoptimizationof production processes
optimizationof production processesSyed Farukh
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)ARC Advisory Group
 

Similaire à Callibratie onderhoud en communicatie interfaces (20)

Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overview
 
First time quality
First time qualityFirst time quality
First time quality
 
Predictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure GaugesPredictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure Gauges
 
What is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoT
What is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoTWhat is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoT
What is Predictive Maintenance? Learn Its Benefits & Role of Industrial IoT
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 
Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...
Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...
Experiences using Root Cause Analysis for Improvement, Ben Linders, European ...
 
Y.Keraron_UPTIMEProject.pdf
Y.Keraron_UPTIMEProject.pdfY.Keraron_UPTIMEProject.pdf
Y.Keraron_UPTIMEProject.pdf
 
Electrical Distribution Maintenance Services Guide
Electrical Distribution Maintenance Services GuideElectrical Distribution Maintenance Services Guide
Electrical Distribution Maintenance Services Guide
 
Esperanto for Engineers, Technical Talk for Medical Engineers
Esperanto for Engineers, Technical Talk for Medical EngineersEsperanto for Engineers, Technical Talk for Medical Engineers
Esperanto for Engineers, Technical Talk for Medical Engineers
 
Asset Management,A Maintenance Perspective
Asset Management,A Maintenance PerspectiveAsset Management,A Maintenance Perspective
Asset Management,A Maintenance Perspective
 
Company profile Felidae Systems
Company profile Felidae SystemsCompany profile Felidae Systems
Company profile Felidae Systems
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equation
 
Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2
 
Df Maint Tutorial
Df Maint TutorialDf Maint Tutorial
Df Maint Tutorial
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
 
Digital productivity is as easy as 1, 2, total insight final
Digital productivity is as easy as 1, 2, total insight finalDigital productivity is as easy as 1, 2, total insight final
Digital productivity is as easy as 1, 2, total insight final
 
optimizationof production processes
optimizationof production processesoptimizationof production processes
optimizationof production processes
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 

Plus de ie-net ingenieursvereniging vzw

Contactloos volume flow meting op transportbanden (ENG.)
Contactloos volume flow meting op transportbanden (ENG.)Contactloos volume flow meting op transportbanden (ENG.)
Contactloos volume flow meting op transportbanden (ENG.)ie-net ingenieursvereniging vzw
 
Hoe maak ik de omgeving van mijn opslagtank veilig efficient
Hoe maak ik de omgeving van mijn opslagtank veilig  efficientHoe maak ik de omgeving van mijn opslagtank veilig  efficient
Hoe maak ik de omgeving van mijn opslagtank veilig efficientie-net ingenieursvereniging vzw
 
Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)ie-net ingenieursvereniging vzw
 
Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)ie-net ingenieursvereniging vzw
 

Plus de ie-net ingenieursvereniging vzw (20)

Ultrasoon_Clamp-on.pdf
Ultrasoon_Clamp-on.pdfUltrasoon_Clamp-on.pdf
Ultrasoon_Clamp-on.pdf
 
Elektromagnetische_debietmeters.pdf
Elektromagnetische_debietmeters.pdfElektromagnetische_debietmeters.pdf
Elektromagnetische_debietmeters.pdf
 
SGS Skybase (NL) .pdf
SGS Skybase (NL) .pdfSGS Skybase (NL) .pdf
SGS Skybase (NL) .pdf
 
VEGA-Radar vs US-26APR2022-NL.pdf
VEGA-Radar vs US-26APR2022-NL.pdfVEGA-Radar vs US-26APR2022-NL.pdf
VEGA-Radar vs US-26APR2022-NL.pdf
 
From process to emission
From process to emissionFrom process to emission
From process to emission
 
Contactloos volume flow meting op transportbanden (ENG.)
Contactloos volume flow meting op transportbanden (ENG.)Contactloos volume flow meting op transportbanden (ENG.)
Contactloos volume flow meting op transportbanden (ENG.)
 
Connecting fieldbus power and knowledge
Connecting fieldbus power and knowledgeConnecting fieldbus power and knowledge
Connecting fieldbus power and knowledge
 
Frequentieregelaars
FrequentieregelaarsFrequentieregelaars
Frequentieregelaars
 
Breekplaten beademingsmachines vlamdover (NED.)
Breekplaten beademingsmachines vlamdover (NED.)Breekplaten beademingsmachines vlamdover (NED.)
Breekplaten beademingsmachines vlamdover (NED.)
 
Veiligheden rond de tank
Veiligheden rond de tankVeiligheden rond de tank
Veiligheden rond de tank
 
Veiligheden rond de tank
Veiligheden rond de tankVeiligheden rond de tank
Veiligheden rond de tank
 
Hima cyber security
Hima cyber securityHima cyber security
Hima cyber security
 
Vik g.haekens-atex risico evaluatie
Vik g.haekens-atex risico evaluatieVik g.haekens-atex risico evaluatie
Vik g.haekens-atex risico evaluatie
 
Hoe maak ik de omgeving van mijn opslagtank veilig efficient
Hoe maak ik de omgeving van mijn opslagtank veilig  efficientHoe maak ik de omgeving van mijn opslagtank veilig  efficient
Hoe maak ik de omgeving van mijn opslagtank veilig efficient
 
Checklist tankcontrole 2018 bacd
Checklist tankcontrole 2018 bacdChecklist tankcontrole 2018 bacd
Checklist tankcontrole 2018 bacd
 
Controle en ingebruikname van uw opslagtank
Controle en ingebruikname van uw opslagtankControle en ingebruikname van uw opslagtank
Controle en ingebruikname van uw opslagtank
 
Certainly not explosive (Eng)
Certainly not explosive (Eng)Certainly not explosive (Eng)
Certainly not explosive (Eng)
 
Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (Nl.)
 
Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)
Elektrische installaties in ruimtes met stofexplosiegevaar (1.3 Mb) (Nl.)
 
Tuev sued-drives-and-controls-2014-presentation
Tuev sued-drives-and-controls-2014-presentationTuev sued-drives-and-controls-2014-presentation
Tuev sued-drives-and-controls-2014-presentation
 

Dernier

Basic overview of nerve conduction studies
Basic overview of nerve conduction studiesBasic overview of nerve conduction studies
Basic overview of nerve conduction studiesDrAbdulAli1
 
Understanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal CodeUnderstanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal CodeBrian Markle
 
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...Sebastiano Panichella
 
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Sebastiano Panichella
 
cse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitycse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitysandeepnani2260
 
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptxerickamwana1
 
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08LloydHelferty
 
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...soumyapottola
 
GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE
 
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityDon't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityApp Ethena
 
Scootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City DeliveryScootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City Deliveryrishi338139
 

Dernier (11)

Basic overview of nerve conduction studies
Basic overview of nerve conduction studiesBasic overview of nerve conduction studies
Basic overview of nerve conduction studies
 
Understanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal CodeUnderstanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal Code
 
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
 
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
 
cse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitycse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber security
 
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
 
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
 
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
 
GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024
 
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityDon't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
 
Scootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City DeliveryScootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City Delivery
 

Callibratie onderhoud en communicatie interfaces

  • 1. 22/06/2012 Advantages of digital communication Unlocking the potenitial of diagnostic information Slide 1 Jeroen Wynants
  • 2. 22/06/2012 OpEx savings maintenance Source: HPI market data 2003 Gulf publishing company Instrument & valves Mechanical equipment Process equipment Electrical equipment
  • 3. 22/06/2012 Customer survey and questionnaire Which maintenance strategy to apply?
  • 4. 22/06/2012 Typical maintenance strategies Corrective Maintenance Device is maintained when it failed > uncontrolled plant shutdowns Preventive Maintenance Device is periodically maintained to prevent failures > controlled but high maintenance intervals Condition Based Maintenance Device detects when a maintenance is necessary and notifies in advance > controlled and optimized low maintenance intervals Corrective Maintenance Preventive Maintenance Condition based Maintenance Consequenceoffailure Increasing effectiveness and efficiency Costs Availability
  • 5. 22/06/2012 Typical maintenance strategies Corrective Maintenance Device is maintained when it failed > uncontrolled plant shutdowns Preventive Maintenance Device is periodically maintained to prevent failures > controlled but high maintenance intervals Condition Based Maintenance Device detects when a maintenance is necessary and notifies in advance > controlled and optimized low maintenance intervals Source: ARC Advisory Group 020406080100 Type of maintenance 65% 30% 5% 60% of preventive maintenance activities is unnecessary!
  • 6. 22/06/2012 Condition Based Maintenance Device detects when a maintenance is necessary and notifies in advance -> controlled and optimized low maintenance intervals Condition based maintenance strategy Condition Time Failure occur Reduction of functional reserve Condition based Initialized on condition (basic diagnosis: diagnosis value 1 device Pro-Active Static analysis ‘Reference value’ • evaluation: <,>, =, hyst.,… Predictive Dynamic analysis ‘Reference trend’ • extrapolation, time, … Condition based Initialized on condition (advanced diagnosis: correlated diagnostic values) Pro-Active Static analysis ‘Reference value’ • evaluation: <, >, =, hyst., .… • Boolean logic (AND, OR, …) • Methods algorithms,… Predictive Dynamic analysis ‘Reference trend’ • evaluation: <, >, =, hyst., .… • Boolean logic (AND, OR, …) • methods, algorithms,… Condition based Initialized on condition (process diagnosis: correlated devices) Pro-Active Static analysis ‘Reference value’ • evaluation: <, >, =, hyst., .… • Boolean logic (AND, OR, …) • correlation algorithms,… Predictive Dynamic analyses ‘Reference trend’ • evaluation: <, >, =, hyst., .… • Boolean logic (AND, OR, …) • correlation, algorithms,… Value B-E-F Value B-E-F Value B-E-F Value B-E-F Value B-E-F Value B-E-F
  • 7. 22/06/2012 Service technician diagnostics in automotive industry Slide 7 Jaap Westeneng Driver Quality Manager • As detailed as possible • Includes suggestions for possible remedies • All information for safe driving • Only essential information, summary messages • As early as possible
  • 8. 22/06/2012 Maintenance technician Process operator diagnostics in process industry Slide 8 Jaap Westeneng Reliability Manager • All information for safe operation • Only essential information, summary messages • As early as possible • As detailed as possible • Includes suggestions for possible remedies
  • 9. 22/06/2012 Challenges faced by today  Difficult to get overview status of process.  Operators are bombarded with nuisance alarms.  Inconsistencies in diagnostics information from different vendors and product classes.  Different applications, terminals, interfaces with unsynchronized data.  Operators are integral part of control loops and need to take decisions in critical situations.
  • 10. 22/06/2012 Status today  Large part of the production and quality losses are primarily result of operator error which can be prevented by ensuring that the right information is available to the right person at the right time. Global process industry loses $ 20 billion, or 5 % of annual production, due to unscheduled downtime and poor quality. ARC estimates that almost 80 % of these losses are preventable and 40 % are primarily the result of operator error.
  • 11. 22/06/2012 Purpose of diagnostics  Analyze status information (i.e. from field devices)  With the objective of detecting causes for potential malfunction. Diagnostics form the basis to remove malfunctions Value of diagnostics:  Minimizes ad-hoc maintenance  Enables proactive maintenance  Minimizes unwanted plant shutdowns  Enables event triggered inspections  Forms the basis for Plant Asset Management  Reduces costs
  • 12. 22/06/2012 NAMUR NE107 Standardisation of diagnostics Slide 12 Jeroen Wynants
  • 13. 22/06/2012 NAMUR NormenArbeitsgemeinschaft für Meß- Und Regeltechnik in der chemischen Industrie NAMUR is an international association of users of automation in process industries. • Membership of NAMUR is open only to companies of the process industries, provided that these companies are • Manufacturers of chemical or pharmaceutical products, or • Users of process plants which bear responsibility for operating these plants, or • Providers of services to chemical/pharmaceutical manufacturers with or without plant operating responsibility; • Also eligible for membership are organizations with a technical or scientific purpose, e.g. scientific bodies, associations, universities etc. Slide 13 Jeroen Wynants
  • 14. 22/06/2012 NAMUR  NAMUR promotes the interests of the process industry in the field of automation 127 member companies Slide 14 Jeroen Wynants
  • 15. 22/06/2012 NAMUR • NAMUR promotes the interests of the process industry in the field of automation, including • Instrumentation with sensors and actuators • Batch control, advanced process control, plant and process monitoring, • DCS, MES and Logistic systems • Communication between process control equipment • Process management, plant asset management and • Electrical engineering • Covering the whole plant life cycle from engineering, procurement, installation, operation, and maintenance right through to decommissioning, Slide 15 Jeroen Wynants
  • 16. 22/06/2012 NAMUR Publications • The results of the work carried out by NAMUR are published: • In NAMUR recommendations (NE) and worksheets • In presentations at the Annual General Meeting • In publications which appear in technical journals (e.g. atp, at, C&A, ChemManager, CIT, etz, GIT,process , P & A, Messtech & Automation, SPS-Magazin, tm ) • In speeches made at workshops and conferences organized by cooperating partners (ARC, DECHEMA, GMA, GVC, ISA, WIB) Slide 16 Jeroen Wynants
  • 17. 22/06/2012 NAMUR Recommendations Slide 17 Jeroen Wynants Current ranges for signal levels of digital transmitters NE 43 (1988): Standardization of the Signal Level for Failure Information • Discrimination between process and failure information • P based devices NE 107 (2005): Self-Monitoring and diagnostics of Field Devices Diagnostics • Analyze status information (i.e. from field devices) • With the objective of detecting causes for potential malfunction. Diagnostics form the basis to remove malfunctions.
  • 18. 22/06/2012 NAMUR Recommendation NE107 Plant Asset Management - Evolution of diagnostics NE107 Self-Monitoring and diagnostics of Field Devices  diagnostics results must be reliable, bad diagnostic is worse than none at all.  The diagnostics results must always be viewed in the context of the application.  Each diagnostic information must be mapped to one of the four categories (FMCS)  The configuration of the mapping between the diagnostic and the category should be free but predefined.  The plant operator to see only the status signals.  Detailed information can be read out by the device specialist.Slide 18 Jeroen Wynants
  • 19. 22/06/2012 NAMUR Categories (FMCS)  Failure – F  The device provides a non-valid output signal due to some malfunction at the device level.  Maintenance required – M  Although the device is still able to provide a valid output signal, the device is about to loose some of its functionality or capability due to some external operation conditions. The maintenance can be needed short-term or mid-term.  Check function – C  The device is temporary non-valid due to some activities, maintenance activities on the device  Off-specification – S  The Device operates out of the specified measurement range Slide 19 Jeroen Wynants
  • 20. 22/06/2012 NAMUR recommendations Maintenance required Out of specification Check function Failure Diagnostics active Diagnostics passive Diagnostic symbols (NE 107) Slide 20 Jeroen Wynants
  • 21. 22/06/2012 Detailed Device Diagnostics e.g. Process Automation, Asset Management, Data Acquisition HART / PROFIBUS / FOUNDATION Fieldbus Detailed Diagnostic Events Slide 21 Jeroen Wynants
  • 22. 22/06/2012 e.g. Process Automation, Asset Management, Data Acquisition HART / PROFIBUS / FOUNDATION Fieldbus Maintenance Required Failure Functional Check Out of Specification Condensed Status and Diagnostics Plant Asset Management - Evolution of diagnostics Slide 22 Jeroen Wynants
  • 23. 22/06/2012 NAMUR recommendations Instrument diagnostics e.g. SIL certified devices (IEC 61508/61511) Application diagnostics (NE 107) e.g. Coriolis mass flow meter Gas bubbles in the liquid, fouling, clogging, erosion, corrosion, faulty mounting, external vibrations, pulsating flow, incomplete filling Application diagnostics are defined for flow -, level -, pressure -, temperature measurements and control valves Plant Asset Management - Evolution of diagnostics Slide 23 Jeroen Wynants
  • 24. 22/06/2012 Connect diagnostic to one status signal NAMUR recommendations On / off switch diagnostics Example: mass flowmeter Coriolis mass flow meter Gas bubbles in the liquid Fouling, clogging Erosion, corrosion Faulty mounting Asymmetry of measuring tubes (dual tube only) External vibrations Pulsating flow Incomplete filling Application diagnostics (NE 107) Plant Asset Management - Evolution of diagnostics Slide 24 Jeroen Wynants
  • 27. 22/06/2012 History HART: Highway Addressable Remote Transducer  1986 Developed by Rosemount  1989 HART communication protocol made an open standard  1993 Standards developed and supported enabled by HART Communication Foundation in Austin, Texas, U.S.A http://www.hartcomm.org  2007 HART added to IEC-61158 International Standard for Fieldbus  2008 HART 7 (Wireless) Specifications finalized.  Most instruments in field today HART 5.  HART 6 and later require prescribed testing to registration.
  • 28. 22/06/2012 HART facts  Digital Frequency Shift Keying (FSK) based on the Bell 202 telephone communication standard  Transmission speed 1.2 kbit/s >> 1 transaction = 500 ms  Binary 0 = 2200 Hz, Binary 1 = 1200 Hz  Simple twisted pair 4-20mA wiring  Analog channel for fastest possible data transfer of control signal (main process value)  Digital channel >> HART based transmission of device parameters and diagnostic data to and from field devices  Frequency modulated signal on the 4-20 mA current signal modulated  Serial data transmission
  • 29. 22/06/2012 HART news and highlights  Field-proven standard used by over 32 million devices around the world  Most instruments in field today HART 5 or HART 6  More and more HART 7 devices are available but at the moment mostly for WirelessHART communication  Currently the HCF is working on a NE107 integration for the HART specification >> improved diagnostics
  • 30. 22/06/2012 Diagnostics  Acyclic access to diagnostics  Commands for transmitting diagnostics data  Command 0 (Read Unique Identifier): Universal Command, supported by every HART device. Response Code (2nd Byte): Field Device Malfunction + More Status available  Command 48 (Read Additional Transmitter Status): Common Practice Command, containing the device status Additional generic device status information  Command 231: Manufacturer Specific Command (Endress+Hauser) for transmission of diagnostics data Transmission of failure number and NE107- Category (MFCS)
  • 33. 22/06/2012 History PROFIBUS: PROcess FIeldBUS  1989 Standards developed and supported enabled by PROFIBUS Nutzer Organisation (PNO) http://www.profibus.com  1995 Founding of PROFIBUS International  1996 PROFIBUS PA (Process Automation)  2000 Standard field devices for process automation, Profile 3.0  2004 PROFIsafe, Condensed status and I&M functions, Profile 3.01  2008 Device integration, fast parameter transmission, Profile 3.02  Most instruments in field today have Profile 3.0 as a minimum
  • 34. 22/06/2012 PROFIBUS facts  Two technologies:  DP (Decentralized Periphery) Transmission speed DP: up to 12Mbit/s  PA (Process Automation) Transmission speed PA: fixed 31.25kbit/s)  Simple twisted pair + Shield  DP: only communication, cable length up to 1200m  PA: power and communication, cable length up to 1900m non- ex, up to 1000m
  • 35. 22/06/2012 PROFIBUS news and highlights  Successful fieldbus with more than 40 million devices installed (6.8 million in process industries)  Latest version PA Profile 3.02 introduces the NAMUR NE107:  Mapping of diagnosis information on standardized and accepted diagnostic categories (Condensed Status & Diagnosis Messages)
  • 36. 22/06/2012 Diagnostics  Continuous transmission of device status (STATUS)  Event-triggered transmission of device status (diagnostics)  Slot index for transmitting diagnostics data Diagnostic data … Calculation of Status Byte Calculation of extended diagnostics data 1 2 3 Slot 0 1 2 3 25 5 … Index 0 255… diagnostics diagnosticsE XTENSION Physical Block …… PROFIBUS diagnostics Status (cyclic data exchange) Diagnostic Parameter: 4 + 1 Byte (Quality code)
  • 37. 22/06/2012 PROFIBUS topology overview PLC/DCS Commissioning tool PROFIBUS DP T T T Remote I/O T PROFIBUS PA
  • 38. 24/10/2012 Products Solutions Services FOUNDATION fieldbus Technology Slide 38 Jeroen Wynants
  • 39. 22/06/2012 Fieldbus Foundation  1994 Standards developed and supported enabled by Fieldbus Foundation http://www.fieldbus.org  1996 FOUNDATION Fieldbus H1  1998 Registration of first H1 fieldbus products  1999 High Speed Ethernet (HSE)  2001 Registration of first HSE linking devices  2005 Safety Instrumented Functions (SIF)  2006 Diagnostic Profiles Specification according to NE107 FF History
  • 40. 22/06/2012 FF facts Two technologies:  HSE (High Speed Ethernet)  H1 (Process Automation) Transmission speed H1: fixed 31.25kbit/s)  Simple twisted pair + Shield  H1: power and communication, cable length up to 1900m non-ex, up to 1000m ex
  • 41. 22/06/2012 FF news and highlights  FF912 introduces the NAMUR NE107:  Mapping of diagnosis information on standardized and accepted diagnostic categories (Condensed Status & Diagnosis Messages)
  • 42. 22/06/2012  Continuous transmission of device status (STATUS)  Automatically and used for control (Status Propagation)  Event-triggered transmission of device status (diagnostics)  Device diagnostic can be reflected in different parts of a FOUNDATION Fieldbus device  Device specific diagnostic parameter e.g. Transducer Block parameter  Transducer Error  Block error  Alarms Diagnostics
  • 43. 22/06/2012 FF topology overview PLC/DCS Commissioning tool T T FF H1