Soumettre la recherche
Mettre en ligne
My Projects
•
Télécharger en tant que PPTX, PDF
•
0 j'aime
•
166 vues
S
sbeeh
Suivre
Signaler
Partager
Signaler
Partager
1 sur 19
Télécharger maintenant
Recommandé
Stm2 tc3 tc4 scope of work part 2
Stm2 tc3 tc4 scope of work part 2
Kosin Tossanaithada
Hafiz Muhammad Bilal
Hafiz Muhammad Bilal
Hafiz Muhammad Bilal
REFERENCE 2015
REFERENCE 2015
Sherif Gabr
Advanced CAE final project
Advanced CAE final project
Mohammad Hejazi
Aa
Aa
Ahmed Mounir
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
Aled Long
Process Simulation using DWSIM
Process Simulation using DWSIM
Naren P.R.
Subsystem Squeak & Rattle Analysis Using Altair’s Squeak and Rattle Director...
Subsystem Squeak & Rattle Analysis Using Altair’s Squeak and Rattle Director...
Altair
Recommandé
Stm2 tc3 tc4 scope of work part 2
Stm2 tc3 tc4 scope of work part 2
Kosin Tossanaithada
Hafiz Muhammad Bilal
Hafiz Muhammad Bilal
Hafiz Muhammad Bilal
REFERENCE 2015
REFERENCE 2015
Sherif Gabr
Advanced CAE final project
Advanced CAE final project
Mohammad Hejazi
Aa
Aa
Ahmed Mounir
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
Aled Long
Process Simulation using DWSIM
Process Simulation using DWSIM
Naren P.R.
Subsystem Squeak & Rattle Analysis Using Altair’s Squeak and Rattle Director...
Subsystem Squeak & Rattle Analysis Using Altair’s Squeak and Rattle Director...
Altair
Top5 initiatives (2)
Top5 initiatives (2)
Jagadish Patra
Bills
Bills
Varun Gupta
Khi 164 revised dt report
Khi 164 revised dt report
Shiraz316
Sap standard pp reports
Sap standard pp reports
ALEJANDRA GONZALEZ GARCIA
Khi 022 revised dt report
Khi 022 revised dt report
Shiraz316
Khi 117 revised dt report
Khi 117 revised dt report
Shiraz316
Khi 087 revised dt report
Khi 087 revised dt report
Shiraz316
Khi 061 revised dt report
Khi 061 revised dt report
Shiraz316
199 Final Report
199 Final Report
Carter Pedersen
Khi 150 revised dt report
Khi 150 revised dt report
Shiraz316
Khi 156 revised dt report
Khi 156 revised dt report
Shiraz316
Parcel c workplan figure 19
Parcel c workplan figure 19
Jonathan Partsch, PG
Khi 078 revised dt report
Khi 078 revised dt report
Shiraz316
Khi 186 revised dt report
Khi 186 revised dt report
Shiraz316
SchlumbergerProjects
SchlumbergerProjects
Jonathan LeSage
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
Sayed Bessat
Europe User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluation
KBC (A Yokogawa Company)
Khi 151 revised dt report
Khi 151 revised dt report
Shiraz316
GTE CoboSafe force and pressure measurement
GTE CoboSafe force and pressure measurement
Gerald Obritzberger
Contenu connexe
Tendances
Top5 initiatives (2)
Top5 initiatives (2)
Jagadish Patra
Bills
Bills
Varun Gupta
Khi 164 revised dt report
Khi 164 revised dt report
Shiraz316
Sap standard pp reports
Sap standard pp reports
ALEJANDRA GONZALEZ GARCIA
Khi 022 revised dt report
Khi 022 revised dt report
Shiraz316
Khi 117 revised dt report
Khi 117 revised dt report
Shiraz316
Khi 087 revised dt report
Khi 087 revised dt report
Shiraz316
Khi 061 revised dt report
Khi 061 revised dt report
Shiraz316
199 Final Report
199 Final Report
Carter Pedersen
Khi 150 revised dt report
Khi 150 revised dt report
Shiraz316
Khi 156 revised dt report
Khi 156 revised dt report
Shiraz316
Parcel c workplan figure 19
Parcel c workplan figure 19
Jonathan Partsch, PG
Khi 078 revised dt report
Khi 078 revised dt report
Shiraz316
Khi 186 revised dt report
Khi 186 revised dt report
Shiraz316
SchlumbergerProjects
SchlumbergerProjects
Jonathan LeSage
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
Sayed Bessat
Europe User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluation
KBC (A Yokogawa Company)
Khi 151 revised dt report
Khi 151 revised dt report
Shiraz316
GTE CoboSafe force and pressure measurement
GTE CoboSafe force and pressure measurement
Gerald Obritzberger
Tendances
(19)
Top5 initiatives (2)
Top5 initiatives (2)
Bills
Bills
Khi 164 revised dt report
Khi 164 revised dt report
Sap standard pp reports
Sap standard pp reports
Khi 022 revised dt report
Khi 022 revised dt report
Khi 117 revised dt report
Khi 117 revised dt report
Khi 087 revised dt report
Khi 087 revised dt report
Khi 061 revised dt report
Khi 061 revised dt report
199 Final Report
199 Final Report
Khi 150 revised dt report
Khi 150 revised dt report
Khi 156 revised dt report
Khi 156 revised dt report
Parcel c workplan figure 19
Parcel c workplan figure 19
Khi 078 revised dt report
Khi 078 revised dt report
Khi 186 revised dt report
Khi 186 revised dt report
SchlumbergerProjects
SchlumbergerProjects
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
Europe User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluation
Khi 151 revised dt report
Khi 151 revised dt report
GTE CoboSafe force and pressure measurement
GTE CoboSafe force and pressure measurement
My Projects
1.
2.
Falling Film Heat
Exchanger Steel Structure
3.
FFHX P&I System
Diagram APC Site
4.
Heat Exchanger Tank
Details APC Site
5.
Conductivity Analyzer Design
APC FFHX Project
6.
Stainless Steel Cable
Ladder Works APC FFHX Project
7.
Filed Control Panel
APC FFHX Project
8.
APC Site Lighting
System APC Site
9.
Control Room (Indication
and Control Units) APC FFHX Project
10.
FRP Pipes Installation
APC FFHX Project
11.
B92 Chiller Utility
Plant 12,000 ton Taibah University-Saudi Arabia
12.
Apsorbtion Chiller 1,000
ton B92 Chiller Utility Plan- Saudi Arabia
13.
Taibah University Project
Store Saudi Arabia
14.
Screening System APC
Screening System
15.
Screening Motor APC
Screening System
16.
Pneumatic Control Valves
APC Screening System
17.
Control Panel APC
Screening System
18.
Crystallizer System APC
System
19.
NUMANN DREDGE APC
Intake
Télécharger maintenant