SlideShare a Scribd company logo
1 of 43
Download to read offline
WASTE WATER AND REUSE
Serra Koz
--
--
OUTLINE
• Hillcrest Housing Association HQ
• The Architect’s House, Gokhle Marg
• PTC Industries LTD. HQ (Upcoming Project)
• Mamak Recycling Centre
CASE STUDY I
HILLCREST HOUSING ASSOCIATION
HEADQUARTERS
Project Data
Project
Type
Commerical
Location
1 Explorer Road,
Technology Park,
Dundee, DD2 1EG
Client
Hillcrest Housing
Association
Date
Completed
December 2010
Project
Value
£5.3m
Architect Nicoll Russell Studios
Main
Contractor
W H Brown
Construction (Dundee)
Ltd
Services
Engineer
Buro Happold
Quantity
Surveyor
KLM Partnership
Specialist
Consultant
CDM Co-ordinator –
Hardies LLP
Gross
Internal
Floor Area
2190 sq. m
Structural
Engineer
Arup Scotland
A new headquarters building intended to reflect the company’s core commitment to
sustainable development and to be an exemplar of ‘environmentally sensitive architecture’.
• modern, open and transparent
• Sustainability
• ‘BREEAM Excellent’ goal
• Flexibility for growing company and departments (Open plan)
Shortlisted for the 2011 RIAS Andrew Doolan Best Building in Scotland Award and awarded a
special mention.
Best Public/ Commercial Building, Best Client and the ‘Supreme’ Award from the Dundee
Institute of Architects, 2011.
LOCATION
• The location was on two separate bus routes, near a cycle route, and with
easy access to the Dundee Freeway for staff coming from the company’s
offices in other parts of Scotland. This way, low-carbon building became
even stronger.
• The proximity of Dundee Freeway caused a noise problem, so ventilation
with opening windows had to be reconsidered.
While office buildings might normally be expected to present a gable end to the south to avoid
over-heating from solar gain, the architects decided after much discussion to orientate the
building on an East-West axis to maximize solar gain in winter, knowing that they could provide
shade from summer sun by simply incorporating fixed external louvers. Manually operated
internal blinds provide occupant control to minimize glare.
ORIENTATION
HEATING AND ELECTRICITY
• A biomass boiler was identified as the main heating
source early on.
• The biomass boiler is located in a separate building to the
west of the main building, to isolate potential fire hazards
from the main building, and to provide easy access from
the car-park level for the lorry delivering woodchips to the
boiler hopper. The building contains the biomass boiler, 2
back-up gas boilers and the filtering equipment and the
heat accumulator.
• Each window on the North and south façades is fitted with
manually operated roller blinds. The glazed West gable is
fitted with mechanically operated blinds triggered by a
light meter.
• The building has also been designed to allow for the future
installation of two 15kW wind turbines.
VENTILATION
• Dynamic energy modelling was carried out to compare the energy consumption for an
air tight mechanically ventilated solution with a naturally ventilated solution.
• The mechanically ventilated solution was found to have lower annual energy
consumption when coupled with an earth tube, natural air conditioning system.
• Earth tubes are a series of buried concrete pipes which pre-heat or cool (depending on
the temperature difference between the external air and ground temperature) the
building’s incoming fresh air before it reaches the building’s air handling unit.
Building Emission Rate of 20.4 kgCO2/m2/year
The design emission rate was 21.7kgCO2/m2/year
• Air is brought into the building through 5 trunk-shaped ducts rising out of the
grass to the back of the building. Low powered fans assist the process. The
air is drawn into a ‘labyrinth’ of 600mm concrete pipes that feed into a brick
chamber which functions on the same principle as a cave – in summer this
will be cooler than the ambient air and in winter warmer, the difference in
temperature being about 3°C. At that stage, if required, the air can be
heated (by the heat generated by the biomass boiler) if required.
ALSO:
• Lamp units throughout the building are low-energy, with daylight control and
occupancy detection to minimize energy consumption.
• Showers, taps and WC’s are designed for low water-consumption. Rain
water is collected from the roof and recycled for use in flushing the toilets.
• SUDS (Sustainable Drainage System) is installed externally.
• The whole building was detailed in order to be demountable for re-use or
recycling.
• The aim of increasing biodiversity helped guide the site planting and
landscaping of the site, with attention paid to choice of native species and
the planting of wildflowers.
• The majority of materials used in the building were Green Guide ‘A’ rated.
This project basically involves finding the
balance between home building and
sustainable environment. The core
concept is targeting an ideal green
project to become a producer and
exporter of resources rather than being a
consumer.
Project Category:
Residential
Lucknow Uttar Pradesh
India
Built up Area (Sq. metre):
548.55 Sq mtrs.
Status:
Completed
THE ARCHITECT’S HOUSE
GOKHLE MARG, LUCKNOW, U.P
Evaluation of self defined spaces – The Zoning
The central circulation core comprising of
staircase and lift automatically defines the public
and private layering of spaces inside the house.
The central core divides the plan into self
containing but interactive spaces.
Enhancing Visual Perception
There are no interior walls except for the
purpose of Toilet/Staircase. Unnecessary
enclosures are eliminated and where
necessary, glass doors are provided to
maintain the visual connection of the
observer.
Living room
Central Staircase
SITE PLANNING
FAÇADE
•South facade with air gap and stone
cladding.
•Reduces solar heat gain from south.
CENTRAL STAIR
•Central stair well acting as
lungs for the entire house.
•Keeps the lower floors of the
house cooler.
Green Roof
•Entire terrace covered with natural grass.
•Restores the green cover and provides insulation.
Sewage Treatment Plant
•Phytorid based technology
Phytorid technology
https://www.youtube.com/watch?v=
O2HGx9fHPA0
•Capacity - 2400 L
Recycled water used for gardening
and washing purposes.
WATER CONSERVATION
WATER CONSERVATION
Rain water harvesting
•4000 L capacity tank
Recycled water used for gardening and washing purposes.
ENERGY CONSERVATION
• LED lighting
•Automated sensor driven technology
60% reduction in lighting loads.
ENERGY CONSERVATION
Solar water heater
Provides up to 500 L hot water per day.
ENERGY CONSERVATION
Solar PV panels
11 KW electricity generation, per day
(assuming 6 hours of average
sunshine/day).
ENERGY CONSERVATION
Variable Refrigerant Volume (VRV) for air
conditioning
40% reduction in air conditioning loads.
ENERGY CONSERVATION
Low e- glass for glazing
Reduces solar heat gain and keeps the interiors cool.
Use of foam concrete blocks (AAC blocks)
MATERIAL CONSERVATION
Eliminates the use of conventional fire burnt
bricks.
PROJECTED SAVINGS
Pocharam campus in Hyderabad, India
April 19, 2012
Types: Public
Awarded Highest LEED Rating: Fourth LEED Platinum rated building at Infosys
PTC INDUSTRIES LTD.
IGBC PLATINUM RATED (APPLIED)
Preserved maximum number of trees, possible.
SITE PLANNING
Cut and Fill
•Earth obtained from excavation of water bodies reused for raising the level as per need, within
the site.
Landscaping
•Top soil stock piled and reused for landscaping. Reduces long term negative effects to the site.
Turf area minimized
•Putting green and fareway green area minimised.
•Turf, plants, shrubs and trees which consume less water and are
resilient to local climatic conditions are used.
Reduces water consumption for irrigation and landscaping.
WATER CONSERVATION
Sewage Treatment Plant
•Phytorid based technology
•Capacity - 15000 L
Recycled water used for: Flushing (660
people present at all times) Irrirgation
(7500 m2) Washing floor (12000 m2).
Water Efficiency: A 48% reduction in overall water
consumption has been achieved in the building
through the use of efficient plumbing fixtures and by
water recycling. 100% of waste water from the
campus will be treated on site, helping in the
reduction of potable water consumption
Rain water harvesting
• Roof top - 12500 m2
• 70% of surface water
Ponds acting as storm water collection pits and landscape features.
ENERGY CONSERVATION
Solar PV panels
•Roof top = 1 MW
•Parking covers = 30 Kw
Self - sufficiency in energy for on- site power generation
and use within the factory building( except heavy
machinery).
Reduces Solar Heat Gain
Reduces Cooling Load
Low e- glass
•AIS geosense - green glass
Insulated sheets to reduce solar heat gain.
Surface sheeting
designed to provide
maximum daylight inside
the workshop.
MATERIAL CONSERVATION
Pre- Engineered Construction
Time - Efficient Energy Efficient Waste reduction.
MAMAK RECYCLING CENTER
BACKGROUND INFORMATION
• Mamak Recycling Center has been founded in 2001, where Mamak
wasteland was located.
• PROBLEMS: The smell, soil and water contamination, methane explosions.
• Ankara Municipality rented the area to ITC company for 49 years to be
rehabilitated and create a solution for the following years.
PROCESS
• Waste products arrive
• Divided into three categories in automatic systems:
• Biodegradable house wastes
• Directly recyclable waste (plastics, paper
(packaging), glass etc.)
• Remaining waste
• Biodegradable house wastes are transferred to
anaerobic tanks constantly kept at 50-55 degrees for
controlled degradation, therefore methane
production (Biomass System)
• Recyclable waste is transferred to facilities such as
Sisecam etc. to be reused
• Remaining waste is sent to industrial fields, mainly
cement factories to be burnt down and to be used
as energy.
• Methane produced by biodegrading waste is burnt and the energy is used
for producing electricity.
• A fraction of this energy is used for maintaining the tanks’ temperature.
• Biodegrading waste is sold as compost and fertilizer for agricultural purposes.
• The burning motors’ excess energy and overheating is solved by running
cold water through pipes around motors. This hot water is used around the
site for heating personnel facilities and greenhouses, also transferred to Nata
Vega shopping centre and some parts of Yenimahalle for heating.
WHAT IS 53 MEGAWATT?
• It is the energy that can used by 200.000-350.000 people for a year.
• The produced energy used for Ankara electricity mainly for Yenimahalle
region becuase of the location of Mamak Recycling Center.
• Mamak and Sincan Recycling Centers are produced 5% of Ankara
Electricity. Mamak (25.4 mW) Sincan (23.8 mW)
GREENHOUSES
• No-soil agriculture is practiced
• Plants are hanging in canals and getting their
nutritional needs from mineralized water
• Recycled shredded coconut shells are used to trap
water, they serve as soil substitute
• Greenhouse is heated by the methane burning
motors’ cooling water.
• The products are organic and free from pesticides.
There is a beehive for natural pollination.
• Turkey’s only orchid breeding laboratory is located
here.
• https://www.youtube.com/watch?v=6HOgBvTXu3w
REFERENCES
• https://www.ads.org.uk/hillcrest-housing-association-headquarters/
• http://www.nrsarchitects.com/_Hillcrest-HQ.html
• http://www.beepindia.org/sites/default/files/Energy%20efficient
• %20building%20in%20Uttar%20Pradesh%20-%20Arinem.pdf
• http://www.arinem.com/content/architects-house
• http://www.4-traders.com/INFOSYS-LTD-9743342/news/Infosys-Ltd-Infosys-
Hyderabad-Building-Awarded-Highest-LEED-Rating-14281293/
• http://www.itcturkiye.com/tr/mamak-ankara/11920

More Related Content

What's hot

Itc green center gurgaon A2sheet
Itc green center gurgaon A2sheetItc green center gurgaon A2sheet
Itc green center gurgaon A2sheetrohit singh
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case studyInu shakya
 
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTTHESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTMokshika Balana
 
Building automation - Cisco Headquarters
Building automation - Cisco HeadquartersBuilding automation - Cisco Headquarters
Building automation - Cisco HeadquartersPrashanth Dommeti
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case studyAr. Prerna Chouhan
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India Satya Rachakonda
 
Case study prestige tech park and select city walk
Case study   prestige tech park and select city walkCase study   prestige tech park and select city walk
Case study prestige tech park and select city walkMadhu Sagar
 
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGeeva Chandana
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office BuildingsRohan Narvekar
 
Intelligent building case study
Intelligent building case studyIntelligent building case study
Intelligent building case studyHamid Hussain
 
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI AS LIVE CASE STUDY AND INDIAN HAB...
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI  AS LIVE CASE STUDY AND INDIAN HAB...CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI  AS LIVE CASE STUDY AND INDIAN HAB...
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI AS LIVE CASE STUDY AND INDIAN HAB...prateek Dulani
 
Teri university case study
Teri university case studyTeri university case study
Teri university case studyDeepika Verma
 
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal  - CII- Sohrabji Godrej Green Business Centre HyderabadArchitectural Appraisal  - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre HyderabadPrastara Architects
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...Chandana R
 

What's hot (20)

Itc green center gurgaon A2sheet
Itc green center gurgaon A2sheetItc green center gurgaon A2sheet
Itc green center gurgaon A2sheet
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case study
 
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTTHESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
 
Building automation - Cisco Headquarters
Building automation - Cisco HeadquartersBuilding automation - Cisco Headquarters
Building automation - Cisco Headquarters
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case study
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India
 
City center kolkata
City center kolkataCity center kolkata
City center kolkata
 
Case study prestige tech park and select city walk
Case study   prestige tech park and select city walkCase study   prestige tech park and select city walk
Case study prestige tech park and select city walk
 
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
 
GRIHA
GRIHAGRIHA
GRIHA
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office Buildings
 
Intelligent building case study
Intelligent building case studyIntelligent building case study
Intelligent building case study
 
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI AS LIVE CASE STUDY AND INDIAN HAB...
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI  AS LIVE CASE STUDY AND INDIAN HAB...CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI  AS LIVE CASE STUDY AND INDIAN HAB...
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI AS LIVE CASE STUDY AND INDIAN HAB...
 
Teri university case study
Teri university case studyTeri university case study
Teri university case study
 
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal  - CII- Sohrabji Godrej Green Business Centre HyderabadArchitectural Appraisal  - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre Hyderabad
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 
ITC Maurya
ITC MauryaITC Maurya
ITC Maurya
 
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
 
Office case study
Office case studyOffice case study
Office case study
 

Similar to IAED 342-Research Presentation

Green Buildings
Green BuildingsGreen Buildings
Green BuildingsYamini K
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTAnthony Osibajo
 
KENDEDA BUILDING.pptx
KENDEDA BUILDING.pptxKENDEDA BUILDING.pptx
KENDEDA BUILDING.pptxKashif390970
 
Green one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA ProjectGreen one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA ProjectNilanjan Bhowal
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case StudyAjayashKekan
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EBArn Akbarieh
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaAnchal Garg
 
Sustainable Development in Architecture
Sustainable Development in ArchitectureSustainable Development in Architecture
Sustainable Development in ArchitectureGargi Bhatele
 
Enviroment and sustainablity of buildings
Enviroment and sustainablity of buildingsEnviroment and sustainablity of buildings
Enviroment and sustainablity of buildingstahia130136
 
Green Architecture.pdf
Green Architecture.pdfGreen Architecture.pdf
Green Architecture.pdfMitiksha Jain
 
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...ISCN_Secretariat
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawanShamitha Reddy
 
Bullitt center ,seattle
Bullitt center ,seattleBullitt center ,seattle
Bullitt center ,seattleApurwa Kumari
 
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...Bernard Ammoun
 
cheshire-oaks-summary-guide-april2015
cheshire-oaks-summary-guide-april2015cheshire-oaks-summary-guide-april2015
cheshire-oaks-summary-guide-april2015Paul Glinn
 

Similar to IAED 342-Research Presentation (20)

Green certified buildings
Green certified buildingsGreen certified buildings
Green certified buildings
 
Green Buildings
Green BuildingsGreen Buildings
Green Buildings
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
 
Sustainable
SustainableSustainable
Sustainable
 
KENDEDA BUILDING.pptx
KENDEDA BUILDING.pptxKENDEDA BUILDING.pptx
KENDEDA BUILDING.pptx
 
Green one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA ProjectGreen one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA Project
 
Green building delhi case study
Green building delhi case studyGreen building delhi case study
Green building delhi case study
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case Study
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EB
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
BREEAM
BREEAMBREEAM
BREEAM
 
Sustainable Development in Architecture
Sustainable Development in ArchitectureSustainable Development in Architecture
Sustainable Development in Architecture
 
Enviroment and sustainablity of buildings
Enviroment and sustainablity of buildingsEnviroment and sustainablity of buildings
Enviroment and sustainablity of buildings
 
Green Architecture.pdf
Green Architecture.pdfGreen Architecture.pdf
Green Architecture.pdf
 
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawan
 
Bullitt center ,seattle
Bullitt center ,seattleBullitt center ,seattle
Bullitt center ,seattle
 
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
 
cheshire-oaks-summary-guide-april2015
cheshire-oaks-summary-guide-april2015cheshire-oaks-summary-guide-april2015
cheshire-oaks-summary-guide-april2015
 
Paryavaran bhawan
Paryavaran bhawanParyavaran bhawan
Paryavaran bhawan
 

More from Serra's Art Studio (20)

Hist200
Hist200Hist200
Hist200
 
A1 turkce-makale
A1 turkce-makaleA1 turkce-makale
A1 turkce-makale
 
A1 turkce-ozdegerlendirme
A1 turkce-ozdegerlendirmeA1 turkce-ozdegerlendirme
A1 turkce-ozdegerlendirme
 
Chema Madoz Sergi Yorumu
Chema Madoz Sergi YorumuChema Madoz Sergi Yorumu
Chema Madoz Sergi Yorumu
 
IAED 342-Research Homework
IAED 342-Research HomeworkIAED 342-Research Homework
IAED 342-Research Homework
 
IAED 381-Field Trip Report
IAED 381-Field Trip ReportIAED 381-Field Trip Report
IAED 381-Field Trip Report
 
IAED 221 Case Study
IAED 221 Case StudyIAED 221 Case Study
IAED 221 Case Study
 
IAED 463 Presentation
IAED 463 PresentationIAED 463 Presentation
IAED 463 Presentation
 
IAED 463-Report
IAED 463-ReportIAED 463-Report
IAED 463-Report
 
IAED 322 Term Project-Part 1
IAED 322 Term Project-Part 1IAED 322 Term Project-Part 1
IAED 322 Term Project-Part 1
 
IAED 301 Research Presentation
IAED 301 Research PresentationIAED 301 Research Presentation
IAED 301 Research Presentation
 
COMD 210 Location Description
COMD 210 Location DescriptionCOMD 210 Location Description
COMD 210 Location Description
 
COMD 210 Chocolate Aisle
COMD 210 Chocolate AisleCOMD 210 Chocolate Aisle
COMD 210 Chocolate Aisle
 
ADA 264-Assignment 5
ADA 264-Assignment 5ADA 264-Assignment 5
ADA 264-Assignment 5
 
Mathematical Exploration
Mathematical ExplorationMathematical Exploration
Mathematical Exploration
 
Physics Lab Report 2
Physics Lab Report 2Physics Lab Report 2
Physics Lab Report 2
 
Physics Lab Report 1
Physics Lab Report 1Physics Lab Report 1
Physics Lab Report 1
 
Chemistry Lab Report 2
Chemistry Lab Report 2Chemistry Lab Report 2
Chemistry Lab Report 2
 
Chemistry Lab Report 3
Chemistry Lab Report 3Chemistry Lab Report 3
Chemistry Lab Report 3
 
Chemistry Lab Report 1
Chemistry Lab Report 1Chemistry Lab Report 1
Chemistry Lab Report 1
 

Recently uploaded

8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Availabledollysharma2066
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...amitlee9823
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneLukeKholes
 
Hire 💕 8617697112 Meerut Call Girls Service Call Girls Agency
Hire 💕 8617697112 Meerut Call Girls Service Call Girls AgencyHire 💕 8617697112 Meerut Call Girls Service Call Girls Agency
Hire 💕 8617697112 Meerut Call Girls Service Call Girls AgencyNitya salvi
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introductionsivagami49
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxsuhanimunjal27
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
Hire 💕 8617697112 Meerut Call Girls Service Call Girls Agency
Hire 💕 8617697112 Meerut Call Girls Service Call Girls AgencyHire 💕 8617697112 Meerut Call Girls Service Call Girls Agency
Hire 💕 8617697112 Meerut Call Girls Service Call Girls Agency
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introduction
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 

IAED 342-Research Presentation

  • 1. WASTE WATER AND REUSE Serra Koz -- --
  • 2. OUTLINE • Hillcrest Housing Association HQ • The Architect’s House, Gokhle Marg • PTC Industries LTD. HQ (Upcoming Project) • Mamak Recycling Centre
  • 3. CASE STUDY I HILLCREST HOUSING ASSOCIATION HEADQUARTERS
  • 4. Project Data Project Type Commerical Location 1 Explorer Road, Technology Park, Dundee, DD2 1EG Client Hillcrest Housing Association Date Completed December 2010 Project Value £5.3m Architect Nicoll Russell Studios Main Contractor W H Brown Construction (Dundee) Ltd Services Engineer Buro Happold Quantity Surveyor KLM Partnership Specialist Consultant CDM Co-ordinator – Hardies LLP Gross Internal Floor Area 2190 sq. m Structural Engineer Arup Scotland A new headquarters building intended to reflect the company’s core commitment to sustainable development and to be an exemplar of ‘environmentally sensitive architecture’. • modern, open and transparent • Sustainability • ‘BREEAM Excellent’ goal • Flexibility for growing company and departments (Open plan) Shortlisted for the 2011 RIAS Andrew Doolan Best Building in Scotland Award and awarded a special mention. Best Public/ Commercial Building, Best Client and the ‘Supreme’ Award from the Dundee Institute of Architects, 2011.
  • 5.
  • 6. LOCATION • The location was on two separate bus routes, near a cycle route, and with easy access to the Dundee Freeway for staff coming from the company’s offices in other parts of Scotland. This way, low-carbon building became even stronger. • The proximity of Dundee Freeway caused a noise problem, so ventilation with opening windows had to be reconsidered. While office buildings might normally be expected to present a gable end to the south to avoid over-heating from solar gain, the architects decided after much discussion to orientate the building on an East-West axis to maximize solar gain in winter, knowing that they could provide shade from summer sun by simply incorporating fixed external louvers. Manually operated internal blinds provide occupant control to minimize glare. ORIENTATION
  • 7. HEATING AND ELECTRICITY • A biomass boiler was identified as the main heating source early on. • The biomass boiler is located in a separate building to the west of the main building, to isolate potential fire hazards from the main building, and to provide easy access from the car-park level for the lorry delivering woodchips to the boiler hopper. The building contains the biomass boiler, 2 back-up gas boilers and the filtering equipment and the heat accumulator. • Each window on the North and south façades is fitted with manually operated roller blinds. The glazed West gable is fitted with mechanically operated blinds triggered by a light meter. • The building has also been designed to allow for the future installation of two 15kW wind turbines.
  • 8. VENTILATION • Dynamic energy modelling was carried out to compare the energy consumption for an air tight mechanically ventilated solution with a naturally ventilated solution. • The mechanically ventilated solution was found to have lower annual energy consumption when coupled with an earth tube, natural air conditioning system. • Earth tubes are a series of buried concrete pipes which pre-heat or cool (depending on the temperature difference between the external air and ground temperature) the building’s incoming fresh air before it reaches the building’s air handling unit. Building Emission Rate of 20.4 kgCO2/m2/year The design emission rate was 21.7kgCO2/m2/year
  • 9. • Air is brought into the building through 5 trunk-shaped ducts rising out of the grass to the back of the building. Low powered fans assist the process. The air is drawn into a ‘labyrinth’ of 600mm concrete pipes that feed into a brick chamber which functions on the same principle as a cave – in summer this will be cooler than the ambient air and in winter warmer, the difference in temperature being about 3°C. At that stage, if required, the air can be heated (by the heat generated by the biomass boiler) if required.
  • 10. ALSO: • Lamp units throughout the building are low-energy, with daylight control and occupancy detection to minimize energy consumption. • Showers, taps and WC’s are designed for low water-consumption. Rain water is collected from the roof and recycled for use in flushing the toilets. • SUDS (Sustainable Drainage System) is installed externally. • The whole building was detailed in order to be demountable for re-use or recycling. • The aim of increasing biodiversity helped guide the site planting and landscaping of the site, with attention paid to choice of native species and the planting of wildflowers. • The majority of materials used in the building were Green Guide ‘A’ rated.
  • 11. This project basically involves finding the balance between home building and sustainable environment. The core concept is targeting an ideal green project to become a producer and exporter of resources rather than being a consumer. Project Category: Residential Lucknow Uttar Pradesh India Built up Area (Sq. metre): 548.55 Sq mtrs. Status: Completed THE ARCHITECT’S HOUSE GOKHLE MARG, LUCKNOW, U.P
  • 12.
  • 13. Evaluation of self defined spaces – The Zoning The central circulation core comprising of staircase and lift automatically defines the public and private layering of spaces inside the house. The central core divides the plan into self containing but interactive spaces. Enhancing Visual Perception There are no interior walls except for the purpose of Toilet/Staircase. Unnecessary enclosures are eliminated and where necessary, glass doors are provided to maintain the visual connection of the observer. Living room Central Staircase SITE PLANNING
  • 14. FAÇADE •South facade with air gap and stone cladding. •Reduces solar heat gain from south. CENTRAL STAIR •Central stair well acting as lungs for the entire house. •Keeps the lower floors of the house cooler.
  • 15. Green Roof •Entire terrace covered with natural grass. •Restores the green cover and provides insulation. Sewage Treatment Plant •Phytorid based technology Phytorid technology https://www.youtube.com/watch?v= O2HGx9fHPA0 •Capacity - 2400 L Recycled water used for gardening and washing purposes. WATER CONSERVATION
  • 16. WATER CONSERVATION Rain water harvesting •4000 L capacity tank Recycled water used for gardening and washing purposes.
  • 17. ENERGY CONSERVATION • LED lighting •Automated sensor driven technology 60% reduction in lighting loads.
  • 18. ENERGY CONSERVATION Solar water heater Provides up to 500 L hot water per day.
  • 19. ENERGY CONSERVATION Solar PV panels 11 KW electricity generation, per day (assuming 6 hours of average sunshine/day).
  • 20. ENERGY CONSERVATION Variable Refrigerant Volume (VRV) for air conditioning 40% reduction in air conditioning loads.
  • 21. ENERGY CONSERVATION Low e- glass for glazing Reduces solar heat gain and keeps the interiors cool.
  • 22. Use of foam concrete blocks (AAC blocks) MATERIAL CONSERVATION Eliminates the use of conventional fire burnt bricks.
  • 24. Pocharam campus in Hyderabad, India April 19, 2012 Types: Public Awarded Highest LEED Rating: Fourth LEED Platinum rated building at Infosys PTC INDUSTRIES LTD. IGBC PLATINUM RATED (APPLIED)
  • 25. Preserved maximum number of trees, possible. SITE PLANNING Cut and Fill •Earth obtained from excavation of water bodies reused for raising the level as per need, within the site. Landscaping •Top soil stock piled and reused for landscaping. Reduces long term negative effects to the site.
  • 26. Turf area minimized •Putting green and fareway green area minimised. •Turf, plants, shrubs and trees which consume less water and are resilient to local climatic conditions are used. Reduces water consumption for irrigation and landscaping.
  • 27. WATER CONSERVATION Sewage Treatment Plant •Phytorid based technology •Capacity - 15000 L Recycled water used for: Flushing (660 people present at all times) Irrirgation (7500 m2) Washing floor (12000 m2). Water Efficiency: A 48% reduction in overall water consumption has been achieved in the building through the use of efficient plumbing fixtures and by water recycling. 100% of waste water from the campus will be treated on site, helping in the reduction of potable water consumption
  • 28. Rain water harvesting • Roof top - 12500 m2 • 70% of surface water Ponds acting as storm water collection pits and landscape features.
  • 29.
  • 30. ENERGY CONSERVATION Solar PV panels •Roof top = 1 MW •Parking covers = 30 Kw Self - sufficiency in energy for on- site power generation and use within the factory building( except heavy machinery).
  • 31. Reduces Solar Heat Gain Reduces Cooling Load Low e- glass •AIS geosense - green glass
  • 32. Insulated sheets to reduce solar heat gain. Surface sheeting designed to provide maximum daylight inside the workshop.
  • 33. MATERIAL CONSERVATION Pre- Engineered Construction Time - Efficient Energy Efficient Waste reduction.
  • 34.
  • 36. BACKGROUND INFORMATION • Mamak Recycling Center has been founded in 2001, where Mamak wasteland was located. • PROBLEMS: The smell, soil and water contamination, methane explosions. • Ankara Municipality rented the area to ITC company for 49 years to be rehabilitated and create a solution for the following years.
  • 37. PROCESS • Waste products arrive • Divided into three categories in automatic systems: • Biodegradable house wastes • Directly recyclable waste (plastics, paper (packaging), glass etc.) • Remaining waste • Biodegradable house wastes are transferred to anaerobic tanks constantly kept at 50-55 degrees for controlled degradation, therefore methane production (Biomass System) • Recyclable waste is transferred to facilities such as Sisecam etc. to be reused • Remaining waste is sent to industrial fields, mainly cement factories to be burnt down and to be used as energy.
  • 38. • Methane produced by biodegrading waste is burnt and the energy is used for producing electricity. • A fraction of this energy is used for maintaining the tanks’ temperature. • Biodegrading waste is sold as compost and fertilizer for agricultural purposes. • The burning motors’ excess energy and overheating is solved by running cold water through pipes around motors. This hot water is used around the site for heating personnel facilities and greenhouses, also transferred to Nata Vega shopping centre and some parts of Yenimahalle for heating.
  • 39.
  • 40. WHAT IS 53 MEGAWATT? • It is the energy that can used by 200.000-350.000 people for a year. • The produced energy used for Ankara electricity mainly for Yenimahalle region becuase of the location of Mamak Recycling Center. • Mamak and Sincan Recycling Centers are produced 5% of Ankara Electricity. Mamak (25.4 mW) Sincan (23.8 mW)
  • 41. GREENHOUSES • No-soil agriculture is practiced • Plants are hanging in canals and getting their nutritional needs from mineralized water • Recycled shredded coconut shells are used to trap water, they serve as soil substitute • Greenhouse is heated by the methane burning motors’ cooling water. • The products are organic and free from pesticides. There is a beehive for natural pollination. • Turkey’s only orchid breeding laboratory is located here. • https://www.youtube.com/watch?v=6HOgBvTXu3w
  • 42.
  • 43. REFERENCES • https://www.ads.org.uk/hillcrest-housing-association-headquarters/ • http://www.nrsarchitects.com/_Hillcrest-HQ.html • http://www.beepindia.org/sites/default/files/Energy%20efficient • %20building%20in%20Uttar%20Pradesh%20-%20Arinem.pdf • http://www.arinem.com/content/architects-house • http://www.4-traders.com/INFOSYS-LTD-9743342/news/Infosys-Ltd-Infosys- Hyderabad-Building-Awarded-Highest-LEED-Rating-14281293/ • http://www.itcturkiye.com/tr/mamak-ankara/11920