Assembly line
balancing
INTRODUCTION
Definition of assembly lines
 Assembly line is a sequence of work stations performing a specified
repeated tasks on a product units moving along the line at constant speed.
 Each unit of the product spends the same amount of time in every station,
this time is called cycle time.
 The sequence, in which operations must be performed, follow certain
constraints called precedence relations.
Assembly line balancing (ALB)
 It is the procedure concerning the assignment of tasks to work stations so
that:
• Precedence relations are respected.
• Workstation time do not exceed the cycl time.
• Minimize the total idle time.
Important relations
 Cycle time (C) =
𝐴𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 𝑤𝑜𝑟𝑘𝑖𝑛𝑔 𝑡𝑖𝑚𝑒
𝐶𝑢𝑠𝑡𝑜𝑚𝑒𝑟 𝑑𝑒𝑚𝑎𝑛𝑑 𝑜𝑟 𝑡ℎ𝑒 𝑑𝑒𝑠𝑖𝑟𝑒𝑑 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛
 Theoretical number of work stations (N)=
𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠
𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒
 Theoretical line efficiency =
𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠
𝑁∗𝐶
%
 Balance delay (BD) =1-Efficiency.
 Smoothing index (SI)= (𝑀𝑎𝑥𝑖𝑚𝑢𝑚 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒 − 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒)
2
 SI is preferred to be small and near zero. This indicates a perfect workload
balance.
Goals of ALB
 The ALB problem can be classified to different types according to the
objective as the following:
• Type-1: minimizing the total number of stations.
• Type-2: minimize the number of work stations.
• Type-3: maximize the work load balance.
• Type-E: this type is concerned with maximizing the efficiency of assembly
line by minimizing cycle time and number of stations.
Example
 The example below shows the tasks required for assembly of electric fan
and the time of each task and the precedence relations between tasks.
Code task time
A Assemble frame 3
B Mount switch 1
C Assemble motor housing 3.25
D Mount motor housing in frame 1.2
E Attach blade 0.5
F Assemble and attach safety grill 1
G Attach cord 1
H Test 1.4
A
C
B
D E F
G
H
2
3.25
1
1.2 .5
1
1.4
1
 Daily demand 100 units per day and the available working time is 420
minutes daily.
 Required cycle time (C) =
420
100
= 4.2 minutes/ unit
 Theoretical number of work stations =
𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠
𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒
=
11.35
4.2
=
2.702. (round up to nearest integer number = 3).
Station no. Task Description Predecessors Assigned
time (min)
Remaining
time
1 A
B
G
Assemble Frame
Mount Switch
Attach Cord
-
A
B
2
1
1
2.2
1.2
0.2
2 C Assemble Motor Housing - 3.25 0.95
3 D
E
F
H
Mount motor housing in
frame
Attach Blade
Assemble and attach safety
grill
Test
A,C
D
E
F,G
1.2
0.5
1
1.4
3
2.5
1.5
0.1
Performance criteria of the line
 Actual cycle time (realized cycle time) =4.1
 Line efficiency =
11.35
4.1∗3
= 92.27 %
 SI= 0.98
Thank you

Contenu connexe

Tendances (20)

Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Line balancing
Line balancingLine balancing
Line balancing
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
Line balancing
Line balancingLine balancing
Line balancing
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
07 Line Balancing
07 Line Balancing07 Line Balancing
07 Line Balancing
 
Final line balancing ppt 4
Final line balancing ppt 4Final line balancing ppt 4
Final line balancing ppt 4
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balance
 
Line balancing
Line balancingLine balancing
Line balancing
 
Line balance
Line balanceLine balance
Line balance
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
Time study
Time studyTime study
Time study
 
Ranked Positional Weight Method | Management
Ranked Positional Weight Method | ManagementRanked Positional Weight Method | Management
Ranked Positional Weight Method | Management
 
Line balancing & EOQ
Line balancing & EOQLine balancing & EOQ
Line balancing & EOQ
 
Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)
 
Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)
 

Similaire à Assembly line balancing

04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancingSonali Guha
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222harkesh singh
 
CIM report - final
CIM report - finalCIM report - final
CIM report - finalPraveen S R
 
22d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp0222d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp02Mostafa Kamal
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production managementJoshua Miranda
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEyosefhadiwibowo
 
Integrated fuzzy logic controller for a Brushless DC Servomotor system
Integrated fuzzylogic controller for a Brushless DC Servomotor systemIntegrated fuzzylogic controller for a Brushless DC Servomotor system
Integrated fuzzy logic controller for a Brushless DC Servomotor systemEhab Al hamayel
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.pptxicohos114
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&AMahmoud Eltaweel
 
Modeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeModeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeIAEME Publication
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip BasicsA B Shinde
 

Similaire à Assembly line balancing (20)

Line Balancing (2).pptx
Line Balancing (2).pptxLine Balancing (2).pptx
Line Balancing (2).pptx
 
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCINGPRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
 
04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancing
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
vignesh conference
vignesh conferencevignesh conference
vignesh conference
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
22d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp0222d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp02
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production management
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
 
Integrated fuzzy logic controller for a Brushless DC Servomotor system
Integrated fuzzylogic controller for a Brushless DC Servomotor systemIntegrated fuzzylogic controller for a Brushless DC Servomotor system
Integrated fuzzy logic controller for a Brushless DC Servomotor system
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.ppt
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&A
 
Modeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeModeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and time
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip Basics
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 

Dernier

Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 

Dernier (20)

Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 

Assembly line balancing

  • 2. Definition of assembly lines  Assembly line is a sequence of work stations performing a specified repeated tasks on a product units moving along the line at constant speed.  Each unit of the product spends the same amount of time in every station, this time is called cycle time.  The sequence, in which operations must be performed, follow certain constraints called precedence relations.
  • 3. Assembly line balancing (ALB)  It is the procedure concerning the assignment of tasks to work stations so that: • Precedence relations are respected. • Workstation time do not exceed the cycl time. • Minimize the total idle time.
  • 4. Important relations  Cycle time (C) = 𝐴𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 𝑤𝑜𝑟𝑘𝑖𝑛𝑔 𝑡𝑖𝑚𝑒 𝐶𝑢𝑠𝑡𝑜𝑚𝑒𝑟 𝑑𝑒𝑚𝑎𝑛𝑑 𝑜𝑟 𝑡ℎ𝑒 𝑑𝑒𝑠𝑖𝑟𝑒𝑑 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛  Theoretical number of work stations (N)= 𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒  Theoretical line efficiency = 𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠 𝑁∗𝐶 %  Balance delay (BD) =1-Efficiency.  Smoothing index (SI)= (𝑀𝑎𝑥𝑖𝑚𝑢𝑚 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒 − 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒) 2  SI is preferred to be small and near zero. This indicates a perfect workload balance.
  • 5. Goals of ALB  The ALB problem can be classified to different types according to the objective as the following: • Type-1: minimizing the total number of stations. • Type-2: minimize the number of work stations. • Type-3: maximize the work load balance. • Type-E: this type is concerned with maximizing the efficiency of assembly line by minimizing cycle time and number of stations.
  • 6. Example  The example below shows the tasks required for assembly of electric fan and the time of each task and the precedence relations between tasks. Code task time A Assemble frame 3 B Mount switch 1 C Assemble motor housing 3.25 D Mount motor housing in frame 1.2 E Attach blade 0.5 F Assemble and attach safety grill 1 G Attach cord 1 H Test 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1 1.4 1
  • 7.  Daily demand 100 units per day and the available working time is 420 minutes daily.  Required cycle time (C) = 420 100 = 4.2 minutes/ unit  Theoretical number of work stations = 𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 = 11.35 4.2 = 2.702. (round up to nearest integer number = 3).
  • 8. Station no. Task Description Predecessors Assigned time (min) Remaining time 1 A B G Assemble Frame Mount Switch Attach Cord - A B 2 1 1 2.2 1.2 0.2 2 C Assemble Motor Housing - 3.25 0.95 3 D E F H Mount motor housing in frame Attach Blade Assemble and attach safety grill Test A,C D E F,G 1.2 0.5 1 1.4 3 2.5 1.5 0.1
  • 9. Performance criteria of the line  Actual cycle time (realized cycle time) =4.1  Line efficiency = 11.35 4.1∗3 = 92.27 %  SI= 0.98