SlideShare une entreprise Scribd logo
1  sur  7
Project Overview
   Elementary Building
          Replace Well
          Replace Concrete Walk to outside storage
          Rework drainage in Southeast corner of Pre-school play area
          Upgrade Classroom windows
          Create water seal on building exterior locations
Project Overview
Bond Proposal
Shall Unionville-Sebewaing Area Schools, Tuscola and Huron Counties Michigan, borrow the sum of not
to exceed Five Million Eight Hundred Fifty Thousand Dollars ($5,850,000) and issue its general obligation
unlimited tax bonds therefor, for the purpose of:

Partially remodeling, furnishing and refurnishing, equipping and re-equipping facilities; acquiring,
         installing and equipping educational technology for school facilities; purchasing school buses;
construction and equipping a new running track and developing and improving sites?

                            The following is for informational purposes only:

No millage will be levied for the proposed bonds in 2013, under current law. The maximum number of
years the bonds may be outstanding, exclusive of any refunding, is fourteen (14) years. The estimated
simple average annual millage anticipated to be required to retire this bond debt is 2.97 ($2.97 on each
$1000.00 of taxable valuation)

If the school district borrows from the State to pay debt service on the bonds, the school district may be
required to continue to levy mills beyond the term of the bonds to repay the State.

(Pursuant to State law, expenditure of bond proceeds must be audited, and the proceeds cannot be used
for repair or maintenance costs, teacher, administrator or employee salaries, or other operating
expenses.)
What are the additional costs?
The state has determined your home or property’s taxable value growth to cap at either 5% or the
rate of inflation, whichever is less per year.

*The taxable value of your home is approximately one-half the market value of a home or property.
 See your most recent tax statement for the exact amount of your taxable value.

Calculate your tax investment by diving the taxable value* of your home or property by 1000 and
then multiply the results by the millage levy.

NOTE: One mill = $1.00 per $1,000 of taxable value of a home or property.

          MILLAGE COST TO TAXPAYERS FOR Proposal One is $5,850,000

                                      0                    MILL LEVY INCREASE
     TAXABLE VALUE*               COST/YEAR             COST/MO.           COST/DAY
$               25,000.00     $               -   $                -    $                   -
$               40,000.00     $               -   $                -    $                   -
$               50,000.00     $               -   $                -    $                   -
$               75,000.00     $               -   $                -    $                   -
$              100,000.00     $               -   $                -    $                   -
After Additional Bonding                                                        Before Additional Bonding


   Tax          Mills needed this   Mills needed all
                                                       Mills Levied Qual. Debt      Tax                       Mills needed all
Year                   issue        qualified Debt                                                                               Mills Levied Qual. Debt
                                                                                 Year                               Debt
2012     2013                            7.62                   7.00             2012     2013                     6.94                   7.00
2013     2014         0.00               9.03                   7.00             2013     2014                     6.90                   7.00
2014     2015         0.00               8.86                   7.00             2014     2015                     6.85                   7.00
2015     2016         0.00               8.69                   7.00             2015     2016                     6.79                   7.00
2016     2017         1.63               6.84                   7.00             2016     2017                     4.59                   6.24
2017     2018         2.88               6.69                   7.00             2017     2018                     4.43                   4.42
2018     2019         3.10               6.51                   7.00             2018     2019                     4.27                   4.27
2019     2020         3.30               6.36                   7.00             2019     2020                     4.12                   4.12
2020     2021         3.50               6.20                   7.00             2020     2021                     3.97                   3.97
2021     2022         3.69               6.09                   7.00             2021     2022                     3.81                   3.81
2022     2023         3.88               5.90                   7.00             2022     2023                     3.66                   3.66
2023     2024         4.00               5.76                   7.00             2023     2024                     3.51                   3.51
2024     2025         4.23               5.62                   7.00             2024     2025                     3.36                   3.36
2025     2026         4.40               5.41                   7.00             2025     2026                     3.21                   3.21
2026     2027         4.17               5.09                   6.63             2026     2027                     3.09                   3.09
20




                                    0.00
                                           1.00
                                                  2.00
                                                         3.00
                                                                4.00
                                                                       5.00
                                                                              6.00
                                                                                     7.00
                                                                                            8.00
                      12
                        -2
                             01
                                3
                    20
                      13
                        -2
                             01
                                4
                                                                                                   Mills Required




                    20
                      14
                        -2
                             01
                                5
                    20
                      15
                        -2
                             01
                                6
                    20
                      16
                        -2
                             01
                                7
                    20
                      17
                        -2
                             01
                                8
                    20
                      18
                        -2
                             01
                                9
                    20
                      19
                        -2




Before Bond Issue
                             02
                                0
                    20
                      20
                        -2
                             02
                                1
                    20
                      21
                        -2
                             02
                                2
                    20
                      22
                        -2
                             02
                                3
                    20
After Bond Issue




                      23
                        -2
                             02
                                4
                    20
                      24
                        -2
                             02
                                5
                    20
                      25
                        -2
                             02
                                6
                    20
                      26
                        -2
                             02
                                7
20




                                    0.00
                                           1.00
                                                  2.00
                                                         3.00
                                                                4.00
                                                                       5.00
                                                                              6.00
                                                                                     7.00
                                                                                            8.00
                      12
                        -2
                             01
                                3
                    20
                      13
                        -2
                             01
                                4
                                                                                                   Mills Required




                    20
                      14
                        -2
                             01
                                5
                    20
                      15
                        -2
                             01
                                6
                    20
                      16
                        -2
                             01
                                7
                    20
                      17
                        -2
                             01
                                8
                    20
                      18
                        -2
                             01
                                9
                    20
                      19
                        -2




Before Bond Issue
                             02
                                0
                    20
                      20
                        -2
                             02
                                1
                    20
                      21
                        -2
                             02
                                2
                    20
                      22
                        -2
                             02
                                3
                    20
After Bond Issue




                      23
                        -2
                             02
                                4
                    20
                      24
                        -2
                             02
                                5
                    20
                      25
                        -2
                             02
                                6
                    20
                      26
                        -2
                             02
                                7

Contenu connexe

Similaire à USA bond Presentation (Mr. Rierson)

HGS The Way Forward Reversing the Curve
HGS The Way Forward Reversing the CurveHGS The Way Forward Reversing the Curve
HGS The Way Forward Reversing the CurveHGS Forward
 
Dividend comparison
Dividend comparisonDividend comparison
Dividend comparisonampanek
 
Dividend Comparison
Dividend ComparisonDividend Comparison
Dividend Comparisonaa545041
 
Alitalia Xl China Eastern
Alitalia Xl China EasternAlitalia Xl China Eastern
Alitalia Xl China Easterndoshihardik
 
3. Seastar 6.5ha Construction Cost Data
3. Seastar 6.5ha   Construction Cost Data3. Seastar 6.5ha   Construction Cost Data
3. Seastar 6.5ha Construction Cost Dataericbali
 
Cavit Financial Model(1)
Cavit Financial Model(1)Cavit Financial Model(1)
Cavit Financial Model(1)guest4e1120
 
Analysis of Revenue guidance - Infosys
Analysis of Revenue guidance - InfosysAnalysis of Revenue guidance - Infosys
Analysis of Revenue guidance - InfosysSarasvathi T.A
 
Dec 2009 Tatum Survey
Dec 2009 Tatum SurveyDec 2009 Tatum Survey
Dec 2009 Tatum Surveyfnapoli
 
Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13
Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13
Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13taitken1
 
Abdul Khani Daud
Abdul Khani DaudAbdul Khani Daud
Abdul Khani Daudmitbca2012
 
pint state.ia.us tax forms educate
pint state.ia.us tax forms  educatepint state.ia.us tax forms  educate
pint state.ia.us tax forms educatetaxman taxman
 
Copy of retirement savings-calculator
Copy of retirement savings-calculatorCopy of retirement savings-calculator
Copy of retirement savings-calculatordavidpelealu
 
CMC Analystmeet 2003 Q2
CMC Analystmeet 2003 Q2CMC Analystmeet 2003 Q2
CMC Analystmeet 2003 Q2finance21
 
Day 2 EE Regional Initiative : Arab EE Guideline
Day 2 EE Regional Initiative : Arab EE GuidelineDay 2 EE Regional Initiative : Arab EE Guideline
Day 2 EE Regional Initiative : Arab EE GuidelineRCREEE
 
Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016Chelan County PUD
 
San Angelo City Council November 6, 2012 Refunding Bond Sale
San Angelo City Council November 6, 2012 Refunding Bond SaleSan Angelo City Council November 6, 2012 Refunding Bond Sale
San Angelo City Council November 6, 2012 Refunding Bond SaleCity of San Angelo Texas
 

Similaire à USA bond Presentation (Mr. Rierson) (20)

HGS The Way Forward Reversing the Curve
HGS The Way Forward Reversing the CurveHGS The Way Forward Reversing the Curve
HGS The Way Forward Reversing the Curve
 
Apres Call 4Q08
Apres Call 4Q08Apres Call 4Q08
Apres Call 4Q08
 
Dividend comparison
Dividend comparisonDividend comparison
Dividend comparison
 
Dividend Comparison
Dividend ComparisonDividend Comparison
Dividend Comparison
 
Alitalia Xl China Eastern
Alitalia Xl China EasternAlitalia Xl China Eastern
Alitalia Xl China Eastern
 
Malhotra15
Malhotra15Malhotra15
Malhotra15
 
Call 4 Q07 Ing
Call 4 Q07 IngCall 4 Q07 Ing
Call 4 Q07 Ing
 
EXOTIC CARS ASSOCIATION
EXOTIC CARS ASSOCIATIONEXOTIC CARS ASSOCIATION
EXOTIC CARS ASSOCIATION
 
3. Seastar 6.5ha Construction Cost Data
3. Seastar 6.5ha   Construction Cost Data3. Seastar 6.5ha   Construction Cost Data
3. Seastar 6.5ha Construction Cost Data
 
Cavit Financial Model(1)
Cavit Financial Model(1)Cavit Financial Model(1)
Cavit Financial Model(1)
 
Analysis of Revenue guidance - Infosys
Analysis of Revenue guidance - InfosysAnalysis of Revenue guidance - Infosys
Analysis of Revenue guidance - Infosys
 
Dec 2009 Tatum Survey
Dec 2009 Tatum SurveyDec 2009 Tatum Survey
Dec 2009 Tatum Survey
 
Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13
Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13
Alan Clayton-Matthews 2013 Economic Forecast presented to Mass Econ 1/18/13
 
Abdul Khani Daud
Abdul Khani DaudAbdul Khani Daud
Abdul Khani Daud
 
pint state.ia.us tax forms educate
pint state.ia.us tax forms  educatepint state.ia.us tax forms  educate
pint state.ia.us tax forms educate
 
Copy of retirement savings-calculator
Copy of retirement savings-calculatorCopy of retirement savings-calculator
Copy of retirement savings-calculator
 
CMC Analystmeet 2003 Q2
CMC Analystmeet 2003 Q2CMC Analystmeet 2003 Q2
CMC Analystmeet 2003 Q2
 
Day 2 EE Regional Initiative : Arab EE Guideline
Day 2 EE Regional Initiative : Arab EE GuidelineDay 2 EE Regional Initiative : Arab EE Guideline
Day 2 EE Regional Initiative : Arab EE Guideline
 
Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016
 
San Angelo City Council November 6, 2012 Refunding Bond Sale
San Angelo City Council November 6, 2012 Refunding Bond SaleSan Angelo City Council November 6, 2012 Refunding Bond Sale
San Angelo City Council November 6, 2012 Refunding Bond Sale
 

USA bond Presentation (Mr. Rierson)

  • 1. Project Overview  Elementary Building  Replace Well  Replace Concrete Walk to outside storage  Rework drainage in Southeast corner of Pre-school play area  Upgrade Classroom windows  Create water seal on building exterior locations
  • 3. Bond Proposal Shall Unionville-Sebewaing Area Schools, Tuscola and Huron Counties Michigan, borrow the sum of not to exceed Five Million Eight Hundred Fifty Thousand Dollars ($5,850,000) and issue its general obligation unlimited tax bonds therefor, for the purpose of: Partially remodeling, furnishing and refurnishing, equipping and re-equipping facilities; acquiring, installing and equipping educational technology for school facilities; purchasing school buses; construction and equipping a new running track and developing and improving sites? The following is for informational purposes only: No millage will be levied for the proposed bonds in 2013, under current law. The maximum number of years the bonds may be outstanding, exclusive of any refunding, is fourteen (14) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.97 ($2.97 on each $1000.00 of taxable valuation) If the school district borrows from the State to pay debt service on the bonds, the school district may be required to continue to levy mills beyond the term of the bonds to repay the State. (Pursuant to State law, expenditure of bond proceeds must be audited, and the proceeds cannot be used for repair or maintenance costs, teacher, administrator or employee salaries, or other operating expenses.)
  • 4. What are the additional costs? The state has determined your home or property’s taxable value growth to cap at either 5% or the rate of inflation, whichever is less per year. *The taxable value of your home is approximately one-half the market value of a home or property. See your most recent tax statement for the exact amount of your taxable value. Calculate your tax investment by diving the taxable value* of your home or property by 1000 and then multiply the results by the millage levy. NOTE: One mill = $1.00 per $1,000 of taxable value of a home or property. MILLAGE COST TO TAXPAYERS FOR Proposal One is $5,850,000 0 MILL LEVY INCREASE TAXABLE VALUE* COST/YEAR COST/MO. COST/DAY $ 25,000.00 $ - $ - $ - $ 40,000.00 $ - $ - $ - $ 50,000.00 $ - $ - $ - $ 75,000.00 $ - $ - $ - $ 100,000.00 $ - $ - $ -
  • 5. After Additional Bonding Before Additional Bonding Tax Mills needed this Mills needed all Mills Levied Qual. Debt Tax Mills needed all Year issue qualified Debt Mills Levied Qual. Debt Year Debt 2012 2013 7.62 7.00 2012 2013 6.94 7.00 2013 2014 0.00 9.03 7.00 2013 2014 6.90 7.00 2014 2015 0.00 8.86 7.00 2014 2015 6.85 7.00 2015 2016 0.00 8.69 7.00 2015 2016 6.79 7.00 2016 2017 1.63 6.84 7.00 2016 2017 4.59 6.24 2017 2018 2.88 6.69 7.00 2017 2018 4.43 4.42 2018 2019 3.10 6.51 7.00 2018 2019 4.27 4.27 2019 2020 3.30 6.36 7.00 2019 2020 4.12 4.12 2020 2021 3.50 6.20 7.00 2020 2021 3.97 3.97 2021 2022 3.69 6.09 7.00 2021 2022 3.81 3.81 2022 2023 3.88 5.90 7.00 2022 2023 3.66 3.66 2023 2024 4.00 5.76 7.00 2023 2024 3.51 3.51 2024 2025 4.23 5.62 7.00 2024 2025 3.36 3.36 2025 2026 4.40 5.41 7.00 2025 2026 3.21 3.21 2026 2027 4.17 5.09 6.63 2026 2027 3.09 3.09
  • 6. 20 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 12 -2 01 3 20 13 -2 01 4 Mills Required 20 14 -2 01 5 20 15 -2 01 6 20 16 -2 01 7 20 17 -2 01 8 20 18 -2 01 9 20 19 -2 Before Bond Issue 02 0 20 20 -2 02 1 20 21 -2 02 2 20 22 -2 02 3 20 After Bond Issue 23 -2 02 4 20 24 -2 02 5 20 25 -2 02 6 20 26 -2 02 7
  • 7. 20 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 12 -2 01 3 20 13 -2 01 4 Mills Required 20 14 -2 01 5 20 15 -2 01 6 20 16 -2 01 7 20 17 -2 01 8 20 18 -2 01 9 20 19 -2 Before Bond Issue 02 0 20 20 -2 02 1 20 21 -2 02 2 20 22 -2 02 3 20 After Bond Issue 23 -2 02 4 20 24 -2 02 5 20 25 -2 02 6 20 26 -2 02 7