SlideShare a Scribd company logo
1 of 21
Engine Ingestion Standards and Certifications
By
 Behzad Mhp 27621760
 Nirmal Raju 26734227
 Nishant Jogadia 27272588
 Siddharth Salkar 27169787
 ENGR 6421- Standards Regulations and
Certifications
WHAT EXACTLY IS ENGINE
INGESTION TEST ?
Bird Ingestion Test
Issued by :
 Federal Aviation
Administration(FAA) under AC
No. 33.76-1A
 Purpose-Title 14 of the Code of
Federal Regulations (14 CFR)
33.76
 Applicability – Engine
Manufacturer or Modifier
• Bird Strike
Usually occur during take-off , climb and landing of airplanes
Rare cause of accidents – only 0.3% of total aircraft Fatal Accident
Frequency Rate from all causes
Force or momentum exchange
Part Struck No. of Strikes % of Strikes
causing
damage
Nose/Fuselage 6393 9.5
Windshield 2546 6.6
Wing/Rotor 3006 25
Landing Gear 1595 9.5
Lights 183 71
Tail 381 30
No. of birds
struck
No. of strikers % of Strikes
causing
damage
1 7704 11.9
2-10 2726 18.9
>10 320 23.8
Total 10750
• Classification of Bird Strike
Single bird
Between 2 and 10 birds
More than 10 birds
• Engine must be structurally and operationally tolerant to:
Large Single Bird Ingestion
Small and Medium Flocking Bird Ingestion
Large Flocking Bird Ingestion
BASIC DEFINITIONS
• Front of the Engine:
• Minimum Engine
• Critical Impact Parameter (CIP):stress , strain , deflection , twist etc
Large Single Bird Ingestion
• Complete loss of thrust
• Determine critical location on first stage of rotating blades
• Evaluation of engine dynamic response
• Selection of optimum ingestion speed (200 knot)
SMALL AND MEDIUM
FLOCKING BIRD INGESTION
• Method
First Bird is targeted for the core primary flow path
Second bird – most critical exposed location
Remaining birds- fan face area
• Engine must produce at least 75% of takeoff power or thrust after ingestion.
• Momentary power drop should not exceed 3 seconds.
• Rig Tests.
• Sustained high vibration after 2 minutes - vary power
• Exceeding Engine Operating Limits
• Total run-on test time – 20 minutes
LARGE FLOCKING BIRD INGESTION
• Selection of target : not less than 50% of airfoil height
• Multiple Stages
• Test Duration : Exceed 20 minutes
• Segment 1= Duration 1 minute
• Power > or = 50% of maximum rated takeoff
• Segment 2 = Duration 13 minutes
• Engine should maintain power not less than 50%
• Sustained Power Loss : more than 3 seconds
Hailstone Ingestion
test
Issued by :
Federal Aviation
Administration(FAA)
under 14 CFR Parts 23,
25 and 33
BACKGROUND
• There have been a number of multiple turbine engine power-loss and instability events, forced
landings, and accidents attributed to operating airplanes in extreme rain or hail.
• If an airplane encounters severe rain or hail with installed engines that are susceptible to
flameout, the airplane will be susceptible to an all engine out, forced landing.
• Rain or hail related in-flight engine shutdowns are rare occurrences. This is due, in large part,
to the high quality of meteorological data available to ground controllers and pilots, and to well
established weather avoidance procedures.
• However, while such events are infrequent, they pose a serious hazard because they typically
occur during a critical phase of flight where recovery is difficult or impossible.
CERTIFICATION TESTING
• The rain and hail ingestion threats have been
defined for purposes of certification testing as 30
seconds duration for hail and 3 minutes duration
for rain.
• Once flameout occurs under these conditions, it is
unlikely that the engine will be capable of recovery
until the ingestion of rain or hail ceases, with or
without an automatic re-ignition system.
ILLUSTRATION OF RAIN AND HAIL TREATS
CERTIFICATION STANDARD ATMOSPHERIC
RAIN AND HAIL CONCENTRATIONS
Altitude (feet)
Rain water content (RWC)
(grams water/meter 3 air)
0 20.0
20,000 20.0
26,300 15.2
32,700 10.8
39,300 7.7
46,000 5.2
Altitude (feet)
Hail water content (HWC)
(grams water/meter 3 air)
0 6.0
7,300 8.9
8,500 9.4
10,000 9.9
12,000 10.0
15,000 10.0
16,000 8.9
17,700 7.8
19,300 6.6
21,500 5.6
24,300 4.4
29,000 3.3
46,000 0.2
Volcanic Ash
Ingestion
 Background
 Effects
 Important Factors
 Safety measures and
Recommendations
 Certification standards
 Challenges
Avoid Visible Ash
BACKGROUND
• Galunggung, June 4th, 1982 – Airbus
747 (BA)
• Failure of all 4 engines
• Molten ash in Comubstor
• Contaminated fuel tanks
• Mount Redoubt, Dec 1989 – Airbus 747
(KLM)
• Flame out of all 4 engines in 80s
• 5 mins & from 28000 ft – 13300 ft
• $80 million in repairs
• Mount Pinatubo, Phillippines June 1991
• 8000 Kms reaching East Coast of Africa
• 20 aircrafts damaged
• Significant effects over 1000 kms.
EYJAFJALLAJÖKULL, ICELAND, APRIL 2010
• Contamination of European Airspace
• Loss of aircraft separation due to ash avoidance
• Air traffic flows reduced; disrupted flight operations; economic
impact
• Ash avoidance principle compromised (SRAs, Threshold limits)
• ICAO set-up International Volcanic Ash Task Force (IVATF) in
response, to understand aviation hazards and impact of flight
operations in ash environment.
• A-NPA by EASA embracing the IVATF approach
EFFECTS
• Erosion of blades and linings
• Melting and clogging the
combustor or other parts
• Damage to filters and seals
• Corrosion
• Negative impact on restarting
ability of engine
• Contamination of bleed air,
sensor data and electronics
IMPORTANT FACTORS
• Eruption type (determines particle size
distribution)
• Energy level (impacts height and distance
of spread)
• Ash constitution
• Weather pattern
• Agglomeration, rate of descent
• Engine characteristics:
• Combustor and peak cycle temperature
• Pressure ratio
• Turbine blade technology
• Cooling and bleed system
• Flight profile (climb, cruise, flight idle)
SAFETY MEASURES AND
RECOMMENDATIONS
• Avoidance of Visible Ash
• Volcanic Ash Advisory Centres (VAAC) and Meteorological
Watch Offices (MWO) to forecast location and concentration
• Safety Risk Assessment (SRA) by the operator
• Establish Upper and Lower limits to differentiate immediate
safety hazards and long term effects
• Flight crew awareness
CERTIFICATION STANDARDS
Objectives:
• Establish upper limit possessing immediate safety hazard
• Ensure built-in safety margin from TC holders
• Establish guidelines for future operations
Challenges:
• The probability of ash encounter is very low.
• Reduce efficiency and performance, environmental and economic
impacts
• Limited accuracy of forecast models or direct measurement devices
• Delay in implementation
• Inadequate testing methods (sand testing)

More Related Content

Similar to Engine Ingestion Test

TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
Neometrix_Engineering_Pvt_Ltd
 
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdfESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
Aman899833
 
Catalogo motores neumaticos
Catalogo motores neumaticosCatalogo motores neumaticos
Catalogo motores neumaticos
uzbeko123
 
S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016
CETN
 
4.0 ground maneuvering boeing
4.0 ground maneuvering boeing4.0 ground maneuvering boeing
4.0 ground maneuvering boeing
eddy santos
 

Similar to Engine Ingestion Test (20)

Commercial-aircraft-operation.pptx
Commercial-aircraft-operation.pptxCommercial-aircraft-operation.pptx
Commercial-aircraft-operation.pptx
 
Vibration and Aviation new.pptx
Vibration and Aviation new.pptxVibration and Aviation new.pptx
Vibration and Aviation new.pptx
 
Product bulletin ametek 116515 13
Product bulletin ametek 116515 13Product bulletin ametek 116515 13
Product bulletin ametek 116515 13
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
 
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
 
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdfESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
 
Catalogo motores neumaticos
Catalogo motores neumaticosCatalogo motores neumaticos
Catalogo motores neumaticos
 
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
 
Airpot design
Airpot designAirpot design
Airpot design
 
S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016
 
Design of fighter aircraft presentation
Design of fighter aircraft presentationDesign of fighter aircraft presentation
Design of fighter aircraft presentation
 
Delta ia mds-ct2000_c_en_20160413
Delta ia mds-ct2000_c_en_20160413Delta ia mds-ct2000_c_en_20160413
Delta ia mds-ct2000_c_en_20160413
 
Hire 20T Bubble crane in melbourne
Hire 20T Bubble crane in melbourneHire 20T Bubble crane in melbourne
Hire 20T Bubble crane in melbourne
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Taneja Aerospace and Aviation limied
Taneja Aerospace and Aviation limiedTaneja Aerospace and Aviation limied
Taneja Aerospace and Aviation limied
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
4.0 ground maneuvering boeing
4.0 ground maneuvering boeing4.0 ground maneuvering boeing
4.0 ground maneuvering boeing
 
CHECKLIST CT210M (1978) CIAC 2020.pdf
CHECKLIST CT210M (1978) CIAC 2020.pdfCHECKLIST CT210M (1978) CIAC 2020.pdf
CHECKLIST CT210M (1978) CIAC 2020.pdf
 
OPERATING MANUAL VALVES Imm 55 cg1-tf128_gb-b
OPERATING MANUAL VALVES Imm 55 cg1-tf128_gb-bOPERATING MANUAL VALVES Imm 55 cg1-tf128_gb-b
OPERATING MANUAL VALVES Imm 55 cg1-tf128_gb-b
 
Factors to be considered for motor selection
Factors  to be considered for motor selectionFactors  to be considered for motor selection
Factors to be considered for motor selection
 

Recently uploaded

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Recently uploaded (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Engine Ingestion Test

  • 1. Engine Ingestion Standards and Certifications By  Behzad Mhp 27621760  Nirmal Raju 26734227  Nishant Jogadia 27272588  Siddharth Salkar 27169787  ENGR 6421- Standards Regulations and Certifications
  • 2. WHAT EXACTLY IS ENGINE INGESTION TEST ?
  • 3. Bird Ingestion Test Issued by :  Federal Aviation Administration(FAA) under AC No. 33.76-1A  Purpose-Title 14 of the Code of Federal Regulations (14 CFR) 33.76  Applicability – Engine Manufacturer or Modifier
  • 4. • Bird Strike Usually occur during take-off , climb and landing of airplanes Rare cause of accidents – only 0.3% of total aircraft Fatal Accident Frequency Rate from all causes Force or momentum exchange Part Struck No. of Strikes % of Strikes causing damage Nose/Fuselage 6393 9.5 Windshield 2546 6.6 Wing/Rotor 3006 25 Landing Gear 1595 9.5 Lights 183 71 Tail 381 30
  • 5. No. of birds struck No. of strikers % of Strikes causing damage 1 7704 11.9 2-10 2726 18.9 >10 320 23.8 Total 10750 • Classification of Bird Strike Single bird Between 2 and 10 birds More than 10 birds
  • 6. • Engine must be structurally and operationally tolerant to: Large Single Bird Ingestion Small and Medium Flocking Bird Ingestion Large Flocking Bird Ingestion
  • 7. BASIC DEFINITIONS • Front of the Engine: • Minimum Engine • Critical Impact Parameter (CIP):stress , strain , deflection , twist etc Large Single Bird Ingestion • Complete loss of thrust • Determine critical location on first stage of rotating blades • Evaluation of engine dynamic response • Selection of optimum ingestion speed (200 knot)
  • 8. SMALL AND MEDIUM FLOCKING BIRD INGESTION • Method First Bird is targeted for the core primary flow path Second bird – most critical exposed location Remaining birds- fan face area • Engine must produce at least 75% of takeoff power or thrust after ingestion. • Momentary power drop should not exceed 3 seconds. • Rig Tests. • Sustained high vibration after 2 minutes - vary power • Exceeding Engine Operating Limits • Total run-on test time – 20 minutes
  • 9. LARGE FLOCKING BIRD INGESTION • Selection of target : not less than 50% of airfoil height • Multiple Stages • Test Duration : Exceed 20 minutes • Segment 1= Duration 1 minute • Power > or = 50% of maximum rated takeoff • Segment 2 = Duration 13 minutes • Engine should maintain power not less than 50% • Sustained Power Loss : more than 3 seconds
  • 10. Hailstone Ingestion test Issued by : Federal Aviation Administration(FAA) under 14 CFR Parts 23, 25 and 33
  • 11. BACKGROUND • There have been a number of multiple turbine engine power-loss and instability events, forced landings, and accidents attributed to operating airplanes in extreme rain or hail. • If an airplane encounters severe rain or hail with installed engines that are susceptible to flameout, the airplane will be susceptible to an all engine out, forced landing. • Rain or hail related in-flight engine shutdowns are rare occurrences. This is due, in large part, to the high quality of meteorological data available to ground controllers and pilots, and to well established weather avoidance procedures. • However, while such events are infrequent, they pose a serious hazard because they typically occur during a critical phase of flight where recovery is difficult or impossible.
  • 12. CERTIFICATION TESTING • The rain and hail ingestion threats have been defined for purposes of certification testing as 30 seconds duration for hail and 3 minutes duration for rain. • Once flameout occurs under these conditions, it is unlikely that the engine will be capable of recovery until the ingestion of rain or hail ceases, with or without an automatic re-ignition system.
  • 13. ILLUSTRATION OF RAIN AND HAIL TREATS
  • 14. CERTIFICATION STANDARD ATMOSPHERIC RAIN AND HAIL CONCENTRATIONS Altitude (feet) Rain water content (RWC) (grams water/meter 3 air) 0 20.0 20,000 20.0 26,300 15.2 32,700 10.8 39,300 7.7 46,000 5.2 Altitude (feet) Hail water content (HWC) (grams water/meter 3 air) 0 6.0 7,300 8.9 8,500 9.4 10,000 9.9 12,000 10.0 15,000 10.0 16,000 8.9 17,700 7.8 19,300 6.6 21,500 5.6 24,300 4.4 29,000 3.3 46,000 0.2
  • 15. Volcanic Ash Ingestion  Background  Effects  Important Factors  Safety measures and Recommendations  Certification standards  Challenges Avoid Visible Ash
  • 16. BACKGROUND • Galunggung, June 4th, 1982 – Airbus 747 (BA) • Failure of all 4 engines • Molten ash in Comubstor • Contaminated fuel tanks • Mount Redoubt, Dec 1989 – Airbus 747 (KLM) • Flame out of all 4 engines in 80s • 5 mins & from 28000 ft – 13300 ft • $80 million in repairs • Mount Pinatubo, Phillippines June 1991 • 8000 Kms reaching East Coast of Africa • 20 aircrafts damaged • Significant effects over 1000 kms.
  • 17. EYJAFJALLAJÖKULL, ICELAND, APRIL 2010 • Contamination of European Airspace • Loss of aircraft separation due to ash avoidance • Air traffic flows reduced; disrupted flight operations; economic impact • Ash avoidance principle compromised (SRAs, Threshold limits) • ICAO set-up International Volcanic Ash Task Force (IVATF) in response, to understand aviation hazards and impact of flight operations in ash environment. • A-NPA by EASA embracing the IVATF approach
  • 18. EFFECTS • Erosion of blades and linings • Melting and clogging the combustor or other parts • Damage to filters and seals • Corrosion • Negative impact on restarting ability of engine • Contamination of bleed air, sensor data and electronics
  • 19. IMPORTANT FACTORS • Eruption type (determines particle size distribution) • Energy level (impacts height and distance of spread) • Ash constitution • Weather pattern • Agglomeration, rate of descent • Engine characteristics: • Combustor and peak cycle temperature • Pressure ratio • Turbine blade technology • Cooling and bleed system • Flight profile (climb, cruise, flight idle)
  • 20. SAFETY MEASURES AND RECOMMENDATIONS • Avoidance of Visible Ash • Volcanic Ash Advisory Centres (VAAC) and Meteorological Watch Offices (MWO) to forecast location and concentration • Safety Risk Assessment (SRA) by the operator • Establish Upper and Lower limits to differentiate immediate safety hazards and long term effects • Flight crew awareness
  • 21. CERTIFICATION STANDARDS Objectives: • Establish upper limit possessing immediate safety hazard • Ensure built-in safety margin from TC holders • Establish guidelines for future operations Challenges: • The probability of ash encounter is very low. • Reduce efficiency and performance, environmental and economic impacts • Limited accuracy of forecast models or direct measurement devices • Delay in implementation • Inadequate testing methods (sand testing)