Leak d Detection feasibility study iFluids Engineering

John Kingsley
John KingsleyBusiness Development Manager at iFluids Engineering à iFluids Engineering
Managing Risks , Delivering Value
www.ifluids.com | info@ifluids.com
About iFluids Engineering
An ISO 9001 2008 company
No. of Projects Executed 150+
Year of Establishment 2013
No. of Employees in India 50+
No. of Employees in Asia 03
No. of Employees in Middle
East
10+
Head Office Location India ,
Chennai
Branch Offices Mumbai
Middle East Office Qatar ,
Oman ,
UAE, Kuwait
Asia Pacific Office Singapore
Our Geographical Presence
Chennai |
Mumbai
Sultanate of
Oman | Qatar |
Kuwait | UAE
Singapore |
Malaysia
www.ifluids.com | info@ifluids.com
About iFluids Engineering
Some of Our Clients include
www.ifluids.com | info@ifluids.com
Our Solutions & Services
Engineering Safety Engineering
Operations &
Maintenance
Operations &
Maintenance
Our team of experts offer advanced solutions to address the most
complex problems in a cost effective & sustainable manner
Industrial Construction
Training
OGC SCOPE
▼ Define the different methods available and it is implication.
▼ To Evaluate & Explore the market for the best suitable leak detection system for gas pipelines .
▼ To Develop evaluation , selection & qualification criteria for gas leak technology.
▼ To perform a desktop study , to Mimic and demonstrate the selected leak detection technology for
OGC members
▼ To provide detailed requirements for installation (hardware’s and software) and engineering to achieve
the performance for each leak detection technology’s for existing and new pipelines.
▼ To Evaluate existing OGC network setup (SCADA , DCS , RTU and time sync) to determine the
readiness to occupy the leak detection technology there after to propose a solution to enhance the
network setup.
▼ To develop engineering specification for selection & installation of leak detection technology’s for
current and newly installed pipelines
▼ Consultant shall provide all qualified skilled/unskilled personnel to carry out the entire job, and all other
necessary materials and facilities required to complete the study.
▼ Provide cost effective solution.
iFluidsiFluidsiFluidsiFluids PhilosophyPhilosophyPhilosophyPhilosophy
WhatWhatWhatWhat the LDS shall be doing irrespective of how the
requirements can be met (of course, within the framework of
technical feasibility).
After having specified the requirements, the selection of
methods and equipment is part of the basic design phase in
which the concept of HowHowHowHow the defined requirements can be
fulfilled is being developed
iFluids Scope
Next Phases of the Project
Project Focus
• Review QRA report to understand basis identified in that
report for the need for the Leak Detection system (as
mentioned in the RFP)
• Identify pipeline corridors to be included in the scope of
work, including compressor stations (if applicable)
• Obtain information on existing instrumentation (e.g.: flow
and pressure sensors, and gas detection) installed
• Establish Leak Detection thresholds (thresholds maybe
different for different corridors)
• Review pipeline routings, pipeline access and other
factors that may influence Leak Detection System
technology selection
• Conduct technology screening and present a short list of
technologies and a list of the pipeline corridors to be
assessed in detail in the feasibility study.
Project MethodologyProject MethodologyProject MethodologyProject Methodology
In BriefIn BriefIn BriefIn Brief
PROJECT EXECUTION STEPS
Phase 1: Feasibility Study Kick-Off and Coordination
• Coordinate the iFluids Feasibility Study Team and review Client provided technical data regarding the
existing pipeline as well as planned expansion of the pipeline, to ensure that adequate information is
available to provide basis for the Feasibility Study, expedited coordination with the Client.
• Develop a set of criteria to consistently evaluate, compare, assess and down-select to a preferred option
for the available off-the-shelf leak detection systems and technologies for use during the Feasibility Study.
• Prepare a desktop evaluation for software compatibility with existing software used by OGC to control
pipeline operations. Desktop evaluation will be capable to be used for demonstration of evaluated systems
to OGC members.
• Develop a detailed set of requirements for the potential installation and implementation of each viable
technology software or associated hardware for comparison and down selection purposes.
• Evaluate the existing OGC network setup (SCADA, DCS, RTU and time-sync) to determine the System’s
readiness to accept the leak detection technology and propose required engineering and/or physical
changes to the pipeline system and controls that may be required to implement the leak detection system.
• Conduct Feasibility Study Team review meetings immediately following the completion of each step above
to ensure observations, recorded data, technical review evidence is collected and documented by the
Team, and consensus is reached on the results of the Feasibility Study and down-selection/recommended
solution process.
PROJECT EXECUTION STEPS
Phase 2: Develop Draft Report and Draft Presentation
• Upon completion of the leak detection feasibility study and review, and consolidation of collected
data, the iFluids assessment team will complete a Draft Leak Detection Feasibility Study Report. The
draft report will be disseminated to the Client’s requested recipients as a PDF file for review and
comments.
• iFluids will develop the engineering specifications for selection and installation of OGC’s preferred
leak detection technology for both existing and future expansion of pipelines. This specification will
be prepared based on the selected technology in Phase 3. This document will act as the guideline for
issuing tender document, vendor selection and installation of the system.
• iFluids will participate in a presentation of the findings and attend a review meeting with client and
OGC members to discuss the findings and recommendation of the draft report to finalize the
proposed changes to be incorporated in the final report.
• A single set of non-conflicting Client comments will be collected on a comment collection form (a
blank form will accompany the report).
PROJECT EXECUTION STEPS
Phase 3: Develop Final Report and Final Presentation
• Within 10 working days of receipt of all written comments from the Client on the comment collection
form, the test team will prepare and deliver one Hard Copy Final Report and one electronic version in
editable form and electronically mail it to the Client’s requested distribution list. A file showing
resolution of all Client comments received will be provided to the Client.
• iFluids will prepare a PowerPoint presentation and participate in a final presentation of the result as
per the study with client and OGC members to discuss the action to be taken and the way forward.
Phase 4: Optional Scope
• iFluids will carry out the actual Testing on OGC pipelines (within 50 to Max 100km only) to evaluate the OGC
selected gas leak detection technology based on outcomes proposed from the scope mentioned above
PROJECT SCHEDULE
• A Detailed Project Schedule along with Project Execution Methodology will be submitted within Five(5)
days on receipt of PO or on date of Kick-Off meeting, whichever is earlier
• Consultant will commence Phase 1 activities immediately upon receipt of a signed proposal and the
Project Initiation Fee Payment.
• The Feasibility Study is planned to be conducted and completed within Five (5) weeks of the date both
conditions above are met.
• It is assumed that the elements of the scope of work will be executed consecutively as a part of a single
test series and set-up will only occur once.
DELIVERABLES
iFluids will provide the following Deliverables:
• 1. Detailed Feasibility Study Report (Drafted in accordance with international standards, Oman local
standard and in line with the OGC scope of work & Technical Clarification raised) in PDF format.
• 2. A PowerPoint Presentation for distribution to OGC management demonstrating the results of the Leak
Detection Feasibility Study.
• 3. Submission of Final Report documenting the Leak Detection Feasibility Study results (Only soft copies in
"Editable format“ is considered).
SITE VISITS, PRESENTATION & MEETINGS
• Only Two(2) visits have been considered during any phase of the project.
• Kick-Off Meeting followed by Data Collection, Site Visit & related activities Etc for a maximum of
Ten(10) days
• Final Presentation Two(2) days on confirmation of submitted draft Feasibility Study
• Any additional, presentation and meetings are to be conducted using WebEx or Skype meeting
resources.
• Our technical team will be operating from the India/Singapore office for this project. Project
management will be carried out from our Oman/India office.
• QRA Report
• Past Reports & Studies Carried Out
• P&ID, Pipeline ROW drawings, and other Process documents
• Flowline Diagram
• Control Narratives
• Control Schematic
• Cause & Effect Matrix
• FGS Philosophy
• Design Basis Documents
• Plot Plans / Layouts
• Pipeline Models / Past Simulations if any
• Pipeline GIS Information/Data
• PODS (Pipeline Open Data Standard)
• And any other document/drawing to successfully conduct
the LDS Feasibility Study
InputsInputsInputsInputs
RequiredRequiredRequiredRequired
Mike Snakard
Process Consultant
Srinivasan
Senior Instrumentation & Control Principal Consultant
with 36 years of rich experience in delivering optimal
results & business value in high-growth environments
Rajendran Subramaniam
Senior Instrumentation & Control Principal Consultant
with 30 years of Refinery expansion, Refinery DCS hot
changeover, Inter Refineries Pipelines, Power Plant
expansion FEED, EPC packages documents on Design,
Procurement & Construction Documents
Nagarajan
Process Head of Department
JothiKannan
Lead Process Engineer
John Kingsley
Project Manager
Project PersonnelProject PersonnelProject PersonnelProject Personnel
THANK YOUTHANK YOUTHANK YOUTHANK YOU
ANY QUESTIONSANY QUESTIONSANY QUESTIONSANY QUESTIONS
1 sur 16

Recommandé

Data Centers Commissioning par
Data Centers Commissioning Data Centers Commissioning
Data Centers Commissioning ASHRAE Rajasthan Chapter
44 vues45 diapositives
SHAMSHAD QAQC RESUME par
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMEMOHAMMED SHAMSHAD ALAM
310 vues7 diapositives
Vipin Resume new qc par
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qcvipin joy
398 vues6 diapositives
Vignesh Kumar C- TPI Coordinator par
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
479 vues4 diapositives
QC par
QCQC
QCMohammag Asif
202 vues5 diapositives
The Commissioning Process par
The Commissioning ProcessThe Commissioning Process
The Commissioning Processd_mackay
11.4K vues91 diapositives

Contenu connexe

Tendances

INSTRUMENT QA QC INSPECTOR par
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
4.9K vues8 diapositives
CVMA_-_QA_Manager_-_Apr 2015 par
CVMA_-_QA_Manager_-_Apr 2015CVMA_-_QA_Manager_-_Apr 2015
CVMA_-_QA_Manager_-_Apr 2015Ayyappan MARIYAPPA ACHARIA
371 vues16 diapositives
QC INSPECTOR E&I par
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
1.2K vues8 diapositives
Building Commissioning, Ongoing Commissioning and quality management using BACS par
Building Commissioning, Ongoing Commissioning and quality management using BACSBuilding Commissioning, Ongoing Commissioning and quality management using BACS
Building Commissioning, Ongoing Commissioning and quality management using BACSLeonardo ENERGY
456 vues75 diapositives
CV - Dayananda Hebbar 24-10-2016 par
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016Dayananda Hebbar
426 vues8 diapositives
Resume_Inst. QC_Hasnat par
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnatmohammad hasnat
607 vues5 diapositives

Tendances(20)

INSTRUMENT QA QC INSPECTOR par Regu Mkc
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
Regu Mkc4.9K vues
Building Commissioning, Ongoing Commissioning and quality management using BACS par Leonardo ENERGY
Building Commissioning, Ongoing Commissioning and quality management using BACSBuilding Commissioning, Ongoing Commissioning and quality management using BACS
Building Commissioning, Ongoing Commissioning and quality management using BACS
Leonardo ENERGY456 vues
Vinoth.s qa qc-ims (qms&ehs) par VINOTH S
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
VINOTH S41 vues
Introduction to DO-178B - Software Considerations in Airborne Systems and Equ... par Swamy Shettru
Introduction to DO-178B - Software Considerations in Airborne Systems and Equ...Introduction to DO-178B - Software Considerations in Airborne Systems and Equ...
Introduction to DO-178B - Software Considerations in Airborne Systems and Equ...
Swamy Shettru3.6K vues
Efren Molina Updated CV.new(Civil Engineer) par Efren Molina
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina537 vues
Mata electric QC PLAN par Tina Sharpe
Mata electric QC PLANMata electric QC PLAN
Mata electric QC PLAN
Tina Sharpe1.3K vues
Gray areas of vda 6.3 process auditors par Kiran Walimbe
Gray areas of vda 6.3 process auditors Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors
Kiran Walimbe560 vues
CV Instrument Control Inspector QAQC par Firoz Mohammad
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
Firoz Mohammad3.1K vues

Similaire à Leak d Detection feasibility study iFluids Engineering

CV par
CVCV
CVAbhinesh Thomas
192 vues4 diapositives
CV_Arvind Pandey par
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind PandeyArvind Pandey
135 vues6 diapositives
ayed cv.newest one 23.11.2011 par
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011Iyad Hassan
147 vues4 diapositives
OMPRAKASH_Resume par
OMPRAKASH_ResumeOMPRAKASH_Resume
OMPRAKASH_ResumeOmprakash Singh
246 vues4 diapositives
Proposal dms for dwf v2 par
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2Media-Mosaic
779 vues49 diapositives
Solar Power Plant Procurements par
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant ProcurementsSunrator Technologies LLP
3K vues18 diapositives

Similaire à Leak d Detection feasibility study iFluids Engineering(20)

ayed cv.newest one 23.11.2011 par Iyad Hassan
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
Iyad Hassan147 vues
Se 381 - lec 28 -- 34 - 12 jun12 - testing 1 of 2 par babak danyal
Se 381 -  lec 28 -- 34 - 12 jun12 - testing 1 of 2Se 381 -  lec 28 -- 34 - 12 jun12 - testing 1 of 2
Se 381 - lec 28 -- 34 - 12 jun12 - testing 1 of 2
babak danyal492 vues
Test planning & estimation par Leslie Smart
Test planning & estimationTest planning & estimation
Test planning & estimation
Leslie Smart2.8K vues

Plus de John Kingsley

MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING par
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGMODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGJohn Kingsley
74 vues2 diapositives
Reliability, availability, maintainability (RAM) study, on reciprocating comp... par
Reliability, availability, maintainability (RAM) study, on reciprocating comp...Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...John Kingsley
59 vues7 diapositives
Introduction to oil and gas exploration and processing par
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingJohn Kingsley
1.1K vues55 diapositives
iFluids Engineering Introduction par
iFluids Engineering IntroductioniFluids Engineering Introduction
iFluids Engineering IntroductionJohn Kingsley
116 vues5 diapositives
iFluids Engineering Brochure par
iFluids Engineering BrochureiFluids Engineering Brochure
iFluids Engineering BrochureJohn Kingsley
79 vues7 diapositives
iFluids Engienering Capability Presentation par
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationJohn Kingsley
76 vues19 diapositives

Plus de John Kingsley(20)

MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING par John Kingsley
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGMODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
John Kingsley74 vues
Reliability, availability, maintainability (RAM) study, on reciprocating comp... par John Kingsley
Reliability, availability, maintainability (RAM) study, on reciprocating comp...Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...
John Kingsley59 vues
Introduction to oil and gas exploration and processing par John Kingsley
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processing
John Kingsley1.1K vues
iFluids Engineering Introduction par John Kingsley
iFluids Engineering IntroductioniFluids Engineering Introduction
iFluids Engineering Introduction
John Kingsley116 vues
iFluids Engienering Capability Presentation par John Kingsley
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability Presentation
John Kingsley76 vues
Hazop Training - Intermediate Level Course iFluids par John Kingsley
Hazop Training  -  Intermediate Level Course iFluidsHazop Training  -  Intermediate Level Course iFluids
Hazop Training - Intermediate Level Course iFluids
John Kingsley131 vues
Introduction to PSM Online Interactive Training par John Kingsley
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive Training
John Kingsley246 vues
Sil assessment Risk Graph and LOPA Training iFluids par John Kingsley
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluids
John Kingsley318 vues
Hazop Fundamentals Online Training iFluids par John Kingsley
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluids
John Kingsley413 vues
John kingsley OT ICS SCADA Cyber security consultant par John Kingsley
John kingsley OT ICS SCADA Cyber security consultantJohn kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultant
John Kingsley685 vues
iFluids Lean Six Sigma Case Study oil & gas par John Kingsley
iFluids Lean Six Sigma Case Study oil & gasiFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gas
John Kingsley207 vues
iFluids Behaviour based safety services and training par John Kingsley
iFluids Behaviour based safety services and trainingiFluids Behaviour based safety services and training
iFluids Behaviour based safety services and training
John Kingsley629 vues
iFluids Tank Inspection services par John Kingsley
iFluids Tank Inspection servicesiFluids Tank Inspection services
iFluids Tank Inspection services
John Kingsley326 vues
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda par John Kingsley
iFluids Cybersecurity Seminar  CIC Qatar 2018 AgendaiFluids Cybersecurity Seminar  CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda
John Kingsley256 vues
How to write a plant operating manual par John Kingsley
How to write a plant operating manualHow to write a plant operating manual
How to write a plant operating manual
John Kingsley1.8K vues
Case study of dcs upgrade how to reduce stress during execution par John Kingsley
Case study of dcs upgrade how to reduce stress during executionCase study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during execution
John Kingsley243 vues
Hydrocarbon leak detection in tank farms par John Kingsley
Hydrocarbon leak detection in tank farmsHydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farms
John Kingsley200 vues
Guide to specifying visual signals par John Kingsley
Guide to specifying visual signalsGuide to specifying visual signals
Guide to specifying visual signals
John Kingsley70 vues
Introduction to bowtie : A barrier-based approach to risk par John Kingsley
Introduction to bowtie : A barrier-based approach to riskIntroduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to risk
John Kingsley149 vues

Dernier

Plastic waste.pdf par
Plastic waste.pdfPlastic waste.pdf
Plastic waste.pdfalqaseedae
110 vues5 diapositives
Use of Probiotics in Aquaculture.pptx par
Use of Probiotics in Aquaculture.pptxUse of Probiotics in Aquaculture.pptx
Use of Probiotics in Aquaculture.pptxAKSHAY MANDAL
81 vues15 diapositives
OEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptx par
OEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptxOEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptx
OEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptxInge de Waard
165 vues29 diapositives
Class 10 English lesson plans par
Class 10 English  lesson plansClass 10 English  lesson plans
Class 10 English lesson plansTARIQ KHAN
239 vues53 diapositives

Dernier(20)

Plastic waste.pdf par alqaseedae
Plastic waste.pdfPlastic waste.pdf
Plastic waste.pdf
alqaseedae110 vues
Use of Probiotics in Aquaculture.pptx par AKSHAY MANDAL
Use of Probiotics in Aquaculture.pptxUse of Probiotics in Aquaculture.pptx
Use of Probiotics in Aquaculture.pptx
AKSHAY MANDAL81 vues
OEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptx par Inge de Waard
OEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptxOEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptx
OEB 2023 Co-learning To Speed Up AI Implementation in Courses.pptx
Inge de Waard165 vues
Class 10 English lesson plans par TARIQ KHAN
Class 10 English  lesson plansClass 10 English  lesson plans
Class 10 English lesson plans
TARIQ KHAN239 vues
EIT-Digital_Spohrer_AI_Intro 20231128 v1.pptx par ISSIP
EIT-Digital_Spohrer_AI_Intro 20231128 v1.pptxEIT-Digital_Spohrer_AI_Intro 20231128 v1.pptx
EIT-Digital_Spohrer_AI_Intro 20231128 v1.pptx
ISSIP256 vues
7 NOVEL DRUG DELIVERY SYSTEM.pptx par Sachin Nitave
7 NOVEL DRUG DELIVERY SYSTEM.pptx7 NOVEL DRUG DELIVERY SYSTEM.pptx
7 NOVEL DRUG DELIVERY SYSTEM.pptx
Sachin Nitave56 vues
Community-led Open Access Publishing webinar.pptx par Jisc
Community-led Open Access Publishing webinar.pptxCommunity-led Open Access Publishing webinar.pptx
Community-led Open Access Publishing webinar.pptx
Jisc69 vues
Chemistry of sex hormones.pptx par RAJ K. MAURYA
Chemistry of sex hormones.pptxChemistry of sex hormones.pptx
Chemistry of sex hormones.pptx
RAJ K. MAURYA119 vues
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) par AnshulDewangan3
 Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)
AnshulDewangan3275 vues
Ch. 7 Political Participation and Elections.pptx par Rommel Regala
Ch. 7 Political Participation and Elections.pptxCh. 7 Political Participation and Elections.pptx
Ch. 7 Political Participation and Elections.pptx
Rommel Regala69 vues

Leak d Detection feasibility study iFluids Engineering

  • 1. Managing Risks , Delivering Value
  • 2. www.ifluids.com | info@ifluids.com About iFluids Engineering An ISO 9001 2008 company No. of Projects Executed 150+ Year of Establishment 2013 No. of Employees in India 50+ No. of Employees in Asia 03 No. of Employees in Middle East 10+ Head Office Location India , Chennai Branch Offices Mumbai Middle East Office Qatar , Oman , UAE, Kuwait Asia Pacific Office Singapore Our Geographical Presence Chennai | Mumbai Sultanate of Oman | Qatar | Kuwait | UAE Singapore | Malaysia
  • 3. www.ifluids.com | info@ifluids.com About iFluids Engineering Some of Our Clients include
  • 4. www.ifluids.com | info@ifluids.com Our Solutions & Services Engineering Safety Engineering Operations & Maintenance Operations & Maintenance Our team of experts offer advanced solutions to address the most complex problems in a cost effective & sustainable manner Industrial Construction Training
  • 5. OGC SCOPE ▼ Define the different methods available and it is implication. ▼ To Evaluate & Explore the market for the best suitable leak detection system for gas pipelines . ▼ To Develop evaluation , selection & qualification criteria for gas leak technology. ▼ To perform a desktop study , to Mimic and demonstrate the selected leak detection technology for OGC members ▼ To provide detailed requirements for installation (hardware’s and software) and engineering to achieve the performance for each leak detection technology’s for existing and new pipelines. ▼ To Evaluate existing OGC network setup (SCADA , DCS , RTU and time sync) to determine the readiness to occupy the leak detection technology there after to propose a solution to enhance the network setup. ▼ To develop engineering specification for selection & installation of leak detection technology’s for current and newly installed pipelines ▼ Consultant shall provide all qualified skilled/unskilled personnel to carry out the entire job, and all other necessary materials and facilities required to complete the study. ▼ Provide cost effective solution.
  • 7. WhatWhatWhatWhat the LDS shall be doing irrespective of how the requirements can be met (of course, within the framework of technical feasibility). After having specified the requirements, the selection of methods and equipment is part of the basic design phase in which the concept of HowHowHowHow the defined requirements can be fulfilled is being developed iFluids Scope Next Phases of the Project Project Focus
  • 8. • Review QRA report to understand basis identified in that report for the need for the Leak Detection system (as mentioned in the RFP) • Identify pipeline corridors to be included in the scope of work, including compressor stations (if applicable) • Obtain information on existing instrumentation (e.g.: flow and pressure sensors, and gas detection) installed • Establish Leak Detection thresholds (thresholds maybe different for different corridors) • Review pipeline routings, pipeline access and other factors that may influence Leak Detection System technology selection • Conduct technology screening and present a short list of technologies and a list of the pipeline corridors to be assessed in detail in the feasibility study. Project MethodologyProject MethodologyProject MethodologyProject Methodology In BriefIn BriefIn BriefIn Brief
  • 9. PROJECT EXECUTION STEPS Phase 1: Feasibility Study Kick-Off and Coordination • Coordinate the iFluids Feasibility Study Team and review Client provided technical data regarding the existing pipeline as well as planned expansion of the pipeline, to ensure that adequate information is available to provide basis for the Feasibility Study, expedited coordination with the Client. • Develop a set of criteria to consistently evaluate, compare, assess and down-select to a preferred option for the available off-the-shelf leak detection systems and technologies for use during the Feasibility Study. • Prepare a desktop evaluation for software compatibility with existing software used by OGC to control pipeline operations. Desktop evaluation will be capable to be used for demonstration of evaluated systems to OGC members. • Develop a detailed set of requirements for the potential installation and implementation of each viable technology software or associated hardware for comparison and down selection purposes. • Evaluate the existing OGC network setup (SCADA, DCS, RTU and time-sync) to determine the System’s readiness to accept the leak detection technology and propose required engineering and/or physical changes to the pipeline system and controls that may be required to implement the leak detection system. • Conduct Feasibility Study Team review meetings immediately following the completion of each step above to ensure observations, recorded data, technical review evidence is collected and documented by the Team, and consensus is reached on the results of the Feasibility Study and down-selection/recommended solution process.
  • 10. PROJECT EXECUTION STEPS Phase 2: Develop Draft Report and Draft Presentation • Upon completion of the leak detection feasibility study and review, and consolidation of collected data, the iFluids assessment team will complete a Draft Leak Detection Feasibility Study Report. The draft report will be disseminated to the Client’s requested recipients as a PDF file for review and comments. • iFluids will develop the engineering specifications for selection and installation of OGC’s preferred leak detection technology for both existing and future expansion of pipelines. This specification will be prepared based on the selected technology in Phase 3. This document will act as the guideline for issuing tender document, vendor selection and installation of the system. • iFluids will participate in a presentation of the findings and attend a review meeting with client and OGC members to discuss the findings and recommendation of the draft report to finalize the proposed changes to be incorporated in the final report. • A single set of non-conflicting Client comments will be collected on a comment collection form (a blank form will accompany the report).
  • 11. PROJECT EXECUTION STEPS Phase 3: Develop Final Report and Final Presentation • Within 10 working days of receipt of all written comments from the Client on the comment collection form, the test team will prepare and deliver one Hard Copy Final Report and one electronic version in editable form and electronically mail it to the Client’s requested distribution list. A file showing resolution of all Client comments received will be provided to the Client. • iFluids will prepare a PowerPoint presentation and participate in a final presentation of the result as per the study with client and OGC members to discuss the action to be taken and the way forward. Phase 4: Optional Scope • iFluids will carry out the actual Testing on OGC pipelines (within 50 to Max 100km only) to evaluate the OGC selected gas leak detection technology based on outcomes proposed from the scope mentioned above
  • 12. PROJECT SCHEDULE • A Detailed Project Schedule along with Project Execution Methodology will be submitted within Five(5) days on receipt of PO or on date of Kick-Off meeting, whichever is earlier • Consultant will commence Phase 1 activities immediately upon receipt of a signed proposal and the Project Initiation Fee Payment. • The Feasibility Study is planned to be conducted and completed within Five (5) weeks of the date both conditions above are met. • It is assumed that the elements of the scope of work will be executed consecutively as a part of a single test series and set-up will only occur once. DELIVERABLES iFluids will provide the following Deliverables: • 1. Detailed Feasibility Study Report (Drafted in accordance with international standards, Oman local standard and in line with the OGC scope of work & Technical Clarification raised) in PDF format. • 2. A PowerPoint Presentation for distribution to OGC management demonstrating the results of the Leak Detection Feasibility Study. • 3. Submission of Final Report documenting the Leak Detection Feasibility Study results (Only soft copies in "Editable format“ is considered).
  • 13. SITE VISITS, PRESENTATION & MEETINGS • Only Two(2) visits have been considered during any phase of the project. • Kick-Off Meeting followed by Data Collection, Site Visit & related activities Etc for a maximum of Ten(10) days • Final Presentation Two(2) days on confirmation of submitted draft Feasibility Study • Any additional, presentation and meetings are to be conducted using WebEx or Skype meeting resources. • Our technical team will be operating from the India/Singapore office for this project. Project management will be carried out from our Oman/India office.
  • 14. • QRA Report • Past Reports & Studies Carried Out • P&ID, Pipeline ROW drawings, and other Process documents • Flowline Diagram • Control Narratives • Control Schematic • Cause & Effect Matrix • FGS Philosophy • Design Basis Documents • Plot Plans / Layouts • Pipeline Models / Past Simulations if any • Pipeline GIS Information/Data • PODS (Pipeline Open Data Standard) • And any other document/drawing to successfully conduct the LDS Feasibility Study InputsInputsInputsInputs RequiredRequiredRequiredRequired
  • 15. Mike Snakard Process Consultant Srinivasan Senior Instrumentation & Control Principal Consultant with 36 years of rich experience in delivering optimal results & business value in high-growth environments Rajendran Subramaniam Senior Instrumentation & Control Principal Consultant with 30 years of Refinery expansion, Refinery DCS hot changeover, Inter Refineries Pipelines, Power Plant expansion FEED, EPC packages documents on Design, Procurement & Construction Documents Nagarajan Process Head of Department JothiKannan Lead Process Engineer John Kingsley Project Manager Project PersonnelProject PersonnelProject PersonnelProject Personnel