Microsoft Project
In 16 Minutes Flat

...and 20 Hot Tips
To Resolve Schedule
and Resource
Problems!

David Geoffrey Litten
MS Project 2010 Top 10 Tips
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

Copyright © 2012 David Geoffrey Litten
CasaBlanca Publishing Corp
All rights reserved.
No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means,
electronic, mechanical, photocopying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the
1976 United States Copyright Act, without the prior written permission of the publisher and author, David Geoffrey Litten.
All trademarked product and company names are the property of their trademark holders.
Copying software used in this publication is prohibited without the express permission of CasaBlanca Publishing Corporation.
Making unauthorized copies of such software violates federal copyright law, which includes both civil and criminal penalties.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

2
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

Using Microsoft Project 2010 In 16 Minutes Flat
I have created this fast-track Video to give you a simplified overview of MS Project 2010 to
build your confidence, and to help you resolve some of the Scheduling and Resourcing
problems that you will encounter in any project.

Have these steps printed out as you watch the video:
12 Simple Steps:
1. Enter project information using Project | Project Information

2. Set default settings in File | Options
(in the dialog box above for Display, Schedule and Advanced tabs)

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

3
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

3. Set up/modify your Project Calendar Project | Change Working Time

4. Set the scheduling method to Auto Schedule (Task | Auto Schedule – enter a
task name first, or go to schedule tab in previous step and set to Auto
Schedule)

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

4
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

5. Enter your tasks, their information, and durations (don’t forget milestones) in
the Gantt View (double-click task name for Task Information box)

6. Set up your outline structure in your project to add summary task bars (Task
tab)

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

5
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

7. Add task dependencies including any internal and external constraints

8. Set up your resource pool and their details in the Resource Sheet view.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

6
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

9. Assign resources to tasks, set their work effort, and add any fixed costs.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

7
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

10. Perform resource leveling if needed to resolve resource over-allocations

11. Review and refine the project schedule and budget to meet requirements

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

8
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

12. Set the project baseline after approval, and proceed to monitor, manage and
report

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

9
MS Project 2010 In 16 Minutes Flat!

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

MS Project 2010

10
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

Ten Hot Tips To Resolve Resource Conflicts

When a resource is over-allocated, resolve resource conflicts by modifying resource
assignments or changing scheduling in some way. Here are some ideas:
1. Use the Task Inspector to identify sources and suggestions for resolving the
over-allocation.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

11
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

2. Revise the resource's availability to the project (Resource Sheet view). Can
the resource be made 100 percent available – or more?

3. Can the resource assignment be replaced on those tasks that are in conflict
and over-allocated? The Team Planner view or one of the Usage views are
most helpful here.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

12
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

4. Move a task to which the resource is assigned to a later date using the Move
Task tool or modify the task's dependency relationships such that the task is
in a different part of the timeframe.

5. For tasks with over-allocated resources, add a second (or more) resource to
share the work. Double click the task name. Make sure the task is set to
effort-driven.(advanced tab)

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

13
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

6. Can an earlier task be assigned more resources to reduce its duration and
free up a resource earlier that is assigned to an over-allocated task, so that
the over-allocated task occurs in a different part of the timeframe.

7. Replace the resource with another on over-allocated tasks or move the task
to a date where the resource IS available. Use a Usage view to spot any
resources that are available

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

14
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

8. Can a temporary or contract resource be added or procured to the resource
pool to replace or share the over-allocated work?

9. Make changes to the resource base calendar to allow the resource to work
more time in a week.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

15
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

10. Consider the knowledge, skills and experience of resources to reduce work
effort time and potentially resolve over-allocations.

Ten Top Tips to Optimize and Crash the Project Schedule
After creating your first draft schedule in Microsoft Project, it is almost certain that it will need
to be refined in some way. Here are some ideas:
1. Ensure that you have auto-schedule selected for your tasks as this will
schedule them to start as soon as possible

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

16
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

2. Use the critical path filter (or set critical tasks to red to do this ‘by eye’), to
focus on critical tasks only, since it is these alone that determine the project
end date.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

17
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

3. Can any task dependencies that are currently finish-to-start be set to startto-start relationships?

4. Do you have any external dependencies? If so can they be set to occur earlier,
or can they be set to act on tasks later/earlier in the schedule (even if they
currently are not constraining any tasks, this is still a helpful approach).

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

18
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

5. Can any tasks use lead dependencies such that they overlap in time and
hence finish earlier (this is always effective on critical tasks, but may also
work on non-critical tasks)?

6. Can the project be re-scoped such that either some tasks are not needed, or
that some tasks require less work? In either case this may have shorten the
project duration. Also re-check quality aspects such as acceptance testing,
reviews, walkthroughs, audits, etc. Can these be carried out in a more
efficient or effective manner that would shorten the project duration.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

19
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

7. Add resources to critical tasks (ensuring they are set to effort-driven), to
shorten their duration and therefore finish time and hence bring in the
project end date.

8. Exchange human resources for those with higher levels of knowledge, skills
or experience so that the work hours may be reduced and hence the task
finish time. Focus on the critical tasks only.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

20
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

9. Outsource certain tasks to a specialist individual or organization if they can
get any critical path task(s) done quicker.

10. Costs. If the budget is a problem, first check all resources, human, materials,
equipment, facilities, tools, even techniques, to see if they can be replaced
with lower cost variants.

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

21
MS Project 2010 In 16 Minutes Flat!
File Menu

MS Project 2010

Project Shortcuts
Keys

Task Menu

Resource Menu

Project Menu

View Menu

Format Menu

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

22
MS Project 2010 In 16 Minutes Flat!

MS Project 2010

Check out more of my quality downloadable Project Management
Video Training Products:
http://www.msproject2010primer.com
http://www.prince2primer.com
http://www.project-management-primer.com
http://www.directingaproject.com
http://www.apmic-primer.com
http://www.pm-primer.com
http://www.taskpack.com
…and coming soon…
http://www.AgileProjectManagementPrimer.com
http://www.earnedvalueprimer.com
http://www.agileprince2.com
http://www.apmpforprince2primer.com
http://www.apmp-primer.com

I look forward to working with you again soon to fast-track your career in easy
bite-sized chunks!

CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat

23

More Related Content

What's hot

Ms project 2010 tutorial 2
Ms project 2010 tutorial   2Ms project 2010 tutorial   2
Ms project 2010 tutorial 2learningquotient
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)douggillis
 
CMGT 410(NEW) Effective Communication/tutorialrank.com
CMGT 410(NEW) Effective Communication/tutorialrank.comCMGT 410(NEW) Effective Communication/tutorialrank.com
CMGT 410(NEW) Effective Communication/tutorialrank.comjonhson190
 
CMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.comCMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.comkopiko203
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013Ong-Art Sanpinit
 
CMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.comCMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.comwilliamwordsworth35
 
CMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.comCMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.comagathachristie182
 
Ms Project Workshop
Ms Project WorkshopMs Project Workshop
Ms Project WorkshopEder Alves
 
CMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.comCMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.comkopiko172
 
CMGT 410 AID Education Counseling / cmgt410aid.com
CMGT 410 AID Education Counseling / cmgt410aid.comCMGT 410 AID Education Counseling / cmgt410aid.com
CMGT 410 AID Education Counseling / cmgt410aid.comkopiko73
 
CMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.comCMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.comkopiko125
 
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.comCMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.comwilliamwordsworth38
 
CMGT 410 HOMEWORK Introduction Education--cmgt410homework.com
CMGT 410 HOMEWORK Introduction Education--cmgt410homework.comCMGT 410 HOMEWORK Introduction Education--cmgt410homework.com
CMGT 410 HOMEWORK Introduction Education--cmgt410homework.comagathachristie264
 
CMGT 410 HOMEWORK Become Exceptional--cmgt410homework.com
CMGT 410 HOMEWORK Become Exceptional--cmgt410homework.comCMGT 410 HOMEWORK Become Exceptional--cmgt410homework.com
CMGT 410 HOMEWORK Become Exceptional--cmgt410homework.comagathachristie111
 
CMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.com
CMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.comCMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.com
CMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.comsrivani507
 
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.comCMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.comKeatonJennings69
 
Ms project 2000 tutorial
Ms project 2000 tutorialMs project 2000 tutorial
Ms project 2000 tutorialpaolocollector
 
CMGT 410 HOMEWORK Inspiring Innovation--cmgt410homework.com
CMGT 410  HOMEWORK Inspiring Innovation--cmgt410homework.comCMGT 410  HOMEWORK Inspiring Innovation--cmgt410homework.com
CMGT 410 HOMEWORK Inspiring Innovation--cmgt410homework.comsachin10202
 

What's hot (20)

Ms project 2010 tutorial 2
Ms project 2010 tutorial   2Ms project 2010 tutorial   2
Ms project 2010 tutorial 2
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)
 
CMGT 410(NEW) Effective Communication/tutorialrank.com
CMGT 410(NEW) Effective Communication/tutorialrank.comCMGT 410(NEW) Effective Communication/tutorialrank.com
CMGT 410(NEW) Effective Communication/tutorialrank.com
 
CMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.comCMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.com
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013
 
PPTs on MS Project 2010
PPTs on MS Project 2010PPTs on MS Project 2010
PPTs on MS Project 2010
 
CMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.comCMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.com
 
CMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.comCMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.com
 
Ms Project Workshop
Ms Project WorkshopMs Project Workshop
Ms Project Workshop
 
CMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.comCMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.com
 
CMGT 410 AID Education Counseling / cmgt410aid.com
CMGT 410 AID Education Counseling / cmgt410aid.comCMGT 410 AID Education Counseling / cmgt410aid.com
CMGT 410 AID Education Counseling / cmgt410aid.com
 
CMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.comCMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.com
 
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.comCMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
 
CMGT 410 HOMEWORK Introduction Education--cmgt410homework.com
CMGT 410 HOMEWORK Introduction Education--cmgt410homework.comCMGT 410 HOMEWORK Introduction Education--cmgt410homework.com
CMGT 410 HOMEWORK Introduction Education--cmgt410homework.com
 
CMGT 410 HOMEWORK Become Exceptional--cmgt410homework.com
CMGT 410 HOMEWORK Become Exceptional--cmgt410homework.comCMGT 410 HOMEWORK Become Exceptional--cmgt410homework.com
CMGT 410 HOMEWORK Become Exceptional--cmgt410homework.com
 
CMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.com
CMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.comCMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.com
CMGT 410 HOMEWORK Your Future Our Mission--cmgt410homework.com
 
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.comCMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
CMGT 410 HOMEWORK Education Counseling--cmgt410homework.com
 
Ms project 2000 tutorial
Ms project 2000 tutorialMs project 2000 tutorial
Ms project 2000 tutorial
 
CMGT 410 HOMEWORK Inspiring Innovation--cmgt410homework.com
CMGT 410  HOMEWORK Inspiring Innovation--cmgt410homework.comCMGT 410  HOMEWORK Inspiring Innovation--cmgt410homework.com
CMGT 410 HOMEWORK Inspiring Innovation--cmgt410homework.com
 
Microsoft project 2010
Microsoft project 2010Microsoft project 2010
Microsoft project 2010
 

Viewers also liked

What Makes Great Infographics
What Makes Great InfographicsWhat Makes Great Infographics
What Makes Great InfographicsSlideShare
 
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareSTOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareEmpowered Presentations
 
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content MarketingHow To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content MarketingContent Marketing Institute
 
Masters of SlideShare
Masters of SlideShareMasters of SlideShare
Masters of SlideShareKapost
 
10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation OptimizationOneupweb
 
2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShareSlideShare
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksSlideShare
 
What to Upload to SlideShare
What to Upload to SlideShareWhat to Upload to SlideShare
What to Upload to SlideShareSlideShare
 
Getting Started With SlideShare
Getting Started With SlideShareGetting Started With SlideShare
Getting Started With SlideShareSlideShare
 

Viewers also liked (10)

What Makes Great Infographics
What Makes Great InfographicsWhat Makes Great Infographics
What Makes Great Infographics
 
You Suck At PowerPoint!
You Suck At PowerPoint!You Suck At PowerPoint!
You Suck At PowerPoint!
 
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareSTOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
 
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content MarketingHow To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
 
Masters of SlideShare
Masters of SlideShareMasters of SlideShare
Masters of SlideShare
 
10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization
 
2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & Tricks
 
What to Upload to SlideShare
What to Upload to SlideShareWhat to Upload to SlideShare
What to Upload to SlideShare
 
Getting Started With SlideShare
Getting Started With SlideShareGetting Started With SlideShare
Getting Started With SlideShare
 

Similar to Msproject2010 in 16 minutes flat

Mgt 402 Success Begins / snaptutorial.com
Mgt 402  Success Begins / snaptutorial.comMgt 402  Success Begins / snaptutorial.com
Mgt 402 Success Begins / snaptutorial.comWilliamsTaylor33
 
Understanding Tasks End-to-End
Understanding Tasks End-to-EndUnderstanding Tasks End-to-End
Understanding Tasks End-to-EndChristian Buckley
 
MGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/SnaptutorialMGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/Snaptutorialwilliamtrumpz4k
 
MGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/SnaptutorialMGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/Snaptutorialwilliamtrumpz2F
 
Do I Use Planner, Project Online, or Azure DevOps?
Do I Use Planner, Project Online, or Azure DevOps?Do I Use Planner, Project Online, or Azure DevOps?
Do I Use Planner, Project Online, or Azure DevOps?Christian Buckley
 
A project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docxA project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docxblondellchancy
 
MGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.comMGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.comjonhson237
 
Mastering Microsoft Project_ A Comprehensive Guide.pptx
Mastering Microsoft Project_ A Comprehensive Guide.pptxMastering Microsoft Project_ A Comprehensive Guide.pptx
Mastering Microsoft Project_ A Comprehensive Guide.pptxkarenbelloc23
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.comUOPCourseHelp
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxcarolinef5
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxdonaldp2
 
Initialization microsoft project 2010
Initialization microsoft project  2010Initialization microsoft project  2010
Initialization microsoft project 2010Wipro
 
Conveyor belt project
Conveyor belt projectConveyor belt project
Conveyor belt projectSamehTeleb
 
Collaboration and Work Management
Collaboration and Work ManagementCollaboration and Work Management
Collaboration and Work ManagementMicrosoft
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeev Gautam
 
Introduction to Agile Project Management
Introduction to Agile Project ManagementIntroduction to Agile Project Management
Introduction to Agile Project Managementliorf
 
CMGT 410 NEW Imagine Your Future/newtonhelp.com   
CMGT 410 NEW Imagine Your Future/newtonhelp.com   CMGT 410 NEW Imagine Your Future/newtonhelp.com   
CMGT 410 NEW Imagine Your Future/newtonhelp.com   bellflower63
 

Similar to Msproject2010 in 16 minutes flat (20)

Mgt 402 Success Begins / snaptutorial.com
Mgt 402  Success Begins / snaptutorial.comMgt 402  Success Begins / snaptutorial.com
Mgt 402 Success Begins / snaptutorial.com
 
Understanding Tasks End-to-End
Understanding Tasks End-to-EndUnderstanding Tasks End-to-End
Understanding Tasks End-to-End
 
MGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/SnaptutorialMGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/Snaptutorial
 
MGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/SnaptutorialMGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/Snaptutorial
 
Microsoft Project 2013
Microsoft Project 2013Microsoft Project 2013
Microsoft Project 2013
 
Do I Use Planner, Project Online, or Azure DevOps?
Do I Use Planner, Project Online, or Azure DevOps?Do I Use Planner, Project Online, or Azure DevOps?
Do I Use Planner, Project Online, or Azure DevOps?
 
A project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docxA project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docx
 
MGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.comMGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.com
 
Mastering Microsoft Project_ A Comprehensive Guide.pptx
Mastering Microsoft Project_ A Comprehensive Guide.pptxMastering Microsoft Project_ A Comprehensive Guide.pptx
Mastering Microsoft Project_ A Comprehensive Guide.pptx
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
Initialization microsoft project 2010
Initialization microsoft project  2010Initialization microsoft project  2010
Initialization microsoft project 2010
 
Cmgt 410 cmgt410
Cmgt 410 cmgt410Cmgt 410 cmgt410
Cmgt 410 cmgt410
 
Conveyor belt project
Conveyor belt projectConveyor belt project
Conveyor belt project
 
Collaboration and Work Management
Collaboration and Work ManagementCollaboration and Work Management
Collaboration and Work Management
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_Infosys
 
Microsoft Project Syllabus
Microsoft Project SyllabusMicrosoft Project Syllabus
Microsoft Project Syllabus
 
Introduction to Agile Project Management
Introduction to Agile Project ManagementIntroduction to Agile Project Management
Introduction to Agile Project Management
 
CMGT 410 NEW Imagine Your Future/newtonhelp.com   
CMGT 410 NEW Imagine Your Future/newtonhelp.com   CMGT 410 NEW Imagine Your Future/newtonhelp.com   
CMGT 410 NEW Imagine Your Future/newtonhelp.com   
 

Msproject2010 in 16 minutes flat

  • 1. Microsoft Project In 16 Minutes Flat ...and 20 Hot Tips To Resolve Schedule and Resource Problems! David Geoffrey Litten MS Project 2010 Top 10 Tips
  • 2. MS Project 2010 In 16 Minutes Flat! MS Project 2010 Copyright © 2012 David Geoffrey Litten CasaBlanca Publishing Corp All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the 1976 United States Copyright Act, without the prior written permission of the publisher and author, David Geoffrey Litten. All trademarked product and company names are the property of their trademark holders. Copying software used in this publication is prohibited without the express permission of CasaBlanca Publishing Corporation. Making unauthorized copies of such software violates federal copyright law, which includes both civil and criminal penalties. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 2
  • 3. MS Project 2010 In 16 Minutes Flat! MS Project 2010 Using Microsoft Project 2010 In 16 Minutes Flat I have created this fast-track Video to give you a simplified overview of MS Project 2010 to build your confidence, and to help you resolve some of the Scheduling and Resourcing problems that you will encounter in any project. Have these steps printed out as you watch the video: 12 Simple Steps: 1. Enter project information using Project | Project Information 2. Set default settings in File | Options (in the dialog box above for Display, Schedule and Advanced tabs) CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 3
  • 4. MS Project 2010 In 16 Minutes Flat! MS Project 2010 3. Set up/modify your Project Calendar Project | Change Working Time 4. Set the scheduling method to Auto Schedule (Task | Auto Schedule – enter a task name first, or go to schedule tab in previous step and set to Auto Schedule) CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 4
  • 5. MS Project 2010 In 16 Minutes Flat! MS Project 2010 5. Enter your tasks, their information, and durations (don’t forget milestones) in the Gantt View (double-click task name for Task Information box) 6. Set up your outline structure in your project to add summary task bars (Task tab) CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 5
  • 6. MS Project 2010 In 16 Minutes Flat! MS Project 2010 7. Add task dependencies including any internal and external constraints 8. Set up your resource pool and their details in the Resource Sheet view. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 6
  • 7. MS Project 2010 In 16 Minutes Flat! MS Project 2010 9. Assign resources to tasks, set their work effort, and add any fixed costs. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 7
  • 8. MS Project 2010 In 16 Minutes Flat! MS Project 2010 10. Perform resource leveling if needed to resolve resource over-allocations 11. Review and refine the project schedule and budget to meet requirements CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 8
  • 9. MS Project 2010 In 16 Minutes Flat! MS Project 2010 12. Set the project baseline after approval, and proceed to monitor, manage and report CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 9
  • 10. MS Project 2010 In 16 Minutes Flat! CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat MS Project 2010 10
  • 11. MS Project 2010 In 16 Minutes Flat! MS Project 2010 Ten Hot Tips To Resolve Resource Conflicts When a resource is over-allocated, resolve resource conflicts by modifying resource assignments or changing scheduling in some way. Here are some ideas: 1. Use the Task Inspector to identify sources and suggestions for resolving the over-allocation. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 11
  • 12. MS Project 2010 In 16 Minutes Flat! MS Project 2010 2. Revise the resource's availability to the project (Resource Sheet view). Can the resource be made 100 percent available – or more? 3. Can the resource assignment be replaced on those tasks that are in conflict and over-allocated? The Team Planner view or one of the Usage views are most helpful here. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 12
  • 13. MS Project 2010 In 16 Minutes Flat! MS Project 2010 4. Move a task to which the resource is assigned to a later date using the Move Task tool or modify the task's dependency relationships such that the task is in a different part of the timeframe. 5. For tasks with over-allocated resources, add a second (or more) resource to share the work. Double click the task name. Make sure the task is set to effort-driven.(advanced tab) CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 13
  • 14. MS Project 2010 In 16 Minutes Flat! MS Project 2010 6. Can an earlier task be assigned more resources to reduce its duration and free up a resource earlier that is assigned to an over-allocated task, so that the over-allocated task occurs in a different part of the timeframe. 7. Replace the resource with another on over-allocated tasks or move the task to a date where the resource IS available. Use a Usage view to spot any resources that are available CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 14
  • 15. MS Project 2010 In 16 Minutes Flat! MS Project 2010 8. Can a temporary or contract resource be added or procured to the resource pool to replace or share the over-allocated work? 9. Make changes to the resource base calendar to allow the resource to work more time in a week. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 15
  • 16. MS Project 2010 In 16 Minutes Flat! MS Project 2010 10. Consider the knowledge, skills and experience of resources to reduce work effort time and potentially resolve over-allocations. Ten Top Tips to Optimize and Crash the Project Schedule After creating your first draft schedule in Microsoft Project, it is almost certain that it will need to be refined in some way. Here are some ideas: 1. Ensure that you have auto-schedule selected for your tasks as this will schedule them to start as soon as possible CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 16
  • 17. MS Project 2010 In 16 Minutes Flat! MS Project 2010 2. Use the critical path filter (or set critical tasks to red to do this ‘by eye’), to focus on critical tasks only, since it is these alone that determine the project end date. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 17
  • 18. MS Project 2010 In 16 Minutes Flat! MS Project 2010 3. Can any task dependencies that are currently finish-to-start be set to startto-start relationships? 4. Do you have any external dependencies? If so can they be set to occur earlier, or can they be set to act on tasks later/earlier in the schedule (even if they currently are not constraining any tasks, this is still a helpful approach). CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 18
  • 19. MS Project 2010 In 16 Minutes Flat! MS Project 2010 5. Can any tasks use lead dependencies such that they overlap in time and hence finish earlier (this is always effective on critical tasks, but may also work on non-critical tasks)? 6. Can the project be re-scoped such that either some tasks are not needed, or that some tasks require less work? In either case this may have shorten the project duration. Also re-check quality aspects such as acceptance testing, reviews, walkthroughs, audits, etc. Can these be carried out in a more efficient or effective manner that would shorten the project duration. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 19
  • 20. MS Project 2010 In 16 Minutes Flat! MS Project 2010 7. Add resources to critical tasks (ensuring they are set to effort-driven), to shorten their duration and therefore finish time and hence bring in the project end date. 8. Exchange human resources for those with higher levels of knowledge, skills or experience so that the work hours may be reduced and hence the task finish time. Focus on the critical tasks only. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 20
  • 21. MS Project 2010 In 16 Minutes Flat! MS Project 2010 9. Outsource certain tasks to a specialist individual or organization if they can get any critical path task(s) done quicker. 10. Costs. If the budget is a problem, first check all resources, human, materials, equipment, facilities, tools, even techniques, to see if they can be replaced with lower cost variants. CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 21
  • 22. MS Project 2010 In 16 Minutes Flat! File Menu MS Project 2010 Project Shortcuts Keys Task Menu Resource Menu Project Menu View Menu Format Menu CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 22
  • 23. MS Project 2010 In 16 Minutes Flat! MS Project 2010 Check out more of my quality downloadable Project Management Video Training Products: http://www.msproject2010primer.com http://www.prince2primer.com http://www.project-management-primer.com http://www.directingaproject.com http://www.apmic-primer.com http://www.pm-primer.com http://www.taskpack.com …and coming soon… http://www.AgileProjectManagementPrimer.com http://www.earnedvalueprimer.com http://www.agileprince2.com http://www.apmpforprince2primer.com http://www.apmp-primer.com I look forward to working with you again soon to fast-track your career in easy bite-sized chunks! CasaBlanca Publishing Corp| microsoft_project_in_16_minutes_flat 23