SlideShare a Scribd company logo
1 of 5
Ch. Srinivas
Mob : 8019176236
Email : srinivas356@gmail.com
OBJECTIVE
To work inan esteemedorganizationwithchallengingassignmentsanddedicate my knowledge and
skillstoachieve the organization’soverall goal aswell asemerge asanexpertinthe fieldof engineering
AREAS OF EXPOSURE
 ValidationActivities
 URS PreparationforPharmaceutical ProcessEquipments
 Responsible forConductingFAT/SAT
 Preparation andExecutionof QualificationProtocols(DQ,IQ,OQ) forProcess Equipments
 Responsible forReviewof ETOPdocuments(P&ID’S,Vendordesigndocuments)
 Responsible forConductingImpactAssessmentatSystemLevel andComponentLevel
 Responsible forPreparing RiskAssessment
 ReviewandPreparationof ValidationandRevalidationProtocols
 Preparationof JobSafetyandAnalysis
 Responsible forexecutionof validationactivitiesandreview of documentsincomplaintsto
cGMP
 QMS AND DOCUMENTATION
 Filingandfollow-upof IncidentsandDeviations
 Change Control ManagementandHandling
 ReviewandPreparationof SOPs
 Performinginvestigationstofindoutrootcause for any non-conformity
 RaisingCAPA itstracking& closure
 Implementationof QualityManagementSystem inthe deliveryof QualityProducts
 ERECTION AND COMMISSIONING
 ExperiencedinErection andcommissioningof all pharmaceutical processequipments
Reactors,Centrifuges,Driers, Filters
 GENERAL AND PREVENTIVE MAINTENANCE OF EQUIPMENTS
 Maintenance of all equipments in the plant and planning of equipments for preventive
maintenance and minimizingthe breakdownsbyeffectivecheckinpreventivemaintenance
 Maintaining the proper documentation of engineering files and plant qualification as per
cGMP requirement
 Managed the operations of CAPEX management and development of budgets for
maintenance andimprovements.
 Implementationof GoodEngineeringPracticesatthe work
 Implementingstatutory andregulatorycomplianceaspertimelines
 PREDECTIVE MAINTENANCEAND THERMOGRAPHY ACTIVITIES
 Predictive maintenance of all process equipments as per the schedule by using SPM A30
instrument.
 Performing thermograph activities for electrical panels by using thermal imager instrument
fluke TI32
 WORK EXPERIENCE (8 + YEARS)
 Dr. Reddy’sLaboratories Limited,Hyderabad
 CurrentlyWorkingasa Juniormanagerinengineeringservicesdepartment
 Durationof EmploymentFromApril 2013 to present
ProjectsHandled:
 Commissioningof dry vacuumpumpwithcapacityof 267 m3
/hr
 Erectionof 1.6 kl glasslinedreactormake de dietrich includingwithutilities
 Erectionof 1.2 kl ssreactors includingwithutilities
Key Skillsand Achievements
 Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray
Driers, Vacuum tray driers, water ring vacuum pumps, Centrifuges, Pumps, Brine chiller
plant, Solid fluid boilers, Air compressor, DG set, Effluent Treatment Plant & Distillation
columns.
 DesigningMaintenanceStrategies, ProceduresandMethods
 Planning&PreparationPreventivemaintenance schedule of Equipments&Utilities.
 Diagnosingbreakdownproblems.
 Directing,Instructingandsupervisingmaintenance techniciansandfitters
 MaintainingDocumentsaspercGMP Requirement.
 SafetySystemImplementation.
 Preparationof DQ,IQ& OQ of equipments
 Preparationof daily,weekly&MonthlyMaintenance relatedreports
 Monitoring& Controllingmaintenance costs.
 Writingmaintenance strategiestohelpwithinstallation&commissioning guidelines.
 Analysisof rootcause of Breakdownsandrectification.
 Preparationof Standardoperatingproceduresof operationof all utilities.
 Ensure goodhousekeepingaspersite objectives
 To meetSHE targetsfor his/herarea.
 To coordinate andassist productionheadinimproving/addressing
complaints/troubleshootingthe processandabsorptionof new technologiesinorderto
improve the productoffering.
 NeulandLaboratories Limited,Hyderabad
 Workedas a Executive EngineerinEngineeringservices department
 Durationof EmploymentFromApril 2010 to April 2013
ProjectsHandled:
 Commissioningcentrifugalpumpswithcapacityof 5 m3
/hr
 Erectionof 630 Lts glasslinedreactormake NILE Ltd includingwithutilities
Key Skillsand Achievements
 Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray
Driers,Vacuumtray driers,waterringvacuumpumps,Centrifuges,Pumps
 DesigningMaintenanceStrategies,ProceduresandMethods
 Planning&PreparationPreventivemaintenance schedule of Equipments
 Diagnosingbreakdownproblems.
 Directing,Instructingandsupervisingmaintenance techniciansand fitters
 MaintainingDocumentsaspercGMP Requirement.
 SafetySystemImplementation.
 Preparationof DQ,IQ& OQ of equipments
 Preparationof daily,weekly&MonthlyMaintenance relatedreports
 Monitoring& Controllingmaintenance costs.
 Writingmaintenance strategiestohelpwithinstallation&commissioningguidelines.
 Analysisof rootcause of Breakdownsandrectification.
 Preparationof Standardoperatingproceduresof operationof all utilities.
 Nutra specialitiesPvtLimited,Vinjamoor,SPSR Nellore Dist,A.P
 Workedas a EngineerinEngineeringservicesdepartment
 Durationof Employment From Sep2008 to Jan 2010
ProjectsHandled:
 Erectionof two no’sof 8kl steel linedreactorswithcondenserandutilityconnections.
 Erection of one 4kl & 8kl Mild Steel reactors with a connection of steam and condenser for
the evaporationof effluent.
 Erection of centrifugal blower with a capacity of 500 CFM for the ware house dispensing
room.
 Execution of Ware house extension building in a dimension of 18.75 met X 12.2 met X 6 met
heightwitharoofingof non asbestossheets.
 Erectionof 500 litcapacityRotary cone vacuum dryerwith the utilityconnections.
 Erectionof pressfilterswithutilityconnections.
 Erection of 5kl SS reactor with 25 sq met condensers and 4 sq met as sub cooler with vent
condenserandutilityconnections.
Key Skillsand Achievements
 Projectwork-Erection
 Maintenance of all equipmentsinthe plant.
 Trouble shootingof Equipment.
 Equipmentscritical sparesarrangements.
 Productionrelatedmodificationworkfallow up.
 FollowupAMC’Sand Calibrationforequipments.
 Preparationof DQ,IQ, and OQ documents.
 Unloadthe material safelyrelatedtothe Projects.
 Give AssetCode fornewEquipments.
 Raise purchase Requisition.
 Followthe preventivemaintenance schedule.
 Preventive,Periodicmaintenance of fuel pumps,multistage/centrifugal/Feedwaterpumps.
 Fallowthe SafetyPermitslike hotwork,Vessel Entry,HeightworkandExcavationwork.
EDUCATION QUALIFICATION:
Degree Institute/ Board Year Percentage
B.Tech (Mechanical ) JNTU 2004-2008 First Class (60.91%)
SOFT SKILLS, INTERESTS & ATTRIBUTES:
 ProficientinusingcomputerskillssuchasMicrosoftWindows,MicrosoftWord,Excel and
PowerPoint.
 Interests-Listeningtomusic,PublicSpeaking,Travelling.
 Target orientedandconfidentpersonality.
 Maintainingleadershipskillsinall endeavors.
LANGUAGES:
 ProficientinEnglish,Telugu.
PERSONAL INFORMATION:
FatherName : Ch.Prakash Rao
Date Of Birth : 08- June -1984
Address: Ch.Srinivas
Flat No:404, Satya devaNilayam, Padmanagarphase 2ring road
Chintal,Hyderabad.
DECLARATION :
I herebydeclare thatthe above-submittedparticularsare true tothe bestof my knowledge.
 Place : Hyderabad.
 Date: (CH.SRINIVAS)

More Related Content

What's hot

Cv permit receiver shams alam-01-2
Cv permit receiver shams alam-01-2Cv permit receiver shams alam-01-2
Cv permit receiver shams alam-01-2Zayed Khan
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Calibration Engineer 2016
Calibration Engineer   2016Calibration Engineer   2016
Calibration Engineer 2016Prasanna kumar
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Haider
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer Shafeek Nazar
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyAjith Puthoor
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)jobby Thomas
 

What's hot (20)

Cv permit receiver shams alam-01-2
Cv permit receiver shams alam-01-2Cv permit receiver shams alam-01-2
Cv permit receiver shams alam-01-2
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Calibration Engineer 2016
Calibration Engineer   2016Calibration Engineer   2016
Calibration Engineer 2016
 
CV-SITE SUPERVISOR
CV-SITE SUPERVISORCV-SITE SUPERVISOR
CV-SITE SUPERVISOR
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 

Similar to Maintenance Manager - CV

Similar to Maintenance Manager - CV (20)

Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
KASHF ALI
KASHF ALIKASHF ALI
KASHF ALI
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
 
QA QC Manager & MR
QA QC Manager & MRQA QC Manager & MR
QA QC Manager & MR
 
Nithya resume
Nithya resumeNithya resume
Nithya resume
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 
BPippey_resume 2 Pg
BPippey_resume 2 PgBPippey_resume 2 Pg
BPippey_resume 2 Pg
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
ramshad process
ramshad processramshad process
ramshad process
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resume
 
CV.SMK
CV.SMKCV.SMK
CV.SMK
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Resume Irshad Ahmed
Resume Irshad AhmedResume Irshad Ahmed
Resume Irshad Ahmed
 
SANJAY PATEL
SANJAY PATELSANJAY PATEL
SANJAY PATEL
 

Maintenance Manager - CV

  • 1. Ch. Srinivas Mob : 8019176236 Email : srinivas356@gmail.com OBJECTIVE To work inan esteemedorganizationwithchallengingassignmentsanddedicate my knowledge and skillstoachieve the organization’soverall goal aswell asemerge asanexpertinthe fieldof engineering AREAS OF EXPOSURE  ValidationActivities  URS PreparationforPharmaceutical ProcessEquipments  Responsible forConductingFAT/SAT  Preparation andExecutionof QualificationProtocols(DQ,IQ,OQ) forProcess Equipments  Responsible forReviewof ETOPdocuments(P&ID’S,Vendordesigndocuments)  Responsible forConductingImpactAssessmentatSystemLevel andComponentLevel  Responsible forPreparing RiskAssessment  ReviewandPreparationof ValidationandRevalidationProtocols  Preparationof JobSafetyandAnalysis  Responsible forexecutionof validationactivitiesandreview of documentsincomplaintsto cGMP  QMS AND DOCUMENTATION  Filingandfollow-upof IncidentsandDeviations  Change Control ManagementandHandling  ReviewandPreparationof SOPs  Performinginvestigationstofindoutrootcause for any non-conformity  RaisingCAPA itstracking& closure  Implementationof QualityManagementSystem inthe deliveryof QualityProducts  ERECTION AND COMMISSIONING  ExperiencedinErection andcommissioningof all pharmaceutical processequipments Reactors,Centrifuges,Driers, Filters
  • 2.  GENERAL AND PREVENTIVE MAINTENANCE OF EQUIPMENTS  Maintenance of all equipments in the plant and planning of equipments for preventive maintenance and minimizingthe breakdownsbyeffectivecheckinpreventivemaintenance  Maintaining the proper documentation of engineering files and plant qualification as per cGMP requirement  Managed the operations of CAPEX management and development of budgets for maintenance andimprovements.  Implementationof GoodEngineeringPracticesatthe work  Implementingstatutory andregulatorycomplianceaspertimelines  PREDECTIVE MAINTENANCEAND THERMOGRAPHY ACTIVITIES  Predictive maintenance of all process equipments as per the schedule by using SPM A30 instrument.  Performing thermograph activities for electrical panels by using thermal imager instrument fluke TI32  WORK EXPERIENCE (8 + YEARS)  Dr. Reddy’sLaboratories Limited,Hyderabad  CurrentlyWorkingasa Juniormanagerinengineeringservicesdepartment  Durationof EmploymentFromApril 2013 to present ProjectsHandled:  Commissioningof dry vacuumpumpwithcapacityof 267 m3 /hr  Erectionof 1.6 kl glasslinedreactormake de dietrich includingwithutilities  Erectionof 1.2 kl ssreactors includingwithutilities Key Skillsand Achievements  Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray Driers, Vacuum tray driers, water ring vacuum pumps, Centrifuges, Pumps, Brine chiller plant, Solid fluid boilers, Air compressor, DG set, Effluent Treatment Plant & Distillation columns.  DesigningMaintenanceStrategies, ProceduresandMethods  Planning&PreparationPreventivemaintenance schedule of Equipments&Utilities.  Diagnosingbreakdownproblems.  Directing,Instructingandsupervisingmaintenance techniciansandfitters  MaintainingDocumentsaspercGMP Requirement.
  • 3.  SafetySystemImplementation.  Preparationof DQ,IQ& OQ of equipments  Preparationof daily,weekly&MonthlyMaintenance relatedreports  Monitoring& Controllingmaintenance costs.  Writingmaintenance strategiestohelpwithinstallation&commissioning guidelines.  Analysisof rootcause of Breakdownsandrectification.  Preparationof Standardoperatingproceduresof operationof all utilities.  Ensure goodhousekeepingaspersite objectives  To meetSHE targetsfor his/herarea.  To coordinate andassist productionheadinimproving/addressing complaints/troubleshootingthe processandabsorptionof new technologiesinorderto improve the productoffering.  NeulandLaboratories Limited,Hyderabad  Workedas a Executive EngineerinEngineeringservices department  Durationof EmploymentFromApril 2010 to April 2013 ProjectsHandled:  Commissioningcentrifugalpumpswithcapacityof 5 m3 /hr  Erectionof 630 Lts glasslinedreactormake NILE Ltd includingwithutilities Key Skillsand Achievements  Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray Driers,Vacuumtray driers,waterringvacuumpumps,Centrifuges,Pumps  DesigningMaintenanceStrategies,ProceduresandMethods  Planning&PreparationPreventivemaintenance schedule of Equipments  Diagnosingbreakdownproblems.  Directing,Instructingandsupervisingmaintenance techniciansand fitters  MaintainingDocumentsaspercGMP Requirement.  SafetySystemImplementation.  Preparationof DQ,IQ& OQ of equipments  Preparationof daily,weekly&MonthlyMaintenance relatedreports  Monitoring& Controllingmaintenance costs.  Writingmaintenance strategiestohelpwithinstallation&commissioningguidelines.  Analysisof rootcause of Breakdownsandrectification.  Preparationof Standardoperatingproceduresof operationof all utilities.
  • 4.  Nutra specialitiesPvtLimited,Vinjamoor,SPSR Nellore Dist,A.P  Workedas a EngineerinEngineeringservicesdepartment  Durationof Employment From Sep2008 to Jan 2010 ProjectsHandled:  Erectionof two no’sof 8kl steel linedreactorswithcondenserandutilityconnections.  Erection of one 4kl & 8kl Mild Steel reactors with a connection of steam and condenser for the evaporationof effluent.  Erection of centrifugal blower with a capacity of 500 CFM for the ware house dispensing room.  Execution of Ware house extension building in a dimension of 18.75 met X 12.2 met X 6 met heightwitharoofingof non asbestossheets.  Erectionof 500 litcapacityRotary cone vacuum dryerwith the utilityconnections.  Erectionof pressfilterswithutilityconnections.  Erection of 5kl SS reactor with 25 sq met condensers and 4 sq met as sub cooler with vent condenserandutilityconnections. Key Skillsand Achievements  Projectwork-Erection  Maintenance of all equipmentsinthe plant.  Trouble shootingof Equipment.  Equipmentscritical sparesarrangements.  Productionrelatedmodificationworkfallow up.  FollowupAMC’Sand Calibrationforequipments.  Preparationof DQ,IQ, and OQ documents.  Unloadthe material safelyrelatedtothe Projects.  Give AssetCode fornewEquipments.  Raise purchase Requisition.  Followthe preventivemaintenance schedule.  Preventive,Periodicmaintenance of fuel pumps,multistage/centrifugal/Feedwaterpumps.  Fallowthe SafetyPermitslike hotwork,Vessel Entry,HeightworkandExcavationwork.
  • 5. EDUCATION QUALIFICATION: Degree Institute/ Board Year Percentage B.Tech (Mechanical ) JNTU 2004-2008 First Class (60.91%) SOFT SKILLS, INTERESTS & ATTRIBUTES:  ProficientinusingcomputerskillssuchasMicrosoftWindows,MicrosoftWord,Excel and PowerPoint.  Interests-Listeningtomusic,PublicSpeaking,Travelling.  Target orientedandconfidentpersonality.  Maintainingleadershipskillsinall endeavors. LANGUAGES:  ProficientinEnglish,Telugu. PERSONAL INFORMATION: FatherName : Ch.Prakash Rao Date Of Birth : 08- June -1984 Address: Ch.Srinivas Flat No:404, Satya devaNilayam, Padmanagarphase 2ring road Chintal,Hyderabad. DECLARATION : I herebydeclare thatthe above-submittedparticularsare true tothe bestof my knowledge.  Place : Hyderabad.  Date: (CH.SRINIVAS)