CONNECTING
METRO VANCOUVER
WITH
THE MOUNTAINS
THE VALLEY
THE WORLD
AT A GLANCE
➤ 5 Corridors
➤ 4 Regions
➤ 2 Airports
➤ 2 Ferry Terminals
➤ 130,000 Daily Riders
➤ 355 km network
➤ $9.6 Billion ($7.8 B shared)
➤ $0.17 per km ($21 from Waterfront to
Whistler)
THE NEED
➤ Connect Metro Vancouver with
surrounding regions
➤ Energize Economic Growth
➤ Enable Sustainable Growth
➤ Reduce GHG Emissions
The Challenges
PLANNING PRINCIPLES
➤ Maximize Utility
➤ Maximize Connectivity
➤ Allow Incremental Implementation
➤ Superior to Car Travel
➤ Leverage Development
PHASE 1: VANCOUVER-SURREY-ABBOTSFORD LINE
VSA LINE
➤ Cost: $2.63 B (2.30 B with sharing)
➤ Objectives:
➤ Connect regions two largest centres
➤ Connect Abbotsford with Metro
Vancouver
➤ Build E-W regional rail trunk
VANCOUVER-SURREY-ABBOTSFORD LINE TRAVEL TIMES
From-To Transit Car Regional Rail
Downtown Vancouver
- Surrey Central
39m 35m-1h05m 17m
Downtown Vancouver
- Abbotsford Central
1h35m 1h00m-2h00m 41m
Surrey Central - YXX 1h10m 30m-1h15m 21m
PHASE 2: WEST COAST EXPRESS 2.0
WCE 2.0
➤ Cost: $290 M
➤ Objectives:
➤ All-day rail service
➤ Full electri
fi
cation
➤ Maintain rail service to North Fraser
➤ Permit rebuilding of Waterfront Station
WEST COAST EXPRESS 2.0 TRAVEL TIMES
From-To Transit Car North Fraser RR
Downtown Vancouver
- Mission
1h17m 50m-2h00m 46m
Downtown Vancouver
- Maple Ridge
1h06m 40m-1h50m 32m
Downtown Vancouver
- Coquitlam Central
31m 30m-1h20m 22m
PHASE 3: WATERFRONT CONNECTOR
WATERFRONT CONNECTOR
➤ Cost: $391 M ($348 with sharing)
➤ Objectives:
➤ New hub at Waterfront Station
➤ Shared tunnel with Hastings RT
➤ Cross-platform transfers
PHASE 4: WATERFRONT TO WHISTLER
WATERFRONT TO WHISTLER
➤ Cost: $2.41 B ($1.89 B with sharing)
➤ Objectives:
➤ New hub at Waterfront Station
➤ Shared tunnel with Hastings RT
➤ Cross-platform transfers
WATERFRONT TO WHISTLER TRAVEL TIMES
From-To Transit Car Sea-to-Sky RR
Downtown Vancouver
- Whistler
2h00m-2h45m 1h30m-2h20m 1h29m
Downtown Vancouver
- Squamish
1h26m-2h00m 50m-1h20m 48m
Downtown Vancouver
- Horseshoe Bay
52m 22m-45m 12m
PHASE 5: TSAWWASSEN TO YVR
TSAWWASSEN TO YVR LINE
➤ Cost: $1.03 B
➤ Objectives:
➤ Quality transit connection to
Tsawwassen Ferry Terminal (via
Canada Line)
➤ Service to South Delta, Tsawwassen
FN
➤ First phase of N-S corridor
PHASE 6: EAST VANCOUVER ACCESS
EAST VANCOUVER ACCESS
➤ Cost: $1.71 B ($1.09 B shared)
➤ Objectives:
➤ Connect N-S corridor with E-W
corridor
➤ Enable service from YVR, Tsawwassen
Ferry terminal to Vancouver and Surrey
➤ Implement Rapid Transit along
Commercial Victoria corridor
PHASE 7: BURRARD TUNNEL
BURRARD TUNNEL
➤ Cost: $516 M ($258 M shared)
➤ Objectives:
➤ Extend N-S corridor to the North
Shore
➤ Enable service from YVR, Tsawwassen
Ferry terminal to Lower Lonsdale
➤ Provide direct rapid transit connection
between North Vancouver and
Downtown Vancouver
TSAWWASSEN CONNECTOR RR TRAVEL TIMES
From-To Transit Car Tsawwassen Connector
Downtown Vancouver
- Tsawwassen Ferry
1h10m 35m-1h10m 28m
Downtown Vancouver
- YVR
25m 18m-55m 19m
Lower Lonsdale -
YVR
48m 30m-1h30m 21m
Surrey Central - YVR 1h3m 30m-55m 27m
NON-CORE PROJECTS
➤ Cascadia High-Speed Rail
➤ Cost: $362 M
➤ Chilliwack Extension
➤ Cost: $254 M ($236 M shared)
MAKING IT A REALITY
1. Keep Costs Down
2. Leverage Development
3. Cooperate and Integrate
Key Cost-Reducing Concepts
LAST-MILE CONNECTIVITY
➤ Rapid Transit Connections
➤ Gondola Lift Services
➤ Whistler
➤ Squamish
➤ Cypress Mountain
➤ Grouse Mountain
➤ Cycling
➤ Separated Bike Lanes
➤ Parking Garages
RIDERSHIP ESTIMATION
➤ 130 000 Daily Riders
➤ Based on 20% of existing Highway
Tra
ffi
c
➤ Does not factor ridership gains from
development
➤ $21 Trip to Whistler without additional
sources of funding
The Endgame
THANK YOU!

More Related Content

Similar to MVX Nexus

CUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSALCUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSAL
J. (Yon) Friedmann
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
RobertsBankRailCorridor
 
NYC 2030: Accepting The Challenge
NYC 2030: Accepting The ChallengeNYC 2030: Accepting The Challenge
NYC 2030: Accepting The Challenge
streetsblog
 

Similar to MVX Nexus (20)

Brisbane airport link & Canada Line
Brisbane airport link & Canada LineBrisbane airport link & Canada Line
Brisbane airport link & Canada Line
 
TEST4-SLIDESHARE
TEST4-SLIDESHARETEST4-SLIDESHARE
TEST4-SLIDESHARE
 
Phil Lawes
Phil LawesPhil Lawes
Phil Lawes
 
Impact of the New Suez Canal on North America
Impact of the New Suez Canal on North AmericaImpact of the New Suez Canal on North America
Impact of the New Suez Canal on North America
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
India's preparedness for IWT
India's preparedness for IWTIndia's preparedness for IWT
India's preparedness for IWT
 
CUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSALCUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSAL
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
HSR Justification Presentation
HSR Justification PresentationHSR Justification Presentation
HSR Justification Presentation
 
Public realm - different transit choices
Public realm - different transit choicesPublic realm - different transit choices
Public realm - different transit choices
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Plan
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
 
NYC 2030: Accepting The Challenge
NYC 2030: Accepting The ChallengeNYC 2030: Accepting The Challenge
NYC 2030: Accepting The Challenge
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping Projects
 
Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017
 
Beaches to Bay
Beaches to Bay Beaches to Bay
Beaches to Bay
 
Network Rail Developments
Network Rail DevelopmentsNetwork Rail Developments
Network Rail Developments
 
Lecture 9 (Water Transport).pptx
Lecture 9 (Water Transport).pptxLecture 9 (Water Transport).pptx
Lecture 9 (Water Transport).pptx
 
Panama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America TradePanama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America Trade
 

Recently uploaded

Recently uploaded (20)

Tennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EVTennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EV
 
Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...
 
IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024
 
Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....
 
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
 
History of DAVAO DE ORO Municipality of Maragusan
History of DAVAO DE ORO Municipality of MaragusanHistory of DAVAO DE ORO Municipality of Maragusan
History of DAVAO DE ORO Municipality of Maragusan
 
NGO working for orphan children’s education kurnool
NGO working for orphan children’s education kurnoolNGO working for orphan children’s education kurnool
NGO working for orphan children’s education kurnool
 
The Outlook for the Budget and the Economy
The Outlook for the Budget and the EconomyThe Outlook for the Budget and the Economy
The Outlook for the Budget and the Economy
 
Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.
 
2024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 332024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 33
 
Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.
 
World Migratory Bird Day 2024 "Protect insects, Protect Birds"
World Migratory Bird Day  2024 "Protect insects, Protect Birds"World Migratory Bird Day  2024 "Protect insects, Protect Birds"
World Migratory Bird Day 2024 "Protect insects, Protect Birds"
 
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdfEDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
 
Harbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical ReviewHarbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical Review
 
International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.
 
"Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant..."Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant...
 
Electric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning OrganizationsElectric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning Organizations
 
Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
WhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical ReviewWhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical Review
 

MVX Nexus

  • 2. AT A GLANCE ➤ 5 Corridors ➤ 4 Regions ➤ 2 Airports ➤ 2 Ferry Terminals ➤ 130,000 Daily Riders ➤ 355 km network ➤ $9.6 Billion ($7.8 B shared) ➤ $0.17 per km ($21 from Waterfront to Whistler)
  • 3. THE NEED ➤ Connect Metro Vancouver with surrounding regions ➤ Energize Economic Growth ➤ Enable Sustainable Growth ➤ Reduce GHG Emissions
  • 5. PLANNING PRINCIPLES ➤ Maximize Utility ➤ Maximize Connectivity ➤ Allow Incremental Implementation ➤ Superior to Car Travel ➤ Leverage Development
  • 6.
  • 8. VSA LINE ➤ Cost: $2.63 B (2.30 B with sharing) ➤ Objectives: ➤ Connect regions two largest centres ➤ Connect Abbotsford with Metro Vancouver ➤ Build E-W regional rail trunk
  • 9. VANCOUVER-SURREY-ABBOTSFORD LINE TRAVEL TIMES From-To Transit Car Regional Rail Downtown Vancouver - Surrey Central 39m 35m-1h05m 17m Downtown Vancouver - Abbotsford Central 1h35m 1h00m-2h00m 41m Surrey Central - YXX 1h10m 30m-1h15m 21m
  • 10. PHASE 2: WEST COAST EXPRESS 2.0
  • 11. WCE 2.0 ➤ Cost: $290 M ➤ Objectives: ➤ All-day rail service ➤ Full electri fi cation ➤ Maintain rail service to North Fraser ➤ Permit rebuilding of Waterfront Station
  • 12. WEST COAST EXPRESS 2.0 TRAVEL TIMES From-To Transit Car North Fraser RR Downtown Vancouver - Mission 1h17m 50m-2h00m 46m Downtown Vancouver - Maple Ridge 1h06m 40m-1h50m 32m Downtown Vancouver - Coquitlam Central 31m 30m-1h20m 22m
  • 13. PHASE 3: WATERFRONT CONNECTOR
  • 14. WATERFRONT CONNECTOR ➤ Cost: $391 M ($348 with sharing) ➤ Objectives: ➤ New hub at Waterfront Station ➤ Shared tunnel with Hastings RT ➤ Cross-platform transfers
  • 15. PHASE 4: WATERFRONT TO WHISTLER
  • 16. WATERFRONT TO WHISTLER ➤ Cost: $2.41 B ($1.89 B with sharing) ➤ Objectives: ➤ New hub at Waterfront Station ➤ Shared tunnel with Hastings RT ➤ Cross-platform transfers
  • 17. WATERFRONT TO WHISTLER TRAVEL TIMES From-To Transit Car Sea-to-Sky RR Downtown Vancouver - Whistler 2h00m-2h45m 1h30m-2h20m 1h29m Downtown Vancouver - Squamish 1h26m-2h00m 50m-1h20m 48m Downtown Vancouver - Horseshoe Bay 52m 22m-45m 12m
  • 19. TSAWWASSEN TO YVR LINE ➤ Cost: $1.03 B ➤ Objectives: ➤ Quality transit connection to Tsawwassen Ferry Terminal (via Canada Line) ➤ Service to South Delta, Tsawwassen FN ➤ First phase of N-S corridor
  • 20. PHASE 6: EAST VANCOUVER ACCESS
  • 21. EAST VANCOUVER ACCESS ➤ Cost: $1.71 B ($1.09 B shared) ➤ Objectives: ➤ Connect N-S corridor with E-W corridor ➤ Enable service from YVR, Tsawwassen Ferry terminal to Vancouver and Surrey ➤ Implement Rapid Transit along Commercial Victoria corridor
  • 23. BURRARD TUNNEL ➤ Cost: $516 M ($258 M shared) ➤ Objectives: ➤ Extend N-S corridor to the North Shore ➤ Enable service from YVR, Tsawwassen Ferry terminal to Lower Lonsdale ➤ Provide direct rapid transit connection between North Vancouver and Downtown Vancouver
  • 24. TSAWWASSEN CONNECTOR RR TRAVEL TIMES From-To Transit Car Tsawwassen Connector Downtown Vancouver - Tsawwassen Ferry 1h10m 35m-1h10m 28m Downtown Vancouver - YVR 25m 18m-55m 19m Lower Lonsdale - YVR 48m 30m-1h30m 21m Surrey Central - YVR 1h3m 30m-55m 27m
  • 25.
  • 26. NON-CORE PROJECTS ➤ Cascadia High-Speed Rail ➤ Cost: $362 M ➤ Chilliwack Extension ➤ Cost: $254 M ($236 M shared)
  • 27. MAKING IT A REALITY 1. Keep Costs Down 2. Leverage Development 3. Cooperate and Integrate
  • 29. LAST-MILE CONNECTIVITY ➤ Rapid Transit Connections ➤ Gondola Lift Services ➤ Whistler ➤ Squamish ➤ Cypress Mountain ➤ Grouse Mountain ➤ Cycling ➤ Separated Bike Lanes ➤ Parking Garages
  • 30. RIDERSHIP ESTIMATION ➤ 130 000 Daily Riders ➤ Based on 20% of existing Highway Tra ffi c ➤ Does not factor ridership gains from development ➤ $21 Trip to Whistler without additional sources of funding