SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
Sukumar Pachipala
E-
mail:pachipalasukumar@gmail.com
Mobile: 08499088665
Annareddypalem (vi-po),
Sangam Mandal, Nellore District
AndhraPradesh-524306
Career Objective
I present myself as a keen learner in an organization that respects innovation, honesty, hard work, sincerity, dedication and where I
can utilize my talents to the optimum. It is my constant endeavor to acquire current and relevant knowledge and develop skills that
enable me to perform and grow effectively atall levels.
Profile Summary
 Having4 Years of work experience in Electrical Maintenance and industrial automation.
 Good understandingof Electrical Drawings,Planningof Projects,Erection & commissioning.
 Both practical aswell as theoretical knowledgeof Different Electrical Instruments.
 Hard working and willingnessto learn new technology
Area of Expertise
 Protection related systems
 Industrial automation and programming
 HT , LT & ESP Panels, VFD, Soft
starter
 Switch Yard Project Management &
Maintenance
 Trouble Shooting & Preventive maintenance
 Process Enhancement / Quality Assurance
 Relationship & Team Management
 Planning, Maintenance and Construction Safety
Educational Qualifications
Bachelors : B.tech from V R Siddhartha EngineeringCollege, Vijayawada,Andharapradesh in March 2011 EEE Department.
Intermediate : Narayana junior college,Nellore,AP. (March 2007)
SSC : Netaji pilotHigh School, Nellore, AP. (March 2005)
Technical Qualification
Obtained Advanced Trainingin Industrial Automation (ATIA) from Technocrat Automation Pvt Limited
(IAO Accredited) Chennai,with 3 months hands on practical experiencein Industrial Automation
Tools specializingin PLC, DCS, SCADA and VFD.
Technical skills
 PLC (Programmable Logic Controllers) & DCS (Distributed Control System) - Programming languages such as LD (Ladder
Diagram) & FBD (Functional Block Diagram) exposure in brands as Siemens, AB (Allen Bradley), ABB (Asea Brown Boveri) and
GE-Fanuic
 SCADA (Supervisory Control & Data Acquisition) –Screen designing,PLC interface, Data collection & storage
 HMI (Human MachineInterface) - Screen designing,PLC interface,DCS interface
 VFD (VariableFrequency Drive) – Commissioningand Troubleshooting
 Pneumatics & Field Instruments ( Control Valve, Sensors, Level Transmitters, Flow Transmitters, Temperature Transmitters,
PressureSwitches)
 Knowledge in Panel wiringand troubleshooting
 Knowledge in PID (Proportional Integral Derivative)
 Troubleshooting – PLC & DCS programming
 Control Panel (Power wiring& Control wiring)
Professional Experience (Selected in campus haring)
Period : 6th June, 2011 to 30th May,2015
Name & Address of the Employer : LANCO INFRATECH LTD.
Position Held : Electrical Engineer.
Job role and key responsibilities
 Handling O & M and trouble shooting of D.G. sets, Transformers, HT/ LT Panels,
Switchgears,Circuitbreakers,etc.
 Operation and maintenancevarious machines and utility systems.
 Involved in performing erections of low voltage switch gear and Load
calculationsand HV& LV cablelaying
 SAP Codification for all emergency spares of all electrical equipments and other
Utilities.Good knowledge regardingSAP MM module.
 Installation of HT and LT cables with proper crimpingand safety measures .
 Operation & Maintenance DG sets a max KVA of 1500.
 Handlingcapability regardingPLC and HMI.
 Relay installation and setting& VariableFrequency Drives (VFD).
 HVAC operation and maintenance.
 Electrical Maintenanceof officebuildingmaintenanceprocesses
 Erection of CP-30 swingsetter batchingplant(Mechanical erection and
Electrical installation work) Maintenance and repair of batching plant, spares
inventory and control
 Erection of Arihanth crusher plantwith capacity of 50TPH
 Complete earth mat work in power house area
 Complete Erection & Commissioningof 90X10 Ton EOT cranein machine hall
 Erection of Draft tube Elbow & Liner for all the units.
 Erection of Embedded pipefor all the units powerhouse area
 Responsiblein Erection of Plumbingwork in employees township
 Execution of project works within approved specifications,cost& timeline.
 Monitoringthe works being executed on siteas per drawings.
 Completed the total house wiring work employees township
 Preparation of Daily Progress Report and reporting to AGM
 Billingof contractors as per siteexecution/BOQ/Drawings.
Safety & Quality control
 Regular monitoring the safety of Machineries, Tools & tackles and Man Power.
 Preparation of work instructionsand implementing safety norms during
Execution of works.
 Conducting Quality checks for various assembly during erection(DPT, Hydro
test)
Computer Skills
Languages known : Fluent in Hindi,English and Telugu.
Computer Skills : Familiarworkingwith MS Office,AUTOCAD(2013).
Workingknowledge on SAP MM Module
Personal Profile
Name : Sukumar Pachipala
Father’s Name : P Raghavareddy
Date of Birth : 31 August 1990.
Gender : Male
Marital Status : Single
Nationality : Indian.
Languages Know : English,Telugu and Hindi.
Passport No : M8425698 (22/04/2015 – 21/04/2025)
Notice period : 15 days
Declaration
I hereby declarethat all the details furnished abovearetrue to the best of my knowledge.
Date:
Place:
[Sukumar pachipala]

Contenu connexe

Tendances (19)

S m umer wasi
S m umer wasiS m umer wasi
S m umer wasi
 
Shubham_updated
Shubham_updatedShubham_updated
Shubham_updated
 
Electrical supervisor 01 11-2018
Electrical supervisor 01 11-2018Electrical supervisor 01 11-2018
Electrical supervisor 01 11-2018
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
 
Resume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV EngineerResume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV Engineer
 
Brahmanand_Jan_2016
Brahmanand_Jan_2016Brahmanand_Jan_2016
Brahmanand_Jan_2016
 
Benjamin R. Remer Resume
Benjamin R. Remer ResumeBenjamin R. Remer Resume
Benjamin R. Remer Resume
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
 
Resume
ResumeResume
Resume
 
electrical eng
electrical engelectrical eng
electrical eng
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
Facebook 1 abb
Facebook 1 abbFacebook 1 abb
Facebook 1 abb
 
c.v of Ibrahim salah ibrahim
c.v of Ibrahim salah ibrahimc.v of Ibrahim salah ibrahim
c.v of Ibrahim salah ibrahim
 
ThomasLitewski_Electronics 2015 Dec
ThomasLitewski_Electronics 2015 DecThomasLitewski_Electronics 2015 Dec
ThomasLitewski_Electronics 2015 Dec
 
Resume
ResumeResume
Resume
 
Resume_Umesh jagtap
Resume_Umesh jagtapResume_Umesh jagtap
Resume_Umesh jagtap
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resume
 
JAGANNATH.N.L +5years exp
JAGANNATH.N.L +5years expJAGANNATH.N.L +5years exp
JAGANNATH.N.L +5years exp
 
Anbazhagan_Resume
Anbazhagan_ResumeAnbazhagan_Resume
Anbazhagan_Resume
 

Similaire à n electrical engineer resume (20)

CV_PANKAJ
CV_PANKAJCV_PANKAJ
CV_PANKAJ
 
resume_Mr_
resume_Mr_resume_Mr_
resume_Mr_
 
Dheeraj Resume
Dheeraj ResumeDheeraj Resume
Dheeraj Resume
 
SidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineeringSidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineering
 
Resume
Resume Resume
Resume
 
Sunil ,cv
Sunil ,cvSunil ,cv
Sunil ,cv
 
Arun kumar resume
Arun kumar resumeArun kumar resume
Arun kumar resume
 
Arun kumar Resume
Arun kumar ResumeArun kumar Resume
Arun kumar Resume
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
John (Instrumentation Engineer)
John (Instrumentation Engineer)John (Instrumentation Engineer)
John (Instrumentation Engineer)
 
Athar CV updated
Athar CV updatedAthar CV updated
Athar CV updated
 
MY CV -2016
MY CV -2016MY CV -2016
MY CV -2016
 
CV
CVCV
CV
 
jawed_CV_instrument 3.7 yr exp
jawed_CV_instrument 3.7 yr expjawed_CV_instrument 3.7 yr exp
jawed_CV_instrument 3.7 yr exp
 
Resume raj bharath be
Resume raj bharath beResume raj bharath be
Resume raj bharath be
 
Arun kumar
Arun kumar Arun kumar
Arun kumar
 
Resume2
Resume2Resume2
Resume2
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
Resume_mohan
Resume_mohanResume_mohan
Resume_mohan
 

n electrical engineer resume

  • 1. Sukumar Pachipala E- mail:pachipalasukumar@gmail.com Mobile: 08499088665 Annareddypalem (vi-po), Sangam Mandal, Nellore District AndhraPradesh-524306 Career Objective I present myself as a keen learner in an organization that respects innovation, honesty, hard work, sincerity, dedication and where I can utilize my talents to the optimum. It is my constant endeavor to acquire current and relevant knowledge and develop skills that enable me to perform and grow effectively atall levels. Profile Summary  Having4 Years of work experience in Electrical Maintenance and industrial automation.  Good understandingof Electrical Drawings,Planningof Projects,Erection & commissioning.  Both practical aswell as theoretical knowledgeof Different Electrical Instruments.  Hard working and willingnessto learn new technology Area of Expertise  Protection related systems  Industrial automation and programming  HT , LT & ESP Panels, VFD, Soft starter  Switch Yard Project Management & Maintenance  Trouble Shooting & Preventive maintenance  Process Enhancement / Quality Assurance  Relationship & Team Management  Planning, Maintenance and Construction Safety Educational Qualifications Bachelors : B.tech from V R Siddhartha EngineeringCollege, Vijayawada,Andharapradesh in March 2011 EEE Department. Intermediate : Narayana junior college,Nellore,AP. (March 2007) SSC : Netaji pilotHigh School, Nellore, AP. (March 2005) Technical Qualification Obtained Advanced Trainingin Industrial Automation (ATIA) from Technocrat Automation Pvt Limited (IAO Accredited) Chennai,with 3 months hands on practical experiencein Industrial Automation Tools specializingin PLC, DCS, SCADA and VFD. Technical skills  PLC (Programmable Logic Controllers) & DCS (Distributed Control System) - Programming languages such as LD (Ladder Diagram) & FBD (Functional Block Diagram) exposure in brands as Siemens, AB (Allen Bradley), ABB (Asea Brown Boveri) and GE-Fanuic  SCADA (Supervisory Control & Data Acquisition) –Screen designing,PLC interface, Data collection & storage  HMI (Human MachineInterface) - Screen designing,PLC interface,DCS interface  VFD (VariableFrequency Drive) – Commissioningand Troubleshooting
  • 2.  Pneumatics & Field Instruments ( Control Valve, Sensors, Level Transmitters, Flow Transmitters, Temperature Transmitters, PressureSwitches)  Knowledge in Panel wiringand troubleshooting  Knowledge in PID (Proportional Integral Derivative)  Troubleshooting – PLC & DCS programming  Control Panel (Power wiring& Control wiring) Professional Experience (Selected in campus haring) Period : 6th June, 2011 to 30th May,2015 Name & Address of the Employer : LANCO INFRATECH LTD. Position Held : Electrical Engineer. Job role and key responsibilities  Handling O & M and trouble shooting of D.G. sets, Transformers, HT/ LT Panels, Switchgears,Circuitbreakers,etc.  Operation and maintenancevarious machines and utility systems.  Involved in performing erections of low voltage switch gear and Load calculationsand HV& LV cablelaying  SAP Codification for all emergency spares of all electrical equipments and other Utilities.Good knowledge regardingSAP MM module.  Installation of HT and LT cables with proper crimpingand safety measures .  Operation & Maintenance DG sets a max KVA of 1500.  Handlingcapability regardingPLC and HMI.  Relay installation and setting& VariableFrequency Drives (VFD).  HVAC operation and maintenance.  Electrical Maintenanceof officebuildingmaintenanceprocesses  Erection of CP-30 swingsetter batchingplant(Mechanical erection and Electrical installation work) Maintenance and repair of batching plant, spares inventory and control  Erection of Arihanth crusher plantwith capacity of 50TPH  Complete earth mat work in power house area  Complete Erection & Commissioningof 90X10 Ton EOT cranein machine hall  Erection of Draft tube Elbow & Liner for all the units.  Erection of Embedded pipefor all the units powerhouse area  Responsiblein Erection of Plumbingwork in employees township  Execution of project works within approved specifications,cost& timeline.  Monitoringthe works being executed on siteas per drawings.  Completed the total house wiring work employees township  Preparation of Daily Progress Report and reporting to AGM  Billingof contractors as per siteexecution/BOQ/Drawings. Safety & Quality control  Regular monitoring the safety of Machineries, Tools & tackles and Man Power.  Preparation of work instructionsand implementing safety norms during Execution of works.  Conducting Quality checks for various assembly during erection(DPT, Hydro test)
  • 3. Computer Skills Languages known : Fluent in Hindi,English and Telugu. Computer Skills : Familiarworkingwith MS Office,AUTOCAD(2013). Workingknowledge on SAP MM Module Personal Profile Name : Sukumar Pachipala Father’s Name : P Raghavareddy Date of Birth : 31 August 1990. Gender : Male Marital Status : Single Nationality : Indian. Languages Know : English,Telugu and Hindi. Passport No : M8425698 (22/04/2015 – 21/04/2025) Notice period : 15 days Declaration I hereby declarethat all the details furnished abovearetrue to the best of my knowledge. Date: Place: [Sukumar pachipala]