Overview
• Introduction to the BestRES project
• The BestRES methodology
• Evaluation of selected business models
• Summary and Conclusions
30/10/2017 2
The BestRES Project
Motivation and Introduction
Introduction
• The transformation of the electricity system (e.g.
integration of renewables, e-mobility) increases the need for
system flexibility.
• The uprising issues cannot be tackled by single individual
market participants.
• Within the BestRES project we develop innovative business
models for integration of renewable energy sources by
aggregation.
We defined “Aggregator” as:
“legal entities that aggregate the load or generation of
various demand and/or generation/production units and
aim at optimizing energy supply and consumption either
technically or economically”
30/10/2017 4
The BestRES project partners
30/10/2017 5
The BestRES project progress
30/10/2017 6
Start
March 2016
Analysis of Current
Business Models
Development and testing of improved
business models
Implementation and monitoring of
improved business models
Recommendations for the uptake of
the existing market barriers
Aug. 2016 Dez. 2018Feb. 2017
End
Feb. 2019April 2018
The BestRES Methodolgy
How do we achieve improved business models for
renewable energy aggregators?
Current and Improved Aggregator Business
models within the BestRES project
Combined
Aggregator-
BRP
Combined
Aggregator-
Supplier
Delegated
Aggregator
Aggregator as
Service
Provider
NKW Germany X X X
NKW France X X
NKW Italy X X
NKW Belgium X X X
Good Energy X X X
Oekostrom X X X X
EDP Portugal X X
EDP Spain X X
FOSS X X
30/10/2017 8
(*) NKW … Next Kraftwerke (**) EDP … Energias de Portugal
X … Current Business Model X … Improved Business Model
Business model canvas
30/10/2017 9
Key Partner Key
Activities
Key
Resources
Value
Proposition
Customer
Relation-
ships
Channels
Customer
Segments
Cost Structure Revenue Stream
For further information see: Osterwalder et al. 2010,
“Business model generation”, ISBN 978-0470-87641-1.
Current Business Model:
Next Kraftwerke Germany
• Next Kraftwerke (NKW) Germany is a Balance
Responsible Party (BRP) in Germany.
• NKW Germany is pooling decentralized generators (PV,
Wind, Biogas, …) and mid-scale customers and
marketing the pool on the day-ahead spot market and
various ancillary markets.
• The key assets are control systems, computer models,
forecast algorithms and administration knowledge.
• Value is generated by offering balancing services and
optimal scheduling of electricity generation, trading
and consumption.
30/10/2017 10
Improved Business Model:
Next Kraftwerke Germany
Supplying „mid-scale“ consumers with time variable
tariffs including grid charges optimization
30/10/2017 11
Business model evaluation
• Unit-Commitment Models:
– Optimal dispatch and investment of generation units to meet
the electrical load
– E.g. reducing balancing costs
• Load Management Models:
Optimal dispatch of flexibility (i.e. demand) to minimize costs
• Hybrid Energy Models:
Optimal dispatch and investment strategy of multi-energy
generation and demand
• Game Theoretical Models:
– Investigate the interaction of different players (e.g. owners
and users of flexibility)
– E.g. Mathematical Program with Equilibrium Constraints
(MPEC), Stackelberg game
30/10/2017 12
Selected business model examples
Next Kraftwerke, Oekostrom and Good Energy
Business model categorization
Within the BestRES project qualitative and preliminary
quantitative analyses have been conducted, in order to
categorize the identified improved business models:
• Group 1: Business models are technically, economically
and regulatory feasible and ready for implementation.
• Group 2: Business models are economically feasible but
face regulatory or technical barriers in the short to
medium term.
• Group 3: Business models are not economically feasible
and / or face substantial regulatory and technical
barriers.
30/10/2017 14
Group 1: NKW Germany
• NKW Germany is already
valorizing flexible
customers at the
wholesale electricity
markets.
• Improvement: Consider
other tariff components
like grid charges in the
optimization algorithm.
30/10/2017 15
Supplying „mid-scale“ consumers with time variable
tariffs including grid charges optimization
Group 1: NKW Germany
30/10/2017 16
Group 2: Oekostrom
30/10/2017 17
Invest and market distributed generation of customers
in apartment houses
• Improvement: Acquisition of new customers and higher
customer loyalty resulting from local investments.
• Opportunity for renewable investments in urban areas
• The aggregator is in charge of dispatching and
allocating generation and of billing.
• The Austrian government passed a law enabling
distributed generation and distribution in apartment
houses in July 2017.
→ Further details need to be clarified to boost the
implementation.
Group 2: Oekostrom
30/10/2017 18
Battery
PV Plant
Consumer 1
Utility function 𝑢𝑢1
𝐶𝐶
Load 𝑞𝑞𝑡𝑡,1
𝐿𝐿
𝑝𝑝𝑡𝑡
𝐺𝐺
Consumer 𝑁𝑁
Utility function 𝑢𝑢𝑁𝑁
𝐶𝐶
Load 𝑞𝑞𝑡𝑡,𝑁𝑁
𝐿𝐿
Utility
Retailer
Distribution
System
Operator
Wholesale
Market
𝑝𝑝𝑡𝑡
𝑀𝑀𝑀𝑀𝑀𝑀
𝑞𝑞𝑡𝑡,1
𝐺𝐺
𝑞𝑞𝑡𝑡,𝑁𝑁
𝐺𝐺
𝑞𝑞𝑡𝑡
𝐵𝐵𝑖𝑖 𝑖𝑖
Electricity grid
𝑞𝑞𝑡𝑡
𝑃𝑃𝑉𝑉𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼
𝑞𝑞𝑡𝑡,𝑖𝑖
𝐵𝐵𝑜𝑜𝑜𝑜𝑜𝑜
𝑞𝑞𝑡𝑡,1
𝑃𝑃𝑃𝑃
+ 𝑞𝑞𝑡𝑡,1
𝐵𝐵𝑜𝑜𝑜𝑜𝑜𝑜
𝑞𝑞𝑡𝑡,𝑁𝑁
𝑃𝑃𝑃𝑃
+ 𝑞𝑞𝑡𝑡,𝑁𝑁
𝐵𝐵𝑜𝑜𝑜𝑜𝑜𝑜
�𝑞𝑞𝑡𝑡
𝑃𝑃𝑃𝑃
Owner
of distributed
generation
Consumers
Aggregation
of distributed
generation
and
consumption
Group 3: Good Energy
“Peer-to-peer” energy matching
• Uniting customers and generators on a local level to
create value for both.
• Currently facing significant legal
and regulatory barriers.
30/10/2017 19
Source: piclo.co.uk
Summary and Conclusions
Summary
• 13 improved business models have been developed and
categorized.
• Seven business models have been allocated into
Group 1 and are currently being implemented in real-
life within the BestRES project.
• Two business models have been allocated to Group 2
and will not be implemented but simulated.
• The remaining four business models are allocated to
Group 3 due to economic infeasibility or major
regulatory barriers (no implementation, simulation
only).
30/10/2017 21
Conclusions
• Possible aggregator business models are manifold.
• EU regulation (e.g. “Winterpackage) is expected to
boost the implementation of aggregator business
models.
• Business models not being in Group 1 is mainly caused
by legal and regulatory barriers.
• Comprehensive analysis (economic, technical and
regulatory) is essential for business model
implementation.  Requires multiple tools.
30/10/2017 22
Thank you for your attention!
Andreas Fleischhacker, Daniel Schwabeneder
fleischhacker@eeg.tuwien.ac.at
schwabeneder@eeg-tuwien.ac.at
Energy Economics Group, TU Wien

More Related Content

What's hot

What's hot (20)

Micro grid
Micro gridMicro grid
Micro grid
 
Grid connected pv solar power plant
Grid connected pv solar power plantGrid connected pv solar power plant
Grid connected pv solar power plant
 
Energy Storage
Energy StorageEnergy Storage
Energy Storage
 
Solar cell
Solar cellSolar cell
Solar cell
 
Energy Storage Inverters
Energy Storage InvertersEnergy Storage Inverters
Energy Storage Inverters
 
Smart Grid Technology.pptx
Smart Grid Technology.pptxSmart Grid Technology.pptx
Smart Grid Technology.pptx
 
Energy and utilities
Energy and utilitiesEnergy and utilities
Energy and utilities
 
Microgrid Energy Management System
Microgrid Energy Management System Microgrid Energy Management System
Microgrid Energy Management System
 
Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application ppt
 
Rural electrification by Lakshmi.Nidoni-seminar ppt
Rural electrification by Lakshmi.Nidoni-seminar pptRural electrification by Lakshmi.Nidoni-seminar ppt
Rural electrification by Lakshmi.Nidoni-seminar ppt
 
Microgrid
MicrogridMicrogrid
Microgrid
 
VIRTUAL POWER PLANT (VPP).pdf
VIRTUAL POWER PLANT (VPP).pdfVIRTUAL POWER PLANT (VPP).pdf
VIRTUAL POWER PLANT (VPP).pdf
 
Advancement in solar cell
Advancement in solar cellAdvancement in solar cell
Advancement in solar cell
 
ABB in microgrid - Infoavond Howest - Voka - Kortrijk
ABB in microgrid - Infoavond Howest - Voka - KortrijkABB in microgrid - Infoavond Howest - Voka - Kortrijk
ABB in microgrid - Infoavond Howest - Voka - Kortrijk
 
Infrared Plastic Solar Cell PPT
Infrared Plastic Solar Cell PPTInfrared Plastic Solar Cell PPT
Infrared Plastic Solar Cell PPT
 
Grid Integration of PV
Grid Integration of PVGrid Integration of PV
Grid Integration of PV
 
Solar Mini grid, Nano grid, Micro grid
Solar Mini grid, Nano grid, Micro gridSolar Mini grid, Nano grid, Micro grid
Solar Mini grid, Nano grid, Micro grid
 
MPPT using PV Module
MPPT using PV ModuleMPPT using PV Module
MPPT using PV Module
 
Renewable energy integration and energy storage
Renewable energy integration and energy storage Renewable energy integration and energy storage
Renewable energy integration and energy storage
 
Solar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptxSolar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptx
 

Similar to Business models for renewable energy aggregators

SmartEnergy-Haydar_Leonie.pptx
SmartEnergy-Haydar_Leonie.pptxSmartEnergy-Haydar_Leonie.pptx
SmartEnergy-Haydar_Leonie.pptx
FIWARE
 

Similar to Business models for renewable energy aggregators (20)

Affordable Housing Renewal: Workshop summary
Affordable Housing Renewal: Workshop summaryAffordable Housing Renewal: Workshop summary
Affordable Housing Renewal: Workshop summary
 
H2020 energía limpia, segura y eficiente próximas oportunidades de participación
H2020 energía limpia, segura y eficiente próximas oportunidades de participaciónH2020 energía limpia, segura y eficiente próximas oportunidades de participación
H2020 energía limpia, segura y eficiente próximas oportunidades de participación
 
IndustRE - Renewables and Industrial Demand Side Management
IndustRE - Renewables and Industrial Demand Side ManagementIndustRE - Renewables and Industrial Demand Side Management
IndustRE - Renewables and Industrial Demand Side Management
 
Intelligent battery cluster as part of an local power self-supply
Intelligent battery cluster as part of an local power self-supplyIntelligent battery cluster as part of an local power self-supply
Intelligent battery cluster as part of an local power self-supply
 
Financing energy storage - Masterclass By MACQUARIE
Financing energy storage - Masterclass By MACQUARIEFinancing energy storage - Masterclass By MACQUARIE
Financing energy storage - Masterclass By MACQUARIE
 
Financing Energy Efficiency - Green Mortgages Workshop
Financing Energy Efficiency - Green Mortgages WorkshopFinancing Energy Efficiency - Green Mortgages Workshop
Financing Energy Efficiency - Green Mortgages Workshop
 
Set plan action-4-smart-networks
Set plan action-4-smart-networksSet plan action-4-smart-networks
Set plan action-4-smart-networks
 
Eci
EciEci
Eci
 
Smart energy innovation may17 (3)
Smart energy innovation   may17 (3)Smart energy innovation   may17 (3)
Smart energy innovation may17 (3)
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
 
Ofgem Strategic Innovation Fund: Competition Launch
Ofgem Strategic Innovation Fund: Competition LaunchOfgem Strategic Innovation Fund: Competition Launch
Ofgem Strategic Innovation Fund: Competition Launch
 
business-models.pdf
business-models.pdfbusiness-models.pdf
business-models.pdf
 
EeMAP: Energy Efficient Morgages Initiative - Marie Louise Andersen, EMF/ECBC
EeMAP: Energy Efficient Morgages Initiative - Marie Louise Andersen, EMF/ECBCEeMAP: Energy Efficient Morgages Initiative - Marie Louise Andersen, EMF/ECBC
EeMAP: Energy Efficient Morgages Initiative - Marie Louise Andersen, EMF/ECBC
 
White Paper Smart grids
White Paper Smart gridsWhite Paper Smart grids
White Paper Smart grids
 
Actors’ behaviour analysis in a decentralised energy system: Overview of TIME...
Actors’ behaviour analysis in a decentralised energy system: Overview of TIME...Actors’ behaviour analysis in a decentralised energy system: Overview of TIME...
Actors’ behaviour analysis in a decentralised energy system: Overview of TIME...
 
The key role of consumers in the new energy model
The key role of consumers in the new energy modelThe key role of consumers in the new energy model
The key role of consumers in the new energy model
 
FLEXcoop Präsentation bei IEA-Meeting, Berlin, Oktober 2018
FLEXcoop Präsentation bei IEA-Meeting, Berlin, Oktober 2018FLEXcoop Präsentation bei IEA-Meeting, Berlin, Oktober 2018
FLEXcoop Präsentation bei IEA-Meeting, Berlin, Oktober 2018
 
Flex coop iea-meeting_berlin_okt18
Flex coop iea-meeting_berlin_okt18Flex coop iea-meeting_berlin_okt18
Flex coop iea-meeting_berlin_okt18
 
Workshop : business cases for Energy Communities - 30/03/21
Workshop : business cases for Energy Communities - 30/03/21Workshop : business cases for Energy Communities - 30/03/21
Workshop : business cases for Energy Communities - 30/03/21
 
SmartEnergy-Haydar_Leonie.pptx
SmartEnergy-Haydar_Leonie.pptxSmartEnergy-Haydar_Leonie.pptx
SmartEnergy-Haydar_Leonie.pptx
 

More from Leonardo ENERGY

More from Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Business models for renewable energy aggregators

  • 1. This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement N°691689. Business models for renewable energy aggregators Andreas Fleischhacker, Daniel Schwabeneder Energy Economics Group, TU Wien October 25th, 2017
  • 2. Overview • Introduction to the BestRES project • The BestRES methodology • Evaluation of selected business models • Summary and Conclusions 30/10/2017 2
  • 4. Introduction • The transformation of the electricity system (e.g. integration of renewables, e-mobility) increases the need for system flexibility. • The uprising issues cannot be tackled by single individual market participants. • Within the BestRES project we develop innovative business models for integration of renewable energy sources by aggregation. We defined “Aggregator” as: “legal entities that aggregate the load or generation of various demand and/or generation/production units and aim at optimizing energy supply and consumption either technically or economically” 30/10/2017 4
  • 5. The BestRES project partners 30/10/2017 5
  • 6. The BestRES project progress 30/10/2017 6 Start March 2016 Analysis of Current Business Models Development and testing of improved business models Implementation and monitoring of improved business models Recommendations for the uptake of the existing market barriers Aug. 2016 Dez. 2018Feb. 2017 End Feb. 2019April 2018
  • 7. The BestRES Methodolgy How do we achieve improved business models for renewable energy aggregators?
  • 8. Current and Improved Aggregator Business models within the BestRES project Combined Aggregator- BRP Combined Aggregator- Supplier Delegated Aggregator Aggregator as Service Provider NKW Germany X X X NKW France X X NKW Italy X X NKW Belgium X X X Good Energy X X X Oekostrom X X X X EDP Portugal X X EDP Spain X X FOSS X X 30/10/2017 8 (*) NKW … Next Kraftwerke (**) EDP … Energias de Portugal X … Current Business Model X … Improved Business Model
  • 9. Business model canvas 30/10/2017 9 Key Partner Key Activities Key Resources Value Proposition Customer Relation- ships Channels Customer Segments Cost Structure Revenue Stream For further information see: Osterwalder et al. 2010, “Business model generation”, ISBN 978-0470-87641-1.
  • 10. Current Business Model: Next Kraftwerke Germany • Next Kraftwerke (NKW) Germany is a Balance Responsible Party (BRP) in Germany. • NKW Germany is pooling decentralized generators (PV, Wind, Biogas, …) and mid-scale customers and marketing the pool on the day-ahead spot market and various ancillary markets. • The key assets are control systems, computer models, forecast algorithms and administration knowledge. • Value is generated by offering balancing services and optimal scheduling of electricity generation, trading and consumption. 30/10/2017 10
  • 11. Improved Business Model: Next Kraftwerke Germany Supplying „mid-scale“ consumers with time variable tariffs including grid charges optimization 30/10/2017 11
  • 12. Business model evaluation • Unit-Commitment Models: – Optimal dispatch and investment of generation units to meet the electrical load – E.g. reducing balancing costs • Load Management Models: Optimal dispatch of flexibility (i.e. demand) to minimize costs • Hybrid Energy Models: Optimal dispatch and investment strategy of multi-energy generation and demand • Game Theoretical Models: – Investigate the interaction of different players (e.g. owners and users of flexibility) – E.g. Mathematical Program with Equilibrium Constraints (MPEC), Stackelberg game 30/10/2017 12
  • 13. Selected business model examples Next Kraftwerke, Oekostrom and Good Energy
  • 14. Business model categorization Within the BestRES project qualitative and preliminary quantitative analyses have been conducted, in order to categorize the identified improved business models: • Group 1: Business models are technically, economically and regulatory feasible and ready for implementation. • Group 2: Business models are economically feasible but face regulatory or technical barriers in the short to medium term. • Group 3: Business models are not economically feasible and / or face substantial regulatory and technical barriers. 30/10/2017 14
  • 15. Group 1: NKW Germany • NKW Germany is already valorizing flexible customers at the wholesale electricity markets. • Improvement: Consider other tariff components like grid charges in the optimization algorithm. 30/10/2017 15 Supplying „mid-scale“ consumers with time variable tariffs including grid charges optimization
  • 16. Group 1: NKW Germany 30/10/2017 16
  • 17. Group 2: Oekostrom 30/10/2017 17 Invest and market distributed generation of customers in apartment houses • Improvement: Acquisition of new customers and higher customer loyalty resulting from local investments. • Opportunity for renewable investments in urban areas • The aggregator is in charge of dispatching and allocating generation and of billing. • The Austrian government passed a law enabling distributed generation and distribution in apartment houses in July 2017. → Further details need to be clarified to boost the implementation.
  • 18. Group 2: Oekostrom 30/10/2017 18 Battery PV Plant Consumer 1 Utility function 𝑢𝑢1 𝐶𝐶 Load 𝑞𝑞𝑡𝑡,1 𝐿𝐿 𝑝𝑝𝑡𝑡 𝐺𝐺 Consumer 𝑁𝑁 Utility function 𝑢𝑢𝑁𝑁 𝐶𝐶 Load 𝑞𝑞𝑡𝑡,𝑁𝑁 𝐿𝐿 Utility Retailer Distribution System Operator Wholesale Market 𝑝𝑝𝑡𝑡 𝑀𝑀𝑀𝑀𝑀𝑀 𝑞𝑞𝑡𝑡,1 𝐺𝐺 𝑞𝑞𝑡𝑡,𝑁𝑁 𝐺𝐺 𝑞𝑞𝑡𝑡 𝐵𝐵𝑖𝑖 𝑖𝑖 Electricity grid 𝑞𝑞𝑡𝑡 𝑃𝑃𝑉𝑉𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼𝐼 𝑞𝑞𝑡𝑡,𝑖𝑖 𝐵𝐵𝑜𝑜𝑜𝑜𝑜𝑜 𝑞𝑞𝑡𝑡,1 𝑃𝑃𝑃𝑃 + 𝑞𝑞𝑡𝑡,1 𝐵𝐵𝑜𝑜𝑜𝑜𝑜𝑜 𝑞𝑞𝑡𝑡,𝑁𝑁 𝑃𝑃𝑃𝑃 + 𝑞𝑞𝑡𝑡,𝑁𝑁 𝐵𝐵𝑜𝑜𝑜𝑜𝑜𝑜 �𝑞𝑞𝑡𝑡 𝑃𝑃𝑃𝑃 Owner of distributed generation Consumers Aggregation of distributed generation and consumption
  • 19. Group 3: Good Energy “Peer-to-peer” energy matching • Uniting customers and generators on a local level to create value for both. • Currently facing significant legal and regulatory barriers. 30/10/2017 19 Source: piclo.co.uk
  • 21. Summary • 13 improved business models have been developed and categorized. • Seven business models have been allocated into Group 1 and are currently being implemented in real- life within the BestRES project. • Two business models have been allocated to Group 2 and will not be implemented but simulated. • The remaining four business models are allocated to Group 3 due to economic infeasibility or major regulatory barriers (no implementation, simulation only). 30/10/2017 21
  • 22. Conclusions • Possible aggregator business models are manifold. • EU regulation (e.g. “Winterpackage) is expected to boost the implementation of aggregator business models. • Business models not being in Group 1 is mainly caused by legal and regulatory barriers. • Comprehensive analysis (economic, technical and regulatory) is essential for business model implementation.  Requires multiple tools. 30/10/2017 22
  • 23. Thank you for your attention! Andreas Fleischhacker, Daniel Schwabeneder fleischhacker@eeg.tuwien.ac.at schwabeneder@eeg-tuwien.ac.at Energy Economics Group, TU Wien