SlideShare a Scribd company logo
1 of 5
CCCUUURRRRRRIIICCCUUULLLUUUMMM VVVIIITTTAAAEEE
Name : TANWEER ALAM
Add : B.P.C.L Mumbai INDIA
Email : tanweeralam777@gmail.com
Mobile No: +918804347402/+918051863064
( EEELLLEEECCCTTTRRRIIICCCAAALLL TTTEEECCCHHHNNNIIICCCIIIAAANNN )
OOOBBBJJJEEECCCTTTIIIVVVEEE:::
To obtaina challengingpositionwhere comprehensive education,proficientpracticesandprofessional
experience will be utilized. Iconsidermyself tobe adiligentteamplayerwhoisalwaysopento
suggestionsonhowqualityandefficiencycanbe improved.Asafast learnerIseektodevelopmyskills,
abilitiesandknowledge soasto provide excellentservice toanyestablishment.
03 Diploma In Electrical Engineering, fromAl- KabirPolytechnicIndia
Secondaryschool leaving (SSLC)
SSSUUUMMMMMMAAARRRYYY OOOFFF QQQUUUAAALLLIIIFFFIIICCCAAATTTIIIOOONNN:::
 More than 10 years
 Experience in Electrical Construction /Commissioning/Maintenance /Shut-down Onshore and
Offshore Equipments and facilities
 components, and systems for commercial and industrial purposes
 Capable of troubleshooting, computation of load schedules, solving electrical related problems
and wiring connections.
 Chemical Industries
 Petrochemical Industries
 Oil & Gas, Power Plant Industries
 Capable of Testing and Commissioning works
 Computer literate.
 MS Office (Excel, Word and Access)
 Knowledge of how to assess and minimize risks associated with working on Hazardous area
 PTW FSI & TSTI Seminar., DOHA QATAR SHELL GTL
 Practical leadership, Training, DOHA QATAR SHELL GTL
 Lock-out and Tag-out Training., DOHA QATAR SHELL GTL
 Train the trainer (TTT) Training., DOHA QATAR SHELL GTL
 Offshore Training OPITO., PRO-S.A.L-OFFSHORE Kazakhstan
GGGUUULLLFFF EEEXXXPPPEEERRRIIIEEENNNCCCEEESSS:::
EEEDDDUUUCCCAAATTTIIIOOONNNAAALLL BBBAAACCCKKKGGGRRROOOUUUNNNDDD:::
HHHSSSEEE TTTRRRAAANNNIIINNNGGGSSS AAANNNDDD SSSEEEMMMIIINNNAAARRRSSS
Company KENTECH SAKHALIN TECHNICAL SERVIES
Plant CHAYVO OPF.EXXON NEFTEGAS , RUSSIA
Position Electrical Technician ( CEP )
Period 10 JULY 2016 To 22 AUG 2016
JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy:::
 34.5 kV PDH ES-04 Substation _ HV / MV / LV Switchgears and Transformers, LV-UPS
and DC Supply Systems, Emergency Power System / Gen. Set, Variable Speed Drives
System, Fire Protection System,
 Assisted with commissioning engineers for start-up activities of all electrical related.
 Resolved various electrical related issues and conflicts.
 Performed surveillance for on-going construction activities.
 Creating power and control schematic diagrams.
 Creating receptacle, equipment and lighting layouts.
 Creating one-line diagrams.
 Calculating circuit loads.
 Calculating foot candle levels.
JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy:::
 Applied electrical theory and related knowledge to test and modify operational electrical
machinery, electrical control equipment and circuitry and Executed daily operations.
 Assembled and tested experimental motor-control devices, switch panels, transformers,
generator windings, solenoids and other electrical equipment according to knowledge of
electrical principles.
 Wrote, and produced maintenance data daily for review by leadership.
 Diagnosed cause of electrical and mechanical malfunction and failure of operational equipment,
performing preventative and corrective maintenance.
 Trained to read and interpret wiring schematics and diagrams.
Company C.C.I.C-GROUP-SAL- SAUDI ARABIA
Position Electrical Technician
Period Dec 2012 to march 2015
Company KENTECH QATAR TECHNICAL SERVIES
Plant QATAR SHELL GTL
Position Electrical Technician ( CEP )
Period 28 Nov 2015 To 14 Apr 2016
 Directed personnel performing routine installation and maintenance duties.
 Planned, directed and recorded periodic electrical testing.
 Operate and maintain generators.
 Troubleshooting and accessing electrical problems.
 Installation of electronics by following the guidelines.
 Work ranges from small to Electrical installation and upkeep of electrical systems and
components.
JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy:::
 13. kV, 4.0 kV and 0.38 kV Sub-station MV/LV Switchgears (ABB and Schneider) and
Transformers,
 Preparation of materials as per site requirement and project specification given by PRO -
SAL Provide work scheduled as per priority of requirement of project according to
management.
 Power transformer, distribution transformer, switchgear low and medium Voltage, and
Submitting Report to our C.C.I.C Supervisor Reviewed and prepared red-lined drawing
prior to final.
 In charge in preparation of hand-over over documents such as, As-built Drawings,
 Effective manage interfaces between new and existing facilities, ensure adherence to
company HSE policies and specifications, without affective the sub contractor Scheduled.
 Solved several electrical related issues due to design inconsistency, indefinite schedules
and drawings.
 Approved estimates, procurements and material take-off by the contractors and ensuring
cogency to the technical specification and company (NAMA) standard.
 Reviewed and commented the contractor’s submitted progress reports and look-ahead
schedules to avoid any setbacks can occur during the construction and pre-commissioning
periods.
 Attended progress / coordination meetings with the consultants and contractors.
 Directly interact with Client (P.R.O S.A.L construction Commissioning and Start-Up
Units) discuss, assess and evaluate the priority issues to avoid any cause of impediment in
critical activities...
 Worked as an EPC focal point for Pre Start up Safety Review (PSSR) Activities and
responsible for event reporting.
 Accountable for monitoring the critical punch points through the Construction Integrated
Management System
 Assisted to construct ‘Close out Report’ as part of Turn over Reports for client (PRO -
SAL)
Company Consolidated Contractor Company (CCC) Abu Dhabi
Position ` ELECTRICAL TECHNICIAN
Period August2006 to February 2010
Company C.C.I.C ENGG & PRO-S.A.L-OFFSHORE Kazakhstan
Position Electrical Technician
Period July 2011 to June 2012
JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy:::
Onsite & Offsite Maintenance work for Electrical, Cabling Erection, and Re Installation works.
Onsite & Offsite HV, LV Substation , FAS, Cabling, Equipment Transformers (AREVA,
BRUSH), switchgears (ABB Switchgears),MCC, PMCC Control centers, Batteries, UPS,
Earthling Erection, Installation works to Supervise and Executive with workers team and
coordinate with Engineers. Coordinate with Maintenance team for Startup Testing, Maintenance
Activities, This project is involved on construction of two 6.6 / 4.16 kV substation with the 4
no’s, 10 mva & 14 nos, 2.5 mva transformer, installation of switchgear medium and low voltage
Also installation of cable tray punching and ladder cable tray, installation of complete sub- Station
building work including relay panel and patch panel, fire alarm system Annunciator panel,
bus duct installation 4.16 kV & 480 volts and ups, battery charger,
 Prepared the compilation of RFI”s Checklists Certificate and Test records for Construction
Dossier Of all MV/LV equipments and utilities PDH ES-04 Substation for project hand-
Over to the client.
 Resolved several issues at site and to ensure minimum stoppage Maintenance activities,
Capable to interpret P&ID and ISO drawings
 Ensured that all Quality Management System standards, test results and inspection
requirements have been obtained.
 Attended weekly and scheduled meetings for project evaluation and status.
 Conducted punch listing/clearing for final acceptance and client turn over.
NNNaaatttuuurrreee ooofff WWWooorrrkkk:::
Performed construction and Maintenance Commissioning Shut-down Electrical works which
includes installation ,connection and termination of power/control cables ,armored medium
voltage ,3 core cables ,cable tray ,lighting panels/fixtures ,fire fighting systems ,loop
checking functional tests of switch gear ,relay panel ,breaker ,commissioning and trouble
shooting and ensure that all the works complete to clients IFC drawings and applicable,
Name of Company Position Pried
ELMATICS ENGG LTD ELECTRICAL TECHNICIAN January 2004 to February2005
ROHINI INDUS ELEC
P.LTD
ELECTRICAL TECHNICIAN July 2002 to November2003
PETRONENGINEERING
CO.LTD
ELECTRICAL TECHNICIAN February 2001 to February 2002
FABCO CONST CO. ELECTRICAL TECHNICIAN September 1999 to December 2000
Ensured that all Quality Management System standards, test results and inspection
requirements have been obtained.
Attended weekly and Scheduled Meetings for project Evaluation and status, Conducted
punch listing/clearing for final acceptance and client turn over. Of switch gear, relay panel,
breaker, commissioning and trouble shooting and ensure that all the works complete to
clients IFC drawings and applicable standards and specifications
PPPeeerrrsssooonnnaaalll SSSkkkiiillllll aaannnddd CCCooommmpppeeettteeennnccciiieeesss:::
Technical: Engineering, Quality Control Analysis, Troubleshooting, Equipment Selection, Installation of Electrical
and Instrumentation equipments and utilities, Operation and Control.
OOOrrrgggaaannniiizzzaaatttiiiooonnnaaalll aaannnddd OOOttthhheeerrrsss::: Teamwork, Hardworking and Leadership.
Name : TANWEER ALAM
Fathers ‘Name : Mohammad Manzoor Alam
Birth Date : April 02/1981
Height/Weight : 5’6”/80 kg
Citizenship : Indian
Marital Status : Single
Passport No : L-5531510 ECNR
Date of Issue : 24-12-2013
Date of Exp : 23-12-2023
Old passport No : E-4578565 ECNR
Place of Issue : Patna Bihar
Mansha Tola Post Bettiah
Dist. west Champaran
State: Bihar-845438
India
Contact: +918804347402/+918051863064 Tanweer Alam
PPPeeerrrsssooonnnaaalll DDDeeetttaaaiiilllsss:::
PPPaaasssssspppooorrrttt DDDeeetttaaaiiilllsss:::
PPPEEERRRMMMAAANNNNNNEEENNNTTT AAADDDDDDRRREEESSSSSS:::

More Related Content

What's hot

ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 

What's hot (20)

Electrical Supervisor
Electrical SupervisorElectrical Supervisor
Electrical Supervisor
 
Electrical site Engineer
Electrical site EngineerElectrical site Engineer
Electrical site Engineer
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 

Viewers also liked

ACADEMIC PORTFOLIO
ACADEMIC PORTFOLIOACADEMIC PORTFOLIO
ACADEMIC PORTFOLIOSukman Ko
 
Опыт Автоматизации тестирования
Опыт Автоматизации тестированияОпыт Автоматизации тестирования
Опыт Автоматизации тестированияAgile Ukraine
 
laser bleu 1000mw puissant à forte vente pas cher
laser bleu 1000mw puissant à forte vente pas cherlaser bleu 1000mw puissant à forte vente pas cher
laser bleu 1000mw puissant à forte vente pas cherhannahjanelle
 
Heartfulness Magazine - Volume 2_issue1_Jan 2017
Heartfulness Magazine - Volume 2_issue1_Jan 2017Heartfulness Magazine - Volume 2_issue1_Jan 2017
Heartfulness Magazine - Volume 2_issue1_Jan 2017heartfulness
 
Роман Гуляк "SMALL THINGS THAT MATTER"
Роман Гуляк "SMALL THINGS THAT MATTER"Роман Гуляк "SMALL THINGS THAT MATTER"
Роман Гуляк "SMALL THINGS THAT MATTER"Agile Ukraine
 
Manjakani Kanza - Jual Obat Manjakani Kanza Aceh Original
Manjakani Kanza - Jual Obat Manjakani Kanza Aceh OriginalManjakani Kanza - Jual Obat Manjakani Kanza Aceh Original
Manjakani Kanza - Jual Obat Manjakani Kanza Aceh OriginalManjakani Kanza
 
Boiling and vaporization and freezing
Boiling and vaporization and freezingBoiling and vaporization and freezing
Boiling and vaporization and freezingPrathamcbh
 
Heartfulness Magazine Issue 13
Heartfulness Magazine Issue 13Heartfulness Magazine Issue 13
Heartfulness Magazine Issue 13heartfulness
 
Top 10 Indoor Places to Play in Kentuckiana
Top 10 Indoor Places to Play in KentuckianaTop 10 Indoor Places to Play in Kentuckiana
Top 10 Indoor Places to Play in KentuckianaMegan Harlan
 
Lapauw Ironing Solutions.pdf
Lapauw Ironing Solutions.pdfLapauw Ironing Solutions.pdf
Lapauw Ironing Solutions.pdfzahoormy
 
A2 Media - Logos and Branding
A2 Media - Logos and BrandingA2 Media - Logos and Branding
A2 Media - Logos and Brandingwhu27
 
Najfach Summer Research 2014 Paper
Najfach Summer Research 2014 PaperNajfach Summer Research 2014 Paper
Najfach Summer Research 2014 PaperAaron Najfach
 
Heartfulness eMagazine - Sep 2015
Heartfulness eMagazine - Sep 2015Heartfulness eMagazine - Sep 2015
Heartfulness eMagazine - Sep 2015heartfulness
 

Viewers also liked (20)

Chapter 5
Chapter 5Chapter 5
Chapter 5
 
ACADEMIC PORTFOLIO
ACADEMIC PORTFOLIOACADEMIC PORTFOLIO
ACADEMIC PORTFOLIO
 
Опыт Автоматизации тестирования
Опыт Автоматизации тестированияОпыт Автоматизации тестирования
Опыт Автоматизации тестирования
 
laser bleu 1000mw puissant à forte vente pas cher
laser bleu 1000mw puissant à forte vente pas cherlaser bleu 1000mw puissant à forte vente pas cher
laser bleu 1000mw puissant à forte vente pas cher
 
Heartfulness Magazine - Volume 2_issue1_Jan 2017
Heartfulness Magazine - Volume 2_issue1_Jan 2017Heartfulness Magazine - Volume 2_issue1_Jan 2017
Heartfulness Magazine - Volume 2_issue1_Jan 2017
 
2016 Client Survey Results
2016 Client Survey Results2016 Client Survey Results
2016 Client Survey Results
 
Роман Гуляк "SMALL THINGS THAT MATTER"
Роман Гуляк "SMALL THINGS THAT MATTER"Роман Гуляк "SMALL THINGS THAT MATTER"
Роман Гуляк "SMALL THINGS THAT MATTER"
 
Sports textile
Sports textileSports textile
Sports textile
 
Manjakani Kanza - Jual Obat Manjakani Kanza Aceh Original
Manjakani Kanza - Jual Obat Manjakani Kanza Aceh OriginalManjakani Kanza - Jual Obat Manjakani Kanza Aceh Original
Manjakani Kanza - Jual Obat Manjakani Kanza Aceh Original
 
Boiling and vaporization and freezing
Boiling and vaporization and freezingBoiling and vaporization and freezing
Boiling and vaporization and freezing
 
LPA Resume
LPA  ResumeLPA  Resume
LPA Resume
 
Heartfulness Magazine Issue 13
Heartfulness Magazine Issue 13Heartfulness Magazine Issue 13
Heartfulness Magazine Issue 13
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Top 10 Indoor Places to Play in Kentuckiana
Top 10 Indoor Places to Play in KentuckianaTop 10 Indoor Places to Play in Kentuckiana
Top 10 Indoor Places to Play in Kentuckiana
 
Work
WorkWork
Work
 
Lapauw Ironing Solutions.pdf
Lapauw Ironing Solutions.pdfLapauw Ironing Solutions.pdf
Lapauw Ironing Solutions.pdf
 
SEMINAR PRESENTATION
SEMINAR PRESENTATIONSEMINAR PRESENTATION
SEMINAR PRESENTATION
 
A2 Media - Logos and Branding
A2 Media - Logos and BrandingA2 Media - Logos and Branding
A2 Media - Logos and Branding
 
Najfach Summer Research 2014 Paper
Najfach Summer Research 2014 PaperNajfach Summer Research 2014 Paper
Najfach Summer Research 2014 Paper
 
Heartfulness eMagazine - Sep 2015
Heartfulness eMagazine - Sep 2015Heartfulness eMagazine - Sep 2015
Heartfulness eMagazine - Sep 2015
 

Similar to ELECTRICAL TECHNICIAN

Similar to ELECTRICAL TECHNICIAN (20)

Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
JKY CV.
JKY CV.JKY CV.
JKY CV.
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
 
manzoorali.project engg
manzoorali.project engg manzoorali.project engg
manzoorali.project engg
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 

ELECTRICAL TECHNICIAN

  • 1. CCCUUURRRRRRIIICCCUUULLLUUUMMM VVVIIITTTAAAEEE Name : TANWEER ALAM Add : B.P.C.L Mumbai INDIA Email : tanweeralam777@gmail.com Mobile No: +918804347402/+918051863064 ( EEELLLEEECCCTTTRRRIIICCCAAALLL TTTEEECCCHHHNNNIIICCCIIIAAANNN ) OOOBBBJJJEEECCCTTTIIIVVVEEE::: To obtaina challengingpositionwhere comprehensive education,proficientpracticesandprofessional experience will be utilized. Iconsidermyself tobe adiligentteamplayerwhoisalwaysopento suggestionsonhowqualityandefficiencycanbe improved.Asafast learnerIseektodevelopmyskills, abilitiesandknowledge soasto provide excellentservice toanyestablishment. 03 Diploma In Electrical Engineering, fromAl- KabirPolytechnicIndia Secondaryschool leaving (SSLC) SSSUUUMMMMMMAAARRRYYY OOOFFF QQQUUUAAALLLIIIFFFIIICCCAAATTTIIIOOONNN:::  More than 10 years  Experience in Electrical Construction /Commissioning/Maintenance /Shut-down Onshore and Offshore Equipments and facilities  components, and systems for commercial and industrial purposes  Capable of troubleshooting, computation of load schedules, solving electrical related problems and wiring connections.  Chemical Industries  Petrochemical Industries  Oil & Gas, Power Plant Industries  Capable of Testing and Commissioning works  Computer literate.  MS Office (Excel, Word and Access)  Knowledge of how to assess and minimize risks associated with working on Hazardous area  PTW FSI & TSTI Seminar., DOHA QATAR SHELL GTL  Practical leadership, Training, DOHA QATAR SHELL GTL  Lock-out and Tag-out Training., DOHA QATAR SHELL GTL  Train the trainer (TTT) Training., DOHA QATAR SHELL GTL  Offshore Training OPITO., PRO-S.A.L-OFFSHORE Kazakhstan GGGUUULLLFFF EEEXXXPPPEEERRRIIIEEENNNCCCEEESSS::: EEEDDDUUUCCCAAATTTIIIOOONNNAAALLL BBBAAACCCKKKGGGRRROOOUUUNNNDDD::: HHHSSSEEE TTTRRRAAANNNIIINNNGGGSSS AAANNNDDD SSSEEEMMMIIINNNAAARRRSSS Company KENTECH SAKHALIN TECHNICAL SERVIES Plant CHAYVO OPF.EXXON NEFTEGAS , RUSSIA Position Electrical Technician ( CEP ) Period 10 JULY 2016 To 22 AUG 2016
  • 2. JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy:::  34.5 kV PDH ES-04 Substation _ HV / MV / LV Switchgears and Transformers, LV-UPS and DC Supply Systems, Emergency Power System / Gen. Set, Variable Speed Drives System, Fire Protection System,  Assisted with commissioning engineers for start-up activities of all electrical related.  Resolved various electrical related issues and conflicts.  Performed surveillance for on-going construction activities.  Creating power and control schematic diagrams.  Creating receptacle, equipment and lighting layouts.  Creating one-line diagrams.  Calculating circuit loads.  Calculating foot candle levels. JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy:::  Applied electrical theory and related knowledge to test and modify operational electrical machinery, electrical control equipment and circuitry and Executed daily operations.  Assembled and tested experimental motor-control devices, switch panels, transformers, generator windings, solenoids and other electrical equipment according to knowledge of electrical principles.  Wrote, and produced maintenance data daily for review by leadership.  Diagnosed cause of electrical and mechanical malfunction and failure of operational equipment, performing preventative and corrective maintenance.  Trained to read and interpret wiring schematics and diagrams. Company C.C.I.C-GROUP-SAL- SAUDI ARABIA Position Electrical Technician Period Dec 2012 to march 2015 Company KENTECH QATAR TECHNICAL SERVIES Plant QATAR SHELL GTL Position Electrical Technician ( CEP ) Period 28 Nov 2015 To 14 Apr 2016
  • 3.  Directed personnel performing routine installation and maintenance duties.  Planned, directed and recorded periodic electrical testing.  Operate and maintain generators.  Troubleshooting and accessing electrical problems.  Installation of electronics by following the guidelines.  Work ranges from small to Electrical installation and upkeep of electrical systems and components. JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy:::  13. kV, 4.0 kV and 0.38 kV Sub-station MV/LV Switchgears (ABB and Schneider) and Transformers,  Preparation of materials as per site requirement and project specification given by PRO - SAL Provide work scheduled as per priority of requirement of project according to management.  Power transformer, distribution transformer, switchgear low and medium Voltage, and Submitting Report to our C.C.I.C Supervisor Reviewed and prepared red-lined drawing prior to final.  In charge in preparation of hand-over over documents such as, As-built Drawings,  Effective manage interfaces between new and existing facilities, ensure adherence to company HSE policies and specifications, without affective the sub contractor Scheduled.  Solved several electrical related issues due to design inconsistency, indefinite schedules and drawings.  Approved estimates, procurements and material take-off by the contractors and ensuring cogency to the technical specification and company (NAMA) standard.  Reviewed and commented the contractor’s submitted progress reports and look-ahead schedules to avoid any setbacks can occur during the construction and pre-commissioning periods.  Attended progress / coordination meetings with the consultants and contractors.  Directly interact with Client (P.R.O S.A.L construction Commissioning and Start-Up Units) discuss, assess and evaluate the priority issues to avoid any cause of impediment in critical activities...  Worked as an EPC focal point for Pre Start up Safety Review (PSSR) Activities and responsible for event reporting.  Accountable for monitoring the critical punch points through the Construction Integrated Management System  Assisted to construct ‘Close out Report’ as part of Turn over Reports for client (PRO - SAL) Company Consolidated Contractor Company (CCC) Abu Dhabi Position ` ELECTRICAL TECHNICIAN Period August2006 to February 2010 Company C.C.I.C ENGG & PRO-S.A.L-OFFSHORE Kazakhstan Position Electrical Technician Period July 2011 to June 2012
  • 4. JJJooobbb RRReeessspppooonnnsssiiibbbiiillliiitttyyy::: Onsite & Offsite Maintenance work for Electrical, Cabling Erection, and Re Installation works. Onsite & Offsite HV, LV Substation , FAS, Cabling, Equipment Transformers (AREVA, BRUSH), switchgears (ABB Switchgears),MCC, PMCC Control centers, Batteries, UPS, Earthling Erection, Installation works to Supervise and Executive with workers team and coordinate with Engineers. Coordinate with Maintenance team for Startup Testing, Maintenance Activities, This project is involved on construction of two 6.6 / 4.16 kV substation with the 4 no’s, 10 mva & 14 nos, 2.5 mva transformer, installation of switchgear medium and low voltage Also installation of cable tray punching and ladder cable tray, installation of complete sub- Station building work including relay panel and patch panel, fire alarm system Annunciator panel, bus duct installation 4.16 kV & 480 volts and ups, battery charger,  Prepared the compilation of RFI”s Checklists Certificate and Test records for Construction Dossier Of all MV/LV equipments and utilities PDH ES-04 Substation for project hand- Over to the client.  Resolved several issues at site and to ensure minimum stoppage Maintenance activities, Capable to interpret P&ID and ISO drawings  Ensured that all Quality Management System standards, test results and inspection requirements have been obtained.  Attended weekly and scheduled meetings for project evaluation and status.  Conducted punch listing/clearing for final acceptance and client turn over. NNNaaatttuuurrreee ooofff WWWooorrrkkk::: Performed construction and Maintenance Commissioning Shut-down Electrical works which includes installation ,connection and termination of power/control cables ,armored medium voltage ,3 core cables ,cable tray ,lighting panels/fixtures ,fire fighting systems ,loop checking functional tests of switch gear ,relay panel ,breaker ,commissioning and trouble shooting and ensure that all the works complete to clients IFC drawings and applicable, Name of Company Position Pried ELMATICS ENGG LTD ELECTRICAL TECHNICIAN January 2004 to February2005 ROHINI INDUS ELEC P.LTD ELECTRICAL TECHNICIAN July 2002 to November2003 PETRONENGINEERING CO.LTD ELECTRICAL TECHNICIAN February 2001 to February 2002 FABCO CONST CO. ELECTRICAL TECHNICIAN September 1999 to December 2000
  • 5. Ensured that all Quality Management System standards, test results and inspection requirements have been obtained. Attended weekly and Scheduled Meetings for project Evaluation and status, Conducted punch listing/clearing for final acceptance and client turn over. Of switch gear, relay panel, breaker, commissioning and trouble shooting and ensure that all the works complete to clients IFC drawings and applicable standards and specifications PPPeeerrrsssooonnnaaalll SSSkkkiiillllll aaannnddd CCCooommmpppeeettteeennnccciiieeesss::: Technical: Engineering, Quality Control Analysis, Troubleshooting, Equipment Selection, Installation of Electrical and Instrumentation equipments and utilities, Operation and Control. OOOrrrgggaaannniiizzzaaatttiiiooonnnaaalll aaannnddd OOOttthhheeerrrsss::: Teamwork, Hardworking and Leadership. Name : TANWEER ALAM Fathers ‘Name : Mohammad Manzoor Alam Birth Date : April 02/1981 Height/Weight : 5’6”/80 kg Citizenship : Indian Marital Status : Single Passport No : L-5531510 ECNR Date of Issue : 24-12-2013 Date of Exp : 23-12-2023 Old passport No : E-4578565 ECNR Place of Issue : Patna Bihar Mansha Tola Post Bettiah Dist. west Champaran State: Bihar-845438 India Contact: +918804347402/+918051863064 Tanweer Alam PPPeeerrrsssooonnnaaalll DDDeeetttaaaiiilllsss::: PPPaaasssssspppooorrrttt DDDeeetttaaaiiilllsss::: PPPEEERRRMMMAAANNNNNNEEENNNTTT AAADDDDDDRRREEESSSSSS:::