Isolation Procedures for Safe Working
on Electrical Systems and Equipment
This instruction chart illustrates the safe isolation procedure to
be applied when working on electrical systems and equipment.
Isolation means the cutting off of the electrical supply to an electrical installation
for safety reasons.This is carried out by operating devices that have been provided
within the electrical installation for isolation to make the electrical system, or part
of it, DEAD.
Once the electrical supply has been isolated, the means of isolation must then be
secured so that the system/equipment cannot be inadvertently made live.
It is important that all sources of electrical supply are isolated and the system/
equipment proved to be DEAD before work is carried out.
The Electricity at Work Regulations requires the isolation of electrical equipment
and systems to prevent danger. All electrical systems or equipment must be
DEAD before installation or maintenance is carried out. A system is any part of
an electrical installation from the source of supply to the equipment installed.
The regulations also state that no person shall take part in any work activity
unless they possess the necessary technical knowledge and experience in order to
prevent danger, or is under suitable supervision.
An approved voltage indicator or test lamp must comply with the Health and
Safety Executive’s guidance note GS38. The approved voltage indicator or test
lamp must be “proved” using a known live supply or proving unit before and after
use to show it is working correctly.
NOTE: Both the Electricity atWork Regulations and the Health and Safety
Executive’s guidance note GS38 should be referred to with this guidance.
THE RULES OF SAFE ISOLATION ARE:
• 	Obtain permission to start work (a Permit may be required in
some situations)
• 	Identify the source(s) of supply using an approved voltage
indicator or test lamp
• 	Prove that the approved voltage indicator or test lamp is
functioning correctly
• 	Isolate the supply(s)
• 	Secure the isolation
• 	Prove the system/equipment is DEAD using an approved
voltage indicator or test lamp
• 	Prove that the approved voltage indicator or test lamp is
functioning correctly
• 	Put up warning signs to tell other people that the electrical
installation has been isolated
• 	Once the system/equipment is proved DEAD, work can begin

Contenu connexe

Tendances

Electrical Safety Techniques
Electrical Safety TechniquesElectrical Safety Techniques
Electrical Safety TechniquesLiving Online
 
Electrical Safety, Personal Protective Equipment, & Z462 Compliance
Electrical Safety, Personal Protective Equipment, & Z462 ComplianceElectrical Safety, Personal Protective Equipment, & Z462 Compliance
Electrical Safety, Personal Protective Equipment, & Z462 ComplianceCCOHS
 
Safe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and SwitchgearSafe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and SwitchgearLiving Online
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety1186429
 
Electrical safety
Electrical safetyElectrical safety
Electrical safetyRaj Patel
 
All About Workplace Electrical Safety
All About Workplace Electrical SafetyAll About Workplace Electrical Safety
All About Workplace Electrical SafetyCurrent Solutions PC
 
Electrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OSElectrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OSEiyla Hamdan
 
Electrical 2
Electrical 2Electrical 2
Electrical 2FFSafety
 
Earth Leakage Circuit Breaker
Earth Leakage Circuit BreakerEarth Leakage Circuit Breaker
Earth Leakage Circuit Breakermilanpatel007
 
Electrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution CenterElectrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution Centertrevor_heller
 
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsIeee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsVincent Wedelich, PE MBA
 
Commissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.pptCommissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.pptAlemayehuAsmare
 
Electrical Safety and Risk Assessments
Electrical Safety and Risk AssessmentsElectrical Safety and Risk Assessments
Electrical Safety and Risk AssessmentsMohd Azmatullah
 
Electrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards swElectrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards swAniruddha Kulkarni
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNikhil Kachare
 
Preliminary electrical load calculation course share
Preliminary electrical load calculation course sharePreliminary electrical load calculation course share
Preliminary electrical load calculation course shareAli Hassan
 
Electrical hazards & safety training
Electrical hazards & safety trainingElectrical hazards & safety training
Electrical hazards & safety trainingSYED HAIDER ABBAS
 

Tendances (20)

Electrical Safety Techniques
Electrical Safety TechniquesElectrical Safety Techniques
Electrical Safety Techniques
 
Basic Electrical Safety by TEC
Basic Electrical Safety by TECBasic Electrical Safety by TEC
Basic Electrical Safety by TEC
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Electrical Safety, Personal Protective Equipment, & Z462 Compliance
Electrical Safety, Personal Protective Equipment, & Z462 ComplianceElectrical Safety, Personal Protective Equipment, & Z462 Compliance
Electrical Safety, Personal Protective Equipment, & Z462 Compliance
 
Safe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and SwitchgearSafe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and Switchgear
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
All About Workplace Electrical Safety
All About Workplace Electrical SafetyAll About Workplace Electrical Safety
All About Workplace Electrical Safety
 
Electrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OSElectrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OS
 
Electrical 2
Electrical 2Electrical 2
Electrical 2
 
Earth Leakage Circuit Breaker
Earth Leakage Circuit BreakerEarth Leakage Circuit Breaker
Earth Leakage Circuit Breaker
 
Electrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution CenterElectrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution Center
 
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsIeee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
 
Commissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.pptCommissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.ppt
 
Electrical Safety and Risk Assessments
Electrical Safety and Risk AssessmentsElectrical Safety and Risk Assessments
Electrical Safety and Risk Assessments
 
Electrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards swElectrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards sw
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Preliminary electrical load calculation course share
Preliminary electrical load calculation course sharePreliminary electrical load calculation course share
Preliminary electrical load calculation course share
 
Electrical hazards & safety training
Electrical hazards & safety trainingElectrical hazards & safety training
Electrical hazards & safety training
 

Similaire à Isolation procedures for safe working on electrical systems and equipment by the jib

lockout-tagout-training.ppt
lockout-tagout-training.pptlockout-tagout-training.ppt
lockout-tagout-training.pptROHITSINGH83692
 
Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationwirethehouse
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system supportMuhammed Fuad Al-Barznji
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1jboullemet
 
Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques Tomeu Capó Capó
 
SAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptxSAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptxFrankHuno1
 
Electrical by osha
Electrical by oshaElectrical by osha
Electrical by oshaleenl76
 
The complete procedure of Logout & tagout
The complete procedure of Logout & tagoutThe complete procedure of Logout & tagout
The complete procedure of Logout & tagoutSaqib Mansoor Ahmed
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Outsspuent
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag OutHvacmach
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptMichaelCazes1
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
Electrical Safety in healthcare.
Electrical Safety in healthcare.Electrical Safety in healthcare.
Electrical Safety in healthcare.Ahmad Thanin
 
Construction Electrical Safety
Construction Electrical SafetyConstruction Electrical Safety
Construction Electrical SafetyDjCurrie
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagoutvtsiri
 
Safety Tip - Electrical Safety in the Field
Safety Tip - Electrical Safety in the FieldSafety Tip - Electrical Safety in the Field
Safety Tip - Electrical Safety in the FieldComplianceSigns, LLC
 

Similaire à Isolation procedures for safe working on electrical systems and equipment by the jib (20)

Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
 
lockout-tagout-training.ppt
lockout-tagout-training.pptlockout-tagout-training.ppt
lockout-tagout-training.ppt
 
shock_arc_flash
shock_arc_flashshock_arc_flash
shock_arc_flash
 
Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolation
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system support
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1
 
Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques
 
Lockout Tagout.ppt
Lockout Tagout.pptLockout Tagout.ppt
Lockout Tagout.ppt
 
SAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptxSAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptx
 
Electrical by osha
Electrical by oshaElectrical by osha
Electrical by osha
 
The complete procedure of Logout & tagout
The complete procedure of Logout & tagoutThe complete procedure of Logout & tagout
The complete procedure of Logout & tagout
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
LOTO.pptx
LOTO.pptxLOTO.pptx
LOTO.pptx
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Electrical Safety in healthcare.
Electrical Safety in healthcare.Electrical Safety in healthcare.
Electrical Safety in healthcare.
 
Construction Electrical Safety
Construction Electrical SafetyConstruction Electrical Safety
Construction Electrical Safety
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 
Safety Tip - Electrical Safety in the Field
Safety Tip - Electrical Safety in the FieldSafety Tip - Electrical Safety in the Field
Safety Tip - Electrical Safety in the Field
 

Plus de Thorne & Derrick International

THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptThorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick InternationalThorne & Derrick International
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Thorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RoweThorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandThorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DThorne & Derrick International
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetThorne & Derrick International
 

Plus de Thorne & Derrick International (20)

THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
 

Dernier

Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 

Dernier (20)

Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 

Isolation procedures for safe working on electrical systems and equipment by the jib

  • 1. Isolation Procedures for Safe Working on Electrical Systems and Equipment This instruction chart illustrates the safe isolation procedure to be applied when working on electrical systems and equipment. Isolation means the cutting off of the electrical supply to an electrical installation for safety reasons.This is carried out by operating devices that have been provided within the electrical installation for isolation to make the electrical system, or part of it, DEAD. Once the electrical supply has been isolated, the means of isolation must then be secured so that the system/equipment cannot be inadvertently made live. It is important that all sources of electrical supply are isolated and the system/ equipment proved to be DEAD before work is carried out. The Electricity at Work Regulations requires the isolation of electrical equipment and systems to prevent danger. All electrical systems or equipment must be DEAD before installation or maintenance is carried out. A system is any part of an electrical installation from the source of supply to the equipment installed. The regulations also state that no person shall take part in any work activity unless they possess the necessary technical knowledge and experience in order to prevent danger, or is under suitable supervision. An approved voltage indicator or test lamp must comply with the Health and Safety Executive’s guidance note GS38. The approved voltage indicator or test lamp must be “proved” using a known live supply or proving unit before and after use to show it is working correctly. NOTE: Both the Electricity atWork Regulations and the Health and Safety Executive’s guidance note GS38 should be referred to with this guidance. THE RULES OF SAFE ISOLATION ARE: • Obtain permission to start work (a Permit may be required in some situations) • Identify the source(s) of supply using an approved voltage indicator or test lamp • Prove that the approved voltage indicator or test lamp is functioning correctly • Isolate the supply(s) • Secure the isolation • Prove the system/equipment is DEAD using an approved voltage indicator or test lamp • Prove that the approved voltage indicator or test lamp is functioning correctly • Put up warning signs to tell other people that the electrical installation has been isolated • Once the system/equipment is proved DEAD, work can begin