SlideShare a Scribd company logo
1 of 13
Download to read offline
Introduction to Urban Answers

Mission Statement: Ensure that capital investments for the rehabilitation / reinvention of public
                             infrastructure assets and private developments save time and money.
A proactive approach to reinventing our infrastructure assets is critical. This includes the re-evaluation of long term viability, cost savings and environmental
improvement. All too often, we have found that we are waiting for our infrastructure to fall apart as a catalyst for new construction, new urbanism. We cannot afford
to look backwards to invent our future or simply rehabilitate and mitigate developmental impacts. Reinventing an environmental and socially responsible infrastructure
first requires acknowledging it is in all of our backyards. Not simply sewers, bridges tunnels and roads, waste management stations or power plants, infrastructure
includes greenways, schools, hospitals and parks.

Areas of Expertise:
      Strategic Transportation Master Planning: Transit oriented development recognizing synergies + adjacencies, within and beyond the project site.
      Pedestrian Engineering: Planning and design that puts pedestrians first from concept through construction; ensuring safety, clarity and improved service.
      Waterfront Revitalization: Promoting a mixed use, working waterfront for residential, recreational, commercial and tourism.
      Community Based Planning: Engage community members and project stakeholders to help develop a project's sense of place and sustainability.
      Design for Disaster: Design for climate change and bring emergency preparedness to communities prone to crisis.
      Owner / Operator Representation: Maintaining and enhancing client vision simultaneously relieving cost and time restraints.

Approach: Holistic problem solving for urban infrastructure and development projects.
There are significant cultural shifts that are already taking place as it relates to a ‘green’ economy. Implementation requires a new approach as well.
Sustainability is no longer a costly addition but a welcome result of proper planning and design from concept through construction.

5 specific elements of success for the next generation of public and/or private development projects:
    1. Transforming a historically 'nimby' attitude (not in my back yard) into a 'wimby' attitude (where in my backyard?)
    2. Looking at and beyond the site. Assessment of physical, ecological and social history helps make responsible decisions physically and programmatically.
    3. Inter-disciplinary engagement. Identification of the proper network of stakeholders and experts then facilitating the work required to meet various needs.
    4. Community participation. Utilizing all aspects of the media to engage the public and monitor progress.
    5. Sustainable and elegant outcomes are often common sense, not added costs.

Urbanism: A Discipline in and of Itself
Definition: (ur’be-niz’em) n, 1. The culture or life style of urban dwellers Cities > 2. Urbanization.
Balancing related disciplines and participants: Agencies, Communities, Developers, Economists, Architects, Landscape Architects,
Planners, Contractors, Sociologists, Geographers, Engineers, Environmentalists and others.




                                                                                                                                fishman@urbananswers.com
                                                                                                                                             646 255 9607
TRANSPORTATION MASTER PLANNING
HISTORIC BATTERY PARK EDGE DESIGN

Connecting the West and East Side Greenways
Client: The Conservancy for Historic Battery Park & NYS Department of
Transportation
Team: Michael Fishman (principal in charge) Sam Schwartz Engineering
Urban Question: How can the east and west greenways be connected around the tip
of lower Manhattan without compromising the 3 million visitors to Ellis Island and
the Statue of Liberty on the waterfront or taking up valuable open space within
Historic Battery Park?
Urban Answer: Negotiating with the NYC Parks Department, NYC/NYS DOT’s and the
NYC Economic Development Corporation over ¾ of an acre of parkland was created
contiguous to Battery Park by narrowing Battery Place. This led to the transfer of the
bikeway into the park and connecting the east and west greenways around the
southern tip of Manhattan.


Realigning The 1/9 South Ferry Subway Terminal
Client: The Conservancy for Historic Battery Park
Team: Michael Fishman (principal in charge) Sam Schwartz Engineering
Urban Question: How can the Park minimize impacts of construction (including loss of ½ the Park’s historic trees and
years of compromised open space) for the new 1/9 subway station?
Urban Answer: By negotiating with the MTA, the subway was realigned in both parties’ best interests. For the Park
shifting the terminal alignment out of the Park as soon as possible saves most of the historic trees maximizing open
space for the Park during construction. By reconsidering the issue, the MTA got a better entrance and connection to
the N/R train, the project was sped up for working adjacent to and not within the Park.




                                                                                                                       fishman@urbananswers.com
                                                                                                                                    646 255 9607
TRANSPORTATION MASTER PLANNING
WORLD TRADE CENTER MASTER PLAN TRANSPORTATION STUDIES
Client: The Lower Manhattan Development Corporation & the Battery Park City Authority
Team: Michael Fishman (Principal for Transportation) Sam Schwartz Engineering
Urban Question: How can transportation act as a catalyst for integration with the fabric of the city as well as set the stage for design and development?
Urban Answer: Access and egress for all modes of transportation for the Memorial Design and master planning beyond the WTC site including all of lower
Manhattan required communicating clearly to designers and decision makers how to improve transportation infrastructure to reflect the aspirations of the
project.

                                                                     Immediate Response Included connecting transit to residential and business communities
                                                                 otherwise disconnected due to the reconstruction of the site and the West Side Highway itself.




Memorial Design                                          Beyond the Site                                         The Region

                                    Looking beyond the site and in detail, at the site itself, clear diagrams with few words
                                 explained the issues and opportunities for redevelopment in short order to decision makers.

                                                                                                      TRANSPORTATION MASTER PLANNING



                                                                                                                         fishman@urbananswers.com
                                                                                                                                      646 255 9607
COLUMBIA UNIVERSITY MASTER PLAN
Client: Columbia University
Team: Michael Fishman (Principal for Transportation) Sam Schwartz Engineering, SOM (lead), Renzo Piano Architects, Muser Rutledge, Buro Happold Engineers,
K. Backus Associates
Urban Question: How to build a new campus in West Harlem for Columbia University while improving the landscape, transportation and economy in this part of
Manhattan?
Urban Answer: Short and long term improvements to the transportation network have already improved conditions on the waterfront and upland in West
Harlem. Short term recommendations were implemented immediately to encourage through (West Side Highway) traffic away from pedestrian critical locations
and the public waterfront as well as closing the adjacent waste transfer station. Long term recommendations included a new Metro North station at 125th Street,
1/9 subway station improvements, bus terminal options and parking recommendations for future demands are primary elements of the 2025 vision for the site.




                                                                                                                                             2025 Master Plan




                                                        Short Term Recommendations




                                                                                                                         fishman@urbananswers.com
                                                                                                                                      646 255 9607
PEDESTRIAN ENGINEERING
Times Square Pedestrian Engineering - Design Trust for Public Space Fellowship
Client: The Design Trust for Public Space and The Times Square Alliance
Fellow: Michael Fishman (working with Philip Habib)
Urban Question: How can the streetscape of Times Square reflect its dynamic qualities at the street level, not
simply as a spectacle looking up?
Urban Answer: After 3 invited public and private participant charettes and 6 months of processing the creative,
political and physical landscapes, a plan to more than double sq/ft for pedestrians was developed. By
eliminating automobiles at the center of Times Square, the unusable medians were designed as public space,
providing a north south connection between the subways and the TKTS booth. This process will give local
employees and tourist more than twice the space to navigate Times Square. NYCDOT has adopted many
aspects of the plan and are currently implementing ‘The Times Square Shuffle.’

Movement Defines Times Square. This is where the world marks the passage of time.
Finally, pedestrians will be given priority in this most precious part of NYC.




 Times Square has been bedeviled since the advent of the automobile. Once bustling with people horse drawn carriages, and wall to wall activity, ‘the bow-tie’
   was immediately reserved maximum rights of way for automobiles. The same curb lines existed for over a century leaving room for cars to reach capacity.
  Pedestrians out number vehicles 10 – 1 during peak periods, but for decades pedestrians have been relegated to 10 foot sidewalks, navigating through one
                                           another and more recently forcing people into moving lanes of traffic.




                                                                                                                         fishman@urbananswers.com
                                                                                                                                      646 255 9607
PEDESTRIAN ENGINEERING
WORLD TRADE CENTER INNOVATIVE DESIGN STUDY EVALUATION
Client: Lower Manhattan Development Corporation
Team: Michael Fishman (principal in charge) Sam Schwartz Engineering, Louis Berger (lead)
Urban Question: Can a transportation evaluation of the 6 competitors for the Master Plan of the World Trade Center site post 9/11 clearly determine the pros
and cons of each submission as it impacts the street level in 6 weeks?
Urban Answer: For the evaluation, over 250 diagrams were produced to explain to decision makers the pros and cons of each scheme at the ground level
considering, cars, busses, service vehicles and pedestrians. This task was accomplished under the direction of Michael Fishman serving as Principal in Charge of
the project. Once complete, the same team was charged with evaluating the memorial design for pedestrian flow and accessibility. Looking beyond the site and
in detail at the site itself, few words and communicative diagrams explained the issues and opportunities for redevelopment in short order to decision makers.




                                                                                                                           fishman@urbananswers.com
                                                                                                                                        646 255 9607
WATERFRONT REVITALIZATION
PIER 76 ADAPTIVE REUSE

Client: Friends of Hudson River Park
Team: Michael Fishman (principal in charge) Halcrow/HPA (lead), Michael Singer Studio, Weisz +Yoes, McLaren
Engineering Group
Urban Question: To site stations that handle waste transfer is complex anywhere. How can this be accomplished
on the west side of Manhattan while improving conditions in the surrounding area and serving multiple functions?
Urban Answer: Exceeding physical and economic expectations, Pier 76 was determined to have the capacity for
adaptive reuse serving multiple waterborne and landside activities. Bringing a sustainable plan for importing /
exporting materials by water (including garbage) solves multiple infrastructure needs on Manhattan’s west side. In
addition, several improvements to the surrounding land uses were determined:
 1. Through grade separation the Highline can connect to the west side ferry terminal, the Javits Convention Center
     and the roof of the facility without forcing pedestrians up and down, encounter trucks using the facility or cross
     the highway at grade.
 2. By programming public space on the green roof, and including a learning center for viewing the infrastructure
     aspects of the site makes the infrastructure transparent and educational.
 3. Waste transfer and material loading and unloading via barge remove trucks on the City streets.

                                                                                      New York City Shorelines Have
                                                                                      Over 10 Times The Linear Feet
                                                                                       Of Most “Global Waterfront
                                                                                       Cities”: Sydney, Dubai, Los
                                                                                       Angeles + On New York City
                                                                                      was largely built by water and
                                                                                        can be re-built by water.




                                                                                                                          fishman@urbananswers.com
                                                                                                                                       646 255 9607
WATERFRONT REVITALIZATION
                                                                                                Above, below, on and adjacent to the water’s edge.
INTRODUCTION: AQUATECTURE

Definition: Interdisciplinary focus on, above and below the surface of the estuaries, rivers, sounds and
oceans; specializing on the unique environments where landuse and water meet.

NYC WASTE TRANSFER FACILITIES REASSESSMENT
Client: Environmental Defense Fund
Team: Urban Answers + Michael Singer’s Studio
Urban Question: Can waterborne elements of our waste management infrastructure improve
communities and their waterfronts economically, environmentally and physically?
Urban Answer: As a city of islands, NY has an opportunity to enhance communities formally burdened with infrastructure by making sustainable and attractive
public works that improve connections to other aspects of the landscape. This assessment set a standard for the design of these facilities city wide.

THE HARBOR SCHOOL (ON GOVERNORS ISLAND)
The Harbor School is an Urban Assembly school of 500 NYC public high school students. The curriculum is devoted to Harbor life
and excursions, therefore dependant on waterfront access - they have been designated to be the first public use on the island.

Client: The New York Harbor School and the Regional Plan Association
Team: Dartmouth University Students (Karolina Kawiaka Professor), Urban Answers Facilitation
Urban Question: Beyond the basic design required to inhabit their new home on Governors Island. Can the planning, design and
construction processes allow life and learning to be encouraged while enhancing the environment above and below the surface of
the water?
Urban Answer: 5 sustainable options were developed for a sustainable waterfront presence for the Harbor School to prepare for
their move to Governors Island in 2010.




                                                                                                                        fishman@urbananswers.com
                                                                                                                                     646 255 9607
COMMUNITY BASED PLANNING

CANAL STREET MASTER PLAN
Client: NYCDOT, Manhattan Borough President
Team: Michael Fishman (principal in charge) Sam Schwartz Engineering
Urban Question: How can the crowded sidewalks of Canal Street gain relief from the under-utilized open spaces
along it’s length, improve safety and turn the street into a connection between lower Manhattan and SoHo?
Urban Answer: By reclaiming open space, lost to the NYSDOT, NYCDOT and Port Authority, new parkland was
created along the length of the street to provide for market, recreational and flexible open spaces.

Working with the Tribeca Community Association, a historic park designed by Calvert Vaux and Fredrick Law
Olmstead was erased from the City map when the West Side Highway was initially under construction.
Uncovering this information the community came to us to negotiate with the NYSDOT to regain the parkland
back as a gateway at the end of Canal Street to the Hudson River Park for Tribeca and SoHo communities.

GOWANUS EXPRESSWAY VISIONING PROJECT
Client: South West Brooklyn Industrial Development Corporation
Team: Michael Fishman (principle in charge) Sam Schwartz Engineering, LLC
Urban Question: Consider the impacts of tunneling the Expressway.
Urban Answer: Incremental and monumental improvements made to reconnect
the Sunset Park Neighborhood to its waterfront.

Narrowing the right of way back to its original width allows for contextual
development (residential and commercial) on the ground floor along 3rd Avenue.
Ensuring that tunnel entrances and exits are properly located to serve
commercial development on the waterfront and inland and simultaneously
protect parks and communities in these locations was a focus and challenge met
by the process.




                                                                                                                    fishman@urbananswers.com
                                                                                                                                 646 255 9607
COMMUNITY BASED PLANNING

THE GRAND CONCOURSE VISION PROJECT

Client: Office of the Bronx Borough President Fernando Ferrer
Team; Michael Fishman (Facilitator – Charettes, preparation and products), Sam Schwartz Engineering
Urban Question: How to restore the Grand Concourse as a safe and attractive European Boulevard.
Urban Answer: Through comprehensive community based planning and agency coordination, reconciling issues for segments of
the Boulevard, respecting its history and imagining a future that meets the diverse needs of the public and private land uses along
its length.

The Grand Concourse: Bronx, NY (built 1883) was the birthplace of urban grade separation.
Well over a century ago, Fredrick Law Olmstead with Central Parks Transverse Roads allowed multiple functions to occur within
the same space on separate levels by creating grade separation. Louis Risse then utilized this concept for the Grand Concourse
outside of the park environment by implemented grade separation for vehicles (horse and carriages, at the time and then
automobiles) to flow within the urban environment, without conflict in with his European Boulevard design on the ridge that runs
the length of the Bronx. This was the first concept of removing at grade intersections gave way to our national highway system
and bridge / tunnel subway networks.




                                                                                                           Historic photos courtesy of the Bronx Historical Society



                                                                                                                            fishman@urbananswers.com
                                                                                                                                         646 255 9607
DESIGN FOR DISASTER
                                                                                                 Design for Climate Change and Unexpected Events

Introduction: Design and educational patterns for preparation, response and recovery patterns have changed dramatically as natural and manmade
catastrophes have bombarded North America and the world in recent years. All geographies prone to crisis can utilize day to day improvements to existing
infrastructure to serve multiple functions from local community based education for disaster planning, associated retail (preparation supplies) and response
shelters and staging areas for goods and materials in recovery stages.




BATTERY PARK CITY / WORLD FINANCIAL CENTER
STREETSCAPE SECURITY PLAN

Client: Battery Park City Authority
Team: Michael Fishman (principal in charge) Sam Schwartz Engineering (lead), Rodgers Marvel Architects (image
credits)
Urban Question: How can a secure streetscape keep a standoff distance from the building line of the World
Financial Center to protect from errand vehicles without compromising aesthetics, functionality of the street and
pedestrian / vehicular needs?
Urban Answer: Protecting our assets need not reflect a desperate condition of
Jersey Barriers and bollards. Analyzing speeds and directionality of potential
vehicular threats, a system of hardened street furniture was developed to
anchor itself into the sidewalk. Using existing streetscape elements: bus
shelters, lampposts, trash receptacles, planters and newsstands; an invisible
security system was designed to extend the impact standoff by 20-30 feet.




                                                                                                                           fishman@urbananswers.com
                                                                                                                                        646 255 9607
DESIGN FOR DISASTER
                                                                                                Design for Climate Change and Unexpected Events
LOWER MANHATTAN IMMEDIATE RESPONSE

Client: Multiple Clients
Team: Michael Fishman (principal in charge) Sam Schwartz Engineering
Urban Question: Although not directed by any one entity to answer the question, could the transit network losses and service yet inaccessible be clearly and
immediately known to all respondents and relevant constituents downtown?
Urban Answer: Immediately following the events of 9/11, maps were developed to communicate the loss and of remaining elements of the transportation
network downtown. This was a requirement that allowed decision makers immediate response and direction for long term reconstruction.




THE ROCKAWAY PENINSULA PREPARATION, RESPONSE AND RECOVERY INFRASTRUCTURE

Client: NYC Office of Emergency Management, Council Members Offices, Local Business Improvement Office
Team: Professors Michael Fishman, Ethel Sheffer and Floyd Lapp with Columbia University Urban Planning Masters Students
Urban Question: Can daily improvements to the infrastructure and development patterns of the peninsula be designed for
disaster given the geographic and social at risk populations needs before, during and after hurricanes and storm surges?
Urban Answer:
    Leverage existing assets by redesigning the elevated stations (originally built with storm surges in mind) to serve as
    evacuation points / survival shelters and recovery staging areas.
    Reconnecting the Long Island Railroad with the NYC subway network to aid in evacuation of the car free population.
      Wage a comprehensive educational and evaluation program to engage the at risk residential and commercial community.




                                                                                                                          fishman@urbananswers.com
                                                                                                                                       646 255 9607
OWNER/OPERATOR’S REPRESENTATIVE
INTRODUCTION: Maintaining Client Vision
Community concerns, legal/political conflicts consultant visions, agency agendas and other critical issues, often force a project to be compromised, deviate from
a client’s best interests or even cause projects to fail. This costs owners and operators time and money.
Third party representation keeps clients from compromising critical roles and maintains an agenda to meet their best interest. Objective problem solving
alleviates tensions for all parties.


THE CITY UNIVERSITY OF NEW YORK GOVERNORS ISLAND MASTER PLAN

Client: City University of New York Chancellor’s Office & Federal Development
Team: Michael Fishman (principal in charge) Halcrow/HPA (lead), Pei Partnership, Beyer Blinder Belle.
Urban Question: The Governors Island Preservation and Education Commission sought proposals for whole island
developments. How might a plan activate the island as quickly and carefully as possible?
Urban Answer: 10,000 people living and learning on the island, a transient
population and permanent economy. Attracting international academic presence
to lower Manhattan as well as serving as a retreat from Wall Street.




                                                                                                                           fishman@urbananswers.com
                                                                                                                                        646 255 9607

More Related Content

What's hot

Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardinerEast
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017City of Toronto Planning
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardinerEast
 
Le Blanc - Andrews Handout
Le Blanc - Andrews HandoutLe Blanc - Andrews Handout
Le Blanc - Andrews HandoutHayley Pallister
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg bookletGardinerEast
 
Replace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu bookletReplace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu bookletGardinerEast
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...Congress for the New Urbanism
 
Remove oma+amo boards
Remove oma+amo boardsRemove oma+amo boards
Remove oma+amo boardsGardinerEast
 
APWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann ArborAPWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann ArborOHM Advisors
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?William Riggs
 
Final Report, Hi7
Final Report, Hi7Final Report, Hi7
Final Report, Hi7Mike White
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Studyrcox1963
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftMatthew Crane
 

What's hot (20)

Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
 
Le Blanc - Andrews Handout
Le Blanc - Andrews HandoutLe Blanc - Andrews Handout
Le Blanc - Andrews Handout
 
Task 10: Community Meeting Notes & Comments
Task 10:  Community Meeting Notes & CommentsTask 10:  Community Meeting Notes & Comments
Task 10: Community Meeting Notes & Comments
 
041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg booklet
 
Replace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu bookletReplace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu booklet
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
 
Remove oma+amo boards
Remove oma+amo boardsRemove oma+amo boards
Remove oma+amo boards
 
APWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann ArborAPWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann Arbor
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Final Report, Hi7
Final Report, Hi7Final Report, Hi7
Final Report, Hi7
 
IndesignFile
IndesignFileIndesignFile
IndesignFile
 
Final report
Final reportFinal report
Final report
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Study
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draft
 
Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014
 

Similar to Areas Of Expertise

Systems Level Approach To Sustainable Urban Arterial Revitalization
Systems Level Approach To Sustainable Urban Arterial RevitalizationSystems Level Approach To Sustainable Urban Arterial Revitalization
Systems Level Approach To Sustainable Urban Arterial Revitalizationbrianhuey
 
Dj pow work samples
Dj pow work samplesDj pow work samples
Dj pow work samplesDanielJPow
 
Harbor Ring Campaign
Harbor Ring CampaignHarbor Ring Campaign
Harbor Ring CampaignNY_Bicycling
 
Pedestrian Engineering Article
Pedestrian Engineering ArticlePedestrian Engineering Article
Pedestrian Engineering ArticleMichael Fishman
 
JMP Development Planning
JMP Development PlanningJMP Development Planning
JMP Development PlanningAlan Bain
 
RayleeMack Portfolio - Sm High Res
RayleeMack Portfolio - Sm High ResRayleeMack Portfolio - Sm High Res
RayleeMack Portfolio - Sm High ResRaylee McKinley
 
Rachel Lindt Portfolio 472015
Rachel Lindt Portfolio 472015Rachel Lindt Portfolio 472015
Rachel Lindt Portfolio 472015Rachel Lindt
 
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...zubeditufail
 
North East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanNorth East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanPaul Vernon
 
PPS Managing Great Public Spaces
PPS Managing Great Public SpacesPPS Managing Great Public Spaces
PPS Managing Great Public Spacessfgreatstreets
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph Raftery
 

Similar to Areas Of Expertise (20)

report_151222
report_151222report_151222
report_151222
 
Report
ReportReport
Report
 
Systems Level Approach To Sustainable Urban Arterial Revitalization
Systems Level Approach To Sustainable Urban Arterial RevitalizationSystems Level Approach To Sustainable Urban Arterial Revitalization
Systems Level Approach To Sustainable Urban Arterial Revitalization
 
Traffic Graphics
Traffic GraphicsTraffic Graphics
Traffic Graphics
 
05.ENTRIPS
05.ENTRIPS05.ENTRIPS
05.ENTRIPS
 
Dj pow work samples
Dj pow work samplesDj pow work samples
Dj pow work samples
 
Harbor Ring Campaign
Harbor Ring CampaignHarbor Ring Campaign
Harbor Ring Campaign
 
Pedestrian Engineering Article
Pedestrian Engineering ArticlePedestrian Engineering Article
Pedestrian Engineering Article
 
JMP Development Planning
JMP Development PlanningJMP Development Planning
JMP Development Planning
 
RayleeMack Portfolio - Sm High Res
RayleeMack Portfolio - Sm High ResRayleeMack Portfolio - Sm High Res
RayleeMack Portfolio - Sm High Res
 
RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)
 
CWSC Chairs' Presentation to Planning Board
CWSC Chairs' Presentation to Planning BoardCWSC Chairs' Presentation to Planning Board
CWSC Chairs' Presentation to Planning Board
 
Rachel Lindt Portfolio 472015
Rachel Lindt Portfolio 472015Rachel Lindt Portfolio 472015
Rachel Lindt Portfolio 472015
 
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
 
North East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanNorth East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development Plan
 
PPS Managing Great Public Spaces
PPS Managing Great Public SpacesPPS Managing Great Public Spaces
PPS Managing Great Public Spaces
 
convert_266361
convert_266361convert_266361
convert_266361
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.
 
Town planner 2
Town planner 2Town planner 2
Town planner 2
 

Recently uploaded

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 

Recently uploaded (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

Areas Of Expertise

  • 1. Introduction to Urban Answers Mission Statement: Ensure that capital investments for the rehabilitation / reinvention of public infrastructure assets and private developments save time and money. A proactive approach to reinventing our infrastructure assets is critical. This includes the re-evaluation of long term viability, cost savings and environmental improvement. All too often, we have found that we are waiting for our infrastructure to fall apart as a catalyst for new construction, new urbanism. We cannot afford to look backwards to invent our future or simply rehabilitate and mitigate developmental impacts. Reinventing an environmental and socially responsible infrastructure first requires acknowledging it is in all of our backyards. Not simply sewers, bridges tunnels and roads, waste management stations or power plants, infrastructure includes greenways, schools, hospitals and parks. Areas of Expertise: Strategic Transportation Master Planning: Transit oriented development recognizing synergies + adjacencies, within and beyond the project site. Pedestrian Engineering: Planning and design that puts pedestrians first from concept through construction; ensuring safety, clarity and improved service. Waterfront Revitalization: Promoting a mixed use, working waterfront for residential, recreational, commercial and tourism. Community Based Planning: Engage community members and project stakeholders to help develop a project's sense of place and sustainability. Design for Disaster: Design for climate change and bring emergency preparedness to communities prone to crisis. Owner / Operator Representation: Maintaining and enhancing client vision simultaneously relieving cost and time restraints. Approach: Holistic problem solving for urban infrastructure and development projects. There are significant cultural shifts that are already taking place as it relates to a ‘green’ economy. Implementation requires a new approach as well. Sustainability is no longer a costly addition but a welcome result of proper planning and design from concept through construction. 5 specific elements of success for the next generation of public and/or private development projects: 1. Transforming a historically 'nimby' attitude (not in my back yard) into a 'wimby' attitude (where in my backyard?) 2. Looking at and beyond the site. Assessment of physical, ecological and social history helps make responsible decisions physically and programmatically. 3. Inter-disciplinary engagement. Identification of the proper network of stakeholders and experts then facilitating the work required to meet various needs. 4. Community participation. Utilizing all aspects of the media to engage the public and monitor progress. 5. Sustainable and elegant outcomes are often common sense, not added costs. Urbanism: A Discipline in and of Itself Definition: (ur’be-niz’em) n, 1. The culture or life style of urban dwellers Cities > 2. Urbanization. Balancing related disciplines and participants: Agencies, Communities, Developers, Economists, Architects, Landscape Architects, Planners, Contractors, Sociologists, Geographers, Engineers, Environmentalists and others. fishman@urbananswers.com 646 255 9607
  • 2. TRANSPORTATION MASTER PLANNING HISTORIC BATTERY PARK EDGE DESIGN Connecting the West and East Side Greenways Client: The Conservancy for Historic Battery Park & NYS Department of Transportation Team: Michael Fishman (principal in charge) Sam Schwartz Engineering Urban Question: How can the east and west greenways be connected around the tip of lower Manhattan without compromising the 3 million visitors to Ellis Island and the Statue of Liberty on the waterfront or taking up valuable open space within Historic Battery Park? Urban Answer: Negotiating with the NYC Parks Department, NYC/NYS DOT’s and the NYC Economic Development Corporation over ¾ of an acre of parkland was created contiguous to Battery Park by narrowing Battery Place. This led to the transfer of the bikeway into the park and connecting the east and west greenways around the southern tip of Manhattan. Realigning The 1/9 South Ferry Subway Terminal Client: The Conservancy for Historic Battery Park Team: Michael Fishman (principal in charge) Sam Schwartz Engineering Urban Question: How can the Park minimize impacts of construction (including loss of ½ the Park’s historic trees and years of compromised open space) for the new 1/9 subway station? Urban Answer: By negotiating with the MTA, the subway was realigned in both parties’ best interests. For the Park shifting the terminal alignment out of the Park as soon as possible saves most of the historic trees maximizing open space for the Park during construction. By reconsidering the issue, the MTA got a better entrance and connection to the N/R train, the project was sped up for working adjacent to and not within the Park. fishman@urbananswers.com 646 255 9607
  • 3. TRANSPORTATION MASTER PLANNING WORLD TRADE CENTER MASTER PLAN TRANSPORTATION STUDIES Client: The Lower Manhattan Development Corporation & the Battery Park City Authority Team: Michael Fishman (Principal for Transportation) Sam Schwartz Engineering Urban Question: How can transportation act as a catalyst for integration with the fabric of the city as well as set the stage for design and development? Urban Answer: Access and egress for all modes of transportation for the Memorial Design and master planning beyond the WTC site including all of lower Manhattan required communicating clearly to designers and decision makers how to improve transportation infrastructure to reflect the aspirations of the project. Immediate Response Included connecting transit to residential and business communities otherwise disconnected due to the reconstruction of the site and the West Side Highway itself. Memorial Design Beyond the Site The Region Looking beyond the site and in detail, at the site itself, clear diagrams with few words explained the issues and opportunities for redevelopment in short order to decision makers. TRANSPORTATION MASTER PLANNING fishman@urbananswers.com 646 255 9607
  • 4. COLUMBIA UNIVERSITY MASTER PLAN Client: Columbia University Team: Michael Fishman (Principal for Transportation) Sam Schwartz Engineering, SOM (lead), Renzo Piano Architects, Muser Rutledge, Buro Happold Engineers, K. Backus Associates Urban Question: How to build a new campus in West Harlem for Columbia University while improving the landscape, transportation and economy in this part of Manhattan? Urban Answer: Short and long term improvements to the transportation network have already improved conditions on the waterfront and upland in West Harlem. Short term recommendations were implemented immediately to encourage through (West Side Highway) traffic away from pedestrian critical locations and the public waterfront as well as closing the adjacent waste transfer station. Long term recommendations included a new Metro North station at 125th Street, 1/9 subway station improvements, bus terminal options and parking recommendations for future demands are primary elements of the 2025 vision for the site. 2025 Master Plan Short Term Recommendations fishman@urbananswers.com 646 255 9607
  • 5. PEDESTRIAN ENGINEERING Times Square Pedestrian Engineering - Design Trust for Public Space Fellowship Client: The Design Trust for Public Space and The Times Square Alliance Fellow: Michael Fishman (working with Philip Habib) Urban Question: How can the streetscape of Times Square reflect its dynamic qualities at the street level, not simply as a spectacle looking up? Urban Answer: After 3 invited public and private participant charettes and 6 months of processing the creative, political and physical landscapes, a plan to more than double sq/ft for pedestrians was developed. By eliminating automobiles at the center of Times Square, the unusable medians were designed as public space, providing a north south connection between the subways and the TKTS booth. This process will give local employees and tourist more than twice the space to navigate Times Square. NYCDOT has adopted many aspects of the plan and are currently implementing ‘The Times Square Shuffle.’ Movement Defines Times Square. This is where the world marks the passage of time. Finally, pedestrians will be given priority in this most precious part of NYC. Times Square has been bedeviled since the advent of the automobile. Once bustling with people horse drawn carriages, and wall to wall activity, ‘the bow-tie’ was immediately reserved maximum rights of way for automobiles. The same curb lines existed for over a century leaving room for cars to reach capacity. Pedestrians out number vehicles 10 – 1 during peak periods, but for decades pedestrians have been relegated to 10 foot sidewalks, navigating through one another and more recently forcing people into moving lanes of traffic. fishman@urbananswers.com 646 255 9607
  • 6. PEDESTRIAN ENGINEERING WORLD TRADE CENTER INNOVATIVE DESIGN STUDY EVALUATION Client: Lower Manhattan Development Corporation Team: Michael Fishman (principal in charge) Sam Schwartz Engineering, Louis Berger (lead) Urban Question: Can a transportation evaluation of the 6 competitors for the Master Plan of the World Trade Center site post 9/11 clearly determine the pros and cons of each submission as it impacts the street level in 6 weeks? Urban Answer: For the evaluation, over 250 diagrams were produced to explain to decision makers the pros and cons of each scheme at the ground level considering, cars, busses, service vehicles and pedestrians. This task was accomplished under the direction of Michael Fishman serving as Principal in Charge of the project. Once complete, the same team was charged with evaluating the memorial design for pedestrian flow and accessibility. Looking beyond the site and in detail at the site itself, few words and communicative diagrams explained the issues and opportunities for redevelopment in short order to decision makers. fishman@urbananswers.com 646 255 9607
  • 7. WATERFRONT REVITALIZATION PIER 76 ADAPTIVE REUSE Client: Friends of Hudson River Park Team: Michael Fishman (principal in charge) Halcrow/HPA (lead), Michael Singer Studio, Weisz +Yoes, McLaren Engineering Group Urban Question: To site stations that handle waste transfer is complex anywhere. How can this be accomplished on the west side of Manhattan while improving conditions in the surrounding area and serving multiple functions? Urban Answer: Exceeding physical and economic expectations, Pier 76 was determined to have the capacity for adaptive reuse serving multiple waterborne and landside activities. Bringing a sustainable plan for importing / exporting materials by water (including garbage) solves multiple infrastructure needs on Manhattan’s west side. In addition, several improvements to the surrounding land uses were determined: 1. Through grade separation the Highline can connect to the west side ferry terminal, the Javits Convention Center and the roof of the facility without forcing pedestrians up and down, encounter trucks using the facility or cross the highway at grade. 2. By programming public space on the green roof, and including a learning center for viewing the infrastructure aspects of the site makes the infrastructure transparent and educational. 3. Waste transfer and material loading and unloading via barge remove trucks on the City streets. New York City Shorelines Have Over 10 Times The Linear Feet Of Most “Global Waterfront Cities”: Sydney, Dubai, Los Angeles + On New York City was largely built by water and can be re-built by water. fishman@urbananswers.com 646 255 9607
  • 8. WATERFRONT REVITALIZATION Above, below, on and adjacent to the water’s edge. INTRODUCTION: AQUATECTURE Definition: Interdisciplinary focus on, above and below the surface of the estuaries, rivers, sounds and oceans; specializing on the unique environments where landuse and water meet. NYC WASTE TRANSFER FACILITIES REASSESSMENT Client: Environmental Defense Fund Team: Urban Answers + Michael Singer’s Studio Urban Question: Can waterborne elements of our waste management infrastructure improve communities and their waterfronts economically, environmentally and physically? Urban Answer: As a city of islands, NY has an opportunity to enhance communities formally burdened with infrastructure by making sustainable and attractive public works that improve connections to other aspects of the landscape. This assessment set a standard for the design of these facilities city wide. THE HARBOR SCHOOL (ON GOVERNORS ISLAND) The Harbor School is an Urban Assembly school of 500 NYC public high school students. The curriculum is devoted to Harbor life and excursions, therefore dependant on waterfront access - they have been designated to be the first public use on the island. Client: The New York Harbor School and the Regional Plan Association Team: Dartmouth University Students (Karolina Kawiaka Professor), Urban Answers Facilitation Urban Question: Beyond the basic design required to inhabit their new home on Governors Island. Can the planning, design and construction processes allow life and learning to be encouraged while enhancing the environment above and below the surface of the water? Urban Answer: 5 sustainable options were developed for a sustainable waterfront presence for the Harbor School to prepare for their move to Governors Island in 2010. fishman@urbananswers.com 646 255 9607
  • 9. COMMUNITY BASED PLANNING CANAL STREET MASTER PLAN Client: NYCDOT, Manhattan Borough President Team: Michael Fishman (principal in charge) Sam Schwartz Engineering Urban Question: How can the crowded sidewalks of Canal Street gain relief from the under-utilized open spaces along it’s length, improve safety and turn the street into a connection between lower Manhattan and SoHo? Urban Answer: By reclaiming open space, lost to the NYSDOT, NYCDOT and Port Authority, new parkland was created along the length of the street to provide for market, recreational and flexible open spaces. Working with the Tribeca Community Association, a historic park designed by Calvert Vaux and Fredrick Law Olmstead was erased from the City map when the West Side Highway was initially under construction. Uncovering this information the community came to us to negotiate with the NYSDOT to regain the parkland back as a gateway at the end of Canal Street to the Hudson River Park for Tribeca and SoHo communities. GOWANUS EXPRESSWAY VISIONING PROJECT Client: South West Brooklyn Industrial Development Corporation Team: Michael Fishman (principle in charge) Sam Schwartz Engineering, LLC Urban Question: Consider the impacts of tunneling the Expressway. Urban Answer: Incremental and monumental improvements made to reconnect the Sunset Park Neighborhood to its waterfront. Narrowing the right of way back to its original width allows for contextual development (residential and commercial) on the ground floor along 3rd Avenue. Ensuring that tunnel entrances and exits are properly located to serve commercial development on the waterfront and inland and simultaneously protect parks and communities in these locations was a focus and challenge met by the process. fishman@urbananswers.com 646 255 9607
  • 10. COMMUNITY BASED PLANNING THE GRAND CONCOURSE VISION PROJECT Client: Office of the Bronx Borough President Fernando Ferrer Team; Michael Fishman (Facilitator – Charettes, preparation and products), Sam Schwartz Engineering Urban Question: How to restore the Grand Concourse as a safe and attractive European Boulevard. Urban Answer: Through comprehensive community based planning and agency coordination, reconciling issues for segments of the Boulevard, respecting its history and imagining a future that meets the diverse needs of the public and private land uses along its length. The Grand Concourse: Bronx, NY (built 1883) was the birthplace of urban grade separation. Well over a century ago, Fredrick Law Olmstead with Central Parks Transverse Roads allowed multiple functions to occur within the same space on separate levels by creating grade separation. Louis Risse then utilized this concept for the Grand Concourse outside of the park environment by implemented grade separation for vehicles (horse and carriages, at the time and then automobiles) to flow within the urban environment, without conflict in with his European Boulevard design on the ridge that runs the length of the Bronx. This was the first concept of removing at grade intersections gave way to our national highway system and bridge / tunnel subway networks. Historic photos courtesy of the Bronx Historical Society fishman@urbananswers.com 646 255 9607
  • 11. DESIGN FOR DISASTER Design for Climate Change and Unexpected Events Introduction: Design and educational patterns for preparation, response and recovery patterns have changed dramatically as natural and manmade catastrophes have bombarded North America and the world in recent years. All geographies prone to crisis can utilize day to day improvements to existing infrastructure to serve multiple functions from local community based education for disaster planning, associated retail (preparation supplies) and response shelters and staging areas for goods and materials in recovery stages. BATTERY PARK CITY / WORLD FINANCIAL CENTER STREETSCAPE SECURITY PLAN Client: Battery Park City Authority Team: Michael Fishman (principal in charge) Sam Schwartz Engineering (lead), Rodgers Marvel Architects (image credits) Urban Question: How can a secure streetscape keep a standoff distance from the building line of the World Financial Center to protect from errand vehicles without compromising aesthetics, functionality of the street and pedestrian / vehicular needs? Urban Answer: Protecting our assets need not reflect a desperate condition of Jersey Barriers and bollards. Analyzing speeds and directionality of potential vehicular threats, a system of hardened street furniture was developed to anchor itself into the sidewalk. Using existing streetscape elements: bus shelters, lampposts, trash receptacles, planters and newsstands; an invisible security system was designed to extend the impact standoff by 20-30 feet. fishman@urbananswers.com 646 255 9607
  • 12. DESIGN FOR DISASTER Design for Climate Change and Unexpected Events LOWER MANHATTAN IMMEDIATE RESPONSE Client: Multiple Clients Team: Michael Fishman (principal in charge) Sam Schwartz Engineering Urban Question: Although not directed by any one entity to answer the question, could the transit network losses and service yet inaccessible be clearly and immediately known to all respondents and relevant constituents downtown? Urban Answer: Immediately following the events of 9/11, maps were developed to communicate the loss and of remaining elements of the transportation network downtown. This was a requirement that allowed decision makers immediate response and direction for long term reconstruction. THE ROCKAWAY PENINSULA PREPARATION, RESPONSE AND RECOVERY INFRASTRUCTURE Client: NYC Office of Emergency Management, Council Members Offices, Local Business Improvement Office Team: Professors Michael Fishman, Ethel Sheffer and Floyd Lapp with Columbia University Urban Planning Masters Students Urban Question: Can daily improvements to the infrastructure and development patterns of the peninsula be designed for disaster given the geographic and social at risk populations needs before, during and after hurricanes and storm surges? Urban Answer: Leverage existing assets by redesigning the elevated stations (originally built with storm surges in mind) to serve as evacuation points / survival shelters and recovery staging areas. Reconnecting the Long Island Railroad with the NYC subway network to aid in evacuation of the car free population. Wage a comprehensive educational and evaluation program to engage the at risk residential and commercial community. fishman@urbananswers.com 646 255 9607
  • 13. OWNER/OPERATOR’S REPRESENTATIVE INTRODUCTION: Maintaining Client Vision Community concerns, legal/political conflicts consultant visions, agency agendas and other critical issues, often force a project to be compromised, deviate from a client’s best interests or even cause projects to fail. This costs owners and operators time and money. Third party representation keeps clients from compromising critical roles and maintains an agenda to meet their best interest. Objective problem solving alleviates tensions for all parties. THE CITY UNIVERSITY OF NEW YORK GOVERNORS ISLAND MASTER PLAN Client: City University of New York Chancellor’s Office & Federal Development Team: Michael Fishman (principal in charge) Halcrow/HPA (lead), Pei Partnership, Beyer Blinder Belle. Urban Question: The Governors Island Preservation and Education Commission sought proposals for whole island developments. How might a plan activate the island as quickly and carefully as possible? Urban Answer: 10,000 people living and learning on the island, a transient population and permanent economy. Attracting international academic presence to lower Manhattan as well as serving as a retreat from Wall Street. fishman@urbananswers.com 646 255 9607