Normally it takes 5 students 1 hour to arrange chairs for a function.
If one of them is absent, how much time will it take for the remaining 4 students to
arrange the same number of chairs?
a) 80 mins b) 75 mins c) 90 mins d) 100 mins
Total units of work by 5 students = 5 * 60 = 300 units.
No of units for 4 students =
300
4
=75 minutes.
MEN
A group of workers can do a piece of work in 60 days.
However 4 workers were absent due to illness and it took 100 days to complete the
work.
How many workers are there in total?
a)6 b)8 c)10 d)12
Let the number of workers be x.
60x = 100(x – 4)
100x – 400 = 60x
X = 10
MEN
66 men can finish a job in 42 days.
If the work has to be completed 9 days earlier, how many additional men must be
engaged to complete the work?
a) 18 b) 5 c) 15 d) 9
No of men required to complete the work = 66 *
42
33
= 84
No of additional men required = 84 – 66 = 18
Beginning
A group of men decided to do a job in 7 days.
But as 10 men dropped out everyday, the job got completed at the end of tenth day.
How many men were at the beginning?
a) 200 b) 180 c) 175 d) 150
Let no. of men in the beginning be x.
Overall work = 7x man-days.
7x = x + (x – 10) + (x – 20) +…+(x – 90).
7x = 10x – 450
3x = 450
x = 150
EFFICIENCY
A is twice as good as B and together they finish a piece of work in 18 days.
In how many days will B alone finish the work?
a) 27 b) 35 c) 42 d) 54
Ratio of efficiency = A:B = 2:1
=
2
x
:
1
x
Work done by together in 1 day=
2
x
+
1
x
=
3
x
=
1
18
X = 54.
Total work done by B in = 54 days.
EFFICIENCY
A can do a piece of work in 20 days.
B is 25% more efficient than A.
How many days will B take to complete the same work?
a) 15 b) 18 c) 16 d) 14
B is 25% more efficient than A
Hence B’s efficiency is 125% of A =
5
4
of A
Work done by B =
4
5
* 20= 16 days.
Days
A, B and C can together do a piece of work in 7.5 days.
A can do alone in 40 days and B alone in 24 days.
In how many days can C do it alone? a) 9 days
b) 12 days c) 15 days d) None of these
(A + B + C)’s 1 day work =
1
7.5
=
2
15
(A + B)’s 1 day work =
64
40 ∗ 24
=
1
15
C’s 1 day work =
1
15
C can complete the work alone in 15 days
LCM OF 7.5, 40, 24 = 120
WORK DONE BY A IN 1 DAY = 3
WORK DONE BY B IN 1 DAY = 5
WORK DONE BY ALL IN 1 DAY = 16
WORK DONE BY C IN 1 DAY = 8
TOTAL NO OF DAYS FOR C = 120/8 = 15
DAYS
Venkat and Prasad can do a job in 12 days.
Prasad alone can finish it in 28 days.
In how many days can Venkat alone finish the work?
a) 21 days b) 20 days c) 15 days d)18 days
Amount of work per day for Venkat =
1
12
−
1
28
=
7 −3
12∗7
=
1
21
No of days required for Venkat alone = 21 days.
Days
5 men can do a work in 20 days of 8 hrs each.
In how many days of 10 hrs each can 8 men do the same work?
a) 6 days b) 8 days c) 10 days d) 12 days
Days =
5
8
∗
8
10
∗ 20 = 10 days
men hours Days
5 8 20
8 10 ?
DAYS
Amar and Akbar can do a job in 20 days.
Akbar alone can finish it in 30 days.
In how many days can Amar alone finish the work?
a)70 days b)60 days c)50 days d)54 days
1 day work of Amar =
1
20
−
1
30
=
1
60
Amar can finish in 60 days.
Days
10 horses and 9 donkeys can do a piece of work in 20 days.
6 horses and 12 donkeys can do the same work in 30 days.
In how many days can the same work be done by 1 horse and 1 donkey?
a)174 days b) 182 days c) 190 days d) 198 days
(10 H + 9 D) * 20 = ( 6 H + 12 D) * 30
200 H + 180 D = 180 H + 360 D
20 H = 180 D
H = 9 D
Hence total units of work = (90 D + 9 D) * 20 = 1980 D units.
Hence 1 Horse and 1 Donkey can do 10 D units in 1 day.
Hence no of days to complete the work by 1 Horse and 1 donkey =
1980
10 = 198.
Days
Two workers Gopal and Shyam can do a work alone in 10 and 15 days respectively.
Find the amount of work done by them in 5 days.
a)
4
9
parts b)
3
8
parts c)
5
6
parts d)
3
4
parts
LCM of 10 and 15 is 30 units.
Work done by both in 1 day =
30
10
+
30
15
= 3 + 2 = 5 units.
Work done in 5 days = 25 units.
Hence amount of work done =
25
30
=
5
6
Days
Bimal starts working on a job and works on it for 20 days and completes 50% of the work.
To help him complete the work, he employs Ritesh and together they work for another 12
days and the work gets completed.
In how many days Ritesh alone can complete the work?
a) 40 days b) 50 days c) 60 days d) None of these
As Bimal completes 50% work in 20 days, Bimal can complete in 40 days.
Let Ritesh can complete in y days. Let the entire work be x.
0.5x = 12 days *
𝑥
40
+
𝑥
𝑦
Solving y = 60 days.
TIME
Three friends Sam, Stephen and Durai can complete a piece of work in 13,5 and 10 days
respectively.
What is the approximate difference in the number of days between the number of days when
Sam alone does the work and the number of days when Stephen and Durai together do the
work?
a)11.3 days b)8.5 days c)9.6 days d)13 days
LCM of 13,5,10 is130 units.
No of units of work done by Stephen and Durai =
130
5
+
130
10
= 26 + 13 = 39
No of days =
130
39
No of units of work done by Sam alone = 13 -
130
39
= 9.66 days.
TIME
Four machines can mow a large playground in 12 hours.
How long will it take 6 machines to mow a playground of same size?
a) 7 hrs b) 8 hrs c) 9 hrs d) 10 hrs
Total units of work for 4 machines = 4 * 12 = 48 hrs
Total units of work for 6 machines =
48
6
= 8 hrs
TIME
Carpenters A and B can do a work in 10 hrs when working at the same time.
B works twice as fast as A.
How long would it take for B to complete the work if B worked alone?
a) 3.33 hrs b) 30 hrs c) 20 hrs d) 15 hrs
Let A do x units of work and B do 2x units of work.
Total units of work = 10 * 3x = 30x
Time taken by B alone =
30𝑥
2𝑥
= 15 hrs.
TIMEA software company in Noida has been doing well in the last four years.
The company recruited people from ECE, CSE, IT streams.
All programmers receive equal amount as salary and perform equal amount of
work.
Suppose 15 such programmers take 15 minutes to write 15 lines of code in
total.
How long will it take for 84 programmers to write 84 lines of code in total?
a)15 minutes b) 84 minutes c) 30 minutes d) 42 minutes
Let no of lines coded by 1 programmer in 1 minute be x.
15 programmers takes 15 minutes to write 15 lines of code. X =
15
15 ∗15
Assume 84 programmers take y minutes to write 84 lines.
X =
84
84∗y
Thus x =
15
15 ∗15
=
84
84 ∗ y
.
Solving y = 15 minutes
PROGRAMMERS LINES OF CODE TIME
15 15 15
84 84 ?
More programmers less time (Indirect)
15 : 84 :: x : 15
More lines more time (direct)
15 : 84 :: 15 : x
Time taken =
15
84 ∗
84
15 ∗15
= 15
TIME
7 men can produce 7 candles in 7 minutes.
1 man can produce 1 candle in how many minutes?
a)49 b)5 c) 7 d) 9
Less men More minutes (inverse) 7:1 :: x : 7
Less candles less minutes (direct) 1:7 :: x : 7
7*1*7 = 1 * 7 * x (or)
7
1
∗
1
7
∗ 7 = 7
X = 7
men candles Minutes
7 7 7
1 1 ?
TIME
If a pipe can fill the tank within 3 hrs but due to a leak at the bottom it took 15
minutes more.
Now once the tank is full, how much time will it take to get emptied through the
leak?
a)39 hrs b)64 hrs c)75 hrs d)None of these
Difference in time taken in 1 hr =
1
3
−
1
3.25
=
0.25
3∗3.25
=
25
3∗325
=
1
39
Hence total time taken to get emptied = 39 hours.
PIPES & CISTERN
Two pipes A and B can fill a tank in 16 minutes and 20 minutes respectively.
Both the pipes are opened together but after 5 minutes, pipe A is turned off.
What is the total time required to fill the tank?
a) 8.75 minutes b) 9.45 minutes c) 8.65 minutes d) 10.15 min
Work done in 5 minutes = 5
16 + 20
16 ∗ 20
=
36
64
=
9
16
Remaining work =
7
16
Time required for B =
7
16
* 20 =
35
4
= 8.75 minutes.
PIPES & CISTERN
Two pipes can fill a tank in 10 and 20 hrs respectively.
There is a leakage at the bottom of the tank which takes 40 hrs to empty the tank.
If both the pipes are used together, then how long will it take to fill the tank? (with the
leakage still being present)?
a) 5hrs b) 12 hrsc) 8 hrs d) 14 hrs.
Work done in one hour =
1
10
+
1
20
−
1
40
=
4 + 2 − 1
40
=
5
40
=
1
8
Total work done in = 8 hrs.
Alternate Method: LCM OF 10,20,40 IS 40. PIPE 1 (4 units), Pipe2 (2) Pipe 3 (1)
Capacity = 4 + 2 – 1 = 5
Total work done = 40/5 = 8 hrs.
PIPES & CISTERN
A pipe can fill a tank in 3 hrs.
Due to a leakage at the bottom of the tank, it takes 3.5hrs to fill the same tank.
In how many hrs will the leakage empty the tank once it is full?
a) 12 hrs b) 15hrs c) 18hrs d) 21 hrs.
Difference in time taken to fill the tank in 1 hr =
1
3
−
1
3.5
=
1
3
−
2
7
=
1
21
Total time taken to empty = 21 hrs.
PIPES & CISTERN
Three pipes A, B and C can together fill a tank in 5 hours.
After working at it together for 2 hours, C is closed and
A and B can fill the remaining part in 8 hours.
The number of hours taken by C alone to fill the tank is
a)8 hours b)9 hours c)10 hours d)12 hours.
Work done by A, B and C together in 2 hours =
2
5
3
5
of work done by A, B together in = 8 hours.
Work done by A,B together in 2 hours =
3
5
*
2
8
=
3
20
Work done by C alone in 2 hours =
2
5
−
3
20
=
5
20
=
1
4
Total work done by C alone in = 8 hours.
PIPES & CISTERN
Pipe A usually fills a tank in 2 hours.
On account of a leak at the bottom of the tank, it takes pipe A 30 more minutes to fill
the tank.
How long will the leak take to empty a full tank if pipe A is shut?
a)6 hrs b)8 hrs c)10 hrs d)12 hrs
Difference in time taken =
1
2
−
1
2.5
=
0.5
5
= 0.1
Hence time taken to empty the tank = 10 hrs.
Ratio
12 Women can do a work in 16 days.
16 men can complete the same work in 17 days.
What is the ratio between the working capacity of a woman and a man?
a)12:17 b)11:16 c) 16:11 d) 17:12
Work done by 1 woman in 1 day =
1
12 ∗ 16
Work done by 1 man in 1 day =
1
17 ∗ 16
Ratio =
1
12 ∗ 16
:
1
17 ∗ 16
= 17 : 12

More Related Content

What's hot

Governor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docx
Governor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docxGovernor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docx
Governor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docxDarya Khan
 
Unit 5 lect-3-multiprocessor
Unit 5 lect-3-multiprocessorUnit 5 lect-3-multiprocessor
Unit 5 lect-3-multiprocessorvishal choudhary
 
Operating system lab project
Operating system lab projectOperating system lab project
Operating system lab projectAshikur Rahman
 
Job sequencing with deadline
Job sequencing with deadlineJob sequencing with deadline
Job sequencing with deadlineArafat Hossan
 
Applications of Mealy & Moore Machine
Applications of  Mealy  & Moore Machine Applications of  Mealy  & Moore Machine
Applications of Mealy & Moore Machine SardarKashifKhan
 
Semantic nets in artificial intelligence
Semantic nets in artificial intelligenceSemantic nets in artificial intelligence
Semantic nets in artificial intelligenceharshita virwani
 
Deterministic context free grammars &non-deterministic
Deterministic context free grammars &non-deterministicDeterministic context free grammars &non-deterministic
Deterministic context free grammars &non-deterministicLeyo Stephen
 
Disk Scheduling Algorithms
Disk Scheduling AlgorithmsDisk Scheduling Algorithms
Disk Scheduling Algorithmsali jawad
 
Cs2303 theory of computation all anna University question papers
Cs2303 theory of computation all anna University question papersCs2303 theory of computation all anna University question papers
Cs2303 theory of computation all anna University question papersappasami
 
Introduction to Parallel and Distributed Computing
Introduction to Parallel and Distributed ComputingIntroduction to Parallel and Distributed Computing
Introduction to Parallel and Distributed ComputingSayed Chhattan Shah
 
Elements of dynamic programming
Elements of dynamic programmingElements of dynamic programming
Elements of dynamic programmingTafhim Islam
 
Career options for ECE engineers in VLSI and Embedded systems domain
Career options for ECE engineers in VLSI and Embedded systems domainCareer options for ECE engineers in VLSI and Embedded systems domain
Career options for ECE engineers in VLSI and Embedded systems domainMukesh Chauhan
 
Operating Systems Process Scheduling Algorithms
Operating Systems   Process Scheduling AlgorithmsOperating Systems   Process Scheduling Algorithms
Operating Systems Process Scheduling Algorithmssathish sak
 

What's hot (20)

Governor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docx
Governor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docxGovernor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docx
Governor Sindh IT course 2nd Entrance Test conducted on 20 july 2023.docx
 
Unit 5 lect-3-multiprocessor
Unit 5 lect-3-multiprocessorUnit 5 lect-3-multiprocessor
Unit 5 lect-3-multiprocessor
 
Peripherals of Microprocessor 8085
Peripherals of Microprocessor 8085Peripherals of Microprocessor 8085
Peripherals of Microprocessor 8085
 
Turing machine
Turing machineTuring machine
Turing machine
 
P vs NP
P vs NP P vs NP
P vs NP
 
Operating system lab project
Operating system lab projectOperating system lab project
Operating system lab project
 
Job sequencing with deadline
Job sequencing with deadlineJob sequencing with deadline
Job sequencing with deadline
 
8051 ch9-950217
8051 ch9-9502178051 ch9-950217
8051 ch9-950217
 
Big o notation
Big o notationBig o notation
Big o notation
 
Applications of Mealy & Moore Machine
Applications of  Mealy  & Moore Machine Applications of  Mealy  & Moore Machine
Applications of Mealy & Moore Machine
 
Daa unit 5
Daa unit 5Daa unit 5
Daa unit 5
 
Semantic nets in artificial intelligence
Semantic nets in artificial intelligenceSemantic nets in artificial intelligence
Semantic nets in artificial intelligence
 
Deterministic context free grammars &non-deterministic
Deterministic context free grammars &non-deterministicDeterministic context free grammars &non-deterministic
Deterministic context free grammars &non-deterministic
 
Disk Scheduling Algorithms
Disk Scheduling AlgorithmsDisk Scheduling Algorithms
Disk Scheduling Algorithms
 
Cs2303 theory of computation all anna University question papers
Cs2303 theory of computation all anna University question papersCs2303 theory of computation all anna University question papers
Cs2303 theory of computation all anna University question papers
 
Introduction to Parallel and Distributed Computing
Introduction to Parallel and Distributed ComputingIntroduction to Parallel and Distributed Computing
Introduction to Parallel and Distributed Computing
 
Elements of dynamic programming
Elements of dynamic programmingElements of dynamic programming
Elements of dynamic programming
 
Career options for ECE engineers in VLSI and Embedded systems domain
Career options for ECE engineers in VLSI and Embedded systems domainCareer options for ECE engineers in VLSI and Embedded systems domain
Career options for ECE engineers in VLSI and Embedded systems domain
 
Operating Systems Process Scheduling Algorithms
Operating Systems   Process Scheduling AlgorithmsOperating Systems   Process Scheduling Algorithms
Operating Systems Process Scheduling Algorithms
 
Concurrency
ConcurrencyConcurrency
Concurrency
 

Viewers also liked (20)

Problems on ages
Problems on agesProblems on ages
Problems on ages
 
Fifty questions with answers in aptitude
Fifty questions with answers in aptitudeFifty questions with answers in aptitude
Fifty questions with answers in aptitude
 
Amcat 2
Amcat 2Amcat 2
Amcat 2
 
Non –verbal reasoning1
Non –verbal reasoning1Non –verbal reasoning1
Non –verbal reasoning1
 
Averages and alligations level 2
Averages and alligations level 2Averages and alligations level 2
Averages and alligations level 2
 
Percentage and profit loss new version 4
Percentage and profit loss new version 4Percentage and profit loss new version 4
Percentage and profit loss new version 4
 
Long division- DOWNLOAD ENABLED
Long division- DOWNLOAD ENABLEDLong division- DOWNLOAD ENABLED
Long division- DOWNLOAD ENABLED
 
Amcat 3-DOWNLOAD ENABLED
Amcat 3-DOWNLOAD ENABLEDAmcat 3-DOWNLOAD ENABLED
Amcat 3-DOWNLOAD ENABLED
 
Srinivasaramanujan a reminiscence 3
Srinivasaramanujan a reminiscence 3Srinivasaramanujan a reminiscence 3
Srinivasaramanujan a reminiscence 3
 
#rkresume
#rkresume#rkresume
#rkresume
 
Diagrammatic Elements
Diagrammatic ElementsDiagrammatic Elements
Diagrammatic Elements
 
Average standard level
Average standard levelAverage standard level
Average standard level
 
Simple equations level 2
Simple equations level 2Simple equations level 2
Simple equations level 2
 
Permutation level two
Permutation level twoPermutation level two
Permutation level two
 
Amcat & nac
Amcat & nac Amcat & nac
Amcat & nac
 
Theme detection
Theme detectionTheme detection
Theme detection
 
Statistics – level 2
Statistics – level 2Statistics – level 2
Statistics – level 2
 
Number system 1surds & indices
Number system 1surds & indicesNumber system 1surds & indices
Number system 1surds & indices
 
Multiplication shortcuts- DOWNLOAD ENABLED
Multiplication shortcuts- DOWNLOAD ENABLEDMultiplication shortcuts- DOWNLOAD ENABLED
Multiplication shortcuts- DOWNLOAD ENABLED
 
Aptitude at ease
Aptitude at easeAptitude at ease
Aptitude at ease
 

Similar to Time and work standard level

time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptxgoud10
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfAsfawosen Dingama
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition GurukulCompetition Gurukul
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdfalphared4
 
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...SOURAV DAS
 
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...SOURAV DAS
 
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's ClassesActuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's ClassesSOURAV DAS
 

Similar to Time and work standard level (20)

time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
Time and work rbi
Time and work rbiTime and work rbi
Time and work rbi
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
Apttitude
ApttitudeApttitude
Apttitude
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Doc
DocDoc
Doc
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Time & work
Time & workTime & work
Time & work
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
TRW
TRWTRW
TRW
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
C11
C11C11
C11
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdf
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition Gurukul
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdf
 
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...
 
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
 
TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's ClassesActuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
 
Đề Thi HK2 Toán 6 - THCS Quốc Tế Canada
Đề Thi HK2 Toán 6 - THCS Quốc Tế CanadaĐề Thi HK2 Toán 6 - THCS Quốc Tế Canada
Đề Thi HK2 Toán 6 - THCS Quốc Tế Canada
 

More from Veeraragavan Subramaniam (16)

Percentage standard level
Percentage standard levelPercentage standard level
Percentage standard level
 
Partnership standard level
Partnership standard levelPartnership standard level
Partnership standard level
 
Profit and loss standard level
Profit and loss standard levelProfit and loss standard level
Profit and loss standard level
 
Numbers standard level
Numbers standard levelNumbers standard level
Numbers standard level
 
Cts 2017
Cts 2017Cts 2017
Cts 2017
 
Logarithms level 2
Logarithms level 2Logarithms level 2
Logarithms level 2
 
Progressions level 2
Progressions level 2Progressions level 2
Progressions level 2
 
Mouse multiple probability
Mouse multiple probabilityMouse multiple probability
Mouse multiple probability
 
Syllogism level 2 new
Syllogism level 2 newSyllogism level 2 new
Syllogism level 2 new
 
Number systems level 2 special equations 4
Number systems level  2 special equations 4Number systems level  2 special equations 4
Number systems level 2 special equations 4
 
Time & distance
Time & distanceTime & distance
Time & distance
 
Qa02 mixtures
Qa02 mixturesQa02 mixtures
Qa02 mixtures
 
Problems on trains (2)
Problems on trains (2)Problems on trains (2)
Problems on trains (2)
 
Height & distance
Height & distanceHeight & distance
Height & distance
 
After plus two
After plus twoAfter plus two
After plus two
 
Mathematical shortcuts1
Mathematical shortcuts1Mathematical shortcuts1
Mathematical shortcuts1
 

Recently uploaded

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 

Recently uploaded (20)

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 

Time and work standard level

  • 1. TIME & WORK Standard level c.s.veeraragavan 9894834264 veeraa1729@gmail.com
  • 2. MEN Normally it takes 5 students 1 hour to arrange chairs for a function. If one of them is absent, how much time will it take for the remaining 4 students to arrange the same number of chairs? a) 80 mins b) 75 mins c) 90 mins d) 100 mins Total units of work by 5 students = 5 * 60 = 300 units. No of units for 4 students = 300 4 =75 minutes.
  • 3. MEN A group of workers can do a piece of work in 60 days. However 4 workers were absent due to illness and it took 100 days to complete the work. How many workers are there in total? a)6 b)8 c)10 d)12 Let the number of workers be x. 60x = 100(x – 4) 100x – 400 = 60x X = 10
  • 4. MEN 66 men can finish a job in 42 days. If the work has to be completed 9 days earlier, how many additional men must be engaged to complete the work? a) 18 b) 5 c) 15 d) 9 No of men required to complete the work = 66 * 42 33 = 84 No of additional men required = 84 – 66 = 18
  • 5. Beginning A group of men decided to do a job in 7 days. But as 10 men dropped out everyday, the job got completed at the end of tenth day. How many men were at the beginning? a) 200 b) 180 c) 175 d) 150 Let no. of men in the beginning be x. Overall work = 7x man-days. 7x = x + (x – 10) + (x – 20) +…+(x – 90). 7x = 10x – 450 3x = 450 x = 150
  • 6. EFFICIENCY A is twice as good as B and together they finish a piece of work in 18 days. In how many days will B alone finish the work? a) 27 b) 35 c) 42 d) 54 Ratio of efficiency = A:B = 2:1 = 2 x : 1 x Work done by together in 1 day= 2 x + 1 x = 3 x = 1 18 X = 54. Total work done by B in = 54 days.
  • 7. EFFICIENCY A can do a piece of work in 20 days. B is 25% more efficient than A. How many days will B take to complete the same work? a) 15 b) 18 c) 16 d) 14 B is 25% more efficient than A Hence B’s efficiency is 125% of A = 5 4 of A Work done by B = 4 5 * 20= 16 days.
  • 8. Days A, B and C can together do a piece of work in 7.5 days. A can do alone in 40 days and B alone in 24 days. In how many days can C do it alone? a) 9 days b) 12 days c) 15 days d) None of these (A + B + C)’s 1 day work = 1 7.5 = 2 15 (A + B)’s 1 day work = 64 40 ∗ 24 = 1 15 C’s 1 day work = 1 15 C can complete the work alone in 15 days LCM OF 7.5, 40, 24 = 120 WORK DONE BY A IN 1 DAY = 3 WORK DONE BY B IN 1 DAY = 5 WORK DONE BY ALL IN 1 DAY = 16 WORK DONE BY C IN 1 DAY = 8 TOTAL NO OF DAYS FOR C = 120/8 = 15
  • 9. DAYS Venkat and Prasad can do a job in 12 days. Prasad alone can finish it in 28 days. In how many days can Venkat alone finish the work? a) 21 days b) 20 days c) 15 days d)18 days Amount of work per day for Venkat = 1 12 − 1 28 = 7 −3 12∗7 = 1 21 No of days required for Venkat alone = 21 days.
  • 10. Days 5 men can do a work in 20 days of 8 hrs each. In how many days of 10 hrs each can 8 men do the same work? a) 6 days b) 8 days c) 10 days d) 12 days Days = 5 8 ∗ 8 10 ∗ 20 = 10 days men hours Days 5 8 20 8 10 ?
  • 11. DAYS Amar and Akbar can do a job in 20 days. Akbar alone can finish it in 30 days. In how many days can Amar alone finish the work? a)70 days b)60 days c)50 days d)54 days 1 day work of Amar = 1 20 − 1 30 = 1 60 Amar can finish in 60 days.
  • 12. Days 10 horses and 9 donkeys can do a piece of work in 20 days. 6 horses and 12 donkeys can do the same work in 30 days. In how many days can the same work be done by 1 horse and 1 donkey? a)174 days b) 182 days c) 190 days d) 198 days (10 H + 9 D) * 20 = ( 6 H + 12 D) * 30 200 H + 180 D = 180 H + 360 D 20 H = 180 D H = 9 D Hence total units of work = (90 D + 9 D) * 20 = 1980 D units. Hence 1 Horse and 1 Donkey can do 10 D units in 1 day. Hence no of days to complete the work by 1 Horse and 1 donkey = 1980 10 = 198.
  • 13. Days Two workers Gopal and Shyam can do a work alone in 10 and 15 days respectively. Find the amount of work done by them in 5 days. a) 4 9 parts b) 3 8 parts c) 5 6 parts d) 3 4 parts LCM of 10 and 15 is 30 units. Work done by both in 1 day = 30 10 + 30 15 = 3 + 2 = 5 units. Work done in 5 days = 25 units. Hence amount of work done = 25 30 = 5 6
  • 14. Days Bimal starts working on a job and works on it for 20 days and completes 50% of the work. To help him complete the work, he employs Ritesh and together they work for another 12 days and the work gets completed. In how many days Ritesh alone can complete the work? a) 40 days b) 50 days c) 60 days d) None of these As Bimal completes 50% work in 20 days, Bimal can complete in 40 days. Let Ritesh can complete in y days. Let the entire work be x. 0.5x = 12 days * 𝑥 40 + 𝑥 𝑦 Solving y = 60 days.
  • 15. TIME Three friends Sam, Stephen and Durai can complete a piece of work in 13,5 and 10 days respectively. What is the approximate difference in the number of days between the number of days when Sam alone does the work and the number of days when Stephen and Durai together do the work? a)11.3 days b)8.5 days c)9.6 days d)13 days LCM of 13,5,10 is130 units. No of units of work done by Stephen and Durai = 130 5 + 130 10 = 26 + 13 = 39 No of days = 130 39 No of units of work done by Sam alone = 13 - 130 39 = 9.66 days.
  • 16. TIME Four machines can mow a large playground in 12 hours. How long will it take 6 machines to mow a playground of same size? a) 7 hrs b) 8 hrs c) 9 hrs d) 10 hrs Total units of work for 4 machines = 4 * 12 = 48 hrs Total units of work for 6 machines = 48 6 = 8 hrs
  • 17. TIME Carpenters A and B can do a work in 10 hrs when working at the same time. B works twice as fast as A. How long would it take for B to complete the work if B worked alone? a) 3.33 hrs b) 30 hrs c) 20 hrs d) 15 hrs Let A do x units of work and B do 2x units of work. Total units of work = 10 * 3x = 30x Time taken by B alone = 30𝑥 2𝑥 = 15 hrs.
  • 18. TIMEA software company in Noida has been doing well in the last four years. The company recruited people from ECE, CSE, IT streams. All programmers receive equal amount as salary and perform equal amount of work. Suppose 15 such programmers take 15 minutes to write 15 lines of code in total. How long will it take for 84 programmers to write 84 lines of code in total? a)15 minutes b) 84 minutes c) 30 minutes d) 42 minutes Let no of lines coded by 1 programmer in 1 minute be x. 15 programmers takes 15 minutes to write 15 lines of code. X = 15 15 ∗15 Assume 84 programmers take y minutes to write 84 lines. X = 84 84∗y Thus x = 15 15 ∗15 = 84 84 ∗ y . Solving y = 15 minutes PROGRAMMERS LINES OF CODE TIME 15 15 15 84 84 ? More programmers less time (Indirect) 15 : 84 :: x : 15 More lines more time (direct) 15 : 84 :: 15 : x Time taken = 15 84 ∗ 84 15 ∗15 = 15
  • 19. TIME 7 men can produce 7 candles in 7 minutes. 1 man can produce 1 candle in how many minutes? a)49 b)5 c) 7 d) 9 Less men More minutes (inverse) 7:1 :: x : 7 Less candles less minutes (direct) 1:7 :: x : 7 7*1*7 = 1 * 7 * x (or) 7 1 ∗ 1 7 ∗ 7 = 7 X = 7 men candles Minutes 7 7 7 1 1 ?
  • 20. TIME If a pipe can fill the tank within 3 hrs but due to a leak at the bottom it took 15 minutes more. Now once the tank is full, how much time will it take to get emptied through the leak? a)39 hrs b)64 hrs c)75 hrs d)None of these Difference in time taken in 1 hr = 1 3 − 1 3.25 = 0.25 3∗3.25 = 25 3∗325 = 1 39 Hence total time taken to get emptied = 39 hours.
  • 21. PIPES & CISTERN Two pipes A and B can fill a tank in 16 minutes and 20 minutes respectively. Both the pipes are opened together but after 5 minutes, pipe A is turned off. What is the total time required to fill the tank? a) 8.75 minutes b) 9.45 minutes c) 8.65 minutes d) 10.15 min Work done in 5 minutes = 5 16 + 20 16 ∗ 20 = 36 64 = 9 16 Remaining work = 7 16 Time required for B = 7 16 * 20 = 35 4 = 8.75 minutes.
  • 22. PIPES & CISTERN Two pipes can fill a tank in 10 and 20 hrs respectively. There is a leakage at the bottom of the tank which takes 40 hrs to empty the tank. If both the pipes are used together, then how long will it take to fill the tank? (with the leakage still being present)? a) 5hrs b) 12 hrsc) 8 hrs d) 14 hrs. Work done in one hour = 1 10 + 1 20 − 1 40 = 4 + 2 − 1 40 = 5 40 = 1 8 Total work done in = 8 hrs. Alternate Method: LCM OF 10,20,40 IS 40. PIPE 1 (4 units), Pipe2 (2) Pipe 3 (1) Capacity = 4 + 2 – 1 = 5 Total work done = 40/5 = 8 hrs.
  • 23. PIPES & CISTERN A pipe can fill a tank in 3 hrs. Due to a leakage at the bottom of the tank, it takes 3.5hrs to fill the same tank. In how many hrs will the leakage empty the tank once it is full? a) 12 hrs b) 15hrs c) 18hrs d) 21 hrs. Difference in time taken to fill the tank in 1 hr = 1 3 − 1 3.5 = 1 3 − 2 7 = 1 21 Total time taken to empty = 21 hrs.
  • 24. PIPES & CISTERN Three pipes A, B and C can together fill a tank in 5 hours. After working at it together for 2 hours, C is closed and A and B can fill the remaining part in 8 hours. The number of hours taken by C alone to fill the tank is a)8 hours b)9 hours c)10 hours d)12 hours. Work done by A, B and C together in 2 hours = 2 5 3 5 of work done by A, B together in = 8 hours. Work done by A,B together in 2 hours = 3 5 * 2 8 = 3 20 Work done by C alone in 2 hours = 2 5 − 3 20 = 5 20 = 1 4 Total work done by C alone in = 8 hours.
  • 25. PIPES & CISTERN Pipe A usually fills a tank in 2 hours. On account of a leak at the bottom of the tank, it takes pipe A 30 more minutes to fill the tank. How long will the leak take to empty a full tank if pipe A is shut? a)6 hrs b)8 hrs c)10 hrs d)12 hrs Difference in time taken = 1 2 − 1 2.5 = 0.5 5 = 0.1 Hence time taken to empty the tank = 10 hrs.
  • 26. Ratio 12 Women can do a work in 16 days. 16 men can complete the same work in 17 days. What is the ratio between the working capacity of a woman and a man? a)12:17 b)11:16 c) 16:11 d) 17:12 Work done by 1 woman in 1 day = 1 12 ∗ 16 Work done by 1 man in 1 day = 1 17 ∗ 16 Ratio = 1 12 ∗ 16 : 1 17 ∗ 16 = 17 : 12