Business Plan 5x60KW (small wind plants)
Cash Flow, Parameters and Assumptions
This document is only a general overview of the subject treated in it. In no way is meant complete, especially without adequate technical explanation and necessary deepening.
2.
BIZANDO srl - Via Tirso 90 – 00198 Roma 2
P.IVA e CF: 10804161007 E-Mail: info@bizando.com
Parameters and assumptions
Number of plants 5
Power
of
single
plant
60
kWp
Cost
of
right
of
surface:
€
30.000
(for
single
plant)
Cost
of
connection
€
5.000
(for
single
plant)
Cost
turnkey
of
plant
€
250.000
(for
single
plant)
Total power 300 kWp
Equivalent
operating
hours
3.148
Total
productivity
944400
kWh/year
Comprehensive
rate
0,268
€/kW
Annual
comprehensive
rate
€
253.099
Length of incentive 20 years
Cost
turnkey
of
plant
€
1.250.000
(for
5
plants)
Cost
of
connection
€
25.000
(for
5
plants)
Cost
of
connected
plant
€
1.275.000
(for
5
plants)
VAT
(10%)
€
127.500
(for
5
plants)
Total
Cost
(VAT
included)
€
1.402.500
(for
5
plants)
Cost
of
right
of
surface:
€
150.000
(for
5
plants)
Initial investment € 1.552.500 (for 5 plants)
ISTAT
adjustment
2%/year
Cost
of
maintenance
€
2.000/year
(for
single
plant)
Outcome
Pay back period: 6 years
IRR: 15%
This
document
is
only
a
general
overview
of
the
subject
treated
in
it.
In
no
way
is
meant
complete,
especially
without
adequate
technical
explanation
and
necessary
deepening.