SlideShare une entreprise Scribd logo
1  sur  16
GROUP MEMBERS:
INTRODUCTION…
The concession, or build-own-operate-transfer
(BOOT), is a type of procurement strategy utilising
project finance to fund infrastructure projects.
Although the term BOOT is relatively new, privatised
infrastructure projects have been around for several
centuries.


In a BOOT project, a project company, normally a
special project vehicle (SPV), is given a concession
to build and operate a facility that would otherwise
be built by the public sector. The facility might be a
power station, toll road, airport, bridge, tunnel, water
supply                  and                   sewerage
system, railway, communication or manufacturing
plant.
STRUCTURE OF BOOT
PROJECTS…
PRINCIPLE



                        CONSESSION
                        AGREEMENT


                                        OFF-TAKE
                                       CONTRACT
                                                       USERS
             SUPPLY
SUPPLIER    CONTRACT




                                       OPERATION
LENDERS       LOAN      PROMOTER       CONTRACT     OPERATOR
            AGREEMENT




              LOAN
INVESTORS   AGREEMENT                CONSTRUCTION   CONSTRUCTOR
                                      CONTRACT
The following are some of the reasons why host governments adopt the BOOT
project procurement strategy (UNIDO, 1996):




   The use of private sector financing provides new sources of capital and
  reduces public and direct spending.

   The development of projects that would otherwise have to wait, and
  compete for, scarce sovereign resources is accelerated.

   The use of private sector capital, initiative and know-how reduces
  project construction costs, shortens schedules and improves operating
  efficiency.

   Project risk and burden that would otherwise have to be borne by the
  public sector is allocated to the private sector.

   The involvement of private sector and experienced commercial
  lenders ensures an in-depth review as an additional sign of project
  feasibility.
CONDITIONS FOR SUCCESSFUL
IMPLEMENTATION OF BOOT
PROJECTS
1)COUNTRY

  Economic stability
  Project will to carry out the project
  Stock and capital markets
  Legislative or judicial process

2) PROJECT

2)CLIENT
CASE STUDY!!!
INTRODUCTION…
 In 1977, the Malaysian Ministry of Works received
official instructions to draw plans of an expressway from
the Malaysia-Thailand border (Bukit Kayu hitam) to the
Johor Causeway.

 In 1980, the Malaysian Highway Authority was
established to monitor all the work progress of the first
national expressway.

 The 30-year concession contract was awarded in
1998 to the United Engineers (Malaysia) Berhad, who
then formed another project company called Project
Lebuhraya     Utara     Selatan  Berhad     (PLUS)  to
design, construct, finance and operate the expressway.
BOOT STRUCTURE OF THE
PROJECT…
Malaysia    Concession
Government                                  UEM
             Agreement




                Loan



   Loan                        PLUS



             Construction                      Payment in
              Contract                          Cash and
                                              Share in PLUS



                            Subcontractor
a) BOOT projects offer the possibility of realising a project that would otherwise
   not be built.

b) The willingness of equity investors and lenders to accept the risk indicates
   that the project is commercially viable.

c) A BOOT project will help in a government’s policy of infrastructure
   privatisation.

d) The efficiency of the promoter and its economic interest in the
   design, construction and operation of the project will produce significant
   cost efficiencies to the principal when the concession period ends.
a) Commercial lenders and export credit guarantee agencies will be
   constrained by the same country risks.

b) There will be no credibility if the government provides too much support to
   the promoter.

c) A BOOT strategy is a highly complicated structure that requires detailed
   planning, time and money throughout the concession period. The
   promoter must have the commitment and interest to maintain the project.
The process of privatization and liberalization in Malaysia has been
motivated more by economic pragmatism than ideological
considerations. Mostly importantly, Malaysia embarked on a process of
restructuring the relationship between the public sector and the private
sector as a response to unsustainable domestic and external conditions.
The poor performance of public enterprises and the high levels of
budgetary deficits acted in concert with a reversal of the buoyant prices
for Malaysian exports to usher in an era of change.

Contenu connexe

Tendances

Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) modelAxay Sharma
 
Analytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsAnalytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsSugiharto TuPiichai
 
Construction contract
Construction contract Construction contract
Construction contract Rakshith Reddy
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Understanding "BOT" projects
Understanding "BOT" projectsUnderstanding "BOT" projects
Understanding "BOT" projectsPrashanth Ravada
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and ArbitrationJIT KUMAR GUPTA
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in WorksDr K M SONI
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAAvinash Kumar Gupta
 
Liquidated damages contracts
Liquidated damages   contractsLiquidated damages   contracts
Liquidated damages contractsBhushan Goyal
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksDr K M SONI
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPTKEVINMISTRY8
 

Tendances (20)

Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
 
Analytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsAnalytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP Projects
 
Construction contract
Construction contract Construction contract
Construction contract
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Understanding "BOT" projects
Understanding "BOT" projectsUnderstanding "BOT" projects
Understanding "BOT" projects
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
DBFOT project
DBFOT projectDBFOT project
DBFOT project
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Tender
TenderTender
Tender
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
Liquidated damages contracts
Liquidated damages   contractsLiquidated damages   contracts
Liquidated damages contracts
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering Works
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPT
 

Similaire à Build,Operate,Own,Transfer (BOOT)

Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsAKSHAYA0000
 
19. financing infrastrucutre projects
19. financing infrastrucutre projects19. financing infrastrucutre projects
19. financing infrastrucutre projectsIshita Shah
 
BOT MODEL.pdf
BOT MODEL.pdfBOT MODEL.pdf
BOT MODEL.pdfvsballa1
 
public private partnership
public private partnershippublic private partnership
public private partnershipDiyaGarg5
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure developmentsakariya88
 
Built operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in PakistanBuilt operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in PakistanMeesum Zaidi
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaEmpowerhosting
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...atulpkhekade
 
Private financial initiative (PFI)
Private financial initiative (PFI)Private financial initiative (PFI)
Private financial initiative (PFI)zyra Nia
 
A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...atulpkhekade
 
Infrastructure financing guide india netz capital
Infrastructure financing guide india netz capitalInfrastructure financing guide india netz capital
Infrastructure financing guide india netz capitalAtul Khekade
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnershipAnkit GAJJAR
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private PartnershipRavi Bhadani
 
Procurement & contract.(bot)
Procurement & contract.(bot)Procurement & contract.(bot)
Procurement & contract.(bot)rajlaxmipardeshi
 
PUBLIC PRIVATE PARTNERSHIP(PPP)
PUBLIC PRIVATE PARTNERSHIP(PPP)PUBLIC PRIVATE PARTNERSHIP(PPP)
PUBLIC PRIVATE PARTNERSHIP(PPP)Parandeep Singh
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYShabaz Khan
 
Private and Public Partnerships Move Mainstream
Private and Public Partnerships Move MainstreamPrivate and Public Partnerships Move Mainstream
Private and Public Partnerships Move MainstreamKerry Carey
 

Similaire à Build,Operate,Own,Transfer (BOOT) (20)

Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojects
 
19. financing infrastrucutre projects
19. financing infrastrucutre projects19. financing infrastrucutre projects
19. financing infrastrucutre projects
 
BOT MODEL.pdf
BOT MODEL.pdfBOT MODEL.pdf
BOT MODEL.pdf
 
public private partnership
public private partnershippublic private partnership
public private partnership
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure development
 
BOOT 2
BOOT 2BOOT 2
BOOT 2
 
Built operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in PakistanBuilt operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in Pakistan
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
 
Private financial initiative (PFI)
Private financial initiative (PFI)Private financial initiative (PFI)
Private financial initiative (PFI)
 
PPP models.pptx
 PPP models.pptx PPP models.pptx
PPP models.pptx
 
A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...
 
Infrastructure financing guide india netz capital
Infrastructure financing guide india netz capitalInfrastructure financing guide india netz capital
Infrastructure financing guide india netz capital
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
Boot model
Boot modelBoot model
Boot model
 
Procurement & contract.(bot)
Procurement & contract.(bot)Procurement & contract.(bot)
Procurement & contract.(bot)
 
PUBLIC PRIVATE PARTNERSHIP(PPP)
PUBLIC PRIVATE PARTNERSHIP(PPP)PUBLIC PRIVATE PARTNERSHIP(PPP)
PUBLIC PRIVATE PARTNERSHIP(PPP)
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 
Private and Public Partnerships Move Mainstream
Private and Public Partnerships Move MainstreamPrivate and Public Partnerships Move Mainstream
Private and Public Partnerships Move Mainstream
 

Plus de Mohd. Ikhwan

Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration TestMohd. Ikhwan
 
UiTM Stadium (Building Maintenance)
UiTM Stadium (Building Maintenance)UiTM Stadium (Building Maintenance)
UiTM Stadium (Building Maintenance)Mohd. Ikhwan
 
Laterite Bricks with Nylon Fiber
Laterite Bricks with Nylon FiberLaterite Bricks with Nylon Fiber
Laterite Bricks with Nylon FiberMohd. Ikhwan
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent buildingMohd. Ikhwan
 

Plus de Mohd. Ikhwan (8)

Law of Tort
Law of TortLaw of Tort
Law of Tort
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration Test
 
Fiscal Theory
Fiscal TheoryFiscal Theory
Fiscal Theory
 
UiTM Stadium (Building Maintenance)
UiTM Stadium (Building Maintenance)UiTM Stadium (Building Maintenance)
UiTM Stadium (Building Maintenance)
 
Audio and Visual
Audio and VisualAudio and Visual
Audio and Visual
 
Laterite Bricks with Nylon Fiber
Laterite Bricks with Nylon FiberLaterite Bricks with Nylon Fiber
Laterite Bricks with Nylon Fiber
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Fully Demolition
Fully Demolition Fully Demolition
Fully Demolition
 

Dernier

Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 

Dernier (20)

Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 

Build,Operate,Own,Transfer (BOOT)

  • 3. The concession, or build-own-operate-transfer (BOOT), is a type of procurement strategy utilising project finance to fund infrastructure projects. Although the term BOOT is relatively new, privatised infrastructure projects have been around for several centuries. In a BOOT project, a project company, normally a special project vehicle (SPV), is given a concession to build and operate a facility that would otherwise be built by the public sector. The facility might be a power station, toll road, airport, bridge, tunnel, water supply and sewerage system, railway, communication or manufacturing plant.
  • 5. PRINCIPLE CONSESSION AGREEMENT OFF-TAKE CONTRACT USERS SUPPLY SUPPLIER CONTRACT OPERATION LENDERS LOAN PROMOTER CONTRACT OPERATOR AGREEMENT LOAN INVESTORS AGREEMENT CONSTRUCTION CONSTRUCTOR CONTRACT
  • 6. The following are some of the reasons why host governments adopt the BOOT project procurement strategy (UNIDO, 1996):  The use of private sector financing provides new sources of capital and reduces public and direct spending.  The development of projects that would otherwise have to wait, and compete for, scarce sovereign resources is accelerated.  The use of private sector capital, initiative and know-how reduces project construction costs, shortens schedules and improves operating efficiency.  Project risk and burden that would otherwise have to be borne by the public sector is allocated to the private sector.  The involvement of private sector and experienced commercial lenders ensures an in-depth review as an additional sign of project feasibility.
  • 8. 1)COUNTRY Economic stability Project will to carry out the project Stock and capital markets Legislative or judicial process 2) PROJECT 2)CLIENT
  • 10.
  • 11. INTRODUCTION…  In 1977, the Malaysian Ministry of Works received official instructions to draw plans of an expressway from the Malaysia-Thailand border (Bukit Kayu hitam) to the Johor Causeway.  In 1980, the Malaysian Highway Authority was established to monitor all the work progress of the first national expressway.  The 30-year concession contract was awarded in 1998 to the United Engineers (Malaysia) Berhad, who then formed another project company called Project Lebuhraya Utara Selatan Berhad (PLUS) to design, construct, finance and operate the expressway.
  • 12. BOOT STRUCTURE OF THE PROJECT…
  • 13. Malaysia Concession Government UEM Agreement Loan Loan PLUS Construction Payment in Contract Cash and Share in PLUS Subcontractor
  • 14. a) BOOT projects offer the possibility of realising a project that would otherwise not be built. b) The willingness of equity investors and lenders to accept the risk indicates that the project is commercially viable. c) A BOOT project will help in a government’s policy of infrastructure privatisation. d) The efficiency of the promoter and its economic interest in the design, construction and operation of the project will produce significant cost efficiencies to the principal when the concession period ends.
  • 15. a) Commercial lenders and export credit guarantee agencies will be constrained by the same country risks. b) There will be no credibility if the government provides too much support to the promoter. c) A BOOT strategy is a highly complicated structure that requires detailed planning, time and money throughout the concession period. The promoter must have the commitment and interest to maintain the project.
  • 16. The process of privatization and liberalization in Malaysia has been motivated more by economic pragmatism than ideological considerations. Mostly importantly, Malaysia embarked on a process of restructuring the relationship between the public sector and the private sector as a response to unsustainable domestic and external conditions. The poor performance of public enterprises and the high levels of budgetary deficits acted in concert with a reversal of the buoyant prices for Malaysian exports to usher in an era of change.