SlideShare une entreprise Scribd logo
1  sur  54
Bylaw 1556/21
Amendment to Bylaw 1313/13
Municipal Development Plan
Bylaw 1555/21
Amendment to Bylaw 882/99
Sturgeon Valley Area Structure Plan
Bylaw 1557/21
Our Future Valley
Sturgeon Valley South Area
Structure Plan
Process and Timelines
The Sturgeon Valley Special
Study Area
May 25, 2021 Committee of the Whole
Our Future Valley - Sturgeon Valley Planning Information Update
Presentation Agenda
Presenter:
Rachel Davies
Long Range Planner, Long Range
& Regional Planning
Presenter:
Nick Pryce
V3 Companies of Canada Ltd.
Presenter:
Martyn Bell
Program Lead, Current Planning
Presenter:
Michael Klassen
Program Lead, Long Range &
Regional Planning
Presentation #1
Process and Timelines
Sturgeon Valley Special Study Area
(2017-2019) – Valley Regional Approvals
SVSSA Terms of Reference approved at EMR Board
meeting
Sept 2017
SVSSA Policies approved at EMR Board Meeting
Dec 2018
EMRB Growth Plan amended to include SVSSA policies
- Overall minimum density of 35 du/nrha established for the area
March 2019
• The development of Sturgeon Valley Special Study Area (SVSSA) policies was a multi-year intermunicipal collaborative effort
that spanned across multiple Council terms.
• Policies are the Terms of Reference that future development in and around the Sturgeon Valley must adhere to.
(2019-2020) - Valley Growth Framework Analysis
Nov thru Dec - Developer Check-in
Nov - Intermunicipal Check-in
Q3-Q4 2019: General Plan
Area Review
Plan Area Land Use and
Servicing Analysis
Jan-Feb 2020
Feb-March 2020:
Preliminary Financial
Assessment, Traffic
Impact Analysis
Developer and Landowner
Expectations
Land Use Analysis
Fiscal Impact Analysis
Transportation Analysis
April 28 2020: Council
Workshop:
Land Use Analysis
Fiscal Impact Analysis
Transportation Analysis
June 2020: Additional
Developer Engagement
Presentation to Council of feedback
from additional developer
engagement
June 19 2020: Council
Presentation of Growth
Framework Report
Presentation of Options for
progression to Phase II Area
Structure Planning
July 14 2020: Council
Direction from Council for
progression to Phase II Area
Structure Planning
August 11 2020: Council
• Detailed analysis of the planning area was completed in 2019 through 2020 in consultation with landowners and the
development community.
• Key intermunicipal planning partners including the cities of Edmonton and St. Albert, along with CFB Edmonton were kept
informed on the progress of the project.
Council direction on
project Communication
and Engagement Plan
Oct 26 2020
Dec 2 - Developer
Information Session
Dec 3 - Public Information
Session
“Call-a-Planner” Sessions
Dec 2020
Developer Engagement
Session
Jan 2021
Public Engagement Session
“Call-a-Planner”
Engagement Sessions
Feb 2021
Home-Owners Association
Engagement Session
March 2021
March 18 2021
Committee of the Whole
“What We Heard Report”
Public presentation of key themes
and comments heard to-date
Public Engagement Session
“Call-the-Panel”
Engagement Session
April 2021
May 25 2021
Committee of the Whole
“Valley Planning
Information Update”
Public presentation on draft
bylaws
(2020-2021) - Valley Area Structure Plan Process
• Engagement with both the public and area developers was completed in 2020 through 2021.
• Key intermunicipal planning partners including the cities of Edmonton and St. Albert, along with CFB Edmonton were kept
informed on the progress of the project.
First Reading of 3 Bylaws
June 8 Council
June 28 Public Hearing for
3 Bylaws (with continuation on
June 29 if required)
June 28/29 (tentative)
Council authorization of REF
submittal of 3 Bylaws.
July 13 Council (tentative)
REF Review Period
July-August (tentative)
Second and Third Reading of
3 Bylaws
Aug 24 Council (tentative)
Additional opportunity for Second
and Third Reading of 3 Bylaws
pending outcomes of REF review
period
Sept 14 Last Council Date
(2020-2021) - Valley Bylaw Process
• All appliable external stakeholders will be provided with a formal intermunicipal referral in accordance with County referral
policies.
• Check-in dates with key intermunicipal planning partners including the cities of Edmonton and St. Albert, EMRB
Administration in mid-June to comments/concerns (if any) of the 3 bylaws.
Future NSP/Outline Plans subject to Council approval
•- Detailed Land Use and Phasing Plan
•- Detailed Servicing Plan (water, sanitary, stormwater)
•- Traffic Impact Assessment
•- Fiscal Impact Assessment
•- Detailed wetlands/natural areas assessment
•- Any other specific requirements
Submittal of NSP/Outline Plan Applications
General Municipal Servicing Standards
Land Use Bylaw Amendments
Offsite Levy Bylaw updates
Valley Design Standards
County Implementation Items
Subject to REF process
Future ASP Amendments
(2021 and beyond) - Valley Implementation Items
• Upon finalization of bylaw amendments for Valley planning documents, significant work needs to be completed prior to
receipt of applications for subdivision and development in the Valley.
Questions
Process and Timelines
Sturgeon Valley Special Study Area
Presentation #2
Valley MDP
Amendments
Bylaw 1556/21
Overview of Municipal Development Plan Amendment
 Adjustments of neighborhood boundaries to account for City of
St. Albert annexation and approval of EMRB SVSSA policies
(impacted Neighbourhoods B, C, H and G).
 Adjustments to Figure 3 – Growth Strategy Concept map to
account for future non-residential along HWY 28.
 Textural amendments in section 2.3 to reference SVSSA.
 Removal of outdated maps in Appendix A-3.
 Complete re-write of Neighbourhood G to be in compliance with
SVSSA policies.
Municipal Development Amendment
Neighbourhood G
• Same style as existing MDP, Neighbourhood G brought up to date.
• Neighbourhood G map area has also been brought up to date.
• The Neighbourhood role reflects the Our Future Valley project and public consultations findings.
Placemaking Principles
• Strong placemaking principles to embed what we have learned during the Our Future Valley Process and public consultation.
• Best practice approach, upfront about the County’s expectations for the area.
• Placemaking Principles cover the whole of the Valley, not just the ASP areas.
Implementation of Placemaking Principles
• Direction on implementation is critical. Clearly sets out what developers need to know and what the County expects.
• Implementation includes Sturgeon Valley heritage/identity, trails, championing natural features and other key points risen
during the process and public consultation.
Strategic Sites
• Strategic Sites are the key in guiding future development in the Valley, provides overarching context for the new ASP.
• Informed through consultation with public, stakeholders and the development community, as well as key studies.
• A unique to Sturgeon planning policy approach.
Strategic Site A
• Each Strategic Site has a unique vision and a preamble that sets the aspirations for the area.
• Upfront development expectations the county has are clear for each site, covering important site-specific issues such as
specific roads, trails, natural features, servicing and development mix.
Strategic Site B
• Key purpose is to define the areas where growth is expected, and to delineate and positively shape the nature of that growth.
• The areas themselves are Informed by regional policy, various studies, servicing realities, natural features and developers.
• The Development Expectations have been greatly shaped by the public consultation.
Strategic Site C
• MDP highlights and sets expectation to implement key regional policy/infrastructure, such as a future transit hub.
• Even though site specific, all Strategic Sites contribute to the wider Neighbourhood G vision and the Placemaking Principles
are embedded using site specific knowledge.
Strategic Site D
• Balancing development pressures, with what we heard during consultation and the County’s expectations.
• Whilst applying the overarching Placemaking Principles, the Strategic Sites Development Expectations sets the scene for the
new ASP and any future NASPs
Strategic Site E
• Carefully considered commercial development principles and market analysis for each site, unique/appropriate opportunities
differ between the sites.
• Placemaking Principles, combined with Strategic Sites focus on preventing a juxtaposition of uses.
• The Strategic Site areas line up with the new ASP areas.
Questions
Valley MDP
AmendmentsBylaw
1556/21
Presentation #3
Our Future Valley
Sturgeon Valley South
Area Structure Plan
Bylaw 1557/21
Area Structure Plan - Vision
The Our Future Valley Area – Sturgeon Valley South
Area Structure Plan was developed in partnership with key area stakeholders
between Dec 2020 through May 2021.
 The Plan details unique development guidance that is sensitive to the
surrounding natural environment, whilst being cognitive of the various
urban and rural neighbours.
 Sturgeon Valley South is a place where identity is maintained and
strengthen through showcasing its history, while capitalizing on
innovative future technological advancements and embracing different
approaches throughout the many years of the Plan’s implementation.
 The Plan will be developed in a fiscally responsible manner that creates
long term resilience through managing the varying phases of
development.
 The Sturgeon Valley South Plan area is a place where people want to
visit, play, work, live and be part of a strong community.
Area Structure Plan Content
The Our Future Valley - Sturgeon Valley South
Area Structure Plan includes an overview of the following key items:
1. Introductory Information
2. Planning Process
3. Area Context
4. Vision
5. Area Structure Plan Policies
6. Implementation
Report is supported with studies related to:
1. Traffic Impact Analysis
2. Fiscal Impact Analysis
3. Environmental Analysis
4. Agricultural Impact Assessment
5. Infrastructure Master Plan
Area Structure Plan – Planning Areas
 Planning Areas provide the structure and policy to guide the
development of Neighbourhood Area Structure Plans (NASPs).
 As part of the process, County Council provided initial direction on
future development of residential/mixed-use and non-residential
Planning Areas (Planning Areas 1 and 2).
 While the Plan’s primary focus is on these two Planning Areas, the Plan
serves as a framework for all other areas to ensure that development
can be responsive to future servicing needs, market demands, changes
in technology and growth opportunities.
 The remaining areas will be considered as future Planning Areas that
will require an amendment. Areas will be required to meet the criteria
outlined in the implementation section prior to moving forward with
the development of a Neighbourhood Area Structure Plan (NASP).
Concept Plan - Full Build Out
 Projected build out of the entire area with the main purpose to
establish the projected population over the long term and understand
how this influences transportation in the area.
Concept Plan – Planning Area 1 (Residential Mixed-Use)
 This Plan recognizes that overall development of the Plan area is
projected to occur over a significant period and in recognizing changes
that will occur over this time; the core focus has been related to the
Planning Areas 1 and 2.
Concept Plan – Planning Area 2 (non-residential HWY 28)
 This Plan recognizes that overall development of the Plan area is
projected to occur over a significant period and in recognizing changes
that will occur over this time; the core focus has been related to the
Planning Areas 1 and 2.
TRANSITIONAL DEVELOPMENT
5.2.1 Objective
To be sensitive of the density and development form within the Plan
areas that border established Sturgeon Valley Core community.
Policies
5.2.1.1 Transitional density levels shall be in general accordance with the Figure.
5.2.1.2 Where possible, the development of roads, parks and/or green corridors may
be used to offset the built form of varying densities.
5.2.1.3 Landscaping, the use of berms and existing natural features may be leveraged as
an important tool to assist with transitioning from higher to lower urban densities
through buffering.
5.2.2 Objective
To be sensitive of the potential impacts light industrial development may
have on residential development and the operations within CFB.
Policies
5.2.2.1 The development of the Neighbourhood Area Structure Plan (NASP) for
Planning Area 2 (Light Industrial) shall be carried out in consultation with CFB to avoid
any potential conflicts relating to operations.
5.2.2.2 The development of the NASP for Planning Area 2 should seek to protect
wetlands and natural water features indicated in the Figure as Environmental Reserve
based on the recommendations of the outcomes of a detailed biophysical assessment.
RESIDENTIAL
5.3.1 Objective
To create a residential community that meets the overall 35du/nrha
within the Plan while respecting established communities by creating
transitional densities.
Policies
5.3.1.1 Density levels shall be in general accordance with the Figure, with each NASP
for Planning Areas 1, 3, 4 & 5 demonstrating compliance with meeting the overall
average density of 35du/nrha.
5.3.1.2 Alternative/innovative housing should be encouraged.
5.3.1.3 Clustering together of more than four multi unit residential dwellings shall be
encouraged, only if integrated within a mixed-use area, adjoining a commercial area or
located along a public transit route.
5.3.1.4 Sturgeon County shall record and monitor the densities as development unfolds
to confirm compliance with the EMRGP density policies.
5.3.2 Objective
To create a residential community that is unique and consists of character
that reflects the history of the Plan area while incorporating innovative
technologies that create a modern, resilient, and functioning community.
Policies
5.3.2.1 The NASPs should be designed in a manner that reflects the Sturgeon Valley’s
unique character through design elements of dwellings, street signage, and community
public spaces.
5.3.2.2 Development within the Plan should incorporate Smart City concepts.
COMMERCIAL/MIXED-USE DEVELOPMENT
5.4.1 Objective
To create a unique commercial destination that focuses on small to
medium sized boutique businesses.
Policies
5.4.1.1 thru 5.4.1.3
5.4.2 Objective
To enable the ability to develop local corner commercial stores within
residential communities.
Policies
5.4.2.1 thru 5.4.2.3
5.4.3 Objective
To create a commercial node that is focused on servicing highway traffic
and the surrounding community.
Policies
5.4.3.1 thru 5.4.3.3
5.4.4 Objective
To create mixed-use nodes comprised of small to medium sized retail
stores.
Policies
5.4.4.1 thru 5.4.4.6
LIGHT INDUSTRIAL
5.5.1 Objective
To enable the light industrial development that could include
warehousing, logistics, flex industrial and light manufacturing activities
along Highway 28.
Policies
5.5.1.1 Light industrial development shall occur on the lands designated as Light
Industrial in the Figure.
5.5.1.2 Development within the light industrial area shall be carried out in consultation
with Alberta Transportation and CFB.
5.5.1.3 The lands should be developed to accommodate light industrial activities that
support CFB operations.
5.5.1.4 The NASP for Planning Area 2 shall include community architectural and
landscape design standards that focus on mitigating the visual impact of the lands
when viewed from Highway 28, CFB and surrounding residential areas.
5.5.1.5 The development of the industrial lands shall comply with all requirements
regarding aerodromes in consultation with CFB at the time of preparing the NASP for
Planning Area 2.
AGRICULTURE
5.6.1 Objective
To continue the productive use of agricultural lands until the market
determines the lands are needed for development.
Policies
5.6.1.1 Existing agricultural lands within the Plan area should remain as agricultural
until development is approved by the County.
5.6.1.2 In preparing a NASP, development staging shall be carried out in a manner to
avoid impacts on agricultural operations so as not to constrain or restrict existing
agricultural lands until the demands requires the lands to be developed.
5.6.1.3 In preparing a NASP, areas of land may be retained for urban agriculture. The
development of a NASP should identify opportunities to incorporate agricultural
elements into new development, examples include: community gardens, greenhouses
etc.
5.6.1.4 The development of a NASP located within the Planning Areas 3 through to 5
(see Figure) shall require an amendment to this Plan in accordance with the criteria
outlined in section 6.1.
PARKS, SCHOOLS, OPEN SPACE AND ENVIRONMENTAL RESERVE
5.7.1 Objective
To designate lands to accommodate future schools.
Policies
5.7.1.1 thru 5.7.1.4
5.7.2 Objective
To champion the protection of key environmental and heritage sensitive
areas within the Plan.
Policies
5.7.3.1 thru 5.7.3.5
COMMUNITY SERVICES
5.8.2 Objective
To work cooperatively with neighbouring municipalities, CFB, private,
public, and non-profit groups to provide community services in the most
cost-effective manner possible.
Policies
5.8.1.1 The County shall require future subdivision and development in the Plan area to
meet all fire protection requirements as outlined in the National Building Code –
Alberta Edition & National Fire Code - Alberta Edition.
5.8.1.2 The County shall encourage homeowners to install and/or implement additional
fire protection parameters if required.
5.8.1.3 The County shall use the RCMP to provide policing services in the Plan area,
until such a time other services are needed.
5.8.1.4 The County shall continue to use the County’s bylaw enforcement officers to
enforce municipal bylaws within the Plan area.
5.8.1.5 The County shall continue to work with Alberta Health Services to provide
ambulance services to the Plan area.
5.8.1.6 The County should continue to look for opportunities for providing shared
protective and preventative services with neighbouring municipalities, other groups, or
on their own.
5.8.1.7 The County shall, through the NASP process, identify if any community facilities,
such as libraries, community halls, police, fire or recreational facilities that are needed
to service the overall community. This may be achieved through negotiations with the
developer via land acquisition, construction of such facilities and/or collection of off-
site levies in accordance with the Municipal Government Act (Section 648).
GREEN DEVELOPMENT
5.9.1 Objective
To provide leadership in the incorporation of green development
techniques and technologies that reduce the overall impact on the
natural environment.
Policies
5.9.1.1 The County shall encourage the installation of energy efficient technology (e.g.
LED lighting).
5.9.1.2 The County shall encourage the inclusion of low impact design into the
development of the Plan area.
5.9.1.3 The County shall encourage the development of net zero carbon buildings.
5.9.1.4 The County shall support the ability to utilize greywater for other household and
business uses subject to compliance with provincial and federal health regulations.
5.9.1.5 The County shall work with developers on incorporating climate adaptation
design standards and initiatives.
5.9.1.5 The development of a NASP should consider EV charging stations and other
alternative energy charging facilities to support the transportation network.
5.9.1.6 The County shall encourage the incorporation of solar and other renewable
technologies.
TRANSPORTATION
5.10.1 Objective
To create a safe and efficient road network system that ties into the
surrounding road network.
Policies
5.10.1.1 thru 5.10.1.9
5.10.2 Objective
To work with other government agencies on funding support and collaboration
relating to major transportation infrastructure that benefits the Plan area and
other communities.
Policies
5.10.2.1 thru 5.10.1.2
5.10.3 Objective
To create a higher density mixed use hub within the Plan area that would
support transit orientated development when determined necessary.
Policies
5.10.3.1 thru 5.10.3.4
5.10.4 Objective
To create an active transportation network system that is attractive, functional,
and useable.
Policies
5.10.4.1 thru 5.10.4.2
5.10.5 Objective
To balance the interface of residential development around the existing
railway corridor that passes through the Plan area.
Policies
5.10.5.1 thru 5.10.5.2
WATER DISTRIBUTION
5.11.1 Objective
To provide sufficient water supply to the Plan area to meet the needs of
development in a cost-efficient manner.
Policies
5.11.1.1 thru 5.11.1.7
WASTEWATER
5.11.2 Objective
To provide adequate wastewater servicing to the Plan area to meet the needs
of development in a cost-efficient manner.
Policies
5.11.2.1 thru 5.11.2.7
STORMWATER
5.11.3 Objective
To provide adequate stormwater servicing to the Plan area to meet the needs
of development in a cost-efficient manner.
Policies
5.11.3.1 thru 5.11.2.5
UTILITY SERVICES
5.11.4 Objective
To enable the provision for telecommunications, gas and power services to be
provided to the residents and businesses located within the Plan area.
Policies
5.11.4.1 thru 5.11.4.2
OIL AND GAS INFRASTRUCTURE
5.11.5 Objective
To manage the transition of development throughout the Plan area with the
phasing out of existing oil and gas infrastructure.
Policies
5.11.5.1 thru 5.11.5.2
INTERMUNICIPAL COORDINATION
5.12.1 Objective
To enable development of the Plan areas in coordination and
collaboration with adjoining municipalities where services and benefit
may extend across boundaries.
Policies
5.12.1.1A NASP shall be referred to the adjoining municipalities for review and
comment.
5.12.1.2 Where applicable, a NASP shall include a referral policy for amendments to the
NASP. A policy shall also be included for referral of any rezoning that are within the
Plan areas.
5.12.1.3 The County shall continue to work with neighboring municipalities to identify
opportunities that provide cost efficiencies to development and ongoing servicing of
the Plan area.
5.12.1.4 The County shall work with regional partners in identifying funding sources
and establishing a cost sharing framework for the development of 127 Street across the
Sturgeon River when traffic demand identifies its need.
PLAN IMPLEMENTATION
6.1.1 Objective
To accommodate for the future development of NASPs that are located within
the Planning Areas 3, 4 & 5.
Policies
6.1.1.1 thru 6.1.1.3
6.1.2 Objective
To enable amendments to the objectives and policies contained within this
Plan.
Policies
6.1.2.1 thru 6.1.2.4
6.2.1 Objective
To enable development to occur in a contiguous manner within the Plan area
that aligns with the policy.
Policies
6.2.2.1 thru 6.2.2.2
6.3.1 Objective
To develop new standards to enable the implementation of the residential
densities required by the Plan.
Policies
6.3.2.1 thru 6.2.2.3
6.4.1 Objective
To establish levy options and arrangements between benefitting municipalities
for intermunicipal, regional, and provincial infrastructure projects, where
mutual benefit is determined.
Policies
6.4.1.1 thru 6.4.1.2
REF Submittals
Area Structure Plan
Land Use Planning
Phase I Growth
Framework Land Use
Analysis
Utility Planning
Sept 2019 Infrastructure
Master Plan
Servicing Design Brief
Transportation
Traffic Impact Analysis
Report
Fiscal
Fiscal Impact Analysis
Report
Environmental
Influencing Environmental
Features Report
Biophysical Assessment
Commercial Needs
Commercial Development
Analysis
Agriculture
Agriculture Impact
Assessment
Questions
Our Future Valley
Sturgeon Valley South
Area Structure Plan
Bylaw 1557/21
Presentation #4
Our Future Valley
Sturgeon Valley Core
Area Structure Plan
Bylaw 1555/21
Sturgeon Valley Area
Structure Plan
Amendment
Planning Pathway
• Outline Plan Submission
• Site Concept
• Development Density
• Servicing and
Transportation Analyses
• Financial Impact
Assessment
• Phase 1 – Environmental
Site Assessment
• Biophysical and Wetland
Assessment
• Heritage Assessment
• Geotechnical and Soil
Analysis
REF Submittals
Area Structure
Plan
Amendment
Stormwater
Management
Plan
Utility Planning
Transportation
-Traffic Impact
Analysis Report
Questions
Our Future Valley
Sturgeon Valley Core
Area Structure Plan
Bylaw 1555/21
Bylaw 1556/21
Amendment to Bylaw 1313/13
Municipal Development Plan
Bylaw 1555/21
Amendment to Bylaw 882/99
Sturgeon Valley Area Structure Plan
Bylaw 1557/21
Our Future Valley
Sturgeon Valley South Area
Structure Plan
June 8 2021
First Reading of 3 Bylaws

Contenu connexe

Tendances

S out 13_1555-design_and_access_statement-409727
S out 13_1555-design_and_access_statement-409727S out 13_1555-design_and_access_statement-409727
S out 13_1555-design_and_access_statement-409727Donald Jones
 
Draft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal AreaDraft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal AreaRockdaleCityNSW
 
Draft Rockdale City Council Plan of Management 2015
Draft Rockdale City Council Plan of Management 2015Draft Rockdale City Council Plan of Management 2015
Draft Rockdale City Council Plan of Management 2015RockdaleCityNSW
 
MVCSP comment letter North Bayshore Residential
MVCSP comment letter North Bayshore ResidentialMVCSP comment letter North Bayshore Residential
MVCSP comment letter North Bayshore ResidentialAdina Levin
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyCity of College Station
 
ONEIA Chris Thompson Presentation
ONEIA Chris Thompson PresentationONEIA Chris Thompson Presentation
ONEIA Chris Thompson PresentationONEIA
 
Chandigarh vipul mehta
Chandigarh vipul mehtaChandigarh vipul mehta
Chandigarh vipul mehtavipularch
 
Robbinsville_ReExam_Print
Robbinsville_ReExam_PrintRobbinsville_ReExam_Print
Robbinsville_ReExam_PrintEric Tuvel
 
2.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 52.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 5Hyojung Garland
 
Understanding the Impact of Growth Plan Reforms
Understanding the Impact of Growth Plan ReformsUnderstanding the Impact of Growth Plan Reforms
Understanding the Impact of Growth Plan ReformsAnne Kaufmann
 
BIP Overview and Next Steps
BIP Overview and Next StepsBIP Overview and Next Steps
BIP Overview and Next StepsWalter Davidson
 
Planned Development Districts Staff Hearing
Planned Development Districts Staff HearingPlanned Development Districts Staff Hearing
Planned Development Districts Staff HearingLA City Code Studies
 
2012 Harford County Master Plan Kickoff
2012 Harford County Master Plan Kickoff2012 Harford County Master Plan Kickoff
2012 Harford County Master Plan Kickoffharfordcountymd
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentationSCVTA
 
Supporting Document – Stage 2 Survey Analysis Report
Supporting Document – Stage 2 Survey Analysis ReportSupporting Document – Stage 2 Survey Analysis Report
Supporting Document – Stage 2 Survey Analysis ReportLoren Lawford
 
Overview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionOverview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionAman Kudesia
 

Tendances (20)

2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
S out 13_1555-design_and_access_statement-409727
S out 13_1555-design_and_access_statement-409727S out 13_1555-design_and_access_statement-409727
S out 13_1555-design_and_access_statement-409727
 
Affordable Housing Development Request
Affordable Housing Development RequestAffordable Housing Development Request
Affordable Housing Development Request
 
Draft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal AreaDraft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal Area
 
Draft Rockdale City Council Plan of Management 2015
Draft Rockdale City Council Plan of Management 2015Draft Rockdale City Council Plan of Management 2015
Draft Rockdale City Council Plan of Management 2015
 
Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance. Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance.
 
MVCSP comment letter North Bayshore Residential
MVCSP comment letter North Bayshore ResidentialMVCSP comment letter North Bayshore Residential
MVCSP comment letter North Bayshore Residential
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park Property
 
ONEIA Chris Thompson Presentation
ONEIA Chris Thompson PresentationONEIA Chris Thompson Presentation
ONEIA Chris Thompson Presentation
 
Chandigarh vipul mehta
Chandigarh vipul mehtaChandigarh vipul mehta
Chandigarh vipul mehta
 
Robbinsville_ReExam_Print
Robbinsville_ReExam_PrintRobbinsville_ReExam_Print
Robbinsville_ReExam_Print
 
2.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 52.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 5
 
Understanding the Impact of Growth Plan Reforms
Understanding the Impact of Growth Plan ReformsUnderstanding the Impact of Growth Plan Reforms
Understanding the Impact of Growth Plan Reforms
 
BIP Overview and Next Steps
BIP Overview and Next StepsBIP Overview and Next Steps
BIP Overview and Next Steps
 
Planned Development Districts Staff Hearing
Planned Development Districts Staff HearingPlanned Development Districts Staff Hearing
Planned Development Districts Staff Hearing
 
2012 Harford County Master Plan Kickoff
2012 Harford County Master Plan Kickoff2012 Harford County Master Plan Kickoff
2012 Harford County Master Plan Kickoff
 
Lcc land use 02 2010
Lcc land use 02 2010Lcc land use 02 2010
Lcc land use 02 2010
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentation
 
Supporting Document – Stage 2 Survey Analysis Report
Supporting Document – Stage 2 Survey Analysis ReportSupporting Document – Stage 2 Survey Analysis Report
Supporting Document – Stage 2 Survey Analysis Report
 
Overview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionOverview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan Region
 

Similaire à Our Future Valley - May 25, 2021 Committee of the Whole

Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018Kathryn Huang
 
Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalorevidhya monisha
 
ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315Matt Lindley
 
North Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentationNorth Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentationPAS_Team
 
NSDF_SANBI CONFERENCE 3 AUG.pptx
NSDF_SANBI CONFERENCE 3 AUG.pptxNSDF_SANBI CONFERENCE 3 AUG.pptx
NSDF_SANBI CONFERENCE 3 AUG.pptxSheena Satikge
 
City of Elkins Strategic Plan Progress, 2018-2021
City of Elkins Strategic Plan Progress, 2018-2021City of Elkins Strategic Plan Progress, 2018-2021
City of Elkins Strategic Plan Progress, 2018-2021Sutton Stokes
 
Jonesboro Scott Park Neighborhood Plan
Jonesboro Scott Park Neighborhood PlanJonesboro Scott Park Neighborhood Plan
Jonesboro Scott Park Neighborhood PlanEms DC
 
RutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentationRutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentationPAS_Team
 
Blueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review DraftBlueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review DraftBrunswick County
 
Massey Complex Briefing 4-25-2018
Massey Complex Briefing 4-25-2018Massey Complex Briefing 4-25-2018
Massey Complex Briefing 4-25-2018Fairfax County
 
City of Elkins Strategic Plan Progress, 2018-2020
City of Elkins Strategic Plan Progress, 2018-2020City of Elkins Strategic Plan Progress, 2018-2020
City of Elkins Strategic Plan Progress, 2018-2020Sutton Stokes
 
www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...
www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...
www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...A Hagan
 
Secrets of a Successful Land Development Approval Process
Secrets of a Successful Land Development Approval ProcessSecrets of a Successful Land Development Approval Process
Secrets of a Successful Land Development Approval Processkevin_riles
 
Think Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation studyThink Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation studyToowoomba Region
 

Similaire à Our Future Valley - May 25, 2021 Committee of the Whole (20)

Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018
 
Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalore
 
ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315
 
North Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentationNorth Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentation
 
SNEAPA 2013 Friday g3 1_45_what is important to us
SNEAPA 2013 Friday g3 1_45_what is important to usSNEAPA 2013 Friday g3 1_45_what is important to us
SNEAPA 2013 Friday g3 1_45_what is important to us
 
NSDF_SANBI CONFERENCE 3 AUG.pptx
NSDF_SANBI CONFERENCE 3 AUG.pptxNSDF_SANBI CONFERENCE 3 AUG.pptx
NSDF_SANBI CONFERENCE 3 AUG.pptx
 
City of Elkins Strategic Plan Progress, 2018-2021
City of Elkins Strategic Plan Progress, 2018-2021City of Elkins Strategic Plan Progress, 2018-2021
City of Elkins Strategic Plan Progress, 2018-2021
 
Woodmere Master Plan Presentation
Woodmere Master Plan PresentationWoodmere Master Plan Presentation
Woodmere Master Plan Presentation
 
Broadview Heights Master Plan: City Council Presentation
Broadview Heights Master Plan: City Council PresentationBroadview Heights Master Plan: City Council Presentation
Broadview Heights Master Plan: City Council Presentation
 
Jonesboro Scott Park Neighborhood Plan
Jonesboro Scott Park Neighborhood PlanJonesboro Scott Park Neighborhood Plan
Jonesboro Scott Park Neighborhood Plan
 
D3 Overcoming Provincialism
D3 Overcoming ProvincialismD3 Overcoming Provincialism
D3 Overcoming Provincialism
 
Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3
 
RutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentationRutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentation
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
 
Blueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review DraftBlueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review Draft
 
Massey Complex Briefing 4-25-2018
Massey Complex Briefing 4-25-2018Massey Complex Briefing 4-25-2018
Massey Complex Briefing 4-25-2018
 
City of Elkins Strategic Plan Progress, 2018-2020
City of Elkins Strategic Plan Progress, 2018-2020City of Elkins Strategic Plan Progress, 2018-2020
City of Elkins Strategic Plan Progress, 2018-2020
 
www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...
www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...
www.AHaganAssociatesLtd.com - Household Energy Efficiency and Carbon Minimisa...
 
Secrets of a Successful Land Development Approval Process
Secrets of a Successful Land Development Approval ProcessSecrets of a Successful Land Development Approval Process
Secrets of a Successful Land Development Approval Process
 
Think Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation studyThink Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation study
 

Dernier

call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...Amil baba
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...narwatsonia7
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOMAIRIEORGERUS
 
In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...ResolutionFoundation
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingSERUDS INDIA
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxjennysansano2
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...Christina Parmionova
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 

Dernier (20)

call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
 
In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donating
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptx
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 

Our Future Valley - May 25, 2021 Committee of the Whole

  • 1. Bylaw 1556/21 Amendment to Bylaw 1313/13 Municipal Development Plan Bylaw 1555/21 Amendment to Bylaw 882/99 Sturgeon Valley Area Structure Plan Bylaw 1557/21 Our Future Valley Sturgeon Valley South Area Structure Plan Process and Timelines The Sturgeon Valley Special Study Area May 25, 2021 Committee of the Whole Our Future Valley - Sturgeon Valley Planning Information Update Presentation Agenda Presenter: Rachel Davies Long Range Planner, Long Range & Regional Planning Presenter: Nick Pryce V3 Companies of Canada Ltd. Presenter: Martyn Bell Program Lead, Current Planning Presenter: Michael Klassen Program Lead, Long Range & Regional Planning
  • 2. Presentation #1 Process and Timelines Sturgeon Valley Special Study Area
  • 3. (2017-2019) – Valley Regional Approvals SVSSA Terms of Reference approved at EMR Board meeting Sept 2017 SVSSA Policies approved at EMR Board Meeting Dec 2018 EMRB Growth Plan amended to include SVSSA policies - Overall minimum density of 35 du/nrha established for the area March 2019 • The development of Sturgeon Valley Special Study Area (SVSSA) policies was a multi-year intermunicipal collaborative effort that spanned across multiple Council terms. • Policies are the Terms of Reference that future development in and around the Sturgeon Valley must adhere to.
  • 4. (2019-2020) - Valley Growth Framework Analysis Nov thru Dec - Developer Check-in Nov - Intermunicipal Check-in Q3-Q4 2019: General Plan Area Review Plan Area Land Use and Servicing Analysis Jan-Feb 2020 Feb-March 2020: Preliminary Financial Assessment, Traffic Impact Analysis Developer and Landowner Expectations Land Use Analysis Fiscal Impact Analysis Transportation Analysis April 28 2020: Council Workshop: Land Use Analysis Fiscal Impact Analysis Transportation Analysis June 2020: Additional Developer Engagement Presentation to Council of feedback from additional developer engagement June 19 2020: Council Presentation of Growth Framework Report Presentation of Options for progression to Phase II Area Structure Planning July 14 2020: Council Direction from Council for progression to Phase II Area Structure Planning August 11 2020: Council • Detailed analysis of the planning area was completed in 2019 through 2020 in consultation with landowners and the development community. • Key intermunicipal planning partners including the cities of Edmonton and St. Albert, along with CFB Edmonton were kept informed on the progress of the project.
  • 5. Council direction on project Communication and Engagement Plan Oct 26 2020 Dec 2 - Developer Information Session Dec 3 - Public Information Session “Call-a-Planner” Sessions Dec 2020 Developer Engagement Session Jan 2021 Public Engagement Session “Call-a-Planner” Engagement Sessions Feb 2021 Home-Owners Association Engagement Session March 2021 March 18 2021 Committee of the Whole “What We Heard Report” Public presentation of key themes and comments heard to-date Public Engagement Session “Call-the-Panel” Engagement Session April 2021 May 25 2021 Committee of the Whole “Valley Planning Information Update” Public presentation on draft bylaws (2020-2021) - Valley Area Structure Plan Process • Engagement with both the public and area developers was completed in 2020 through 2021. • Key intermunicipal planning partners including the cities of Edmonton and St. Albert, along with CFB Edmonton were kept informed on the progress of the project.
  • 6. First Reading of 3 Bylaws June 8 Council June 28 Public Hearing for 3 Bylaws (with continuation on June 29 if required) June 28/29 (tentative) Council authorization of REF submittal of 3 Bylaws. July 13 Council (tentative) REF Review Period July-August (tentative) Second and Third Reading of 3 Bylaws Aug 24 Council (tentative) Additional opportunity for Second and Third Reading of 3 Bylaws pending outcomes of REF review period Sept 14 Last Council Date (2020-2021) - Valley Bylaw Process • All appliable external stakeholders will be provided with a formal intermunicipal referral in accordance with County referral policies. • Check-in dates with key intermunicipal planning partners including the cities of Edmonton and St. Albert, EMRB Administration in mid-June to comments/concerns (if any) of the 3 bylaws.
  • 7. Future NSP/Outline Plans subject to Council approval •- Detailed Land Use and Phasing Plan •- Detailed Servicing Plan (water, sanitary, stormwater) •- Traffic Impact Assessment •- Fiscal Impact Assessment •- Detailed wetlands/natural areas assessment •- Any other specific requirements Submittal of NSP/Outline Plan Applications General Municipal Servicing Standards Land Use Bylaw Amendments Offsite Levy Bylaw updates Valley Design Standards County Implementation Items Subject to REF process Future ASP Amendments (2021 and beyond) - Valley Implementation Items • Upon finalization of bylaw amendments for Valley planning documents, significant work needs to be completed prior to receipt of applications for subdivision and development in the Valley.
  • 8. Questions Process and Timelines Sturgeon Valley Special Study Area
  • 10. Overview of Municipal Development Plan Amendment  Adjustments of neighborhood boundaries to account for City of St. Albert annexation and approval of EMRB SVSSA policies (impacted Neighbourhoods B, C, H and G).  Adjustments to Figure 3 – Growth Strategy Concept map to account for future non-residential along HWY 28.  Textural amendments in section 2.3 to reference SVSSA.  Removal of outdated maps in Appendix A-3.  Complete re-write of Neighbourhood G to be in compliance with SVSSA policies. Municipal Development Amendment
  • 11. Neighbourhood G • Same style as existing MDP, Neighbourhood G brought up to date. • Neighbourhood G map area has also been brought up to date. • The Neighbourhood role reflects the Our Future Valley project and public consultations findings.
  • 12. Placemaking Principles • Strong placemaking principles to embed what we have learned during the Our Future Valley Process and public consultation. • Best practice approach, upfront about the County’s expectations for the area. • Placemaking Principles cover the whole of the Valley, not just the ASP areas.
  • 13. Implementation of Placemaking Principles • Direction on implementation is critical. Clearly sets out what developers need to know and what the County expects. • Implementation includes Sturgeon Valley heritage/identity, trails, championing natural features and other key points risen during the process and public consultation.
  • 14. Strategic Sites • Strategic Sites are the key in guiding future development in the Valley, provides overarching context for the new ASP. • Informed through consultation with public, stakeholders and the development community, as well as key studies. • A unique to Sturgeon planning policy approach.
  • 15. Strategic Site A • Each Strategic Site has a unique vision and a preamble that sets the aspirations for the area. • Upfront development expectations the county has are clear for each site, covering important site-specific issues such as specific roads, trails, natural features, servicing and development mix.
  • 16. Strategic Site B • Key purpose is to define the areas where growth is expected, and to delineate and positively shape the nature of that growth. • The areas themselves are Informed by regional policy, various studies, servicing realities, natural features and developers. • The Development Expectations have been greatly shaped by the public consultation.
  • 17. Strategic Site C • MDP highlights and sets expectation to implement key regional policy/infrastructure, such as a future transit hub. • Even though site specific, all Strategic Sites contribute to the wider Neighbourhood G vision and the Placemaking Principles are embedded using site specific knowledge.
  • 18. Strategic Site D • Balancing development pressures, with what we heard during consultation and the County’s expectations. • Whilst applying the overarching Placemaking Principles, the Strategic Sites Development Expectations sets the scene for the new ASP and any future NASPs
  • 19. Strategic Site E • Carefully considered commercial development principles and market analysis for each site, unique/appropriate opportunities differ between the sites. • Placemaking Principles, combined with Strategic Sites focus on preventing a juxtaposition of uses. • The Strategic Site areas line up with the new ASP areas.
  • 21. Presentation #3 Our Future Valley Sturgeon Valley South Area Structure Plan Bylaw 1557/21
  • 22. Area Structure Plan - Vision The Our Future Valley Area – Sturgeon Valley South Area Structure Plan was developed in partnership with key area stakeholders between Dec 2020 through May 2021.  The Plan details unique development guidance that is sensitive to the surrounding natural environment, whilst being cognitive of the various urban and rural neighbours.  Sturgeon Valley South is a place where identity is maintained and strengthen through showcasing its history, while capitalizing on innovative future technological advancements and embracing different approaches throughout the many years of the Plan’s implementation.  The Plan will be developed in a fiscally responsible manner that creates long term resilience through managing the varying phases of development.  The Sturgeon Valley South Plan area is a place where people want to visit, play, work, live and be part of a strong community.
  • 23. Area Structure Plan Content The Our Future Valley - Sturgeon Valley South Area Structure Plan includes an overview of the following key items: 1. Introductory Information 2. Planning Process 3. Area Context 4. Vision 5. Area Structure Plan Policies 6. Implementation Report is supported with studies related to: 1. Traffic Impact Analysis 2. Fiscal Impact Analysis 3. Environmental Analysis 4. Agricultural Impact Assessment 5. Infrastructure Master Plan
  • 24. Area Structure Plan – Planning Areas  Planning Areas provide the structure and policy to guide the development of Neighbourhood Area Structure Plans (NASPs).  As part of the process, County Council provided initial direction on future development of residential/mixed-use and non-residential Planning Areas (Planning Areas 1 and 2).  While the Plan’s primary focus is on these two Planning Areas, the Plan serves as a framework for all other areas to ensure that development can be responsive to future servicing needs, market demands, changes in technology and growth opportunities.  The remaining areas will be considered as future Planning Areas that will require an amendment. Areas will be required to meet the criteria outlined in the implementation section prior to moving forward with the development of a Neighbourhood Area Structure Plan (NASP).
  • 25. Concept Plan - Full Build Out  Projected build out of the entire area with the main purpose to establish the projected population over the long term and understand how this influences transportation in the area.
  • 26. Concept Plan – Planning Area 1 (Residential Mixed-Use)  This Plan recognizes that overall development of the Plan area is projected to occur over a significant period and in recognizing changes that will occur over this time; the core focus has been related to the Planning Areas 1 and 2.
  • 27. Concept Plan – Planning Area 2 (non-residential HWY 28)  This Plan recognizes that overall development of the Plan area is projected to occur over a significant period and in recognizing changes that will occur over this time; the core focus has been related to the Planning Areas 1 and 2.
  • 28. TRANSITIONAL DEVELOPMENT 5.2.1 Objective To be sensitive of the density and development form within the Plan areas that border established Sturgeon Valley Core community. Policies 5.2.1.1 Transitional density levels shall be in general accordance with the Figure. 5.2.1.2 Where possible, the development of roads, parks and/or green corridors may be used to offset the built form of varying densities. 5.2.1.3 Landscaping, the use of berms and existing natural features may be leveraged as an important tool to assist with transitioning from higher to lower urban densities through buffering. 5.2.2 Objective To be sensitive of the potential impacts light industrial development may have on residential development and the operations within CFB. Policies 5.2.2.1 The development of the Neighbourhood Area Structure Plan (NASP) for Planning Area 2 (Light Industrial) shall be carried out in consultation with CFB to avoid any potential conflicts relating to operations. 5.2.2.2 The development of the NASP for Planning Area 2 should seek to protect wetlands and natural water features indicated in the Figure as Environmental Reserve based on the recommendations of the outcomes of a detailed biophysical assessment.
  • 29. RESIDENTIAL 5.3.1 Objective To create a residential community that meets the overall 35du/nrha within the Plan while respecting established communities by creating transitional densities. Policies 5.3.1.1 Density levels shall be in general accordance with the Figure, with each NASP for Planning Areas 1, 3, 4 & 5 demonstrating compliance with meeting the overall average density of 35du/nrha. 5.3.1.2 Alternative/innovative housing should be encouraged. 5.3.1.3 Clustering together of more than four multi unit residential dwellings shall be encouraged, only if integrated within a mixed-use area, adjoining a commercial area or located along a public transit route. 5.3.1.4 Sturgeon County shall record and monitor the densities as development unfolds to confirm compliance with the EMRGP density policies. 5.3.2 Objective To create a residential community that is unique and consists of character that reflects the history of the Plan area while incorporating innovative technologies that create a modern, resilient, and functioning community. Policies 5.3.2.1 The NASPs should be designed in a manner that reflects the Sturgeon Valley’s unique character through design elements of dwellings, street signage, and community public spaces. 5.3.2.2 Development within the Plan should incorporate Smart City concepts.
  • 30. COMMERCIAL/MIXED-USE DEVELOPMENT 5.4.1 Objective To create a unique commercial destination that focuses on small to medium sized boutique businesses. Policies 5.4.1.1 thru 5.4.1.3 5.4.2 Objective To enable the ability to develop local corner commercial stores within residential communities. Policies 5.4.2.1 thru 5.4.2.3 5.4.3 Objective To create a commercial node that is focused on servicing highway traffic and the surrounding community. Policies 5.4.3.1 thru 5.4.3.3 5.4.4 Objective To create mixed-use nodes comprised of small to medium sized retail stores. Policies 5.4.4.1 thru 5.4.4.6
  • 31. LIGHT INDUSTRIAL 5.5.1 Objective To enable the light industrial development that could include warehousing, logistics, flex industrial and light manufacturing activities along Highway 28. Policies 5.5.1.1 Light industrial development shall occur on the lands designated as Light Industrial in the Figure. 5.5.1.2 Development within the light industrial area shall be carried out in consultation with Alberta Transportation and CFB. 5.5.1.3 The lands should be developed to accommodate light industrial activities that support CFB operations. 5.5.1.4 The NASP for Planning Area 2 shall include community architectural and landscape design standards that focus on mitigating the visual impact of the lands when viewed from Highway 28, CFB and surrounding residential areas. 5.5.1.5 The development of the industrial lands shall comply with all requirements regarding aerodromes in consultation with CFB at the time of preparing the NASP for Planning Area 2.
  • 32. AGRICULTURE 5.6.1 Objective To continue the productive use of agricultural lands until the market determines the lands are needed for development. Policies 5.6.1.1 Existing agricultural lands within the Plan area should remain as agricultural until development is approved by the County. 5.6.1.2 In preparing a NASP, development staging shall be carried out in a manner to avoid impacts on agricultural operations so as not to constrain or restrict existing agricultural lands until the demands requires the lands to be developed. 5.6.1.3 In preparing a NASP, areas of land may be retained for urban agriculture. The development of a NASP should identify opportunities to incorporate agricultural elements into new development, examples include: community gardens, greenhouses etc. 5.6.1.4 The development of a NASP located within the Planning Areas 3 through to 5 (see Figure) shall require an amendment to this Plan in accordance with the criteria outlined in section 6.1.
  • 33. PARKS, SCHOOLS, OPEN SPACE AND ENVIRONMENTAL RESERVE 5.7.1 Objective To designate lands to accommodate future schools. Policies 5.7.1.1 thru 5.7.1.4 5.7.2 Objective To champion the protection of key environmental and heritage sensitive areas within the Plan. Policies 5.7.3.1 thru 5.7.3.5
  • 34. COMMUNITY SERVICES 5.8.2 Objective To work cooperatively with neighbouring municipalities, CFB, private, public, and non-profit groups to provide community services in the most cost-effective manner possible. Policies 5.8.1.1 The County shall require future subdivision and development in the Plan area to meet all fire protection requirements as outlined in the National Building Code – Alberta Edition & National Fire Code - Alberta Edition. 5.8.1.2 The County shall encourage homeowners to install and/or implement additional fire protection parameters if required. 5.8.1.3 The County shall use the RCMP to provide policing services in the Plan area, until such a time other services are needed. 5.8.1.4 The County shall continue to use the County’s bylaw enforcement officers to enforce municipal bylaws within the Plan area. 5.8.1.5 The County shall continue to work with Alberta Health Services to provide ambulance services to the Plan area. 5.8.1.6 The County should continue to look for opportunities for providing shared protective and preventative services with neighbouring municipalities, other groups, or on their own. 5.8.1.7 The County shall, through the NASP process, identify if any community facilities, such as libraries, community halls, police, fire or recreational facilities that are needed to service the overall community. This may be achieved through negotiations with the developer via land acquisition, construction of such facilities and/or collection of off- site levies in accordance with the Municipal Government Act (Section 648).
  • 35. GREEN DEVELOPMENT 5.9.1 Objective To provide leadership in the incorporation of green development techniques and technologies that reduce the overall impact on the natural environment. Policies 5.9.1.1 The County shall encourage the installation of energy efficient technology (e.g. LED lighting). 5.9.1.2 The County shall encourage the inclusion of low impact design into the development of the Plan area. 5.9.1.3 The County shall encourage the development of net zero carbon buildings. 5.9.1.4 The County shall support the ability to utilize greywater for other household and business uses subject to compliance with provincial and federal health regulations. 5.9.1.5 The County shall work with developers on incorporating climate adaptation design standards and initiatives. 5.9.1.5 The development of a NASP should consider EV charging stations and other alternative energy charging facilities to support the transportation network. 5.9.1.6 The County shall encourage the incorporation of solar and other renewable technologies.
  • 36. TRANSPORTATION 5.10.1 Objective To create a safe and efficient road network system that ties into the surrounding road network. Policies 5.10.1.1 thru 5.10.1.9 5.10.2 Objective To work with other government agencies on funding support and collaboration relating to major transportation infrastructure that benefits the Plan area and other communities. Policies 5.10.2.1 thru 5.10.1.2 5.10.3 Objective To create a higher density mixed use hub within the Plan area that would support transit orientated development when determined necessary. Policies 5.10.3.1 thru 5.10.3.4 5.10.4 Objective To create an active transportation network system that is attractive, functional, and useable. Policies 5.10.4.1 thru 5.10.4.2 5.10.5 Objective To balance the interface of residential development around the existing railway corridor that passes through the Plan area. Policies 5.10.5.1 thru 5.10.5.2
  • 37. WATER DISTRIBUTION 5.11.1 Objective To provide sufficient water supply to the Plan area to meet the needs of development in a cost-efficient manner. Policies 5.11.1.1 thru 5.11.1.7 WASTEWATER 5.11.2 Objective To provide adequate wastewater servicing to the Plan area to meet the needs of development in a cost-efficient manner. Policies 5.11.2.1 thru 5.11.2.7 STORMWATER 5.11.3 Objective To provide adequate stormwater servicing to the Plan area to meet the needs of development in a cost-efficient manner. Policies 5.11.3.1 thru 5.11.2.5
  • 38. UTILITY SERVICES 5.11.4 Objective To enable the provision for telecommunications, gas and power services to be provided to the residents and businesses located within the Plan area. Policies 5.11.4.1 thru 5.11.4.2 OIL AND GAS INFRASTRUCTURE 5.11.5 Objective To manage the transition of development throughout the Plan area with the phasing out of existing oil and gas infrastructure. Policies 5.11.5.1 thru 5.11.5.2
  • 39. INTERMUNICIPAL COORDINATION 5.12.1 Objective To enable development of the Plan areas in coordination and collaboration with adjoining municipalities where services and benefit may extend across boundaries. Policies 5.12.1.1A NASP shall be referred to the adjoining municipalities for review and comment. 5.12.1.2 Where applicable, a NASP shall include a referral policy for amendments to the NASP. A policy shall also be included for referral of any rezoning that are within the Plan areas. 5.12.1.3 The County shall continue to work with neighboring municipalities to identify opportunities that provide cost efficiencies to development and ongoing servicing of the Plan area. 5.12.1.4 The County shall work with regional partners in identifying funding sources and establishing a cost sharing framework for the development of 127 Street across the Sturgeon River when traffic demand identifies its need.
  • 40. PLAN IMPLEMENTATION 6.1.1 Objective To accommodate for the future development of NASPs that are located within the Planning Areas 3, 4 & 5. Policies 6.1.1.1 thru 6.1.1.3 6.1.2 Objective To enable amendments to the objectives and policies contained within this Plan. Policies 6.1.2.1 thru 6.1.2.4 6.2.1 Objective To enable development to occur in a contiguous manner within the Plan area that aligns with the policy. Policies 6.2.2.1 thru 6.2.2.2 6.3.1 Objective To develop new standards to enable the implementation of the residential densities required by the Plan. Policies 6.3.2.1 thru 6.2.2.3 6.4.1 Objective To establish levy options and arrangements between benefitting municipalities for intermunicipal, regional, and provincial infrastructure projects, where mutual benefit is determined. Policies 6.4.1.1 thru 6.4.1.2
  • 41. REF Submittals Area Structure Plan Land Use Planning Phase I Growth Framework Land Use Analysis Utility Planning Sept 2019 Infrastructure Master Plan Servicing Design Brief Transportation Traffic Impact Analysis Report Fiscal Fiscal Impact Analysis Report Environmental Influencing Environmental Features Report Biophysical Assessment Commercial Needs Commercial Development Analysis Agriculture Agriculture Impact Assessment
  • 42. Questions Our Future Valley Sturgeon Valley South Area Structure Plan Bylaw 1557/21
  • 43. Presentation #4 Our Future Valley Sturgeon Valley Core Area Structure Plan Bylaw 1555/21
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51. Sturgeon Valley Area Structure Plan Amendment Planning Pathway • Outline Plan Submission • Site Concept • Development Density • Servicing and Transportation Analyses • Financial Impact Assessment • Phase 1 – Environmental Site Assessment • Biophysical and Wetland Assessment • Heritage Assessment • Geotechnical and Soil Analysis
  • 52. REF Submittals Area Structure Plan Amendment Stormwater Management Plan Utility Planning Transportation -Traffic Impact Analysis Report
  • 53. Questions Our Future Valley Sturgeon Valley Core Area Structure Plan Bylaw 1555/21
  • 54. Bylaw 1556/21 Amendment to Bylaw 1313/13 Municipal Development Plan Bylaw 1555/21 Amendment to Bylaw 882/99 Sturgeon Valley Area Structure Plan Bylaw 1557/21 Our Future Valley Sturgeon Valley South Area Structure Plan June 8 2021 First Reading of 3 Bylaws

Notes de l'éditeur

  1. Michael
  2. Michael
  3. Michael
  4. Michael
  5. Michael
  6. Michael
  7. Michael
  8. Michael
  9. Michael
  10. Michael
  11. Michael
  12. Nick
  13. Nick
  14. Nick
  15. Nick
  16. Nick
  17. Nick
  18. Nick
  19. Nick
  20. Nick
  21. Nick
  22. Nick
  23. Nick
  24. Nick
  25. Nick
  26. Nick
  27. Nick
  28. Nick
  29. Nick
  30. Speaker (Nick) Put into boxes
  31. Thank you Nick. Good afternoon Council, colleagues in Administration, and members of the Public. For the record my name is Martyn Bell and I’m the Program Lead for Current Planning within Planning and Development Services. The final area of the Our Future Valley project to be discussed today is the amendment to the existing Sturgeon Valley Area Structure Plan – which is to be known as the Sturgeon Valley Core - Area Structure Plan.
  32. This Plan came into effect in 1999 and has provided the planning framework for the growth and development of the Sturgeon Valley for the last 22 years. While periodic amendments have occurred to the document during that time, mostly to accommodate Outline Plans for new development, a full review of the Plan hasn’t occurred. As has been mentioned previously, the impetus behind the proposed amendments to this Area Structure Plan are rooted in the recent changes made to the Edmonton Metro Region Growth Plan, specifically the adoption of the Sturgeon Valley Special Study Area policies. While amendments are being proposed – they are not wholesale. The key policy differences are focused on the reduction in size of the plan area and an increase to permitted residential densities for the limited greenfield opportunities – also known as Valley Core Reserve, within the newly proposed plan area. Many of the policies contained within the existing Area Structure Plan have served the plan area well and are to be incorporated within the new document.
  33. The plan area is proposed to be reduced in size from approximately 5,060ha (50.60 km²) to 1,750 hectares (17.5 km²), a reduction of almost two-thirds. While the lands to the south, as well as some land to the west and east are to be included as part of the Sturgeon Valley South – Area Structure Plan, much of the agricultural land between Highways 2, 28, and 37 will no longer be within a defined plan area and will revert back to the policies as outlined within the Municipal Development Plan.
  34. This approach will focus the plan area on the existing residential communities established within the Sturgeon Valley, while allowing for potential residential growth in the north, east, and south of the proposed plan area. These greenfield areas, also known as Valley Core Reserve will benefit from updated policies within the EMRB Growth Plan, specifically the increase in density to a maximum of 20 dwelling units per net residential hectare. It is important to note that no changes are being proposed to existing residential communities. Infill subdivision will continue to be considered based on the minimum size requirements of a parcel within the land use district that the parcel resides. For example, the R2 – Country Estate Residential land use district which covers the majority of parcels within the plan area requires a minimum parcel size of half an acre. Therefore a one acre parcel could theoretically be split in two, subject to approval from the relevant subdivision authority and consideration of servicing capacity.
  35. Areas identified as Valley Core Reserve within the new plan area include this area to the north. These lands are to be included as they can be serviced in a fiscally responsible manner. Land immediately beyond the northern boundary include the Richfield Estates and Green Acres subdivisions – these are older country residential areas that have private servicing – this area was considered to be included, but the cost of extending servicing (including the construction of a lift station) was deemed to be prohibitive, thus resulting it its exclusion from the proposed plan area.
  36. A parcel to the east of the plan area, immediately south of Sturgeon Road East is proposed to be included. This parcel benefits from the R2 – Country Residential Estate land use district, but no subdivision plan has been approved for the site. Including this parcel within this plan area recognizes it’s current land use district – which will likely require amending at a future date to in order to comply with the density requirements of the relevant statutory plans.
  37. A final parcel to the south is also proposed to be included within the plan area. This parcel has already been subject to a Regional Evaluation Framework – or REF review. While the proposal was ultimately refused at the regional level, the reason for its refusal was that it exceeded the density requirements, which at the time established a density ceiling, as opposed to a minimum. As it also sits on the southern boundary of the proposed plan area it will also help serve as a transition between the lower densities established within the existing residential communities, and the 35 dwellings per net residential hectare contemplated by the Sturgeon Valley South – Area Structure Plan.
  38. These Valley Core Reserve parcels will remain zoned as Agriculture until such time as Outline Plans are approved and the redistricting process is complete.
  39. As with policy, very few changes are being contemplated for the planning process. Currently, developers are required to submit an Outline Plan indicating how their development will align with the Area Structure Plan (and in turn the Municipal Development Plan and Regional Growth Plan). This process will continue for those areas identified as Valley Core Reserve. Developers will still be required to provide documentation that supports the Outline Plan submission – the reports and studies shown on the slide is not an exhaustive list (as all parcels have unique site characteristics) but indicate the typical information that is required. The only small change in the process is that developer’s will be required to provide a Fiscal Impact Analysis. This is a document that will identify the ongoing maintenance and replacement costs of the infrastructure that is required to serve the development. This will help Administration budget accordingly, both from a maintenance and Capital Plan perspective.
  40. In regards to the Regional Evaluation Framework submission, the proposed amendments have been supported by those documents and focus areas shown on the slide and will form key role in the package to be reviewed by the EMRB. Developers will need to review these documents and focus areas as they prepare future Outline Plan submissions. Servicing is a key component of any future growth and while the Infrastructure Master Plan, completed in September 2019 didn’t contemplate any growth to the north, but did consider lands to the south of the proposed Plan. It also provides key information regarding existing capacity. Developer’s and their consultants should review the information of this document prior to developing their concepts. Likewise for the Traffic Impact Analysis that has been prepared by Bunt and Associates. Finally, a high-level stormwater management plan has also been prepared for the lands to the north and will be incorporated into the Sturgeon Valley Core – Area Structure Plan allowing developer’s within that area to build off the information to create more detailed stormwater management plans for their proposed developments.
  41. That concludes this portion of the presentation, and I - along with the rest of the Project Team, are available to answer any questions that Council may have in respect to the amendment of the existing Area Structure Plan. Thank you.