โ€ข Tri-dimensional surfaces
โ€ข Resist loads through their geometry
โ€ข Self supported structures
โ€ข No additional columns or frames needed
โ€ข Grid pattern replaces the shell material which enables the overall structure to
benefit from the combined action of shell and arches and thus to achieve unique
shapes.
โ€ข Same structural behavior as shells, gain their stability from their geometric shape
โ€ข Internal forces are carried by members and therefore have to follow a restricted
number of paths.
โ€ข A plain, continuous shell can resist
normal and shear forces while the
lattice shell can only resist forces in
the direction of the lath i.e. axial
forces.
โ€ข The grid was initially flat and the structure was later
raised into its doubly-curved shape.
โ€ข The forces transformed the square grids into similar
parallelograms causing the diagonal lines through
the nodes to change.
โ€ข Aesthetics required the cross-section of the laths be
50mm x 50mm.
โ€ข Increased lath size also increased the initial bending
stress.
โ€ข Engineers decided to double the laths one above the
other creating four - rather than two - layers of
wooden laths.
โ€ข Four layers of laths complicated the construction scheme
โ€ข Members needed to rotate and slide between two
parallel laths during the erection process, creating the
parallelogram cells.
โ€ข For this, a pinned connection was needed between the
middle two laths and slotted holes were needed in the
outer layers to allow for this movement
โ€ข During its erection, the grid is pushed up from
below using scaffolding towers, which induce
bending stresses in the laths.
โ€ข After the mesh is lifted into shape, the
boundaries must be fixed.
โ€ข The pins were tightened with node bolts to
retain the shape.
โ€ข Addition of blocking pieces, known as shear
blocks, between parallel laths increased the
shell's overall stiffness.
โ€ข Although the out of plane shear stiffness was
provided by bolting and shear blocks, steel cable
ties were needed to provide the diagonal
stiffness to the shell.
โ€ข Steel cables of 6mm diameter were tied and
stressed by inserting a small block of steel
between two parallel cables
Hanging chain model
โ€ข When a uniform distributed load is
applied to a suspended line, it
naturally shapes itself so as to be
free of bending moments.
โ€ข Chains remain fully in tension
โ€ข Once inverted, all the internal
forces act in compression.
โ€ข Minimized shear forces.
โ€ข The Mannheim Multihalle spans 85 meters and contains 7400 m2 of roof area,
but its shell thickness is less than half a meter.
โ€ข The ratio of the thickness of the shell to the span is approximately .00625 which
means that the structure is proportionately thinner than an eggshell!
โ€ข The completed roof structure weighs only 16 kg/m, much lesser than an average
concrete plain shell.
โ€ข The out of plane shear stiffness was provided by bolting and shear blocks while
steel cable ties provided the diagonal stiffness to the shell.
โ€ข The forces flow down to the boundary of the mesh, where the structure has a
concrete boundary.
โ€ข The laths are connected with bolts to a wooden board that is set at the correct
angle and connected to concrete blocks using steel brackets.
โ€ข The boundaries at locations where there are openings were either arches or
laminated timber beams which provide the necessary resistance to the lath force
without increasing edge thickness, which are often connected to columns.
โ€ข A simplified structural analysis was performed.
โ€ข Two forces need to be considered:
โ€ข The initial force (Pinitial) required to begin deflecting a lath,
โ€ข The subsequent force (P) required to keep the lath deflected once it is in
place, to be referred to as the "lift force."
โ€ข These two forces were determined (without considering the lath's self-weight)
using Timoshenko's elastic stability theory
P= Force needed to maintain bent shape of lath
โ€ข Since the elastic stability theory deals with a cantilevered beam, only half the arc
length of the Multihalle was considered. Therefore, l is defined in Equation 1 as:
(1)
โ€ข where L = 80m, and l = 40m. Given this value of l and angle of deflection ฮฑ of 60
degrees for the Multihalle (based on the arc length and the Multihalle's estimated
height of 20 m), the elastic stability theory allows for an estimation of the elliptic
integral B that can be used to solve for the lift force P.
โ€ข For the dimensions of the Multihalle, B = 1.686. Using B, k can be solved by
substituting Equation 3 into Equation 2:
(2)
(3)
which, when combined, yield Equation 4 to solve for the lift force P:
(4)
โ€ข The initial force Pinitial can be solved using Equation 5:
(5)
โ€ข Specificity of the construction scheme requires members to be flexible enough so
that they can deform during the construction phase.
โ€ข Materials with a large Young's Modulus, such as steel (E = 210 GPa), are stiffer
and require a greater Pinitial and P because more force is needed to bend them.
โ€ข Materials with a smaller Young's Modulus, such as wood (E~10 GPa) and
aluminum (E = 69 GPa), are more flexible and require a smaller Pinitial and P
because they bend more easily.
โ€ข The capacity of timber to bend without braking and to remain elastic makes
timber a material of choice.
โ€ข It is important to note the significant increase in initial force, Pinitial, that occurs if
the shear blocks are introduced before erection, due to increased moment of
inertia.
โ€ข For wood, for example, the initial force increases from 0.04 kN to 0.92 kN if the
shear blocks are placed prior to erection, which is a significant difference.
โ€ข These values confirm the ingenuity of the erection process used to construct the
Mannheim Pavilion, since the process reduced the overall lift force required
without sacrificing the shell's final stiffness.
โ€ข Once these forces were determined, the stresses experienced by the shell were
calculated under four different load cases:
โ€ข The lift force required to erect the shell lattice
โ€ข The self-weight of the lattice
โ€ข The design snow load
โ€ข The design wind load
โ€ข For the first and second load cases: (6)
where Ia is the moment of inertia of a single lath, since these load cases are resisted by individual
laths before they become connected via shear blocks, and ya is equal to 0.25m (perpendicular
distance from the edge of a lath to its neutral axis).
โ€ข The equation used to calculate the stress of the laths in the third and fourth load
cases is the following:
(7)
where Ib is the moment of inertia of two connected laths, joined by a shear block, since these load
cases are resisted by the shell as a whole once the shear blocks are in place, and yb is equal to 0.75m
(perpendicular distance from the edge of a lath to the neutral axis of the combined laths and shear
block).The area is twice as large in this instance because the stress is shared by two laths that are now
connected.
โ€ข Considering that the compressive strength of hemlock is 46.7 MPa, the maximum
stresses created by the design loads (~25 MPa) is less than what this type of
wood can resist.
โ€ข The cost of the multipurpose hall was relatively low compared to other typical
building projects at the time.
โ€ข The Mannheim Pavilion is impressive not only for its unique construction process,
but also for its design durability despite the technological limits of the time in
which it was envisaged and realized.
โ€ข The Mannheim Multihalle is a physical proof that little more than simple math
and a detailed model could be used to create a structure with both organic
materials and form.
โ€ข The design of grid shells structures both in the form finding process and in the
prediction behavior of the building under operation appears to be a complex
process.
โ€ข Contrary to other more common structural systems no design guide lines exist
and no tools have been developed specially for their study until now and the
engineers have resorted to techniques such as chain form finding test their
designs.
โ€ข The fact is, that the lack of expertise in this field is a hindrance to the further
development of grid shells.
Understanding Gridshell Structures - Mannheim Multihalle Case Study

More Related Content

What's hot

VAULT CONSTRUCTION
VAULT CONSTRUCTIONVAULT CONSTRUCTION
VAULT CONSTRUCTION
Aida Nesa
ย 

What's hot (20)

Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
ย 
Long span structure
Long span structureLong span structure
Long span structure
ย 
The cable in building structures
The cable in building structuresThe cable in building structures
The cable in building structures
ย 
Mannheim, Grid-Shell long span structure, Frei Otto
Mannheim, Grid-Shell long span structure, Frei OttoMannheim, Grid-Shell long span structure, Frei Otto
Mannheim, Grid-Shell long span structure, Frei Otto
ย 
LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures
 LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures
LIGHTWEIGHT CONSTRUCTIONS-'MEMBRANES' in Light wight and Membrane structures
ย 
Shell structures- advanced building construction
Shell structures- advanced building constructionShell structures- advanced building construction
Shell structures- advanced building construction
ย 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural System
ย 
Space frames!
Space frames!Space frames!
Space frames!
ย 
Form Active system
Form Active systemForm Active system
Form Active system
ย 
SURFACE ACTIVE STRUCTURES(structure systems)
SURFACE ACTIVE STRUCTURES(structure systems)SURFACE ACTIVE STRUCTURES(structure systems)
SURFACE ACTIVE STRUCTURES(structure systems)
ย 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures
ย 
Folded plates and space truss structures
Folded plates and space truss  structuresFolded plates and space truss  structures
Folded plates and space truss structures
ย 
Tensile
TensileTensile
Tensile
ย 
VAULT CONSTRUCTION
VAULT CONSTRUCTIONVAULT CONSTRUCTION
VAULT CONSTRUCTION
ย 
FOLDED PLATES AND SHELL STRUCTURES
FOLDED PLATES AND SHELL STRUCTURES FOLDED PLATES AND SHELL STRUCTURES
FOLDED PLATES AND SHELL STRUCTURES
ย 
Space frame
Space frameSpace frame
Space frame
ย 
Vector Structure System
Vector Structure SystemVector Structure System
Vector Structure System
ย 
Large span structures
Large span structuresLarge span structures
Large span structures
ย 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
ย 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
ย 

Viewers also liked

STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMESTUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
Haya Haroon
ย 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
eileen_0692
ย 
Stucture large span area
Stucture large span areaStucture large span area
Stucture large span area
Abhishek Mewada
ย 
Millennium dome %28 pp%29
Millennium dome %28 pp%29Millennium dome %28 pp%29
Millennium dome %28 pp%29
carodriguez21
ย 
Tensile Fabric Structures
Tensile Fabric StructuresTensile Fabric Structures
Tensile Fabric Structures
Richard Luxenburg
ย 

Viewers also liked (20)

STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMESTUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
ย 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
ย 
Stucture large span area
Stucture large span areaStucture large span area
Stucture large span area
ย 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
ย 
TENSEGRITY - Smart Structures - G@T
TENSEGRITY - Smart Structures -  G@TTENSEGRITY - Smart Structures -  G@T
TENSEGRITY - Smart Structures - G@T
ย 
Steel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edSteel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_ed
ย 
Structure as Architecture
Structure as ArchitectureStructure as Architecture
Structure as Architecture
ย 
Millennium dome %28 pp%29
Millennium dome %28 pp%29Millennium dome %28 pp%29
Millennium dome %28 pp%29
ย 
TENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINARTENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINAR
ย 
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric visionBase Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
ย 
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvelBRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
ย 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013
ย 
Tensile Fabric Structures
Tensile Fabric StructuresTensile Fabric Structures
Tensile Fabric Structures
ย 
Spanning Space, Horizontal-span Building Structures, Wolfgang Schueller
Spanning Space, Horizontal-span Building Structures, Wolfgang SchuellerSpanning Space, Horizontal-span Building Structures, Wolfgang Schueller
Spanning Space, Horizontal-span Building Structures, Wolfgang Schueller
ย 
Tensile structures
Tensile structuresTensile structures
Tensile structures
ย 
Roof
RoofRoof
Roof
ย 
Long span cable
Long span cableLong span cable
Long span cable
ย 
Long span structures
Long span structures  Long span structures
Long span structures
ย 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadium
ย 
Roof
RoofRoof
Roof
ย 

Similar to Understanding Gridshell Structures - Mannheim Multihalle Case Study

Diagrid structural system
Diagrid structural systemDiagrid structural system
Diagrid structural system
vivek bhathee
ย 
TUBE-STRUCTURES.ppt
TUBE-STRUCTURES.pptTUBE-STRUCTURES.ppt
TUBE-STRUCTURES.ppt
aliakmal13
ย 

Similar to Understanding Gridshell Structures - Mannheim Multihalle Case Study (20)

Overvew column analysis
Overvew column analysisOvervew column analysis
Overvew column analysis
ย 
Tube structures and its type with comparison .
Tube structures and its type with comparison .Tube structures and its type with comparison .
Tube structures and its type with comparison .
ย 
Industrial building
Industrial buildingIndustrial building
Industrial building
ย 
Waffle slab
Waffle slabWaffle slab
Waffle slab
ย 
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE  CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
CHALLENGES OF AN ICONIC PEDESTRIAN BRIDGE
ย 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 report
ย 
Multi storey frames
Multi storey framesMulti storey frames
Multi storey frames
ย 
COMPOSITE BEAMS.pdf
COMPOSITE BEAMS.pdfCOMPOSITE BEAMS.pdf
COMPOSITE BEAMS.pdf
ย 
Space frames-modular construction technology
Space frames-modular construction technologySpace frames-modular construction technology
Space frames-modular construction technology
ย 
Building Construciton techniques - Grid shells
Building Construciton techniques -  Grid shellsBuilding Construciton techniques -  Grid shells
Building Construciton techniques - Grid shells
ย 
civil RCC.pdf
civil RCC.pdfcivil RCC.pdf
civil RCC.pdf
ย 
Beams and columns
Beams and columns Beams and columns
Beams and columns
ย 
STRUCTURAL-BEHAVIOUS-OF-HIGH-STRENGTH-CONCRETE.pptx
STRUCTURAL-BEHAVIOUS-OF-HIGH-STRENGTH-CONCRETE.pptxSTRUCTURAL-BEHAVIOUS-OF-HIGH-STRENGTH-CONCRETE.pptx
STRUCTURAL-BEHAVIOUS-OF-HIGH-STRENGTH-CONCRETE.pptx
ย 
Diagrid structural system
Diagrid structural systemDiagrid structural system
Diagrid structural system
ย 
Pile cap analysis and design.pdf
Pile cap analysis and design.pdfPile cap analysis and design.pdf
Pile cap analysis and design.pdf
ย 
BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
ย 
Tube structures
 Tube structures  Tube structures
Tube structures
ย 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
ย 
TUBE-STRUCTURES.ppt
TUBE-STRUCTURES.pptTUBE-STRUCTURES.ppt
TUBE-STRUCTURES.ppt
ย 
retrofitting
retrofittingretrofitting
retrofitting
ย 

Recently uploaded

Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
tbatkhuu1
ย 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
University of Wisconsin-Milwaukee
ย 
CALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service ๐Ÿงต
CALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service  ๐ŸงตCALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service  ๐Ÿงต
CALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service ๐Ÿงต
anilsa9823
ย 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
home
ย 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
suhanimunjal27
ย 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
tbatkhuu1
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)
Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)
Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)
amitlee9823
ย 

Recently uploaded (20)

Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
ย 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
ย 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
ย 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
ย 
call girls in Kaushambi (Ghaziabad) ๐Ÿ” >เผ’8448380779 ๐Ÿ” genuine Escort Service ๐Ÿ”...
call girls in Kaushambi (Ghaziabad) ๐Ÿ” >เผ’8448380779 ๐Ÿ” genuine Escort Service ๐Ÿ”...call girls in Kaushambi (Ghaziabad) ๐Ÿ” >เผ’8448380779 ๐Ÿ” genuine Escort Service ๐Ÿ”...
call girls in Kaushambi (Ghaziabad) ๐Ÿ” >เผ’8448380779 ๐Ÿ” genuine Escort Service ๐Ÿ”...
ย 
CALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service ๐Ÿงต
CALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service  ๐ŸงตCALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service  ๐Ÿงต
CALL ON โžฅ8923113531 ๐Ÿ”Call Girls Kalyanpur Lucknow best Female service ๐Ÿงต
ย 
Call Girls Service Mukherjee Nagar @9999965857 Delhi ๐Ÿซฆ No Advance VVIP ๐ŸŽ SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi ๐Ÿซฆ No Advance  VVIP ๐ŸŽ SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi ๐Ÿซฆ No Advance  VVIP ๐ŸŽ SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi ๐Ÿซฆ No Advance VVIP ๐ŸŽ SER...
ย 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
ย 
Pastel Portfolio _ by Slidesgo.pptx. Xxx
Pastel Portfolio _ by Slidesgo.pptx. XxxPastel Portfolio _ by Slidesgo.pptx. Xxx
Pastel Portfolio _ by Slidesgo.pptx. Xxx
ย 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
ย 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
ย 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
ย 
Top Rated Pune Call Girls Saswad โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
ย 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
ย 
Top Rated Pune Call Girls Koregaon Park โŸŸ 6297143586 โŸŸ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park โŸŸ 6297143586 โŸŸ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park โŸŸ 6297143586 โŸŸ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park โŸŸ 6297143586 โŸŸ Call Me For Genuine S...
ย 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)
Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)
Escorts Service Basapura โ˜Ž 7737669865โ˜Ž Book Your One night Stand (Bangalore)
ย 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
ย 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
ย 

Understanding Gridshell Structures - Mannheim Multihalle Case Study

  • 1.
  • 2. โ€ข Tri-dimensional surfaces โ€ข Resist loads through their geometry โ€ข Self supported structures โ€ข No additional columns or frames needed
  • 3. โ€ข Grid pattern replaces the shell material which enables the overall structure to benefit from the combined action of shell and arches and thus to achieve unique shapes. โ€ข Same structural behavior as shells, gain their stability from their geometric shape โ€ข Internal forces are carried by members and therefore have to follow a restricted number of paths. โ€ข A plain, continuous shell can resist normal and shear forces while the lattice shell can only resist forces in the direction of the lath i.e. axial forces.
  • 4.
  • 5.
  • 6. โ€ข The grid was initially flat and the structure was later raised into its doubly-curved shape. โ€ข The forces transformed the square grids into similar parallelograms causing the diagonal lines through the nodes to change.
  • 7.
  • 8. โ€ข Aesthetics required the cross-section of the laths be 50mm x 50mm. โ€ข Increased lath size also increased the initial bending stress. โ€ข Engineers decided to double the laths one above the other creating four - rather than two - layers of wooden laths.
  • 9. โ€ข Four layers of laths complicated the construction scheme โ€ข Members needed to rotate and slide between two parallel laths during the erection process, creating the parallelogram cells. โ€ข For this, a pinned connection was needed between the middle two laths and slotted holes were needed in the outer layers to allow for this movement
  • 10.
  • 11. โ€ข During its erection, the grid is pushed up from below using scaffolding towers, which induce bending stresses in the laths. โ€ข After the mesh is lifted into shape, the boundaries must be fixed. โ€ข The pins were tightened with node bolts to retain the shape.
  • 12.
  • 13. โ€ข Addition of blocking pieces, known as shear blocks, between parallel laths increased the shell's overall stiffness. โ€ข Although the out of plane shear stiffness was provided by bolting and shear blocks, steel cable ties were needed to provide the diagonal stiffness to the shell. โ€ข Steel cables of 6mm diameter were tied and stressed by inserting a small block of steel between two parallel cables
  • 14.
  • 15.
  • 16. Hanging chain model โ€ข When a uniform distributed load is applied to a suspended line, it naturally shapes itself so as to be free of bending moments. โ€ข Chains remain fully in tension โ€ข Once inverted, all the internal forces act in compression. โ€ข Minimized shear forces.
  • 17.
  • 18. โ€ข The Mannheim Multihalle spans 85 meters and contains 7400 m2 of roof area, but its shell thickness is less than half a meter. โ€ข The ratio of the thickness of the shell to the span is approximately .00625 which means that the structure is proportionately thinner than an eggshell! โ€ข The completed roof structure weighs only 16 kg/m, much lesser than an average concrete plain shell.
  • 19. โ€ข The out of plane shear stiffness was provided by bolting and shear blocks while steel cable ties provided the diagonal stiffness to the shell. โ€ข The forces flow down to the boundary of the mesh, where the structure has a concrete boundary. โ€ข The laths are connected with bolts to a wooden board that is set at the correct angle and connected to concrete blocks using steel brackets. โ€ข The boundaries at locations where there are openings were either arches or laminated timber beams which provide the necessary resistance to the lath force without increasing edge thickness, which are often connected to columns.
  • 20. โ€ข A simplified structural analysis was performed. โ€ข Two forces need to be considered: โ€ข The initial force (Pinitial) required to begin deflecting a lath, โ€ข The subsequent force (P) required to keep the lath deflected once it is in place, to be referred to as the "lift force." โ€ข These two forces were determined (without considering the lath's self-weight) using Timoshenko's elastic stability theory P= Force needed to maintain bent shape of lath
  • 21. โ€ข Since the elastic stability theory deals with a cantilevered beam, only half the arc length of the Multihalle was considered. Therefore, l is defined in Equation 1 as: (1) โ€ข where L = 80m, and l = 40m. Given this value of l and angle of deflection ฮฑ of 60 degrees for the Multihalle (based on the arc length and the Multihalle's estimated height of 20 m), the elastic stability theory allows for an estimation of the elliptic integral B that can be used to solve for the lift force P.
  • 22. โ€ข For the dimensions of the Multihalle, B = 1.686. Using B, k can be solved by substituting Equation 3 into Equation 2: (2) (3) which, when combined, yield Equation 4 to solve for the lift force P: (4) โ€ข The initial force Pinitial can be solved using Equation 5: (5)
  • 23. โ€ข Specificity of the construction scheme requires members to be flexible enough so that they can deform during the construction phase. โ€ข Materials with a large Young's Modulus, such as steel (E = 210 GPa), are stiffer and require a greater Pinitial and P because more force is needed to bend them. โ€ข Materials with a smaller Young's Modulus, such as wood (E~10 GPa) and aluminum (E = 69 GPa), are more flexible and require a smaller Pinitial and P because they bend more easily. โ€ข The capacity of timber to bend without braking and to remain elastic makes timber a material of choice.
  • 24. โ€ข It is important to note the significant increase in initial force, Pinitial, that occurs if the shear blocks are introduced before erection, due to increased moment of inertia. โ€ข For wood, for example, the initial force increases from 0.04 kN to 0.92 kN if the shear blocks are placed prior to erection, which is a significant difference. โ€ข These values confirm the ingenuity of the erection process used to construct the Mannheim Pavilion, since the process reduced the overall lift force required without sacrificing the shell's final stiffness.
  • 25. โ€ข Once these forces were determined, the stresses experienced by the shell were calculated under four different load cases: โ€ข The lift force required to erect the shell lattice โ€ข The self-weight of the lattice โ€ข The design snow load โ€ข The design wind load โ€ข For the first and second load cases: (6) where Ia is the moment of inertia of a single lath, since these load cases are resisted by individual laths before they become connected via shear blocks, and ya is equal to 0.25m (perpendicular distance from the edge of a lath to its neutral axis).
  • 26. โ€ข The equation used to calculate the stress of the laths in the third and fourth load cases is the following: (7) where Ib is the moment of inertia of two connected laths, joined by a shear block, since these load cases are resisted by the shell as a whole once the shear blocks are in place, and yb is equal to 0.75m (perpendicular distance from the edge of a lath to the neutral axis of the combined laths and shear block).The area is twice as large in this instance because the stress is shared by two laths that are now connected.
  • 27.
  • 28. โ€ข Considering that the compressive strength of hemlock is 46.7 MPa, the maximum stresses created by the design loads (~25 MPa) is less than what this type of wood can resist. โ€ข The cost of the multipurpose hall was relatively low compared to other typical building projects at the time. โ€ข The Mannheim Pavilion is impressive not only for its unique construction process, but also for its design durability despite the technological limits of the time in which it was envisaged and realized. โ€ข The Mannheim Multihalle is a physical proof that little more than simple math and a detailed model could be used to create a structure with both organic materials and form.
  • 29. โ€ข The design of grid shells structures both in the form finding process and in the prediction behavior of the building under operation appears to be a complex process. โ€ข Contrary to other more common structural systems no design guide lines exist and no tools have been developed specially for their study until now and the engineers have resorted to techniques such as chain form finding test their designs. โ€ข The fact is, that the lack of expertise in this field is a hindrance to the further development of grid shells.