2. Transbay Transition: Temporary Terminal Opening Signage TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 2
Canopy Sign
Fence Sign
3. Transbay Transition: Temporary Terminal Opening Signage
Canopy and Fence Signage
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 3
Signage Facing Howard Street
Facing Howard St.
4. Transbay Transition: Temporary Terminal Opening Signage
Fence Signage
TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 4
Signage Facing Folsom Street
Facing Folsom St.
6. Transbay Transition: Wayfinding Signage TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 6
Sidewalk Decal
WE’RE MAKING THE MOVE
巴士總站遷址
NOS ESTAMOS MUDANDO
to the 臨時巴士總站 a la
Temporary Terminal terminal temporal
LOCATED AT HOWARD AND MAIN
位於HOWARD夾MAIN街 LOCALIZADA EN LAS CALLES
STREETS: STARTING 啟用時間 HOWARD Y MAIN: EMPEZANDO EL
AUGUST 7, 2010 2010年8月7日 7 DE AGOSTO, 2010
®
For more information, visit | 詳情請瀏覽網頁
Para más información, visite
temporaryterminal.org
Metal Street Sign Bus Card
7. Transbay Transit Center: Visionary Banners TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 7
Opening 2017 Opening 2017
Transbay Transit Center Transbay Transit Center
www.transbaycenter.org www.transbaycenter.org
Fremont Street 1st Street
8. Transbay Terminal: Historical Tours TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 8
v
INAL
TRANSBAY Terminal
TRANSBAY TE RMURS
TO
CALL FOR MEMORIES
HISTORIC AL
PAUL
BAY T L T MINAL
TRANSORICAE ROURS
H IS T
anice
Do you have a memory of the
J Transbay Terminal that you
would like to share?
TRANSBACAL RMURS L
Y TE INA
TO
H IS TO RI The TJPA is collecting positive memories about the
Transbay Terminal and its place in San Francisco’s
Frank Smith
history. Please share your memories by emailing
memories@transbaycenter.org. Memories will be
posted on our website in the coming weeks.
E-Blast Invitation Event Handout
Tour Group Name Badges
10. Transbay Terminal: Historical Tours TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 10
Cuddles Bar Transbay Diner
Transbay Jail Transbay Pursuit of Happyness Benches
11. Transbay Transit Center: Groundbreaking Ceremony TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 11
RAY LAHOOD MILLER
SECRETARY OF TRAN
SPORTATION GEORGESMAN
S
CONGRE
A BOXER
BARBAR ATES SENATOR
T
UNITED S
NANCY PELOSI
SPEAKER OF THE HOUSE
WSOM
GAVIN NE Y OF SAN FRANCISC
O
IT
MAYOR, C
Speaker Name Badges
12. Transbay Terminal: Demolition Public Outreach TRANSBAY TRANSIT CENTER PUBLIC OUTREACH—Summer 2010 | 12
Transbay Transit Center
Demolition Update
10 DAY LOOK AHEAD: Transbay Demolition and Construction Activities
Friday, October 8, 2010 – Monday, October 18, 2010
THIS WEEK AT TRANSBAY...
WEEKEND WORK: This Saturday, October 9, 2010, sidewalk paving will occur on the south side of Howard Street, between Main and Beale
Streets, as well as on the east side of Beale Street between Howard and Mission Streets. These sidewalks will be closed for repair and
restoration work. Abatement of the Terminal will continue through the weekend in order to prepare for the removal of the roof later this month.
This work will occur from 7:00 AM until 3:30 PM.
The Temporary Terminal contractor, McGuire and Hester, will be repairing the sidewalk on the west side of Main Street between Mission and
Howard Streets. This sidewalk will be closed during this activity. Trenching and utility installation work will also occur in the Temporary Terminal
phase II site between 7:00 AM until 3:30 PM.
WEEKDAY WORK: Weekday work for the demolition project between Monday, October 11, 2010, and Friday, October 15, 2010, will focus on the
completion of preparations for the demolition of the roof and upper deck of the Transbay Terminal building. Demolition of the East Terminal roof
and upper deck will follow.
Weekday work at the Temporary Terminal between Monday, October 11, 2010, and Friday, October 15, 2010, will focus on trenching and grading
activities, as well as foundation work. Delivery of remaining site palm trees is also expected.
HOURS OF WORK: The contractors will be working between the hours of 7:00 AM and 11:00 PM Monday-Friday. Weekend work may be
conducted 24-hours a day with a moratorium on jack hammering and other excessive noise producing activities between the hours of 11:00 PM
and 6:00 AM.
STREET AND SIDEWALK CLOSURE: This weekend, sidewalks on the west side of Main Street between Howard and Mission Streets, the east side
of Beale Street between Howard and Mission Streets, and the south side of Howard Street between Main and Beale Streets will be closed for
repair and restoration work. Due to significant progress made in the past few weeks, there will be no full street closures this weekend.
WHAT TO EXPECT NEXT WEEKEND (10/15 – 10/17): The demolition contractor will continue work on the demolition of the existing Terminal East
of Fremont Street. Due to the upcoming demolition of the Fremont Street Crossing, the Fremont Street sidewalk may be closed beginning Friday,
October 15, 2010 until November 15, 2010.
Weekend work may be conducted 24 hours a day with a moratorium on jack hammering and other excessive noise producing activities between
the hours of 11:00 PM and 6:00 AM.
COMMUNITY MEETINGS: Please join us for our upcoming community meetings on Wednesday, October 20, 2010. The first community meeting
will be held from 12:00 noon until 1:00 PM. The second community meeting will be held from 6:00 PM until 7:00 PM. Both meetings will feature
the same content and will be held at the TJPA’s offices located at 201 Mission Street, Suite 2100.
NOTICE: The demolition of Terminal is expected to begin on Saturday, October 16, 2010. In order to safely bring down the facility, the demolition
contractor will be working, at a minimum, double shifts. It is highly likely that weekend and weekday 24 hour work will need to occur between
October 16th and November 15th. The TJPA has instructed its demolition contractors to make every effort to minimize the impact to the
community and to progress through this phase of work as quickly as possible. However, due to the nature of this portion of demolition, safety
will require 24 hour work to be conducted regularly over the 30 day span. It may also require periodic lifting of the moratorium.
Should you have any general questions about the Transbay Transit Center Project, please call Courtney Lodato or Adam Alberti, Transbay
Outreach Team, at: (415) 227-9700 or via e-mail at: info@transbaycenter.org.
If you have any urgent questions regarding site-specific demolition activities, please call our construction activity number: (415) 409-TJPA (8572).
Please continue to check our website for the most up to date schedule of activities at www.transbaycenter.org/demolition
Learn more at:
www.transbaycenter.org
Downloadable PDF