Discuss the suitability of the traditional procurement bid route.docx
1. FMT203: Discuss the suitability of the traditional procurement (design bid
build) route
An experienced business owner with a proven track record in pharmaceutical
manufacturing intends to build a building to expand his research and development
activities in Singapore. The proposed building project will be technically complex and
equipped with sophisticated features that need to be incorporated into the design and
construction of the new building. The owner wants to retain control over the design of the
new building and has two other similar buildings to the new building’s design.