SlideShare une entreprise Scribd logo
1  sur  6
Education
Personal Information
Current Job
Name: - Yasser Ahmed abd alaziz maklad
Address: - Omar shaheen- badr- elbehra
Nationality Status: - Egyptian
Material Status: - married 2 child
Date of birth: 17/12/1974
Military Status: - Completed
Driving License: - Valid (GCC)
Telephone / Mobile: -0096565659428
E-mail: - yasser_maklad2006@yahoo.com
B.Sc. electrical Power engineering Helwan University July 2001
B.Sc. Graduation project: -
Improving power factor in factories by adding suitable capacitors with the aiding of
(PLC system-microprocessor z 8086 system)
Job Title: -Lead electrical engineer
COMPANY: - KHARAFI NATIONAL (STATE OF KUWAIT)
From 17/2/2010 till now
Job description: -
responsible for co-ordinating all activities to ensure that the project
meets its obligations to startup first time on time and on budget with
an admiral HSE record, and to interface with the project
management team to ensure that all areas of the project contribute
to these goals.
Concerned activities
Previous Job
1- Receive Project documentation and understands Scope of Work related to
discipline what is required.
2- Lead a team to undertake commissioning activities in project.
3- Interfaces with other disciplines to ensure integration of activities.
4- Implement & test the subsystems as per project commissioning test
sheets.
5- Preparation of method statements, procedures and routines where
required.
6- Interface towards Pre-commissioning and Company personnel.
7- Reports on work progress, bringing to notice potential problems or
delays and recommends solutions.
8- Assist during the database preparation for pre-commissioning status
index and commissioning technical database.
9- Plan, Monitor and assist in Vendor activities as required.
10- Ensure temporary supplies and commissioning spares are adequate for
the subsystem testing.
11- Perform inter-discipline checks.
12- Compliance in accordance with HSE Standard
13- Preparation of Commissioning scope of work and answer bidder
technical queries.
IN KUWAIT
A - SABIYA POWER STATION – KUWAIT
GE & HYUNDAI HEVEAY IDUSTRIES (HHI)
COMBINED CYCLE (3X750) MW- CCGT
FROM 2010 TO 2013
b- AAZOUR POWER STATION – KUWAIT
ALGHANEM INTENATIONAL (AGI)
STEAM UNIT (360) MW- CONVERSION FROM SIMPLE TO
COMBINED CYCLE.
FROM 2013 TO 2014
c- SABIYA POWER STATION – KUWAIT
ALGHANEM INTENATIONAL (AGI)
SIMPLE CYCLE GAS TURBINE (2X250) MW
FROM 2014 TILL 2016
d- SABIYA POWER STATION – KUWAIT
ALGHANEM INTENATIONAL (AGI)
SIMPLE CYCLE GAS TURBINE (2X250) MW
FROM 2016 under Commissioning
COMPANY: - Middle Delta Electricity Production Company (MDEPC)
NUBARIA POWER STATION І & П (2 × 750 MW), EGYPT
From 12/4/2004 to 17/2/2010.
Job description: -
A- receiving electrical materials from vendors making material receiving
report (MRR) for all materials in the site
B- pre-commissioning and field inspection for all electrical equipment in the
site ( tests)
C- Commissioning and start up for all electrical equipment in the site
SIEMENS Gas Turbine (SIEMENS V94-3A) 250 MW
Precommissioning and commissioning for
- Starting frequency converter ( SFC )
- Static excitation equipment ( SEE )
- Generator with air cooling (Insulation resistance...etc)
- Generator circuit breaker ( ABB type HECS)
- 6.3/0.4 kV dry transformer and 0.4 kV bus bars
ZTR Ukrainian Company -Commissioning by Conisys-Shaker Group.
- High voltage transformers 500/220 kv tie transformers (visual check, insulation
resistance, no load loss and current, oil temp, oltc checking, primary to earth,
winding temp...etc)
- High voltage transformers 16.5/500 kv main transformers for Siemens gas turbine
- High voltage transformers 15/500 kv main transformers for Mitsubishi steam turbine
-Medium voltage transformers 16.5/6.3 kv auxiliary transformers
Consortium of Japan AE power system/Sumitomo Corporation/Conisys
- Site test on 550 kv gas (sf6) circuit breaker (anti pumping, switching...etc)
- Site test on current transformers and voltage transformers (turns ratio, saturation...)
- Site test on 220 kv gas (sf6) circuit breaker (anti pumping, switching...etc)
- Site test on current transformers and voltage transformers (turns ratio, saturation...)
- Surge arrestor and wave trap tests
- Switchgear and manual control tests
INITEC energia Spain
precommissioning and commissioning for all medium and low
Voltage (SCHNIDER EQUIEPMENT) (Insulation resistance...etc)
- Medium voltage 6.3 kv switchgear with 4 incoming
- 6.3/0.4 kV dry transformers
- All medium and low voltage breakers
- 400 v bus bars MCC motors control center
- Insulation resistance test for all types of cables and bus ducts with high dc voltage
(meggring test)
- Testing for motors (rotation direction, earthling, winding...etc)
INITEC energia Spain and Global Partner Company Egypt
- All tests and Commissioning for U.P.S and DC system including
- Battery tests (charging and discharging, cell voltage, capacity...etc)
- Battery charger and inverter tests
COMPANY: - AL Ezz Ceramics & Porcelain Co (GEMMA)
Job description: -
Maintenance of all electrical equipment including
Training courses
-1 mega transformer (11kv /400 v (electrical and protection)
- All electrical panels (power & control)-
- All production lines (ac motors, stepper motors and servo motors) -
From 1/8/2001 to 1/3/2004 El Sadat city – al mnofia governorate
1- FIRE AND FIGHTING SYSTEM (CHEMTROL PROYECTOS SISTEMAS.
S.L.C, MADRID - SPAIN)
Operation and maintenance for fire and fighting system
Location: - NUBARIA POWER STATION, EGYPT
From June 11, 2006 – June 22, 2006.
2- Pumps (INITEC Energia, KSB, ITALY)
Operation for feed boiler pumps, condensate pumps, closed cooling pumps, service
pumps and circulating pumps
Location: - NUBARIA POWER STATION, EGYPT
From June 1, 2006 – June 10, 2006
3- ALSTOM HRSG Operator (ALSTOM Power Inc. , USA )
160 Hours HRSG Operator training program.
Location: - Surabaya, Indonesia
From September 9, 2005 – October 3,2005
4- PACIS SYSTEM (AREVA, LATTES, FRANCE)
Operator training program to PACIS system to operate switch yard
Location: - NUBARIA POWER STATION, EGYPT
From September 3, 2005 – September 7, 2005
5- Continuous Emission Monitoring System Training (Altech Environment
USA) analysis of exhaust gases of gas turbine.
Location: - NUBARIA POWER STATION, EGYPT.
From May 29, 2005 --June 1,2005.
6- Basic Operation Training of Gas Turbine (SIEMENS V94.3A)
Introduction to the plant, Mechanical, Electrical and I&C the parts of gas turbine
Location: - NUBARIA POWER STATION, EGYPT.
From April 10, 2005 --April 25, 2005.
7- Operation and maintenance of combined cycle stations
70 Hour GAS TURBINE operator training program (JE.MS 5001, FRAME 5,
USA)
70 Hour HRSG operator training program (NM, HOLNDA)
70 Hour STEAM TURBINE operator training program (HITACHI, JAPAN)
Location: - DAMANHOUR POWER STATION, EGYPT.
From November 20, 2004-- December 9, 2004.
8- Operation and maintenance of gas turbine stations
Others
96 Hour GAS TURBINE operation and maintenance training program (JE.MS
5001, FRAME 5, USA and SIEMENS V94-3A)
Location: - ABI OUEER POWER STATION, EGYPT.
From December 17, 2005-- December 31, 2006.
Years of Experience: -15 Years.
Language: - English fluent (written, spoken)
Computer skills: - DCS OPERATION SYSTEM ( alstom)
Ms-Office: Word, Excel, Access, and Power Point, Internet.
Programming: - FORTRAN 77, Assembly Language.
Personal skills: - energetic, self-motive, good communication skills
Availability job requested
Availability: I am able to start work after 4 weeks from announcement
As: Full Time
Rank : Any
I can work in: Egypt - Arab Countries - Foreign Countries
CV last update: October 2016
Others
96 Hour GAS TURBINE operation and maintenance training program (JE.MS
5001, FRAME 5, USA and SIEMENS V94-3A)
Location: - ABI OUEER POWER STATION, EGYPT.
From December 17, 2005-- December 31, 2006.
Years of Experience: -15 Years.
Language: - English fluent (written, spoken)
Computer skills: - DCS OPERATION SYSTEM ( alstom)
Ms-Office: Word, Excel, Access, and Power Point, Internet.
Programming: - FORTRAN 77, Assembly Language.
Personal skills: - energetic, self-motive, good communication skills
Availability job requested
Availability: I am able to start work after 4 weeks from announcement
As: Full Time
Rank : Any
I can work in: Egypt - Arab Countries - Foreign Countries
CV last update: October 2016

Contenu connexe

Tendances (16)

Mohamed Azzouz C.V
Mohamed  Azzouz C.VMohamed  Azzouz C.V
Mohamed Azzouz C.V
 
Yasser Elghoul C.V
Yasser Elghoul C.VYasser Elghoul C.V
Yasser Elghoul C.V
 
Selva updated resume
Selva updated resumeSelva updated resume
Selva updated resume
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
 
Ahmad Ismail Resume jan2015
Ahmad Ismail Resume jan2015Ahmad Ismail Resume jan2015
Ahmad Ismail Resume jan2015
 
Mohamed A.Razaq
Mohamed A.RazaqMohamed A.Razaq
Mohamed A.Razaq
 
SAMER ALI CV
SAMER ALI CVSAMER ALI CV
SAMER ALI CV
 
yogesh Barvadiya (3)
yogesh Barvadiya (3)yogesh Barvadiya (3)
yogesh Barvadiya (3)
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
 
Allan Borja CV
Allan Borja CVAllan Borja CV
Allan Borja CV
 
khaled cv
khaled cvkhaled cv
khaled cv
 
M.Atif's CV
M.Atif's CVM.Atif's CV
M.Atif's CV
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
 
Sharad lodhi
Sharad lodhiSharad lodhi
Sharad lodhi
 

Similaire à lead electrical commissioning engineer

Similaire à lead electrical commissioning engineer (20)

Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
 
Alaa cv update
Alaa cv updateAlaa cv update
Alaa cv update
 
CV electrician
CV electricianCV electrician
CV electrician
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
Abdou fattouh cv
Abdou fattouh cvAbdou fattouh cv
Abdou fattouh cv
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Moh cv
Moh cvMoh cv
Moh cv
 
Hamdy cv
Hamdy cvHamdy cv
Hamdy cv
 
c.v
c.vc.v
c.v
 
Osama Fouad (Update)
Osama Fouad (Update)Osama Fouad (Update)
Osama Fouad (Update)
 
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
 
CV karim convert[1] (2)
CV karim convert[1] (2)CV karim convert[1] (2)
CV karim convert[1] (2)
 
ENG RABEI CV
ENG RABEI CVENG RABEI CV
ENG RABEI CV
 
LAST up date for cv mohamed elsabagh.
LAST up date for cv mohamed elsabagh.LAST up date for cv mohamed elsabagh.
LAST up date for cv mohamed elsabagh.
 
LAST up date for cv mohamed elsabagh.
LAST up date for cv mohamed elsabagh.LAST up date for cv mohamed elsabagh.
LAST up date for cv mohamed elsabagh.
 
C.v gaber a. elrazek
C.v   gaber a. elrazekC.v   gaber a. elrazek
C.v gaber a. elrazek
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 

lead electrical commissioning engineer

  • 1. Education Personal Information Current Job Name: - Yasser Ahmed abd alaziz maklad Address: - Omar shaheen- badr- elbehra Nationality Status: - Egyptian Material Status: - married 2 child Date of birth: 17/12/1974 Military Status: - Completed Driving License: - Valid (GCC) Telephone / Mobile: -0096565659428 E-mail: - yasser_maklad2006@yahoo.com B.Sc. electrical Power engineering Helwan University July 2001 B.Sc. Graduation project: - Improving power factor in factories by adding suitable capacitors with the aiding of (PLC system-microprocessor z 8086 system) Job Title: -Lead electrical engineer COMPANY: - KHARAFI NATIONAL (STATE OF KUWAIT) From 17/2/2010 till now Job description: - responsible for co-ordinating all activities to ensure that the project meets its obligations to startup first time on time and on budget with an admiral HSE record, and to interface with the project management team to ensure that all areas of the project contribute to these goals. Concerned activities
  • 2. Previous Job 1- Receive Project documentation and understands Scope of Work related to discipline what is required. 2- Lead a team to undertake commissioning activities in project. 3- Interfaces with other disciplines to ensure integration of activities. 4- Implement & test the subsystems as per project commissioning test sheets. 5- Preparation of method statements, procedures and routines where required. 6- Interface towards Pre-commissioning and Company personnel. 7- Reports on work progress, bringing to notice potential problems or delays and recommends solutions. 8- Assist during the database preparation for pre-commissioning status index and commissioning technical database. 9- Plan, Monitor and assist in Vendor activities as required. 10- Ensure temporary supplies and commissioning spares are adequate for the subsystem testing. 11- Perform inter-discipline checks. 12- Compliance in accordance with HSE Standard 13- Preparation of Commissioning scope of work and answer bidder technical queries. IN KUWAIT A - SABIYA POWER STATION – KUWAIT GE & HYUNDAI HEVEAY IDUSTRIES (HHI) COMBINED CYCLE (3X750) MW- CCGT FROM 2010 TO 2013 b- AAZOUR POWER STATION – KUWAIT ALGHANEM INTENATIONAL (AGI) STEAM UNIT (360) MW- CONVERSION FROM SIMPLE TO COMBINED CYCLE. FROM 2013 TO 2014 c- SABIYA POWER STATION – KUWAIT ALGHANEM INTENATIONAL (AGI) SIMPLE CYCLE GAS TURBINE (2X250) MW FROM 2014 TILL 2016 d- SABIYA POWER STATION – KUWAIT ALGHANEM INTENATIONAL (AGI) SIMPLE CYCLE GAS TURBINE (2X250) MW FROM 2016 under Commissioning COMPANY: - Middle Delta Electricity Production Company (MDEPC) NUBARIA POWER STATION І & П (2 × 750 MW), EGYPT From 12/4/2004 to 17/2/2010.
  • 3. Job description: - A- receiving electrical materials from vendors making material receiving report (MRR) for all materials in the site B- pre-commissioning and field inspection for all electrical equipment in the site ( tests) C- Commissioning and start up for all electrical equipment in the site SIEMENS Gas Turbine (SIEMENS V94-3A) 250 MW Precommissioning and commissioning for - Starting frequency converter ( SFC ) - Static excitation equipment ( SEE ) - Generator with air cooling (Insulation resistance...etc) - Generator circuit breaker ( ABB type HECS) - 6.3/0.4 kV dry transformer and 0.4 kV bus bars ZTR Ukrainian Company -Commissioning by Conisys-Shaker Group. - High voltage transformers 500/220 kv tie transformers (visual check, insulation resistance, no load loss and current, oil temp, oltc checking, primary to earth, winding temp...etc) - High voltage transformers 16.5/500 kv main transformers for Siemens gas turbine - High voltage transformers 15/500 kv main transformers for Mitsubishi steam turbine -Medium voltage transformers 16.5/6.3 kv auxiliary transformers Consortium of Japan AE power system/Sumitomo Corporation/Conisys - Site test on 550 kv gas (sf6) circuit breaker (anti pumping, switching...etc) - Site test on current transformers and voltage transformers (turns ratio, saturation...) - Site test on 220 kv gas (sf6) circuit breaker (anti pumping, switching...etc) - Site test on current transformers and voltage transformers (turns ratio, saturation...) - Surge arrestor and wave trap tests - Switchgear and manual control tests INITEC energia Spain precommissioning and commissioning for all medium and low Voltage (SCHNIDER EQUIEPMENT) (Insulation resistance...etc) - Medium voltage 6.3 kv switchgear with 4 incoming - 6.3/0.4 kV dry transformers - All medium and low voltage breakers - 400 v bus bars MCC motors control center - Insulation resistance test for all types of cables and bus ducts with high dc voltage (meggring test) - Testing for motors (rotation direction, earthling, winding...etc) INITEC energia Spain and Global Partner Company Egypt - All tests and Commissioning for U.P.S and DC system including - Battery tests (charging and discharging, cell voltage, capacity...etc) - Battery charger and inverter tests COMPANY: - AL Ezz Ceramics & Porcelain Co (GEMMA) Job description: - Maintenance of all electrical equipment including
  • 4. Training courses -1 mega transformer (11kv /400 v (electrical and protection) - All electrical panels (power & control)- - All production lines (ac motors, stepper motors and servo motors) - From 1/8/2001 to 1/3/2004 El Sadat city – al mnofia governorate 1- FIRE AND FIGHTING SYSTEM (CHEMTROL PROYECTOS SISTEMAS. S.L.C, MADRID - SPAIN) Operation and maintenance for fire and fighting system Location: - NUBARIA POWER STATION, EGYPT From June 11, 2006 – June 22, 2006. 2- Pumps (INITEC Energia, KSB, ITALY) Operation for feed boiler pumps, condensate pumps, closed cooling pumps, service pumps and circulating pumps Location: - NUBARIA POWER STATION, EGYPT From June 1, 2006 – June 10, 2006 3- ALSTOM HRSG Operator (ALSTOM Power Inc. , USA ) 160 Hours HRSG Operator training program. Location: - Surabaya, Indonesia From September 9, 2005 – October 3,2005 4- PACIS SYSTEM (AREVA, LATTES, FRANCE) Operator training program to PACIS system to operate switch yard Location: - NUBARIA POWER STATION, EGYPT From September 3, 2005 – September 7, 2005 5- Continuous Emission Monitoring System Training (Altech Environment USA) analysis of exhaust gases of gas turbine. Location: - NUBARIA POWER STATION, EGYPT. From May 29, 2005 --June 1,2005. 6- Basic Operation Training of Gas Turbine (SIEMENS V94.3A) Introduction to the plant, Mechanical, Electrical and I&C the parts of gas turbine Location: - NUBARIA POWER STATION, EGYPT. From April 10, 2005 --April 25, 2005. 7- Operation and maintenance of combined cycle stations 70 Hour GAS TURBINE operator training program (JE.MS 5001, FRAME 5, USA) 70 Hour HRSG operator training program (NM, HOLNDA) 70 Hour STEAM TURBINE operator training program (HITACHI, JAPAN) Location: - DAMANHOUR POWER STATION, EGYPT. From November 20, 2004-- December 9, 2004. 8- Operation and maintenance of gas turbine stations
  • 5. Others 96 Hour GAS TURBINE operation and maintenance training program (JE.MS 5001, FRAME 5, USA and SIEMENS V94-3A) Location: - ABI OUEER POWER STATION, EGYPT. From December 17, 2005-- December 31, 2006. Years of Experience: -15 Years. Language: - English fluent (written, spoken) Computer skills: - DCS OPERATION SYSTEM ( alstom) Ms-Office: Word, Excel, Access, and Power Point, Internet. Programming: - FORTRAN 77, Assembly Language. Personal skills: - energetic, self-motive, good communication skills Availability job requested Availability: I am able to start work after 4 weeks from announcement As: Full Time Rank : Any I can work in: Egypt - Arab Countries - Foreign Countries CV last update: October 2016
  • 6. Others 96 Hour GAS TURBINE operation and maintenance training program (JE.MS 5001, FRAME 5, USA and SIEMENS V94-3A) Location: - ABI OUEER POWER STATION, EGYPT. From December 17, 2005-- December 31, 2006. Years of Experience: -15 Years. Language: - English fluent (written, spoken) Computer skills: - DCS OPERATION SYSTEM ( alstom) Ms-Office: Word, Excel, Access, and Power Point, Internet. Programming: - FORTRAN 77, Assembly Language. Personal skills: - energetic, self-motive, good communication skills Availability job requested Availability: I am able to start work after 4 weeks from announcement As: Full Time Rank : Any I can work in: Egypt - Arab Countries - Foreign Countries CV last update: October 2016