Testing in the Lifecycle 1 Principles 2 Lifecycle 4 Dynamic test techniques 3 Static testing 5 Management 6 Tools Software Testing  ISTQB / ISEB Foundation Exam Practice Chapter 2
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing  Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
V-Model: test levels Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing Code Design Specification System Specification Project Specification Business Requirements
V-Model: late test design Tests Business Requirements Tests Project Specification Tests System Specification Tests Design Specification Tests Code Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing “ We don’t have time to design tests early” Design Tests?
V-Model: early test design Tests Business Requirements Tests Project Specification Tests System Specification Tests Design Specification Tests Code Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing Tests Tests Tests Tests Tests Run Tests Design Tests
Early test design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Early test design helps to build quality, stops fault multiplication
Experience report: Phase 1 Phase 1: Plan 2 mo 2 mo dev test test 150  faults 1st mo. 50  faults users not happy Quality fraught, lots of dev overtime Actual "has to go in" but didn't work
Experience report: Phase 2 Source: Simon Barlow & Alan Veitch, Scottish Widows, Feb 96 Phase 2: Plan 2 mo 6 wks dev test test 50  faults 1st mo. 0  faults happy users! Quality smooth, not much for dev to do Actual acc test: full week (vs half day) on time Phase 1: Plan 2 mo 2 mo dev test test 150  faults 1st mo. 50  faults users not happy Quality fraught, lots of dev overtime Actual "has to go in" but didn't work Phase 2: Plan 2 mo 6 wks dev test test 50  faults 1st mo. 0  faults happy users! Quality smooth, not much for dev to do Actual acc test: full week (vs half day) on time
VV&T ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Verification, Validation and Testing Verification Validation Testing Any
V-model exercise
The V Model  -  Exercise Exceptions: Conversion Test FOS: DN/Gldn DS FD Build Components Build Units TD Build System Code Build Assemblage VD System Test Integration Test Review FD Review TD TUT FUT Review DS Review VD Assembly  Test
How would you test this spec? ,[object Object]
“Testing is expensive” ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What do software faults cost? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Hypothetical Cost - 1 ,[object Object],[object Object],- detect ( .5 hr) £25 - report ( .5 hr) £25 - receive & process (1 hr)   £50 - assign & bkgnd (4 hrs) £200 - debug ( .5 hr)   £25 - test fault fix ( .5 hr)   £25 - regression test (8 hrs) £400 £700   £50
Hypothetical Cost - 2 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Hypothetical Cost - 3 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Cost of fixing faults Req Use Des Test 1 10 1000 100
How expensive for you? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],(10 minutes)
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing  Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
(Before planning for a set of tests) ,[object Object],[object Object],[object Object],[object Object],[object Object],See: Structured Testing, an introduction to TMap®, Pol & van Veenendaal, 1998
High level test planning ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Test Plan 1 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Source: ANSI/IEEE Std 829-1998, Test Documentation
Test Plan 2 ,[object Object],[object Object],[object Object],[object Object]
Test Plan 3 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Test Plan 4 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Test Plan 5 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Test Plan 6 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing  Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
Component testing  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Component test strategy 1 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],*Source: BS 7925-2, Software Component Testing Standard
Component test strategy 2 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Component  Test Document  Hierarchy Source: BS 7925-2, Software Component Testing Standard, Annex A Component Test Strategy Project Component Test Plan Component Test Specification Component Test Plan Component Test Report
Component test process Checking for Component Test Completion Component Test Planning Component Test Specification Component Test Execution Component Test Recording BEGIN END
Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test planning - how the test strategy and project test plan apply to the component under test - any exceptions to the strategy - all software the component will interact with (e.g. stubs and drivers
Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test specification - test cases are designed using the test case design  techniques specified in the test plan (Section 3) - Test case: objective initial state of component input expected outcome - test cases should be  repeatable
Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test execution - each test case is executed - standard does not specify whether executed manually or using a test execution tool
Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test recording - identities & versions of  component,  test specification - actual outcome recorded & compared to expected outcome - discrepancies logged - repeat test activities to establish removal of the discrepancy (fault in test or verify fix) - record coverage levels achieved for test completion criteria specified in test plan Sufficient to show test  activities carried out
Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Checking for component  test completion - check test records against specified test completion criteria - if not met, repeat test activities - may need to repeat test specification to design test cases to meet completion criteria (e.g. white box)
Test design techniques ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],= Yes = No Also a measurement technique?
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing  Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
Integration testing in the small  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Big-Bang Integration ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Incremental Integration ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Top-Down Integration a b c d e f g h i j k l m n o a b c d e f g h i j
Stubs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Pros & cons of top-down approach ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Bottom-up Integration a b c e f g k l m d i n o h j b d i n o h j
Drivers ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Pros & cons of bottom-up approach ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Minimum Capability Integration (also called Functional) f g k l m a b d i c e n o h j a b d i c e n o h j
Pros & cons of Minimum Capability ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Thread Integration (also called functional) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],k l m i h j b c a f g d e n o b c k l m i h j f g d e
Integration Guidelines ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Integration Planning ,[object Object],[object Object],[object Object],[object Object]
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing  Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
System testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Functional system testing ,[object Object],[object Object],[object Object],[object Object]
Requirements-based testing ,[object Object],[object Object],[object Object],[object Object],[object Object]
Business process-based testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Non-functional system testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Performance Tests ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Multi-User Tests ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Source: Sue Atkins, Magic Performance Management
Usability Tests ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Who should design / perform these tests?
Security Tests ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Configuration and Installation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Reliability / Qualities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Back-up and Recovery ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Documentation Testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing  Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
Integration testing in the large  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Approach ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Planning considerations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing   Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
User acceptance testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Why customer / user involvement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Benefit: detailed understanding of the new system
User Acceptance testing 20% of function by 80% of code System testing distributed over this line Acceptance testing distributed over this line 80% of function by 20% of code
Contract acceptance testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Alpha and Beta tests: similarities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Alpha and Beta tests: differences ,[object Object],[object Object],[object Object],[object Object]
Acceptance testing motto If you don't have patience to test the system  the system will surely test your patience
Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing  Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
Maintenance testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What to test in maintenance testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Poor or missing specifications ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What should the system do? ,[object Object],[object Object],[object Object],[object Object],[object Object]
Summary: Key Points V-model shows test levels, early test design High level test planning Component testing using the standard Integration testing in the small: strategies System testing (non-functional and functional)  Integration testing in the large  Acceptance testing: user responsibility Maintenance testing to preserve quality Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice

More Related Content

What's hot

ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1
Yogindernath Gupta
 

What's hot (20)

ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1
 
Software Testing Process
Software Testing ProcessSoftware Testing Process
Software Testing Process
 
Fundamentals of Software Testing
Fundamentals of Software TestingFundamentals of Software Testing
Fundamentals of Software Testing
 
TestComplete – A Sophisticated Automated Testing Tool by SmartBear
TestComplete – A Sophisticated Automated Testing Tool by SmartBearTestComplete – A Sophisticated Automated Testing Tool by SmartBear
TestComplete – A Sophisticated Automated Testing Tool by SmartBear
 
Chapter 5 - Test Management
Chapter 5 - Test ManagementChapter 5 - Test Management
Chapter 5 - Test Management
 
ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2
 
Test management
Test managementTest management
Test management
 
Software Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing TrendsSoftware Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing Trends
 
Iseb, ISTQB Static Testing
Iseb, ISTQB Static TestingIseb, ISTQB Static Testing
Iseb, ISTQB Static Testing
 
Qa exploratory test charter template
Qa exploratory test charter templateQa exploratory test charter template
Qa exploratory test charter template
 
Chapter 6 - Tool Support for Testing
Chapter 6 - Tool Support for TestingChapter 6 - Tool Support for Testing
Chapter 6 - Tool Support for Testing
 
ISTQB Foundation - Chapter 2
ISTQB Foundation - Chapter 2ISTQB Foundation - Chapter 2
ISTQB Foundation - Chapter 2
 
Testing & Quality Assurance
Testing & Quality AssuranceTesting & Quality Assurance
Testing & Quality Assurance
 
Chapter 2 - Testing Throughout the Development LifeCycle
Chapter 2 - Testing Throughout the Development LifeCycleChapter 2 - Testing Throughout the Development LifeCycle
Chapter 2 - Testing Throughout the Development LifeCycle
 
Software Testing or Quality Assurance
Software Testing or Quality AssuranceSoftware Testing or Quality Assurance
Software Testing or Quality Assurance
 
Test Strategy and Planning
Test Strategy and PlanningTest Strategy and Planning
Test Strategy and Planning
 
Chapter 1 - Testing Process
Chapter 1 - Testing ProcessChapter 1 - Testing Process
Chapter 1 - Testing Process
 
INTRODUCTION TO ISTQB FOUNDATION LEVEL - CTFL
INTRODUCTION TO ISTQB FOUNDATION LEVEL - CTFLINTRODUCTION TO ISTQB FOUNDATION LEVEL - CTFL
INTRODUCTION TO ISTQB FOUNDATION LEVEL - CTFL
 
Chapter 2 - Test Management
Chapter 2 - Test ManagementChapter 2 - Test Management
Chapter 2 - Test Management
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycle
 

Viewers also liked

KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail
KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail
KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail
Keytorc Software Testing Services
 
ISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam PracticeISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam Practice
Yogindernath Gupta
 
KeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test Management
KeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test ManagementKeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test Management
KeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test Management
Keytorc Software Testing Services
 
EbruKazaskeroglu_CV2016_ENG.PDF
EbruKazaskeroglu_CV2016_ENG.PDFEbruKazaskeroglu_CV2016_ENG.PDF
EbruKazaskeroglu_CV2016_ENG.PDF
Ebru Kazaskeroglu
 
Keynote Systems - Mobile Solutions Overview Presentation
Keynote Systems - Mobile Solutions Overview PresentationKeynote Systems - Mobile Solutions Overview Presentation
Keynote Systems - Mobile Solutions Overview Presentation
vprathap
 
KeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption Theory
KeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption TheoryKeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption Theory
KeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption Theory
Keytorc Software Testing Services
 
Test Automation - Keytorc Approach
Test Automation - Keytorc Approach Test Automation - Keytorc Approach
Test Automation - Keytorc Approach
Keytorc Software Testing Services
 

Viewers also liked (20)

Testistanbul 2016 - Keynote: "Enterprise Challenges of Test Data" by Rex Black
Testistanbul 2016 - Keynote: "Enterprise Challenges of Test Data" by Rex BlackTestistanbul 2016 - Keynote: "Enterprise Challenges of Test Data" by Rex Black
Testistanbul 2016 - Keynote: "Enterprise Challenges of Test Data" by Rex Black
 
KeytorcTestTalks #11 - Duygu Onaral, Agile QA'in rolü
KeytorcTestTalks #11 - Duygu Onaral, Agile QA'in rolüKeytorcTestTalks #11 - Duygu Onaral, Agile QA'in rolü
KeytorcTestTalks #11 - Duygu Onaral, Agile QA'in rolü
 
KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail
KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail
KeytorcTestTalks #11 - Onur Başkirt, Agile Test Management with Testrail
 
ISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam PracticeISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam Practice
 
KeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test Management
KeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test ManagementKeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test Management
KeytorcTestTalks #11 - Serkan Akoğlanoğlu, Release Management vs Test Management
 
Testistanbul 2016 - Keynote: "The Story of Appium" by Dan Cuellar
Testistanbul 2016 - Keynote: "The Story of Appium" by Dan CuellarTestistanbul 2016 - Keynote: "The Story of Appium" by Dan Cuellar
Testistanbul 2016 - Keynote: "The Story of Appium" by Dan Cuellar
 
EbruKazaskeroglu_CV2016_ENG.PDF
EbruKazaskeroglu_CV2016_ENG.PDFEbruKazaskeroglu_CV2016_ENG.PDF
EbruKazaskeroglu_CV2016_ENG.PDF
 
Testistanbul 2016 - Keynote: "Why Automated Verification Matters" by Kristian...
Testistanbul 2016 - Keynote: "Why Automated Verification Matters" by Kristian...Testistanbul 2016 - Keynote: "Why Automated Verification Matters" by Kristian...
Testistanbul 2016 - Keynote: "Why Automated Verification Matters" by Kristian...
 
Istqb ctfl-series - Black Box Testing
Istqb ctfl-series - Black Box TestingIstqb ctfl-series - Black Box Testing
Istqb ctfl-series - Black Box Testing
 
Keytorc Proje Ekibi Zubizu Sunumu - Emirhan Şen
Keytorc Proje Ekibi Zubizu Sunumu - Emirhan ŞenKeytorc Proje Ekibi Zubizu Sunumu - Emirhan Şen
Keytorc Proje Ekibi Zubizu Sunumu - Emirhan Şen
 
PRINCE 2 foundation & practitioner certification training
PRINCE 2   foundation & practitioner certification trainingPRINCE 2   foundation & practitioner certification training
PRINCE 2 foundation & practitioner certification training
 
İyi Bir Test Uzmanı Olmak İçin...
İyi Bir Test Uzmanı Olmak İçin...İyi Bir Test Uzmanı Olmak İçin...
İyi Bir Test Uzmanı Olmak İçin...
 
Testistanbul 2016 - Keynote: "Performance Testing of Big Data" by Roland Leusden
Testistanbul 2016 - Keynote: "Performance Testing of Big Data" by Roland LeusdenTestistanbul 2016 - Keynote: "Performance Testing of Big Data" by Roland Leusden
Testistanbul 2016 - Keynote: "Performance Testing of Big Data" by Roland Leusden
 
Keynote Systems - Mobile Solutions Overview Presentation
Keynote Systems - Mobile Solutions Overview PresentationKeynote Systems - Mobile Solutions Overview Presentation
Keynote Systems - Mobile Solutions Overview Presentation
 
KeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption Theory
KeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption TheoryKeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption Theory
KeytorcTestTalks #11 - Berk Dülger, DevOps Tactical Adaption Theory
 
Keytorc Proje Ekibi Zubizu Sunumu - Ozan İlhan
Keytorc Proje Ekibi Zubizu Sunumu - Ozan İlhanKeytorc Proje Ekibi Zubizu Sunumu - Ozan İlhan
Keytorc Proje Ekibi Zubizu Sunumu - Ozan İlhan
 
Introduction to ISTQB & ISEB Certifications
Introduction to ISTQB & ISEB CertificationsIntroduction to ISTQB & ISEB Certifications
Introduction to ISTQB & ISEB Certifications
 
ISTQB Foundation Level: Why, Why Not and How?
ISTQB Foundation Level: Why, Why Not and How?ISTQB Foundation Level: Why, Why Not and How?
ISTQB Foundation Level: Why, Why Not and How?
 
Keytorc Proje Ekibi Zubizu Sunumu - Miray Doğan
Keytorc Proje Ekibi Zubizu Sunumu - Miray DoğanKeytorc Proje Ekibi Zubizu Sunumu - Miray Doğan
Keytorc Proje Ekibi Zubizu Sunumu - Miray Doğan
 
Test Automation - Keytorc Approach
Test Automation - Keytorc Approach Test Automation - Keytorc Approach
Test Automation - Keytorc Approach
 

Similar to ISTQB / ISEB Foundation Exam Practice - 2

Testing Attributes
Testing AttributesTesting Attributes
Testing Attributes
Abiha Naqvi
 
Testing documents
Testing documentsTesting documents
Testing documents
Hari Tiru
 

Similar to ISTQB / ISEB Foundation Exam Practice - 2 (20)

ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
 
ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
 
stlc
stlcstlc
stlc
 
stlc
stlcstlc
stlc
 
ISTQB, ISEB Lecture Notes
ISTQB, ISEB Lecture NotesISTQB, ISEB Lecture Notes
ISTQB, ISEB Lecture Notes
 
AiTi Education Software Testing Session 02 a
AiTi Education Software Testing Session 02 aAiTi Education Software Testing Session 02 a
AiTi Education Software Testing Session 02 a
 
Estimating test effort part 1 of 2
Estimating test effort part 1 of 2Estimating test effort part 1 of 2
Estimating test effort part 1 of 2
 
STLC-ppt-1.pptx
STLC-ppt-1.pptxSTLC-ppt-1.pptx
STLC-ppt-1.pptx
 
Performance testing reference model
Performance testing reference modelPerformance testing reference model
Performance testing reference model
 
Testing Attributes
Testing AttributesTesting Attributes
Testing Attributes
 
Testing documents
Testing documentsTesting documents
Testing documents
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
ISTQBCH foundation level chapter 01 fundamentals of testing
ISTQBCH foundation level chapter 01 fundamentals of testingISTQBCH foundation level chapter 01 fundamentals of testing
ISTQBCH foundation level chapter 01 fundamentals of testing
 
manual-testing
manual-testingmanual-testing
manual-testing
 
Software testing interview Q&A – Part 2
Software testing interview Q&A – Part 2Software testing interview Q&A – Part 2
Software testing interview Q&A – Part 2
 
Continuous testing in agile projects 2015
Continuous testing in agile projects 2015Continuous testing in agile projects 2015
Continuous testing in agile projects 2015
 
1st module.....
1st module.....1st module.....
1st module.....
 
Testing methodology
Testing methodologyTesting methodology
Testing methodology
 
Test Life Cycle
Test Life CycleTest Life Cycle
Test Life Cycle
 
Stlc ppt
Stlc pptStlc ppt
Stlc ppt
 

More from Yogindernath Gupta

Introduction to specification based test design techniques
Introduction to specification based test design techniquesIntroduction to specification based test design techniques
Introduction to specification based test design techniques
Yogindernath Gupta
 

More from Yogindernath Gupta (20)

Learn Software Testing for ISTQB Foundation Exam
Learn Software Testing for ISTQB Foundation ExamLearn Software Testing for ISTQB Foundation Exam
Learn Software Testing for ISTQB Foundation Exam
 
ISTQB Advanced Study Guide - 8
ISTQB Advanced Study Guide - 8ISTQB Advanced Study Guide - 8
ISTQB Advanced Study Guide - 8
 
ISTQB Advanced Study Guide - 7
ISTQB Advanced Study Guide - 7ISTQB Advanced Study Guide - 7
ISTQB Advanced Study Guide - 7
 
ISTQB Advanced Study Guide - 6
ISTQB Advanced Study Guide - 6ISTQB Advanced Study Guide - 6
ISTQB Advanced Study Guide - 6
 
ISTQB Advanced Study Guide - 5
ISTQB Advanced Study Guide - 5ISTQB Advanced Study Guide - 5
ISTQB Advanced Study Guide - 5
 
ISTQB Advanced Study Guide - 4
ISTQB Advanced Study Guide - 4ISTQB Advanced Study Guide - 4
ISTQB Advanced Study Guide - 4
 
ISTQB Advanced Study Guide - 3
ISTQB Advanced Study Guide - 3ISTQB Advanced Study Guide - 3
ISTQB Advanced Study Guide - 3
 
ISTQB Advanced Study Guide - 2
ISTQB Advanced Study Guide - 2ISTQB Advanced Study Guide - 2
ISTQB Advanced Study Guide - 2
 
ISTQB Advanced – Study Guide -1
ISTQB Advanced – Study Guide -1ISTQB Advanced – Study Guide -1
ISTQB Advanced – Study Guide -1
 
Introduction to specification based test design techniques
Introduction to specification based test design techniquesIntroduction to specification based test design techniques
Introduction to specification based test design techniques
 
Knowledge Levels In Certifications
Knowledge Levels In CertificationsKnowledge Levels In Certifications
Knowledge Levels In Certifications
 
Design Review & Software Testing
Design Review & Software TestingDesign Review & Software Testing
Design Review & Software Testing
 
Software Development Life Cycle - SDLC
Software Development Life Cycle - SDLCSoftware Development Life Cycle - SDLC
Software Development Life Cycle - SDLC
 
Tutorial - 16 : How to pass parameters from one script to another by CallScri...
Tutorial - 16 : How to pass parameters from one script to another by CallScri...Tutorial - 16 : How to pass parameters from one script to another by CallScri...
Tutorial - 16 : How to pass parameters from one script to another by CallScri...
 
Tutorial - 14 How to insert a verification point from the script explorer usi...
Tutorial - 14 How to insert a verification point from the script explorer usi...Tutorial - 14 How to insert a verification point from the script explorer usi...
Tutorial - 14 How to insert a verification point from the script explorer usi...
 
A Practical Roadmap To HP QTP Certification
A Practical Roadmap To HP QTP CertificationA Practical Roadmap To HP QTP Certification
A Practical Roadmap To HP QTP Certification
 
Unearthing The Power Of IBM – Rational Functional Tester 7.0 - RFT
Unearthing The Power Of IBM – Rational Functional Tester 7.0 - RFTUnearthing The Power Of IBM – Rational Functional Tester 7.0 - RFT
Unearthing The Power Of IBM – Rational Functional Tester 7.0 - RFT
 
RFT Tutorial 4 How Do We Record A Script Using Rational Functional Tester - RFT
RFT Tutorial 4 How Do We Record A Script Using Rational Functional Tester - RFTRFT Tutorial 4 How Do We Record A Script Using Rational Functional Tester - RFT
RFT Tutorial 4 How Do We Record A Script Using Rational Functional Tester - RFT
 
RFT Tutorial 11 How To Data Drive A Test Script Using Ibm – Rational Function...
RFT Tutorial 11 How To Data Drive A Test Script Using Ibm – Rational Function...RFT Tutorial 11 How To Data Drive A Test Script Using Ibm – Rational Function...
RFT Tutorial 11 How To Data Drive A Test Script Using Ibm – Rational Function...
 
RFT Tutorial - 9 How To Create A Properties Verification Point In Rft For Tes...
RFT Tutorial - 9 How To Create A Properties Verification Point In Rft For Tes...RFT Tutorial - 9 How To Create A Properties Verification Point In Rft For Tes...
RFT Tutorial - 9 How To Create A Properties Verification Point In Rft For Tes...
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Recently uploaded (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 

ISTQB / ISEB Foundation Exam Practice - 2

  • 1. Testing in the Lifecycle 1 Principles 2 Lifecycle 4 Dynamic test techniques 3 Static testing 5 Management 6 Tools Software Testing ISTQB / ISEB Foundation Exam Practice Chapter 2
  • 2. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 3. V-Model: test levels Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing Code Design Specification System Specification Project Specification Business Requirements
  • 4. V-Model: late test design Tests Business Requirements Tests Project Specification Tests System Specification Tests Design Specification Tests Code Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing “ We don’t have time to design tests early” Design Tests?
  • 5. V-Model: early test design Tests Business Requirements Tests Project Specification Tests System Specification Tests Design Specification Tests Code Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing Tests Tests Tests Tests Tests Run Tests Design Tests
  • 6.
  • 7. Experience report: Phase 1 Phase 1: Plan 2 mo 2 mo dev test test 150 faults 1st mo. 50 faults users not happy Quality fraught, lots of dev overtime Actual "has to go in" but didn't work
  • 8. Experience report: Phase 2 Source: Simon Barlow & Alan Veitch, Scottish Widows, Feb 96 Phase 2: Plan 2 mo 6 wks dev test test 50 faults 1st mo. 0 faults happy users! Quality smooth, not much for dev to do Actual acc test: full week (vs half day) on time Phase 1: Plan 2 mo 2 mo dev test test 150 faults 1st mo. 50 faults users not happy Quality fraught, lots of dev overtime Actual "has to go in" but didn't work Phase 2: Plan 2 mo 6 wks dev test test 50 faults 1st mo. 0 faults happy users! Quality smooth, not much for dev to do Actual acc test: full week (vs half day) on time
  • 9.
  • 10. Verification, Validation and Testing Verification Validation Testing Any
  • 12. The V Model - Exercise Exceptions: Conversion Test FOS: DN/Gldn DS FD Build Components Build Units TD Build System Code Build Assemblage VD System Test Integration Test Review FD Review TD TUT FUT Review DS Review VD Assembly Test
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Cost of fixing faults Req Use Des Test 1 10 1000 100
  • 20.
  • 21. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 31.
  • 32.
  • 33.
  • 34. Component Test Document Hierarchy Source: BS 7925-2, Software Component Testing Standard, Annex A Component Test Strategy Project Component Test Plan Component Test Specification Component Test Plan Component Test Report
  • 35. Component test process Checking for Component Test Completion Component Test Planning Component Test Specification Component Test Execution Component Test Recording BEGIN END
  • 36. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test planning - how the test strategy and project test plan apply to the component under test - any exceptions to the strategy - all software the component will interact with (e.g. stubs and drivers
  • 37. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test specification - test cases are designed using the test case design techniques specified in the test plan (Section 3) - Test case: objective initial state of component input expected outcome - test cases should be repeatable
  • 38. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test execution - each test case is executed - standard does not specify whether executed manually or using a test execution tool
  • 39. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test recording - identities & versions of component, test specification - actual outcome recorded & compared to expected outcome - discrepancies logged - repeat test activities to establish removal of the discrepancy (fault in test or verify fix) - record coverage levels achieved for test completion criteria specified in test plan Sufficient to show test activities carried out
  • 40. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Checking for component test completion - check test records against specified test completion criteria - if not met, repeat test activities - may need to repeat test specification to design test cases to meet completion criteria (e.g. white box)
  • 41.
  • 42. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 72.
  • 73.
  • 74.
  • 75. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 76.
  • 77.
  • 78. User Acceptance testing 20% of function by 80% of code System testing distributed over this line Acceptance testing distributed over this line 80% of function by 20% of code
  • 79.
  • 80.
  • 81.
  • 82. Acceptance testing motto If you don't have patience to test the system the system will surely test your patience
  • 83. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
  • 84.
  • 85.
  • 86.
  • 87.
  • 88. Summary: Key Points V-model shows test levels, early test design High level test planning Component testing using the standard Integration testing in the small: strategies System testing (non-functional and functional) Integration testing in the large Acceptance testing: user responsibility Maintenance testing to preserve quality Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice

Editor's Notes

  1. Work takes twice as long to do for one week for five users: £50/hr x 7 = £350/day * 5 = £1750/wk / 2 = £875 / wk * 5 users = £4375 Double check because they don't trust it any more, 12% more time for 5 weeks: £350/day * 5 users = £1750, so 12% = £200/day * 25 days = £5000 747 away from stand late £1000/min