СЭА                                 QUALITY MANAGEMENT SYSTEM
The document
name                      Procedure management of inappropriate production
                                                             Effective date:
Code:                                  SEA P802              15.03.2006




                                        THE MAINTENANCE:


                                  1. THE PURPOSE
                                  2. SCOPE OF APPLICATION

                                  3. REFERENCES TO DOCUMENTS

                                  4. THE INSTRUCTION DESCRIPTION

                                  5. RESPONSIBILITY AND POWERS

                                  6. DESIGNATIONS AND REDUCTIONS

                                  7. APPENDICES




THE                      HAS PREPARED:            HAS CHECKED UP:              HAS CONFIRMED:
DOCUMENT

Post:                Нач. Technological
                        department                The chief engineer           The general   director
 FIRST NAME,
MIDDLE
INITIAL, LAST
                           Varakin O.                 Lerner B.                    Lobach A.
NAME:
The signature:

                 №                1.         2.            3.           4.              5.
Changes          Date:
                 The signature:

SEA P802 Sheet 1 1from 5
СЭА                   QUALITY MANAGEMENT SYSTEM
The document
name                  Procedure management of inappropriate production
                                                     Effective date:
Code:                       SEA P802                 15.03.2006




                           Sheet of mailing of the document


№             The name                                          Date      The
                                            Post
пп           Divisions                                      Receptions   signature
1     The top management      The general director           16.03.06
2                             The chief engineer             16.03.06 г
3                             Head СМК                       16.03.06 г
4                             The chief accountant           16.03.06 г
5                             The agent on supply            16.03.06 г
6                             The manager on the personnel   16.03.06 г
7     Technological           The chief of department        16.03.06 г
      department
8                             The mechanic                   16.03.06 г
9     Industrial site №1      The chief of a site            17.03.06г.
10    Industrial site №2      The chief of a site            17.03.06г.




SEA P802 Sheet 1 2from 5
СЭА                         QUALITY MANAGEMENT SYSTEM
 The document
 name                  Procedure management of inappropriate production
                                                               Effective date:
 Code:                           SEA P802                      15.03.2006


1.   The procedure    purpose:
   The given procedure describes managerial process by production which does not correspond to
requirements of specifications, standards, THAT of the project, etc.

2. Scope of application
     Process is carried out: 1) – heads of divisions, departments;
                               2) – separate workers of departments and divisions on
                                    To the decision of heads of divisions;
                               3) – manufacturers of works on building sites.

3. The reference to documents
     ISO 9001: 2000, the river 8;
     Quality manual of SEA QM-01

4. The process description
Н – the process Beginning.
1. Reception of the information on discrepancy of production or establishment of the fact of
    discrepancy.
The Controller on a platform of building or the manufacturer of works fix discrepancy of production
(a separate element of process, a part of the design documentation, marriage in the put equipment,
etc.). The information is transferred in the form of records, certificates, reports, results of gaugings.
The fact of discrepancy of production to requirements of standard documents, the design or
technological documentation is established at entrance control, at performance of control operations
and acceptance tests in the course of building.
2. Documentation registration.
    The certificate about discrepancy of production is made out. It is carried out by the controller on
    a platform or under the direction of the chief of a site.
3. Isolation of inappropriate production.
4. The discrepancy analysis.
       The commission appointed the Chief engineer which structure includes the qualified experts,
makes the analysis of marriage and defines the further actions with inappropriate production.
5. Probably to use?
       Depending on defect degree decisions on possibility of further use are made.
6. Probably to use without alteration?
7. Transfer to repair or on alteration.
8. Registration, the coordination and the statement of permissions to use of inappropriate
    production.
    The permission is made out by division, the originator of the established discrepancies
    The permission is co-ordinated with the Chief engineer, affirms the General director.
9. Completion or correction of inappropriate production.
   Completion or alteration of inappropriate production is carried out by division, the originator of
the admitted discrepancy
10. Tests or control after completion or alteration of inappropriate production.
SEA P802 Sheet 1 3from 5
СЭА                          QUALITY MANAGEMENT SYSTEM
 The document
 name                 Procedure management of inappropriate production
                                                             Effective date:
 Code:                          SEA P802                     15.03.2006
    Control and test is carried out by the manufacturer of works with the assistance of
    representatives ПТО, according to the procedures developed for these purposes.
11. Production has passed control or tests?
    Whether there has passed production control or tests are defined by the controller or the
commission.
12. Transfer to the further manufacture.
13. Informing of the client.
   The client is informed in the event that it is stipulated in the contract or the contract.
To – the process end

5. Responsibility and powers
Responsibility for an establishment of the facts of discrepancies, them актирования, decision-
making on such production, and its further use, is assigned to controllers on a platform and chief
ПТО
6. Designations and reductions
СМК – quality management System
ПТО – Technological department

8. Appendices
SEA О802.01 «Magazine of registration of discrepancies»
The block the scheme of managerial process by inappropriate production




SEA P802 Sheet 1 4from 5
СЭА                              QUALITY MANAGEMENT SYSTEM
 The document
 name                   Procedure management of inappropriate production
                                                       Effective date:
 Code:                               SEA P802          15.03.2006
The block   – the process scheme.
                                                                                  The appendix

                    Н

                                                Н – the process beginning
                   1
                                                1 – Reception of the information on discrepancy
                   2
                                                of production or an establishment of the fact of
                                                discrepancy
                   3
                                                2 – documentation Registration
                                                It is carried out by the controller on a platform or
                                                the chief of a site
                   4
                                                3 – Isolation of inappropriate production
                                                It is carried out by the chief of a site or the
                   5                            manufacturer of works
        NO
                                                4 – the discrepancy Analysis
                                                It is carried out by the commission
    7             YES
                                                5 – Probably to use?
                           YES                  6 – Probably to use after repair?
                   6                            7 – It is impossible to use
                                                8 – Registration and the permission coordination
                  NO                            It is carried out by division – the originator of
                                 8              marriage
                   9                            9 – Completion or correction of inappropriate
                                                production
                   10                           It is carried out by industrial division - the
                                                originator of marriage
                                                10 – Tests or control after completion or alteration
                   11      NO                   of inappropriate production
                                                It is carried out by the manufacturer of works
                                 13
                  YES                           together with representatives ПТО
                                                11 – Production has passed control or tests?
                                                12 – Transfer to the further manufacture
                                                13 – Informing of the client
                                                14 – the process End
                   12




                  TO




SEA P802 Sheet 1 5from 5

More Related Content

Viewers also liked

12. audit account
12. audit account12. audit account
12. audit account
zemm1
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policy
zemm1
 
13. company profile
13. company profile13. company profile
13. company profile
zemm1
 
9. c vs of staff
9. c vs of staff9. c vs of staff
9. c vs of staff
zemm1
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipments
zemm1
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapraturs
Ram Mohan S R
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
Ram Mohan S R
 

Viewers also liked (20)

12. audit account
12. audit account12. audit account
12. audit account
 
design qualification
design qualification design qualification
design qualification
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policy
 
13. company profile
13. company profile13. company profile
13. company profile
 
Market complaints
Market complaintsMarket complaints
Market complaints
 
Tunnel thermographs
Tunnel thermographsTunnel thermographs
Tunnel thermographs
 
9. c vs of staff
9. c vs of staff9. c vs of staff
9. c vs of staff
 
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
 
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
 
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipments
 
Design qualification
Design qualificationDesign qualification
Design qualification
 
Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapraturs
 
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
 
Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 
ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5
 
problems in tablet manufacturing and coating
problems in tablet manufacturing and coatingproblems in tablet manufacturing and coating
problems in tablet manufacturing and coating
 

Similar to 6. non conformance control

Pharmaceutical Deviation SOP
Pharmaceutical Deviation SOPPharmaceutical Deviation SOP
Pharmaceutical Deviation SOP
Mohamed Wallash
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
woodruffeloisa
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
ValentinoDhiyu1
 
Validation Theory And Application 3
Validation   Theory And Application 3Validation   Theory And Application 3
Validation Theory And Application 3
antoi alvarez
 
A folder sysem for uks 2008 2011
A folder sysem for uks 2008   2011A folder sysem for uks 2008   2011
A folder sysem for uks 2008 2011
Clive Burgess
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
mmmmm624454
 

Similar to 6. non conformance control (20)

Pharmaceutical Deviation SOP
Pharmaceutical Deviation SOPPharmaceutical Deviation SOP
Pharmaceutical Deviation SOP
 
Managing Validation.3
Managing Validation.3Managing Validation.3
Managing Validation.3
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
 
Peer Review
Peer ReviewPeer Review
Peer Review
 
Tpm
TpmTpm
Tpm
 
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
 
PM Notebook - Chapter 5 - Scope Management
PM Notebook - Chapter 5 - Scope ManagementPM Notebook - Chapter 5 - Scope Management
PM Notebook - Chapter 5 - Scope Management
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
 
Root Cause Analysis.pdf
Root Cause Analysis.pdfRoot Cause Analysis.pdf
Root Cause Analysis.pdf
 
Tpm training
Tpm trainingTpm training
Tpm training
 
tpm olisa vincent
tpm olisa vincenttpm olisa vincent
tpm olisa vincent
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
 
P dsachin
P dsachinP dsachin
P dsachin
 
Pdsachin 161117105202
Pdsachin 161117105202Pdsachin 161117105202
Pdsachin 161117105202
 
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
 
Validation Theory And Application 3
Validation   Theory And Application 3Validation   Theory And Application 3
Validation Theory And Application 3
 
A folder sysem for uks 2008 2011
A folder sysem for uks 2008   2011A folder sysem for uks 2008   2011
A folder sysem for uks 2008 2011
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
 
Surface treatment seminar introduction
Surface treatment seminar introductionSurface treatment seminar introduction
Surface treatment seminar introduction
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 

6. non conformance control

  • 1. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 THE MAINTENANCE: 1. THE PURPOSE 2. SCOPE OF APPLICATION 3. REFERENCES TO DOCUMENTS 4. THE INSTRUCTION DESCRIPTION 5. RESPONSIBILITY AND POWERS 6. DESIGNATIONS AND REDUCTIONS 7. APPENDICES THE HAS PREPARED: HAS CHECKED UP: HAS CONFIRMED: DOCUMENT Post: Нач. Technological department The chief engineer The general director FIRST NAME, MIDDLE INITIAL, LAST Varakin O. Lerner B. Lobach A. NAME: The signature: № 1. 2. 3. 4. 5. Changes Date: The signature: SEA P802 Sheet 1 1from 5
  • 2. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 Sheet of mailing of the document № The name Date The Post пп Divisions Receptions signature 1 The top management The general director 16.03.06 2 The chief engineer 16.03.06 г 3 Head СМК 16.03.06 г 4 The chief accountant 16.03.06 г 5 The agent on supply 16.03.06 г 6 The manager on the personnel 16.03.06 г 7 Technological The chief of department 16.03.06 г department 8 The mechanic 16.03.06 г 9 Industrial site №1 The chief of a site 17.03.06г. 10 Industrial site №2 The chief of a site 17.03.06г. SEA P802 Sheet 1 2from 5
  • 3. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 1. The procedure purpose: The given procedure describes managerial process by production which does not correspond to requirements of specifications, standards, THAT of the project, etc. 2. Scope of application Process is carried out: 1) – heads of divisions, departments; 2) – separate workers of departments and divisions on To the decision of heads of divisions; 3) – manufacturers of works on building sites. 3. The reference to documents ISO 9001: 2000, the river 8; Quality manual of SEA QM-01 4. The process description Н – the process Beginning. 1. Reception of the information on discrepancy of production or establishment of the fact of discrepancy. The Controller on a platform of building or the manufacturer of works fix discrepancy of production (a separate element of process, a part of the design documentation, marriage in the put equipment, etc.). The information is transferred in the form of records, certificates, reports, results of gaugings. The fact of discrepancy of production to requirements of standard documents, the design or technological documentation is established at entrance control, at performance of control operations and acceptance tests in the course of building. 2. Documentation registration. The certificate about discrepancy of production is made out. It is carried out by the controller on a platform or under the direction of the chief of a site. 3. Isolation of inappropriate production. 4. The discrepancy analysis. The commission appointed the Chief engineer which structure includes the qualified experts, makes the analysis of marriage and defines the further actions with inappropriate production. 5. Probably to use? Depending on defect degree decisions on possibility of further use are made. 6. Probably to use without alteration? 7. Transfer to repair or on alteration. 8. Registration, the coordination and the statement of permissions to use of inappropriate production. The permission is made out by division, the originator of the established discrepancies The permission is co-ordinated with the Chief engineer, affirms the General director. 9. Completion or correction of inappropriate production. Completion or alteration of inappropriate production is carried out by division, the originator of the admitted discrepancy 10. Tests or control after completion or alteration of inappropriate production. SEA P802 Sheet 1 3from 5
  • 4. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 Control and test is carried out by the manufacturer of works with the assistance of representatives ПТО, according to the procedures developed for these purposes. 11. Production has passed control or tests? Whether there has passed production control or tests are defined by the controller or the commission. 12. Transfer to the further manufacture. 13. Informing of the client. The client is informed in the event that it is stipulated in the contract or the contract. To – the process end 5. Responsibility and powers Responsibility for an establishment of the facts of discrepancies, them актирования, decision- making on such production, and its further use, is assigned to controllers on a platform and chief ПТО 6. Designations and reductions СМК – quality management System ПТО – Technological department 8. Appendices SEA О802.01 «Magazine of registration of discrepancies» The block the scheme of managerial process by inappropriate production SEA P802 Sheet 1 4from 5
  • 5. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 The block – the process scheme. The appendix Н Н – the process beginning 1 1 – Reception of the information on discrepancy 2 of production or an establishment of the fact of discrepancy 3 2 – documentation Registration It is carried out by the controller on a platform or the chief of a site 4 3 – Isolation of inappropriate production It is carried out by the chief of a site or the 5 manufacturer of works NO 4 – the discrepancy Analysis It is carried out by the commission 7 YES 5 – Probably to use? YES 6 – Probably to use after repair? 6 7 – It is impossible to use 8 – Registration and the permission coordination NO It is carried out by division – the originator of 8 marriage 9 9 – Completion or correction of inappropriate production 10 It is carried out by industrial division - the originator of marriage 10 – Tests or control after completion or alteration 11 NO of inappropriate production It is carried out by the manufacturer of works 13 YES together with representatives ПТО 11 – Production has passed control or tests? 12 – Transfer to the further manufacture 13 – Informing of the client 14 – the process End 12 TO SEA P802 Sheet 1 5from 5