Introduction
 Service tunnel
 Basement car park
 A lower ground, ground and 1st floor
Introduction
HVAC
Ventilation:
No natural ventilation - sealed building.
Mechanical ventilation : 1. extraction fan (car park)
2. air-conditioning (every shops, lift, toilets)
3. extraction grilles (toilets, roof level)
Air-conditioning system: - centralized system (water chiller system)
- cooled air supplied via ducting system (outlet)
- use “open-ceiling” (inlet)
- Plant room –3 chillers, compressor, distributor
pumps,condenser pumps, chiller pumps.
- T.G.I.FRiDAY’S restaurant –package system
“Open ceiling”
Condenser pumps
Linear diffuser Cone diffuser
Multi-direction diffuser
Air Handling Unit (AHU):
- 68 units
- manually operated
- controls the air-conditioning system of 5 shops.
- Air supplied = 2˚C, returns = 23˚C.
- Thermostat - control the temperature of air supplied.
- Maintenance works for cooling coil – every 2 months.
Control panel
Thermostat
Air filters
Cooled air supply
Chiller:
- 3 chillers
- 1 chiller filled with 750 tons of water (10:30a.m to 7:00 p.m.)
- 2 chillers filled with 1500 tons of water(9:30 a.m. to 9:30 p.m.).
- have been used for over 26 years and do not encounter any
overheat problems.
Chiller Chiller control penal
Cooling tower:
- 6 at roof top.
- balancing pipes - ensure the water is supplied at the same volume.
- ball valve - indicate and control the supply of water.
- hot water is pumped from the condenser to the cooling tower by using
condenser water pump.
Cooling tower
Ball valve
Cooling towers
Zoning:
- single zone variable air volume. (air is supplied in same
temperature but different volume).
- MBO cinema - single zone constant air volume.
Fire Protection
Fire Protection
Active Passive
1. portable fire extinguishers 1. Escape route: Pressurized staircase
2. Automatic extinguisher
- Carbon dioxide gas extinguishing
system
- Sprinkler system
2. Fire rated door
3. Fire hydrant 3. Fire man lift
4. Hose reel
5. Risers
6. Detectors
7. Alarm system and voice
communication system
1. Portable fire extinguishers
 Powder type
- used inside the mall
- provided one in every shop
- placed in white metal box
 Carbon dioxide type
-Used in electrical room, transformer room and water plant room
 Maintenance: once a year
 9kg
2. Automatic extinguishing system
a. Automatic Carbon dioxide system
 TNB rooms
 both smoke and heat detectors
 non-conductive properties
b. Sprinkler system
- wet sprinkler
- distance: 3m
- red bulb liquid color = 68 degree Celsius
- pressed steel storage tank = 48,000 gallons capacity
-1 duty pump, 2 standby pumps and 2 jockey pumps
-ball valves
3. Fire hydrant
 8
 3- way hydrant
 Hydrant – hydrant = 68m
 hydrant - building = 8.90m
 hydrant - road = 6m
4. Hose reel
 11 sets
 wet riser tank & close range pumps
 30m long
 diameter of 8.47mm
 Canvas reel – landing valve
5. Risers
 11 Wet risers
 basement level -first floor (16.458m)
 8.534m×3.658m×2.438m tank
 16,800 gallons capacity
6. Detectors
a. Smoke
-lift lobby and inside the mall
-35m2
b. Heat
-TNB rooms
 connected to fire alarm panel and linked to fire control
room
7. Alarm detection
 Manual call points = 1.46m
 connected to fire alarm panel and fire control room
 Automatic alarm bells
 Fire switch
8. Voice communication system
 installed at every services room and lift lobbies
 Communicate to the people in the fire control room.
Passive: 1. Escape route- Pressurized staircase
 purpose made ventilation grille of independent pressurization
system
 Fire switch
 Emergency light
 riser =160mm
 tread =270mm
2. Fire rated door
 1 hour
 escape route and service rooms
3. Fire Elevator
 When there is fire, all elevators will return in sequence
directly to the designated floor, which is the LG Floor.
 Only fire elevator can be manually operated by the
firemen via the fire lift switch.
fire elevator fire lift switch
Vertical Transportation
System
1. Elevator
2. Escalator
Elevator
9 groups serving the whole shopping mall.
• 7 are connected directly to the car park.
( electric elevators )
• 2 groups within the shopping mall excluding car
park level
( hydraulic elevators )
• In one group, there are 2 elevators, with one of the
elevator designated for Bomba in terms of
emergency.
Electric elevators accessible directly to the car park
hydarulic
elevators for
interfloor traffic
only, excluding
car park
Specifications
Electric Elevator Hydraulic Elevator
Elevator Capacity 1800kg 1360kg, 26 persons
Internal Car Size 180cm*183cm 90cm*270cm
Door arrangement two - speed centre
opening
single - speed centre
opening
Round-Trip Time(RTT) 1 minute 2 minutes 15 seconds
Operation of System
Electric Elevators moves
the elevator car up and down
using traction steel ropes and
sheaves with a counterweight
to balance the load.
Operation of System
Hydraulic Elevator use
hydraulic power to
pressurise the piston at the
base of the elevator to
raise and lower the car.
Motor Room
 Located on top of the elevator shaft.
 Housed traction machines of all elevators, including the
control panel.
Traction Machine Traction Sheave
Escalators
 moving stairs used to convey people between floor
levels.
 It can be constructed in few arrangements, which are
one-way traffic and two-way traffic.
 7 criss-cross and 2 parallel
Two-way traffic (parallel)
Two-way traffic (criss-cross)
Electricity
High Voltage Room
Feeder
 3 Feeder with 11kVA
switchboard section
 Circuit conductor for
power supply source
 Final branch circuit
overcurrent device.
Vacuum Circuit Breaker
 25 VCB
 interrupt the current using
vacuum
Transformer Room
Transformers
17 transformers
5 12
HVAC system Electric supply
Step down 11kV 415V
Silica gel breather
Prevent damage as incoming
air consists of moisture & dirt.
Blue when installed & turn
purple when they absorb
moisture.
Low Voltage Room
Main Switch Board (MSB)
 3 main switch board
Bar coupler
Electric Riser
Feeder pillar panel
2 feeder pillar panel
Only 1 feeder pillar
panel is used
Another 1 is use when
the existing feeder
failure
Electric riser
Distributes electric
supply
Bar coupler
Transfers electric
when the feeder is
failure.
Generator Set
 Electrical generator + engine
mounted together
 Convert mechanicalelectrical
energy
 3 generator set
 With battery
 11250kVa
 21000kVa
 Use for backup
Air Circuit Breaker (ACB)
 Main circuit breakers
 Compressed air is used to
interrupt circuit.
Electric Panel Room
Distribution Panel
 Distributes power to the
consuming loads
Miniature Circuit Breaker
(MCB)
 A small trip switch
Busbar
 A copper conductor
A copper conductor
Enclosed busbar for safety
purposes
Electric distribution Main switch board
Busbar
.
Miniature
Circuit
Breaker
(MCB)
Distribution
Panel.
Load.
Cold Water Supply
Cold Water Supply
 Pneumatic water pressure boosting system
 Suitable for tall buildings
 Water enter from rising main> store in tank
 System consists electrical control panel, hydro-
pneumatic pump, water storage tank.
 Pneumatic water pressure boosting system
 System pressure maintained by small air compressor and
pneumatic cylinder
 Small air compressor: contain water with pressurized air
space
 Indirect boosting from break tank
- using pneumatic cylinder
- a continuous running pump
 Break tank
- supply the system if main supply becomes
insufficient
- create pressure zones
 GI piping- rust easily
 Why choose?
- first mall in KL in the 80’s
- PVC not popular
 Make up tank- compensate water shortage period
Let’s watch a video
 http://www.youtube.com/watch?v=LJiT3VHJwZI
1. Single Zone Variable Air Volume  Multi
Zone Variable Air Volume
More energy efficiency
Recommendations- HVAC
2. Manual Controller  Automatic Controller
 The operation will be more accurate
 Energy efficiency
 Usage of manpower and related cost can be cut down
How it works
 The electronic control unit evaluates the signals from sensors to
determine the operating conditions, and controls the actuators to
move dampers and valves that control the volume, temperature and
direction of the air delivered
3. Industrial fan & UV glass
• Distribute air evenly
• Block 99% of UV radiation while transmitting the desired light
4.Return duct
• Can be used to extract warm air & recycle it through
the system for either cooling or heating purpose
• Energy efficient compared to open ceiling system
1. Fire blanket and fire extinguishing ball 
Portable Fire extinguisher
Recommendations- Fire Protection
 i. Fire blanket
 flame-resistant blanket
 extinguish small fire or protect a person from fire by wrapping the
blanket around
 made from 2 layers of woven glass fibre fabric and an inner layer
of fire retardant film
 ii. Fire extinguishing ball
 spherical shape of fire extinguisher
 1.3kg only
 is activated when it is contact with flame and it will burst to
spread dry chemical to extinguish fire when temperature is
reach 70 Degree Celsius
 Make noise when activated to alert occupants
2. Fire rated door for landing door & fire control room door
i. UBBL clause 152.2
ii. landing door shall have a FRP (fire
resistance period) of not less than half
the FRP of hoist way structure with
minimum FRP of one hour.
iii. prevent the spread of fire from landing
side into the lift shaft for a period time
 Infra-red photo of landing doors of
lift during fire test.
3.Visible Fire alarm system + Alarm bell  Alarm bell system
i. UBBL clause 242
ii. special requirements for fire alarm system
should be provided where occupants are
undesirable for audible alarm system
iii. visible alarm signal such as fire alarm strobe
lighting device
 Fire alarm strobe lighting device
4. Replace Diameter of hose reel
i. 8.47mm diameter (old)
ii. BS EN 671-1,
requirement is 19mm or 25mm
Conclusion
THE END~

Contenu connexe

Tendances

Screw Air Compressors
Screw Air CompressorsScrew Air Compressors
Screw Air Compressorsksatm
 
Eta lyra series reflow oven
Eta lyra series reflow ovenEta lyra series reflow oven
Eta lyra series reflow ovenCarrie Zhang
 
HVAC Service Class
HVAC Service ClassHVAC Service Class
HVAC Service Classadadams
 
How Does A Chiller Work? - What Is A Chiller & How To Choose the Best One
How Does A Chiller Work? - What Is A Chiller & How To Choose the Best OneHow Does A Chiller Work? - What Is A Chiller & How To Choose the Best One
How Does A Chiller Work? - What Is A Chiller & How To Choose the Best Oneannairdrychilldrychi
 
Air conditioning system presentation
Air conditioning system presentationAir conditioning system presentation
Air conditioning system presentationSaimum Bari
 
B&d air compressor promotion(2019)
B&d air compressor promotion(2019)B&d air compressor promotion(2019)
B&d air compressor promotion(2019)Emma Kwok
 
2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENT
2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENT2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENT
2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENTNorrazman Zaiha Zainol
 
Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)Satish kumar Hiremath
 
Air conditioning of small buildings
Air conditioning of small buildingsAir conditioning of small buildings
Air conditioning of small buildingsNoor Azila
 
Integrated building systems measures & evaluation
Integrated building systems measures & evaluationIntegrated building systems measures & evaluation
Integrated building systems measures & evaluationEman Abdel Sabour
 
Technical description vd 2014 (en) light
Technical description vd 2014 (en) lightTechnical description vd 2014 (en) light
Technical description vd 2014 (en) lightAdicomp s.r.l
 
Multipurpose Device Using Single Vapor Compression Refrigeration Cycle
Multipurpose Device Using Single Vapor Compression Refrigeration CycleMultipurpose Device Using Single Vapor Compression Refrigeration Cycle
Multipurpose Device Using Single Vapor Compression Refrigeration CycleIRJET Journal
 
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Ong Seng Peng Jeff
 

Tendances (17)

Screw Air Compressors
Screw Air CompressorsScrew Air Compressors
Screw Air Compressors
 
Eta lyra series reflow oven
Eta lyra series reflow ovenEta lyra series reflow oven
Eta lyra series reflow oven
 
chillers
chillerschillers
chillers
 
Basic Pneumatics
Basic PneumaticsBasic Pneumatics
Basic Pneumatics
 
HVAC Service Class
HVAC Service ClassHVAC Service Class
HVAC Service Class
 
How Does A Chiller Work? - What Is A Chiller & How To Choose the Best One
How Does A Chiller Work? - What Is A Chiller & How To Choose the Best OneHow Does A Chiller Work? - What Is A Chiller & How To Choose the Best One
How Does A Chiller Work? - What Is A Chiller & How To Choose the Best One
 
Air conditioning system presentation
Air conditioning system presentationAir conditioning system presentation
Air conditioning system presentation
 
B&d air compressor promotion(2019)
B&d air compressor promotion(2019)B&d air compressor promotion(2019)
B&d air compressor promotion(2019)
 
Bs2 presentation
Bs2 presentation Bs2 presentation
Bs2 presentation
 
2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENT
2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENT2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENT
2012 ASHRAE HANDBOOK: HVAC SYSTEMS AND EQUIPMENT
 
Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)Heat ventilation and air conditioning (hvac)
Heat ventilation and air conditioning (hvac)
 
Air conditioning of small buildings
Air conditioning of small buildingsAir conditioning of small buildings
Air conditioning of small buildings
 
Integrated building systems measures & evaluation
Integrated building systems measures & evaluationIntegrated building systems measures & evaluation
Integrated building systems measures & evaluation
 
Kt rtu
Kt rtuKt rtu
Kt rtu
 
Technical description vd 2014 (en) light
Technical description vd 2014 (en) lightTechnical description vd 2014 (en) light
Technical description vd 2014 (en) light
 
Multipurpose Device Using Single Vapor Compression Refrigeration Cycle
Multipurpose Device Using Single Vapor Compression Refrigeration CycleMultipurpose Device Using Single Vapor Compression Refrigeration Cycle
Multipurpose Device Using Single Vapor Compression Refrigeration Cycle
 
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
 

En vedette

Mitosiscellcycle2012
Mitosiscellcycle2012Mitosiscellcycle2012
Mitosiscellcycle2012jjcorrea121
 
الناس اللي شادين الطريق.. ردو البال فالويكاند!!
الناس اللي شادين الطريق.. ردو البال فالويكاند!!الناس اللي شادين الطريق.. ردو البال فالويكاند!!
الناس اللي شادين الطريق.. ردو البال فالويكاند!!Med Sugar Man
 
2nd Annual Congress Discovery Partnerships 2011
2nd Annual Congress Discovery Partnerships 20112nd Annual Congress Discovery Partnerships 2011
2nd Annual Congress Discovery Partnerships 2011Torben Haagh
 
Cell factory2012
Cell factory2012Cell factory2012
Cell factory2012jjcorrea121
 
Graduate-recruiting-Extended-2-12-2012
Graduate-recruiting-Extended-2-12-2012Graduate-recruiting-Extended-2-12-2012
Graduate-recruiting-Extended-2-12-2012Fred Ahrens
 
Nucleic acids and proteins academy
Nucleic acids and proteins academyNucleic acids and proteins academy
Nucleic acids and proteins academymohre
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignmentYap Xin
 
Chapter 2 - Basic Chemistry
Chapter 2 - Basic ChemistryChapter 2 - Basic Chemistry
Chapter 2 - Basic Chemistrycavalierem
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
6949 comparative analysis b321
6949 comparative analysis b3216949 comparative analysis b321
6949 comparative analysis b321Nick Crafts
 
Essay structure new
Essay structure   newEssay structure   new
Essay structure newNick Crafts
 
L11 l14 - footnote resource
L11   l14 - footnote resourceL11   l14 - footnote resource
L11 l14 - footnote resourceNick Crafts
 
Hidrostática flotabilidad
Hidrostática flotabilidadHidrostática flotabilidad
Hidrostática flotabilidadJavier Naranjo
 
End of Summer Project (2)
End of Summer Project (2)End of Summer Project (2)
End of Summer Project (2)Erin Bedesem
 
LA Ember.js Meetup, Jan 2017
LA Ember.js Meetup, Jan 2017LA Ember.js Meetup, Jan 2017
LA Ember.js Meetup, Jan 2017Matthew Beale
 

En vedette (20)

Gíardia lamblia
Gíardia lambliaGíardia lamblia
Gíardia lamblia
 
Mitosiscellcycle2012
Mitosiscellcycle2012Mitosiscellcycle2012
Mitosiscellcycle2012
 
الناس اللي شادين الطريق.. ردو البال فالويكاند!!
الناس اللي شادين الطريق.. ردو البال فالويكاند!!الناس اللي شادين الطريق.. ردو البال فالويكاند!!
الناس اللي شادين الطريق.. ردو البال فالويكاند!!
 
2nd Annual Congress Discovery Partnerships 2011
2nd Annual Congress Discovery Partnerships 20112nd Annual Congress Discovery Partnerships 2011
2nd Annual Congress Discovery Partnerships 2011
 
Cell factory2012
Cell factory2012Cell factory2012
Cell factory2012
 
Graduate-recruiting-Extended-2-12-2012
Graduate-recruiting-Extended-2-12-2012Graduate-recruiting-Extended-2-12-2012
Graduate-recruiting-Extended-2-12-2012
 
Nucleic acids and proteins academy
Nucleic acids and proteins academyNucleic acids and proteins academy
Nucleic acids and proteins academy
 
Comex umh 20 20
Comex  umh 20 20Comex  umh 20 20
Comex umh 20 20
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignment
 
Chapter 2 - Basic Chemistry
Chapter 2 - Basic ChemistryChapter 2 - Basic Chemistry
Chapter 2 - Basic Chemistry
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
6949 comparative analysis b321
6949 comparative analysis b3216949 comparative analysis b321
6949 comparative analysis b321
 
Essay structure new
Essay structure   newEssay structure   new
Essay structure new
 
L11 l14 - footnote resource
L11   l14 - footnote resourceL11   l14 - footnote resource
L11 l14 - footnote resource
 
Hidrostática flotabilidad
Hidrostática flotabilidadHidrostática flotabilidad
Hidrostática flotabilidad
 
blitzkrieg
blitzkriegblitzkrieg
blitzkrieg
 
End of Summer Project (2)
End of Summer Project (2)End of Summer Project (2)
End of Summer Project (2)
 
Proposal
ProposalProposal
Proposal
 
Kerb's cycle.
Kerb's cycle.Kerb's cycle.
Kerb's cycle.
 
LA Ember.js Meetup, Jan 2017
LA Ember.js Meetup, Jan 2017LA Ember.js Meetup, Jan 2017
LA Ember.js Meetup, Jan 2017
 

Similaire à Group members and HVAC system overview

Xenon lamp aging test chamber
Xenon lamp aging test chamberXenon lamp aging test chamber
Xenon lamp aging test chamber世满 江
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentationLee Chun Yee
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finaleTee Joanne
 
Xenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamberXenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamber世满 江
 
Xenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamberXenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamber世满 江
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRCAsim Ghatak
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsColt UK
 
Bs present yeahh!
Bs present yeahh!Bs present yeahh!
Bs present yeahh!Hasif Alias
 
Hecu – high energy efficiency solution for condensing units fitted with DC co...
Hecu – high energy efficiency solution for condensing units fitted with DC co...Hecu – high energy efficiency solution for condensing units fitted with DC co...
Hecu – high energy efficiency solution for condensing units fitted with DC co...CAREL Industries S.p.A
 
Building
BuildingBuilding
Buildingkumudg
 
L3 Unit 11 LO 3 Fire Systems Master .pptx
L3 Unit 11 LO 3 Fire Systems Master .pptxL3 Unit 11 LO 3 Fire Systems Master .pptx
L3 Unit 11 LO 3 Fire Systems Master .pptxMarkWootton11
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTXinYee Khoo
 
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERINGBio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERINGanirbanmaity1992
 
Control Valves for the Power Generation Industry" A Product and Applications ...
Control Valves for the Power Generation Industry" A Product and Applications ...Control Valves for the Power Generation Industry" A Product and Applications ...
Control Valves for the Power Generation Industry" A Product and Applications ...Belilove Company-Engineers
 

Similaire à Group members and HVAC system overview (20)

Xenon lamp aging test chamber
Xenon lamp aging test chamberXenon lamp aging test chamber
Xenon lamp aging test chamber
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finale
 
Xenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamberXenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamber
 
Xenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamberXenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamber
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRC
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
Environmental test chamber
Environmental test chamberEnvironmental test chamber
Environmental test chamber
 
Bs present yeahh!
Bs present yeahh!Bs present yeahh!
Bs present yeahh!
 
DEBORA PPT.pptx
DEBORA PPT.pptxDEBORA PPT.pptx
DEBORA PPT.pptx
 
Bs ii
Bs iiBs ii
Bs ii
 
Hecu – high energy efficiency solution for condensing units fitted with DC co...
Hecu – high energy efficiency solution for condensing units fitted with DC co...Hecu – high energy efficiency solution for condensing units fitted with DC co...
Hecu – high energy efficiency solution for condensing units fitted with DC co...
 
Building
BuildingBuilding
Building
 
Fire protection system ax 272 f
Fire protection system ax 272 fFire protection system ax 272 f
Fire protection system ax 272 f
 
L3 Unit 11 LO 3 Fire Systems Master .pptx
L3 Unit 11 LO 3 Fire Systems Master .pptxL3 Unit 11 LO 3 Fire Systems Master .pptx
L3 Unit 11 LO 3 Fire Systems Master .pptx
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
 
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERINGBio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
 
Control Valves for the Power Generation Industry" A Product and Applications ...
Control Valves for the Power Generation Industry" A Product and Applications ...Control Valves for the Power Generation Industry" A Product and Applications ...
Control Valves for the Power Generation Industry" A Product and Applications ...
 
Eurocar_en
Eurocar_enEurocar_en
Eurocar_en
 
Muffle furnace
Muffle furnaceMuffle furnace
Muffle furnace
 

Plus de Yap Xin

Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consructionYap Xin
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Yap Xin
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel reportYap Xin
 
Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Yap Xin
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
CT Part 2
CT Part 2CT Part 2
CT Part 2Yap Xin
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slideYap Xin
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)Yap Xin
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) correctedYap Xin
 

Plus de Yap Xin (11)

Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consruction
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel report
 
Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
CT Part 2
CT Part 2CT Part 2
CT Part 2
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slide
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) corrected
 

Dernier

Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRachelAnnTenibroAmaz
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxJohnree4
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGYpruthirajnayak525
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEMCharmi13
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxAsifArshad8
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...漢銘 謝
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comsaastr
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this periodSaraIsabelJimenez
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRRsarwankumar4524
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...Henrik Hanke
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptxogubuikealex
 
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.KathleenAnnCordero2
 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxCarrieButtitta
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 

Dernier (20)

Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptx
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEM
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this period
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptx
 
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptx
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 

Group members and HVAC system overview

  • 1. Group member 1. Chia Khai Yuean 2. Chin Wei Sun 3. Jenny Wong Yen Li 4. Teo Jun Tang 5. Yap Hue Eng 6. Yap Zhi Xin
  • 4.  Service tunnel  Basement car park  A lower ground, ground and 1st floor Introduction
  • 6. Ventilation: No natural ventilation - sealed building. Mechanical ventilation : 1. extraction fan (car park) 2. air-conditioning (every shops, lift, toilets) 3. extraction grilles (toilets, roof level) Air-conditioning system: - centralized system (water chiller system) - cooled air supplied via ducting system (outlet) - use “open-ceiling” (inlet) - Plant room –3 chillers, compressor, distributor pumps,condenser pumps, chiller pumps. - T.G.I.FRiDAY’S restaurant –package system “Open ceiling”
  • 7. Condenser pumps Linear diffuser Cone diffuser Multi-direction diffuser
  • 8. Air Handling Unit (AHU): - 68 units - manually operated - controls the air-conditioning system of 5 shops. - Air supplied = 2˚C, returns = 23˚C. - Thermostat - control the temperature of air supplied. - Maintenance works for cooling coil – every 2 months. Control panel Thermostat
  • 10. Chiller: - 3 chillers - 1 chiller filled with 750 tons of water (10:30a.m to 7:00 p.m.) - 2 chillers filled with 1500 tons of water(9:30 a.m. to 9:30 p.m.). - have been used for over 26 years and do not encounter any overheat problems. Chiller Chiller control penal
  • 11. Cooling tower: - 6 at roof top. - balancing pipes - ensure the water is supplied at the same volume. - ball valve - indicate and control the supply of water. - hot water is pumped from the condenser to the cooling tower by using condenser water pump. Cooling tower
  • 13. Zoning: - single zone variable air volume. (air is supplied in same temperature but different volume). - MBO cinema - single zone constant air volume.
  • 15. Fire Protection Active Passive 1. portable fire extinguishers 1. Escape route: Pressurized staircase 2. Automatic extinguisher - Carbon dioxide gas extinguishing system - Sprinkler system 2. Fire rated door 3. Fire hydrant 3. Fire man lift 4. Hose reel 5. Risers 6. Detectors 7. Alarm system and voice communication system
  • 16. 1. Portable fire extinguishers  Powder type - used inside the mall - provided one in every shop - placed in white metal box  Carbon dioxide type -Used in electrical room, transformer room and water plant room  Maintenance: once a year  9kg
  • 17. 2. Automatic extinguishing system a. Automatic Carbon dioxide system  TNB rooms  both smoke and heat detectors  non-conductive properties
  • 18. b. Sprinkler system - wet sprinkler - distance: 3m - red bulb liquid color = 68 degree Celsius - pressed steel storage tank = 48,000 gallons capacity -1 duty pump, 2 standby pumps and 2 jockey pumps -ball valves
  • 19.
  • 20. 3. Fire hydrant  8  3- way hydrant  Hydrant – hydrant = 68m  hydrant - building = 8.90m  hydrant - road = 6m
  • 21. 4. Hose reel  11 sets  wet riser tank & close range pumps  30m long  diameter of 8.47mm  Canvas reel – landing valve
  • 22.
  • 23. 5. Risers  11 Wet risers  basement level -first floor (16.458m)  8.534m×3.658m×2.438m tank  16,800 gallons capacity
  • 24. 6. Detectors a. Smoke -lift lobby and inside the mall -35m2 b. Heat -TNB rooms  connected to fire alarm panel and linked to fire control room
  • 25.
  • 26. 7. Alarm detection  Manual call points = 1.46m  connected to fire alarm panel and fire control room  Automatic alarm bells  Fire switch
  • 27. 8. Voice communication system  installed at every services room and lift lobbies  Communicate to the people in the fire control room.
  • 28. Passive: 1. Escape route- Pressurized staircase  purpose made ventilation grille of independent pressurization system  Fire switch  Emergency light  riser =160mm  tread =270mm
  • 29.
  • 30. 2. Fire rated door  1 hour  escape route and service rooms
  • 31. 3. Fire Elevator  When there is fire, all elevators will return in sequence directly to the designated floor, which is the LG Floor.  Only fire elevator can be manually operated by the firemen via the fire lift switch.
  • 32. fire elevator fire lift switch
  • 34. Elevator 9 groups serving the whole shopping mall. • 7 are connected directly to the car park. ( electric elevators ) • 2 groups within the shopping mall excluding car park level ( hydraulic elevators ) • In one group, there are 2 elevators, with one of the elevator designated for Bomba in terms of emergency.
  • 35. Electric elevators accessible directly to the car park
  • 37. Specifications Electric Elevator Hydraulic Elevator Elevator Capacity 1800kg 1360kg, 26 persons Internal Car Size 180cm*183cm 90cm*270cm Door arrangement two - speed centre opening single - speed centre opening Round-Trip Time(RTT) 1 minute 2 minutes 15 seconds
  • 38. Operation of System Electric Elevators moves the elevator car up and down using traction steel ropes and sheaves with a counterweight to balance the load.
  • 39. Operation of System Hydraulic Elevator use hydraulic power to pressurise the piston at the base of the elevator to raise and lower the car.
  • 40. Motor Room  Located on top of the elevator shaft.  Housed traction machines of all elevators, including the control panel. Traction Machine Traction Sheave
  • 41. Escalators  moving stairs used to convey people between floor levels.  It can be constructed in few arrangements, which are one-way traffic and two-way traffic.  7 criss-cross and 2 parallel
  • 46. Feeder  3 Feeder with 11kVA switchboard section  Circuit conductor for power supply source  Final branch circuit overcurrent device.
  • 47. Vacuum Circuit Breaker  25 VCB  interrupt the current using vacuum
  • 49. Transformers 17 transformers 5 12 HVAC system Electric supply Step down 11kV 415V Silica gel breather Prevent damage as incoming air consists of moisture & dirt. Blue when installed & turn purple when they absorb moisture.
  • 51. Main Switch Board (MSB)  3 main switch board
  • 52. Bar coupler Electric Riser Feeder pillar panel 2 feeder pillar panel Only 1 feeder pillar panel is used Another 1 is use when the existing feeder failure Electric riser Distributes electric supply Bar coupler Transfers electric when the feeder is failure.
  • 53. Generator Set  Electrical generator + engine mounted together  Convert mechanicalelectrical energy  3 generator set  With battery  11250kVa  21000kVa  Use for backup
  • 54. Air Circuit Breaker (ACB)  Main circuit breakers  Compressed air is used to interrupt circuit.
  • 56. Distribution Panel  Distributes power to the consuming loads
  • 57. Miniature Circuit Breaker (MCB)  A small trip switch
  • 58. Busbar  A copper conductor A copper conductor Enclosed busbar for safety purposes
  • 59. Electric distribution Main switch board Busbar . Miniature Circuit Breaker (MCB) Distribution Panel. Load.
  • 61. Cold Water Supply  Pneumatic water pressure boosting system  Suitable for tall buildings  Water enter from rising main> store in tank
  • 62.  System consists electrical control panel, hydro- pneumatic pump, water storage tank.
  • 63.  Pneumatic water pressure boosting system  System pressure maintained by small air compressor and pneumatic cylinder  Small air compressor: contain water with pressurized air space
  • 64.  Indirect boosting from break tank - using pneumatic cylinder - a continuous running pump
  • 65.  Break tank - supply the system if main supply becomes insufficient - create pressure zones
  • 66.  GI piping- rust easily  Why choose? - first mall in KL in the 80’s - PVC not popular  Make up tank- compensate water shortage period
  • 67. Let’s watch a video  http://www.youtube.com/watch?v=LJiT3VHJwZI
  • 68. 1. Single Zone Variable Air Volume  Multi Zone Variable Air Volume More energy efficiency Recommendations- HVAC
  • 69. 2. Manual Controller  Automatic Controller  The operation will be more accurate  Energy efficiency  Usage of manpower and related cost can be cut down How it works  The electronic control unit evaluates the signals from sensors to determine the operating conditions, and controls the actuators to move dampers and valves that control the volume, temperature and direction of the air delivered
  • 70. 3. Industrial fan & UV glass • Distribute air evenly • Block 99% of UV radiation while transmitting the desired light
  • 71. 4.Return duct • Can be used to extract warm air & recycle it through the system for either cooling or heating purpose • Energy efficient compared to open ceiling system
  • 72. 1. Fire blanket and fire extinguishing ball  Portable Fire extinguisher Recommendations- Fire Protection
  • 73.  i. Fire blanket  flame-resistant blanket  extinguish small fire or protect a person from fire by wrapping the blanket around  made from 2 layers of woven glass fibre fabric and an inner layer of fire retardant film
  • 74.  ii. Fire extinguishing ball  spherical shape of fire extinguisher  1.3kg only  is activated when it is contact with flame and it will burst to spread dry chemical to extinguish fire when temperature is reach 70 Degree Celsius  Make noise when activated to alert occupants
  • 75. 2. Fire rated door for landing door & fire control room door i. UBBL clause 152.2 ii. landing door shall have a FRP (fire resistance period) of not less than half the FRP of hoist way structure with minimum FRP of one hour. iii. prevent the spread of fire from landing side into the lift shaft for a period time
  • 76.  Infra-red photo of landing doors of lift during fire test.
  • 77. 3.Visible Fire alarm system + Alarm bell  Alarm bell system i. UBBL clause 242 ii. special requirements for fire alarm system should be provided where occupants are undesirable for audible alarm system iii. visible alarm signal such as fire alarm strobe lighting device
  • 78.  Fire alarm strobe lighting device