Personal Information
Entreprise/Lieu de travail
Surat Area, India India
Profession
Assistant Manager, MaxPro+ (Industrial Engineer) at UPL Limited (formerly known as United Phosphorus Ltd.)
Secteur d’activité
Chemicals
Site Web
http://www.sambit-saha.co.nr
À propos
Lean Manufacturing - VSM (Value Stream Mapping), Line balancing, Standard Work, Pull System (KANBAN, Supermarket), 5S-Visual Management, SMED-Quick Changeover, Kaizen, 3M (Muda, Mura and Muri) and 7 Wastes Reduction
Industrial Engineering – Time & Motion Study, Work Sampling, Layout & Workplace Design, Spaghetti Diagram, Equipment / Manpower Planning, Incentive Scheme design, Plant capacity & utilization, Maynard Operation Sequence Technique (MOST) & other PMTS, AVIX Video Study, Warehouse Designing
WCM – Autonomous Maintenance, Continuous Improvement, OPL (One Point Lesson), TPM basics
Productivity Improvement – OEE (Overall Equipment Effectiveness), Labour Productivity
Process...
- Présentations
- Documents
- Infographies
Value Stream Mapping: Case Studies
TKMG, Inc.
•
il y a 10 ans
Flow process chart
Malaviya National Institute of Technology, Jaipur
•
il y a 10 ans
Pitch Like a Boss: Talk to Anyone, Anytime, Anywhere.
Michael Koenka
•
il y a 9 ans
10 Powerful Body Language Tips for your next Presentation
SOAP Presentations
•
il y a 10 ans
5S Techniques by Operational Excellence Consulting
Operational Excellence Consulting
•
il y a 13 ans
The Toyota Production System - A Transition from Mass Production to Lean Manufacturing and Supply Chain Management
Nurhazman Abdul Aziz
•
il y a 17 ans
Management Team Training 4-2-07
wendyw
•
il y a 17 ans
SMED Setup & Lead Time Reduction
Anand Subramaniam
•
il y a 14 ans