Types Of Installation:

Contents:

     Types Of Installation

     Indoor Installation

     Outdoor Installation
Indoor Installation:



   Indoor Cable Tray

   Grounding Bar

   Battery Bank Installation

   SMPS Installation

   BTS Installation

   Connection of Power Cable
Installation Of Indoor Cable Tray:




Indoor Cable tray types-

   Wall mounted

   Roof Mounted
Some Basic Things for the cable tray installation:


   Grounding of cable tray with IGB (Internal Grounding Bus Bar).

   Distance between cable tray & roof of shelter is Depends on the dimension of Hatch
    plate.

   Cable tray should right below the hatch Plate.

   Drills are made on the shelter walls or roof to provide support for Horizontal Cable
    Tray.

   After marking the drilling holes, the ladder is fixed using supporting clamps.

   Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF
    & RF Cable routing is done over this Cable tray.
Cable Tray forms a major part of
installation work since all the
Grounding,Power,E1,IF & RF Cable
routing is done over this Cable
tray.
Grounding Bar Installation:




There are two types of grounding bars-

   External Grounding Bar (EGB)

   Internal Grounding Bar (IGB)
Some Basic Things for Grounding Bar installation:


   EGB and IGB both are installed right below the hatch plate, and both are connected
    to each other by double connection of 35 mm square grounding cable.

   EGB (External Grounding Bar) is directly connected by the Earth Pit by the GI strip.

   IGB (Internal Grounding Bar) which is installed inside the shelter room, this is made
    up of GI strip.

   EGB (External Grounding Bar) which is installed on the out side of shelter, This is
    totally made of Copper strip.

   Every indoor equipment should be grounded through IGB.

   Then crimp and fix the Lugs at both ends of above these three types of cables &
    wrap with insulating tape with same color of cable.

   Grounding resistance of working ground, Protection ground and lightening arrester
    should be not more than 5 Ω. (Recommended range 0.5 Ω to 5Ω for working ground
    &1-5 Ω for protection ground).
Battery Bank Installation:


   In Telecom BTS site 48 volt DC battery bank installed. there are 24 cells in each
    Battery Bank each is having the 2 volt DC. These battery bank are installed on stand
    and grouted in the shelter properly.

   These battery bank have certain distance from the SMPS and we should try to keep
    O/P of each terminal is in opposite direction of SMPS.

   Grounding of Battery bank is done with the IGB by the 35 mm square grounding
    cable & connected to EGB (Internal Grounding Bar).
SMPS INSTALLATION:


   SMPS is installed nearby the Shelter Door.

   Battery bank directly connected with the SMPS.

   SMPS is the DC supply source by which all the equipment inside the shelter is
    connected like BTS and MW Rack.

   It charges the battery bank by the AC supply, There are modules which converts AC
    supply to DC supply.

   In absence of AC supply it gives the supply by Battery Bank to equipments.

   It Should be grounded on two points One is on positive bus bar and one is with the
    body of SMPS with the 35 mm square grounding cable.
SMPS GROUNDING:


  Positive Bus bar grounding   Body grounding
BTS Installation:


   The BTS installation position should be consistent and must be as per shelter layout
    design.

   Now mark the position of BTS base bolts position at ground & do the grouting of
    Bolts.

   Then fix base of BTS into grouted bolts also check the leveling.

   BTS, Microwave rack, DDF box and all the equipment except power equipment are
    installed on the same side right in front the power equipments.

   BTS should be grouted properly.
SURGE ARRESTER INSTALLATION:


   Surge arrester are high frequency protector, these surge arrester protects the BTS
    from the lightning. These surge arrester fix on the surge arrester stand and this
    surge arrester stand grounded with EGB.




            Surge Arrester Stand           Surge Arrester
JUMPER CABLE CONNECTION ON BTS:


   Jumper cable connects on the BTS top.

   All feeder of three sector connects by the jumper cable.

   Feeder connects by the jumper via Surge Arrester.
Power cable connection On BTS:


   BTS power cable blue one connects with the negative bar which is right in front the
    SMPS via the particular rating of fuses. And positive bus bar connect with black wire
    of BTS terminal. This negative blue cable connects with the negative terminal of BTS
    and black one connects with the Gnd of BTS.
Out Door Installation:


   GSM Antenna Installation on the Tower.

   Feeder cable Installation and routing.

   Earthing of Feeder cable.

   Connection of Jumper cable to Feeder on GSM antenna end.

   Connection of Jumper cable to Feeder on BTS end.
GSM Antenna Installation on the Tower:


   GSM Antenna installed on the tower according to the RF plan.

   The orientation (Azimuth) of the GSM antenna should be according to network
    plan.

   GSM antenna also have the tilt by which the coverage area can be increased or
    decreased, it is also according to plan.

   Tilt may be zero, two, three or four degree.

   GSM antenna clamp should be tightened on the tower properly, it should be not
    loose.
Feeder cable Installation and routing:


   Feeder cable ( 7/8”) connects with the BTS and GSM antenna.
   It is connected with BTS and GSM antenna via the Jumper cable.
   Feeder cable should be routed on the tower by Dummy clamp.
   In feeder cable installation feeder cable should not be bend more then 90 degree at
    certain point.




                                  Feeder cable routing   Bending is not more then 90 degree
Feeder cable comes in the shelter and
before entering in the shelter it takes a
“U” drop. Due to this U drop the water
do not go inside the shelter. So we
must take care about this U drop just
before the entrance in shelter.




                  U drop of Feeder
GROUNDING OF FEEDER CABLE:



• Feeder cable should be grounded
  on three points. Two on the tower
  and one with the EGB.

• Grounding is very necessary and it
  must be on three points.

• Grounding is done by the
  Grounding kit and it should be
  properly shield with weather proof.
Connection of Jumper cable to Feeder on GSM antenna end:


•   Feeder cable connects with GSM antenna by the
    jumper cable .
.

•   Connection should be very tight and shield with
    weather proof.

•   Weather proof should be properly done, if it is
    not proper then this may be on of the reason of
    VSWR.




                                                      Weather proofing on GSM
                                                      and jumper cable on Tower
Connection of Jumper cable to Feeder on BTS end:



    Feeder cable connect with BTS by the
     jumper cable.

    Between jumper and feeder surge arrester
     should be connected




                         Feeder Cable

                    Surge Arrester Stand

                         Jumper cable
Precaution:


   Connection of each power cable should be proper.

   Before switching on the BTS we should check the Input voltage on the BTS
    terminal by the Multimeter, If it is ok then we should switch on the BTS.

   We should visually check the Grounding connection of each equipment.

   All equipments inside the shelter must be grouted.

   At the time of connection of power cable to Battery Bank we must take care about
    the safety.
Thank You

Contenu connexe

Tendances

O&M Doc for Telecom Sites
O&M Doc  for Telecom Sites       O&M Doc  for Telecom Sites
O&M Doc for Telecom Sites
Muhmmad Javed
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
Shahid Rasool
 
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
moussaCoulibaly22
 

Tendances (20)

Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom
 
O&M Doc for Telecom Sites
O&M Doc  for Telecom Sites       O&M Doc  for Telecom Sites
O&M Doc for Telecom Sites
 
ZTE BTS Manual
ZTE BTS ManualZTE BTS Manual
ZTE BTS Manual
 
Base Transceiver Station (BTS)
Base Transceiver Station (BTS)Base Transceiver Station (BTS)
Base Transceiver Station (BTS)
 
Antenna Installation Engineering.
Antenna Installation Engineering.Antenna Installation Engineering.
Antenna Installation Engineering.
 
Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000
 
Ericsson RBS 6000
Ericsson RBS 6000Ericsson RBS 6000
Ericsson RBS 6000
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
 
Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structure
 
Microwave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom SiteMicrowave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom Site
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
 
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
 
Huawei RET alarms Troubleshooting Guide Flow Chart
Huawei RET alarms Troubleshooting Guide   Flow Chart Huawei RET alarms Troubleshooting Guide   Flow Chart
Huawei RET alarms Troubleshooting Guide Flow Chart
 
Nokia FLexi Edge BTS Installation Cabling and Checks
Nokia FLexi Edge BTS Installation Cabling and ChecksNokia FLexi Edge BTS Installation Cabling and Checks
Nokia FLexi Edge BTS Installation Cabling and Checks
 
Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5
 
Implementation of-mw-link-and-bts
Implementation of-mw-link-and-btsImplementation of-mw-link-and-bts
Implementation of-mw-link-and-bts
 
Bsnl Industrial training report
Bsnl Industrial training reportBsnl Industrial training report
Bsnl Industrial training report
 
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
Huawei GSM Principles
Huawei GSM PrinciplesHuawei GSM Principles
Huawei GSM Principles
 

En vedette

En vedette (7)

LTE Planning
LTE PlanningLTE Planning
LTE Planning
 
Telecommunication Tower
Telecommunication TowerTelecommunication Tower
Telecommunication Tower
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication tower
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication Towers
 
Throughput Calculation for LTE TDD and FDD System
Throughput Calculation for  LTE TDD and FDD SystemThroughput Calculation for  LTE TDD and FDD System
Throughput Calculation for LTE TDD and FDD System
 
How to dimension user traffic in LTE
How to dimension user traffic in LTEHow to dimension user traffic in LTE
How to dimension user traffic in LTE
 

Similaire à Bts-site-installation

Similaire à Bts-site-installation (20)

RF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and AcceptanceRF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and Acceptance
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
Ipmu ic procedure
Ipmu ic procedureIpmu ic procedure
Ipmu ic procedure
 
KL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfKL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdf
 
WIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAMWIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAM
 
IGBT circuit diagram.pptx
IGBT circuit diagram.pptxIGBT circuit diagram.pptx
IGBT circuit diagram.pptx
 
System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
User manual-part-2-3501466
User manual-part-2-3501466User manual-part-2-3501466
User manual-part-2-3501466
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometers
 
Substation structures
Substation structuresSubstation structures
Substation structures
 
Slide Wire Dc potentiometer
Slide Wire Dc potentiometerSlide Wire Dc potentiometer
Slide Wire Dc potentiometer
 
ppt_ae.pdf
ppt_ae.pdfppt_ae.pdf
ppt_ae.pdf
 
igbt and its characteristics
igbt and its characteristicsigbt and its characteristics
igbt and its characteristics
 
igbt and its characteristics
igbt and its characteristicsigbt and its characteristics
igbt and its characteristics
 
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and AcceptanceMicrowave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
 
Installation and troubleshooting of solar pv power plants
Installation and troubleshooting of solar pv power plantsInstallation and troubleshooting of solar pv power plants
Installation and troubleshooting of solar pv power plants
 
System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
Inverters
InvertersInverters
Inverters
 
Strain Gauges
Strain GaugesStrain Gauges
Strain Gauges
 
High voltage transformers
High voltage transformersHigh voltage transformers
High voltage transformers
 

Plus de Ali Usman

Database ,18 Current Issues
Database ,18 Current IssuesDatabase ,18 Current Issues
Database ,18 Current Issues
Ali Usman
 
Database , 17 Web
Database , 17 WebDatabase , 17 Web
Database , 17 Web
Ali Usman
 
Database ,16 P2P
Database ,16 P2P Database ,16 P2P
Database ,16 P2P
Ali Usman
 
Database , 15 Object DBMS
Database , 15 Object DBMSDatabase , 15 Object DBMS
Database , 15 Object DBMS
Ali Usman
 
Database ,14 Parallel DBMS
Database ,14 Parallel DBMSDatabase ,14 Parallel DBMS
Database ,14 Parallel DBMS
Ali Usman
 
Database , 13 Replication
Database , 13 ReplicationDatabase , 13 Replication
Database , 13 Replication
Ali Usman
 
Database , 12 Reliability
Database , 12 ReliabilityDatabase , 12 Reliability
Database , 12 Reliability
Ali Usman
 
Database ,11 Concurrency Control
Database ,11 Concurrency ControlDatabase ,11 Concurrency Control
Database ,11 Concurrency Control
Ali Usman
 
Database ,10 Transactions
Database ,10 TransactionsDatabase ,10 Transactions
Database ,10 Transactions
Ali Usman
 
Database , 8 Query Optimization
Database , 8 Query OptimizationDatabase , 8 Query Optimization
Database , 8 Query Optimization
Ali Usman
 
Database ,7 query localization
Database ,7 query localizationDatabase ,7 query localization
Database ,7 query localization
Ali Usman
 
Database , 6 Query Introduction
Database , 6 Query Introduction Database , 6 Query Introduction
Database , 6 Query Introduction
Ali Usman
 
Database , 5 Semantic
Database , 5 SemanticDatabase , 5 Semantic
Database , 5 Semantic
Ali Usman
 
Database , 4 Data Integration
Database , 4 Data IntegrationDatabase , 4 Data Integration
Database , 4 Data Integration
Ali Usman
 
Database, 3 Distribution Design
Database, 3 Distribution DesignDatabase, 3 Distribution Design
Database, 3 Distribution Design
Ali Usman
 
Database ,2 Background
 Database ,2 Background Database ,2 Background
Database ,2 Background
Ali Usman
 
Database , 1 Introduction
 Database , 1 Introduction Database , 1 Introduction
Database , 1 Introduction
Ali Usman
 
Processor Specifications
Processor SpecificationsProcessor Specifications
Processor Specifications
Ali Usman
 

Plus de Ali Usman (20)

Cisco Packet Tracer Overview
Cisco Packet Tracer OverviewCisco Packet Tracer Overview
Cisco Packet Tracer Overview
 
Islamic Arts and Architecture
Islamic Arts and  ArchitectureIslamic Arts and  Architecture
Islamic Arts and Architecture
 
Database ,18 Current Issues
Database ,18 Current IssuesDatabase ,18 Current Issues
Database ,18 Current Issues
 
Database , 17 Web
Database , 17 WebDatabase , 17 Web
Database , 17 Web
 
Database ,16 P2P
Database ,16 P2P Database ,16 P2P
Database ,16 P2P
 
Database , 15 Object DBMS
Database , 15 Object DBMSDatabase , 15 Object DBMS
Database , 15 Object DBMS
 
Database ,14 Parallel DBMS
Database ,14 Parallel DBMSDatabase ,14 Parallel DBMS
Database ,14 Parallel DBMS
 
Database , 13 Replication
Database , 13 ReplicationDatabase , 13 Replication
Database , 13 Replication
 
Database , 12 Reliability
Database , 12 ReliabilityDatabase , 12 Reliability
Database , 12 Reliability
 
Database ,11 Concurrency Control
Database ,11 Concurrency ControlDatabase ,11 Concurrency Control
Database ,11 Concurrency Control
 
Database ,10 Transactions
Database ,10 TransactionsDatabase ,10 Transactions
Database ,10 Transactions
 
Database , 8 Query Optimization
Database , 8 Query OptimizationDatabase , 8 Query Optimization
Database , 8 Query Optimization
 
Database ,7 query localization
Database ,7 query localizationDatabase ,7 query localization
Database ,7 query localization
 
Database , 6 Query Introduction
Database , 6 Query Introduction Database , 6 Query Introduction
Database , 6 Query Introduction
 
Database , 5 Semantic
Database , 5 SemanticDatabase , 5 Semantic
Database , 5 Semantic
 
Database , 4 Data Integration
Database , 4 Data IntegrationDatabase , 4 Data Integration
Database , 4 Data Integration
 
Database, 3 Distribution Design
Database, 3 Distribution DesignDatabase, 3 Distribution Design
Database, 3 Distribution Design
 
Database ,2 Background
 Database ,2 Background Database ,2 Background
Database ,2 Background
 
Database , 1 Introduction
 Database , 1 Introduction Database , 1 Introduction
Database , 1 Introduction
 
Processor Specifications
Processor SpecificationsProcessor Specifications
Processor Specifications
 

Dernier

Dernier (20)

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 

Bts-site-installation

  • 1. BTS Site Installation (Training Material) Prepare By:-Usman Riaz Date:- 1-July-2011
  • 2. Types Of Installation: Contents:  Types Of Installation  Indoor Installation  Outdoor Installation
  • 3. Indoor Installation:  Indoor Cable Tray  Grounding Bar  Battery Bank Installation  SMPS Installation  BTS Installation  Connection of Power Cable
  • 4. Installation Of Indoor Cable Tray: Indoor Cable tray types-  Wall mounted  Roof Mounted
  • 5. Some Basic Things for the cable tray installation:  Grounding of cable tray with IGB (Internal Grounding Bus Bar).  Distance between cable tray & roof of shelter is Depends on the dimension of Hatch plate.  Cable tray should right below the hatch Plate.  Drills are made on the shelter walls or roof to provide support for Horizontal Cable Tray.  After marking the drilling holes, the ladder is fixed using supporting clamps.  Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF & RF Cable routing is done over this Cable tray.
  • 6. Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF & RF Cable routing is done over this Cable tray.
  • 7. Grounding Bar Installation: There are two types of grounding bars-  External Grounding Bar (EGB)  Internal Grounding Bar (IGB)
  • 8. Some Basic Things for Grounding Bar installation:  EGB and IGB both are installed right below the hatch plate, and both are connected to each other by double connection of 35 mm square grounding cable.  EGB (External Grounding Bar) is directly connected by the Earth Pit by the GI strip.  IGB (Internal Grounding Bar) which is installed inside the shelter room, this is made up of GI strip.  EGB (External Grounding Bar) which is installed on the out side of shelter, This is totally made of Copper strip.  Every indoor equipment should be grounded through IGB.  Then crimp and fix the Lugs at both ends of above these three types of cables & wrap with insulating tape with same color of cable.  Grounding resistance of working ground, Protection ground and lightening arrester should be not more than 5 Ω. (Recommended range 0.5 Ω to 5Ω for working ground &1-5 Ω for protection ground).
  • 9. Battery Bank Installation:  In Telecom BTS site 48 volt DC battery bank installed. there are 24 cells in each Battery Bank each is having the 2 volt DC. These battery bank are installed on stand and grouted in the shelter properly.  These battery bank have certain distance from the SMPS and we should try to keep O/P of each terminal is in opposite direction of SMPS.  Grounding of Battery bank is done with the IGB by the 35 mm square grounding cable & connected to EGB (Internal Grounding Bar).
  • 10. SMPS INSTALLATION:  SMPS is installed nearby the Shelter Door.  Battery bank directly connected with the SMPS.  SMPS is the DC supply source by which all the equipment inside the shelter is connected like BTS and MW Rack.  It charges the battery bank by the AC supply, There are modules which converts AC supply to DC supply.  In absence of AC supply it gives the supply by Battery Bank to equipments.  It Should be grounded on two points One is on positive bus bar and one is with the body of SMPS with the 35 mm square grounding cable.
  • 11. SMPS GROUNDING: Positive Bus bar grounding Body grounding
  • 12. BTS Installation:  The BTS installation position should be consistent and must be as per shelter layout design.  Now mark the position of BTS base bolts position at ground & do the grouting of Bolts.  Then fix base of BTS into grouted bolts also check the leveling.  BTS, Microwave rack, DDF box and all the equipment except power equipment are installed on the same side right in front the power equipments.  BTS should be grouted properly.
  • 13. SURGE ARRESTER INSTALLATION:  Surge arrester are high frequency protector, these surge arrester protects the BTS from the lightning. These surge arrester fix on the surge arrester stand and this surge arrester stand grounded with EGB. Surge Arrester Stand Surge Arrester
  • 14. JUMPER CABLE CONNECTION ON BTS:  Jumper cable connects on the BTS top.  All feeder of three sector connects by the jumper cable.  Feeder connects by the jumper via Surge Arrester.
  • 15. Power cable connection On BTS:  BTS power cable blue one connects with the negative bar which is right in front the SMPS via the particular rating of fuses. And positive bus bar connect with black wire of BTS terminal. This negative blue cable connects with the negative terminal of BTS and black one connects with the Gnd of BTS.
  • 16. Out Door Installation:  GSM Antenna Installation on the Tower.  Feeder cable Installation and routing.  Earthing of Feeder cable.  Connection of Jumper cable to Feeder on GSM antenna end.  Connection of Jumper cable to Feeder on BTS end.
  • 17. GSM Antenna Installation on the Tower:  GSM Antenna installed on the tower according to the RF plan.  The orientation (Azimuth) of the GSM antenna should be according to network plan.  GSM antenna also have the tilt by which the coverage area can be increased or decreased, it is also according to plan.  Tilt may be zero, two, three or four degree.  GSM antenna clamp should be tightened on the tower properly, it should be not loose.
  • 18. Feeder cable Installation and routing:  Feeder cable ( 7/8”) connects with the BTS and GSM antenna.  It is connected with BTS and GSM antenna via the Jumper cable.  Feeder cable should be routed on the tower by Dummy clamp.  In feeder cable installation feeder cable should not be bend more then 90 degree at certain point. Feeder cable routing Bending is not more then 90 degree
  • 19. Feeder cable comes in the shelter and before entering in the shelter it takes a “U” drop. Due to this U drop the water do not go inside the shelter. So we must take care about this U drop just before the entrance in shelter. U drop of Feeder
  • 20. GROUNDING OF FEEDER CABLE: • Feeder cable should be grounded on three points. Two on the tower and one with the EGB. • Grounding is very necessary and it must be on three points. • Grounding is done by the Grounding kit and it should be properly shield with weather proof.
  • 21. Connection of Jumper cable to Feeder on GSM antenna end: • Feeder cable connects with GSM antenna by the jumper cable . . • Connection should be very tight and shield with weather proof. • Weather proof should be properly done, if it is not proper then this may be on of the reason of VSWR. Weather proofing on GSM and jumper cable on Tower
  • 22. Connection of Jumper cable to Feeder on BTS end:  Feeder cable connect with BTS by the jumper cable.  Between jumper and feeder surge arrester should be connected Feeder Cable Surge Arrester Stand Jumper cable
  • 23. Precaution:  Connection of each power cable should be proper.  Before switching on the BTS we should check the Input voltage on the BTS terminal by the Multimeter, If it is ok then we should switch on the BTS.  We should visually check the Grounding connection of each equipment.  All equipments inside the shelter must be grouted.  At the time of connection of power cable to Battery Bank we must take care about the safety.